This is a Baseline Schedule Review Checklist Form used by the National Park Service Denver Service Center to evaluate construction project schedules submitted by contractors. The checklist establishes mandatory and optional requirements for baseline schedules prior to the pre-construction conference and is applied to the ROMO 326235 Rehabilitate Kawuneeche Visitor Center project at Rocky Mountain National Park, Colorado.

The general requirements mandate that draft schedules must include procurement and construction activities with specific milestones (Award, Notice to Proceed, Substantial Completion, and Project Completion) aligned to contract dates. Activities must have sequential predecessors and successors, include a critical path, use whole working days with a 15-day maximum duration (with exceptions for mobilization, submittals, fabrication, delivery, and curing), and incorporate contractor and subcontractor coordination. Schedules must reflect realistic durations considering scope and resource loading, incorporate contract constraints such as seasonal shutdowns and holidays, account for normal bad weather, and align with the Schedule of Values for progress tracking and monthly billing. Additional optional requirements depending on project complexity include numerical activity identification in 10-digit increments, resource loading by labor category and equipment type, and inclusion of milestones identified in specifications and by the Project Manager or Contracting Officer Representative. The checklist emphasizes that schedules must demonstrate logical sequencing and work plans that prevent frontloading of high-cost items to flag potential cash flow manipulation issues.

View the file

Other files

File Type Posted
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part3_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part2_0005.pdf PDF
B09_QR_Tracker_ROMO_326235_9_4_26_0005.pdf PDF
Sol_140P2026R0057_Amd_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part2_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part3_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part1_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part1_0005.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_9_4_26_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part4_0005.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_26_0004.pdf PDF
Sol_140P2026R0057_Amd_0004.pdf PDF
2nd_Site_Visit_Sign_in_Sheet_0003.pdf PDF
Sol_140P2026R0057_Amd_0003.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_21_0003.pdf PDF
B09_QR_Tracker_ROMO_326235_0003.pdf PDF
B08_Solit_PSP_Vol_II_Deliverables_LmtOnSubconRpt_REQD_0003.xlsx XLSX spreadsheet
Sol_140P2026R0057_Amd_0002.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_19_0002.pdf PDF
B09_Attachment_5_Solit_PSP_Vol_I_Exp_REQD_0002.docx DOCX document
Contact_Procedures_Reminder_0002.docx DOCX document
B09_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD_0002.docx DOCX document
B09_QR_Tracker_ROMO_326235_0002.pdf PDF
B11_PreProposal_Conf_Slides_ROMO_325250_0001.pptx PPTX presentation
B09_Amendment_1_ROMO_KVC_326235_ContractPriceSchedule_Rev_1_8-5-26_0001.xlsx XLSX spreadsheet
B09_P2026R0057_SF30_QA_and_Clauses_8_13_0001.pdf PDF
Sol_140P2026R0057_Amd_0001.pdf PDF
B09_QR_Tracker_ROMO_326235_0001.pdf PDF
ROMO_326235__-_Virtual_PreBid_Conference_Transcription_0001.docx DOCX document
Prebid_sign_in_sheet_0001.pdf PDF
B09_Amendment_1_What_Evaluators_Will_Ask_for_Each_Factor_0001.docx DOCX document
Virtual_sign_in_sheet_0001.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part4.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part1.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part1.pdf PDF
B08_Attachment_10_ROMO_KVC_326235_CD_ContractPriceSchedule_BLANK.xlsx XLSX spreadsheet
Sol_140P2026R0057.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_II_BidBond.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part2.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part3.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part2.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part3.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_SubKPlan.pdf PDF
B08_Attachment_5_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_3_Wage_Determination.pdf PDF
B08_Attachment_4_Construction_Contract_Administration.pdf PDF
B08_P2026R0057_SF1442_and_Clauses_7_30_26.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Baseline Schedule Review Checklist Form National Park Service (NPS) - Denver Service Center (DSC) | 10-22-18 General ☐ Draft Baseline Schedule submitted before Pre-Construction Conference.

Initial Schedule - Basic Requirements

☐Review against requirements in Specification Section 01 32 16 Construction Schedule
☐Check dates of Award, Notice to Proceed, Substantial Completion(s-if there are multiple beneficial occupancies), and Project Completion with contract. Completion Date is the contract completion date, not an earlier date.
☐Include in Project Schedule: Procurement and Construction activities including mobilization; submittals; and fabrication and delivery of key and long-lead procurement items.
☐Schedules containing items of work currently underway or design progress and milestones shall be up to date and correct. Check milestones against contract.
☐Activities shall have at least one predecessor and one successor except Notice to Proceed and Project Completion.
☐Include a Critical Path.
☐Include concise description of work represented by activity (48-character maximum).
☐Activity duration shall be in whole working days, 15-work day maximum. (Exceptions include mobilization, shop drawings and sample submittals, fabrication of materials, delivery of materials and equipment, and concrete curing times).
☐Include and coordinate work by Contractor and Subcontractor.
☐Show sequence and interdependence of activities for complete performance of work.
☐Show a coordinated work plan with logical sequence.
☐Assign realistic duration to each activity, considering scope and resource loading.
☐Start activities on a work day, not a holiday or weekend.
☐Incorporate contract constraints into schedule such as seasonal shutdown, blackout non-work dates, holidays, and breaks in schedule where work is not performed.
☐Compare to Schedule of Values to ensure that progress and monthly billings can be tracked with relative ease. Consider what will happen if there is delay or work done out of sequence? Can progress still be followed without a degree in scheduling? Does presented schedule work with CLINs (contract line item numbers)?
☐Account for “normal” bad weather in schedule. Normal bad weather information is available, so this number should not be a swag.
☐Start-up and testing shall have a duration of at least 10 days, depending on what is being tested.
☐Activities can include Mobilization but not General Conditions and Overhead Profit. There may be multiple mobilizations.
☐Review schedule for frontloaded or unreasonably scheduled high cost items to allow for higher billing during early stages of project. A schedule is a work plan and if the plan makes sense, costs will follow. But at the beginning of the job, if there is a particularly high cost not associated with long lead items, it could indicate an attempt to obtain a lot of money up front to fund a job and this can lead to problems later.

Initial Schedule - Optional Requirements Depending on Complexity, Duration, Cost and/or Phasing

☐Identify activities numerically (5-digit maximum) in 10-digit increments.
☐Limit one activity to one work trade.
☐Resource load each activity by labor category and equipment type.
☐If applicable, account for special circumstances in the Schedule-Traffic Control and/or Coordination activities and avoid double-charging. Include in schedule if critical to project.
☐Include milestones. At a minimum, include Notice to Proceed, Substantial Completion, and milestones identified in Division 01 Specifications and by Project Manager (PM) and/or Contracting Officer Representative (COR).
NPS DSC Baseline Schedule Review Checklist Form, 10-22-18page 1 of 2

File details come from the government source that posted it. Updated .