B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part3_0005.pdf
PDF 22 MB Posted
- Solicitation number
- 140P2026R0057
About this file
This document comprises architectural and engineering design drawings and schedules for the mechanical, plumbing, and electrical rehabilitation of the Kawuneeche Visitor Center at Rocky Mountain National Park, dated January 16, 2026.
The mechanical systems scope includes installation of gas furnaces (six units ranging from 39-120 MBH capacity), an air-handling unit with economizer mixing box, split-system air conditioning, exhaust fans, electric water heaters, and associated ductwork, piping, and controls. The plumbing scope encompasses new domestic water supply distribution, sanitary waste and vent lines, gas service extensions, and fixtures including water coolers, lavatories, sinks, floor drains, and water heaters across multiple building zones (Comfort Station, Admin Wing, Visitor Center, and Mechanical Rooms). The electrical scope requires three new 200-amp panelboards (L1A, L2A, L3A) with subfeeds from existing service; new branch circuitry for lighting, receptacles, and equipment; LED lighting fixtures with integral or remote emergency battery backup and dimming controls; wireless distributed lighting control system with networked head-end; lightning protection system with air terminals, downleads, and ground rods; and dedicated circuits for mechanical equipment. All work must comply with 2024 IBC/IEBC, 2023 NEC, 2024 IFC, and 2016 ASHRAE 90.1. Schedules detail equipment specifications including manufacturers, models, electrical ratings, and performance characteristics for all HVAC units, plumbing fixtures, and electrical devices. Detailed specifications reference Division 22-26 of the Construction Specifications Institute standards.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L
M
10 11 12
(D) F-1
24"x96"
MECH. / ELEC.
(D) F-2 (D) F-3
(D) 24"x96" RETURN
AIR PLENUM
(D) COMBUSITION
AIR LOUVER
(D) 58"X12" RA UP
(D) 36"X12"
RA DN6
M300
L
M
10 11 12
MECH. / ELEC.
(D) 24"x96" RETURN
AIR PLENUM
(D) 58"X12" RA DN
136"x12"
58"x12"58"x12"
(D) 136"x12" FRESH
AIR INTAKE PLENUM
(D) 12"X20" RA
DROPS TO
FURNACES
(D) 12"x36" GRILLE
IN CEILING
(D) 24"x12" RA
M300
(D) 58"X12" RA DNEXTERIOR LOUVER TO
REMAIN AND RECEIVE
NEW DUCTWORK
CONNECTION
EXTERIOR LOUVER TO
REMAIN AND RECEIVE
NEW DUCTWORK
CONNECTION
H
MECH. RM
"x
"x
16"x14" 14"x16"
(D) EXISTING
SUPPLY AIR
DIFFUSER
(D) EXISTING
RETURN AIR
GRILLE
(D) EXISTING
SUPPLY AIR
DIFFUSER
(D) COMBUSTION
AIR PIPING
(D) F-4
(D) F-5
EXTERIOR LOUVER TO
REMAIN AND RECEIVE NEW
DUCTWORK CONNECTION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: D
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
6:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
M400
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 99 177
MECHANICAL DEMO
ENLARGED PLANS
SCALE DM400
1 115 - MECH ROOM DEMO PLAN AT FLOOR
SCALE DM400
2 115 - MECH ROOM DEMO PLAN AT CEILING
TRUE PLAN
SCALE DM400
3 106 - MECH ROOM DEMOLITION PLAN
EXTERIOR LOUVER TO
REMAIN AND RECEIVE NEW
DUCTWORK CONNECTION
20 42
SCALE OF FEET
01/16/26
F
F F
F
F
L
M
10 11 12
MECH. / ELEC.
115 GF-1
GF-2
GF-3
M300
22.20
M300
135"x20" B/C
"x
B /C
"x
B /C
18"x18" B/C
"x
B /C
130"x12" B/C
"x
B /C
"x
B /C
"x
B /C
"x
B /C
"x
B /C
EWH-1
3/4"ø CD
1/2"ø CD
1/2"ø CD
23.35
AC-1
H
MECH. RM
GF-4
GF-5
6"x6" B
125 CFM
M300
14"x14" D
M300
12"x6" C
250 CFM
T
"x
"x
A /C
"x
A /C
"x
B /C
18"x18" B/C
8"x24" B/C
4" CONCENTRIC
VENT TERMINATION
UP THRU ROOF
12"x6" A/C
GF-5
23.37
CO₂
23.36
1"ø CD
D
MECH. RM
GF-6
23.28
12"x6"
200 CFM
23.41
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: D
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
M401
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 100 177
MECHANICAL
ENLARGED PLANS
SCALE DM401
1 115 - MECH/ELEC - MECHANICAL ENLARGED PLAN
SCALE DM401
2 106 - MECH. RM - MECHANICAL ENLARGED PLAN
# KEYNOTES:
22.20 ROUTE 3/4"CONDENSATE TO FLOOR DRAIN. TERMINATE
VIA AIRGAP AT (E) FLOOR DRAIN.
23.28 NEW FURNACE SHALL BE INSTALLED PER
MANUFACTURER INSTRUCTIONS. CONNECT TO EXISTING
SUPPLY AND RETURN AIR DUCTWORK.
23.35 INSTALL ACID NEUTRALIZATION KIT IN CONDENSATE
DRAIN LINE IN ACCESSIBLE LOCATION.
23.36 DISCHARGE CONDENSATE DRAIN TO GRADE. PIPING ON
BUILDING EXTERIOR SHALL BE HEAT TRACED. SEAL
PENETRATION ON BUILDING EXTERIOR TO MATCH
EXISTING CONDITIONS.
23.37 INSTALL 1/2" CONDENSATE DRAIN WITH ACID
NEUTRALIZATION KIT IN ACCESSIBLE LOCATION.
DISCHARGE TO GRADE AS SHOWN ON M401.
23.41 PROVIDE NEW 8" EXHAUST WALL CAP TO MATCH NEW
FASCIA.
TRUE PLAN
SCALE DM401
3 153 - MECH. RM ENLARGED PLAN
20 42
SEAL AIRTIGHT AROUND ENTIRE TAKE-OFF
AIR FLOW
W
PROVIDE MANUAL BALANCING DAMPER
1/4 OF DIMENSION
"W" OR 6 INCHES,
WHICHEVER IS
GREATER
SUPPLY GRILLE
EXPOSED PIPING
TO BE PAINTED
UNION
FURNACE
6" DIRT LEG
GAS COCK
PROVIDE WITH
BACKDRAFT DAMPER
MOUNT FAN IN CEILING
MOUNT FAN FROM
STRUCTURE ABOVE WITH
METAL STRAPS AND
VIBRATION ISOLATION
FLEXIBLE
CONNECTION
A
C
MINIMUM CONDENSATE PIPE SIZE
MIN. DRAIN SIZE
1"
AC TONS
6 TO 20
0 TO 5 3/4"
B
CLEAN-OUT
(LEFT OPEN)
CASING SLEEVE
UNION IF REQUIRED
FOR DISASSEMBLY
DRAIN PAN
CAPA = (SEE TABLE)
B = (1" FOR EACH 1" OF
MAXIMUM NEGATIVE
STATIC PRESSURE + 1"
C = HALF OF B
3/4" CONDENSATE
DRAIN LINE
FURNACE
ECONOMIZER
MIXING BOX
MOUNT EACH CORNER OF
AHU ON STILTS/UNISTRUT
WITH WAFFLE PADS.
ECONOMIZER MIXING BOX
SHALL BE INSIDE SUPPORTS
SUPPLY AIR DUCT
36" FOR FUTURE
INSTALLATION OF
EVAPORATOR COIL
FLEXIBLE CONNECTION
WITH COPPER JUMPER
VIBRATION ISOLATION WAFFLE PAD (TYP.)
2" DEEP AUXILIARY DRAIN PAN
RETURN
AIR DUCT
OUTDOOR
AIR DUCT
MANUAL
BALANCING
DAMPER
NOTE:
1. THIS DETAIL IS SHOWN AS A SCHEMATIC LAYOUT. SEE FLOOR
PLANS FOR DUCTWORK SIZES AND ROUTING.
3/4" CONDENSATE
DRAIN LINE
FURNACE
ECONOMIZER
MIXING BOX
MOUNT EACH CORNER OF
AHU ON STILTS/UNISTRUT
WITH WAFFLE PADS.
SUPPLY AIR DUCT
36" FOR FUTURE
INSTALLATION OF
EVAPORATOR COIL
FLEXIBLE CONNECTION
WITH COPPER JUMPER
VIBRATION ISOLATION WAFFLE PAD (TYP.)
RETURN
AIR DUCTOUTDOOR
AIR DUCT
MANUAL
BALANCING
DAMPER
NOTE:
1. THIS DETAIL IS SHOWN AS A SCHEMATIC LAYOUT. SEE FLOOR
PLANS FOR DUCTWORK SIZES AND ROUTING.
FINISHED FLOOR
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
M500
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 101 177
MECHANICAL DETAILS
NOT TO SCALEM500
1 45° DUCT TAKE-OFF DETAIL
NOT TO SCALEM500
2 GAS EQUIPMENT CONNECTION DETAIL
NOT TO SCALEM500
3 CEILING MOUNTED EXHAUST FAN DETAIL
NOT TO SCALEM500
4 AC UNIT DRAIN TRAP DETAIL
NOT TO SCALEM500
5 VERTICAL UPFLOW FURNACE DETAIL
SCALE AM500
6 VERTICAL DOWNFLOW FURNACE DETAIL
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
M600
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 102 177
MECHANICAL
SCHEDULES
GRILLES, REGISTERS, AND DIFFUSERS SCHEDULE / SALIENT CHARACTERISTICS
GENERAL
NOTES
TAG
BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL SERVICE MATERIAL FACE SIZE FINISH
- - - SUPPLY - SEE DRAWINGS - 1,6
A TITUS 300FL SUPPLY ALUMINUM 14x6 PRIME FINISH TO BE FIELD PAINTED 2,3,5
B TITUS 300FL SUPPLY ALUMINUM 6x6 PRIME FINISH TO BE FIELD PAINTED 2,3,5
C TITUS 300FL SUPPLY ALUMINUM 12x6 PRIME FINISH TO BE FIELD PAINTED 2,3,5
D TITUS 350FL RETURN ALUMINUM SEE DRAWINGS PRIME FINISH TO BE FIELD PAINTED 3,5
E RECTORSEAL 375 SUPPLY STEEL SEE DRAWINGS STORM GRAY 4,5,6
F HART & COOLEY 420 SUPPLY STEEL SEE DRAWINGS GOLDEN SAND 4
G HART & COOLEY 406 SUPPLY STEEL SEE DRAWINGS WHITE 4,6
FAN SCHEDULE / SALIENT CHARACTERISTICS
GENERAL PERFORMANCE (@ 8,841FT) ELECTRICAL PHYSICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
LOCATION TYPE AIRFLOW
[CFM]
ESP
[IN. W.C.]
SPEED
[RPM]
POWER
[W]
SOUND
[SONES]
VOLTAGE
[V]
PHASE MCA
[A]
MOCP
[A]
FLA
[A]
LENGTH
[IN.]
WIDTH
[IN.]
HEIGHT
[IN.]
WEIGHT
[LB]
CF-1 BIG ASS FANS HAIKU 101 - EXHIBIT CEILING 403 / 6062 - 174 2.4 / 15.9 - 115 1 - - - 60 60 12 18.5 4
EF-1 GREENHECK SP-A125 112 - RR CEILING 70 0.25 1100 15 1.2 115 1 0.2 15 0.18 11 13 9 17 1-3
EF-2 GREENHECK SP-A125 113 - RR CEILING 70 0.25 1100 15 1.2 115 1 0.2 15 0.18 11 13 9 17 1-3
SPLIT SYSTEMS SCHEDULE - OUTDOOR UNIT / SALIENT CHARACTERISTICS
GENERAL DX COOLING ELECTRICAL PHYSICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
LOCATION REFRIGERANT TOTAL COOLING
[BTU/H]
SENSIBLE CAPACITY
[BTU/H]
OPERATING RANGE
[°F]
VOLTAGE
[V]
PHASE FREQ.
[Hz]
MCA
[A]
MOCP
[A]
LENGTH
[IN]
WIDTH
[IN]
HEIGHT
[IN]
WEIGHT
[LB]
CU-1 MITSUBISHI PUY-AH30 GRADE R454B 30,400 21,000 -40 - 115 208/230 1 60 22.0 37 37-13/32 14 37-1/8 155 1-8
SPLIT SYSTEMS SCHEDULE - INDOOR UNIT / SALIENT CHARACTERISTICS
GENERAL SUPPLY FAN DX COOLING EFFICIENCY PHYSICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
LOCATION REFRIGERANT OUTDOOR
UNIT
AIRFLOW
[CFM]
OUTSIDE AIR
[CFM]
TOTAL COOLING
[BTU/H]
SENSIBLE CAPACITY
[BTU/H]
OPERATING RANGE
[°F]
SEER2 LENGTH
[IN]
WIDTH
[IN]
HEIGHT
[IN]
WEIGHT
[LB]
AC-1 MITSUBISHI PKA-AK30 019 - SERVER ROOM R454B CU-1 705 0 30,400 21,000 66 - 90 19.7 51-3/16 11-5/8 14-3/8 46 1-5
FURNACE SCHEDULE / SALIENT CHARACTERISTICS
GENERAL SUPPLY FAN GAS HEATING ELECTRICAL PHYSICAL
NOTES
TAG BASIS OF
DESIGN
MANUFACTURER
BASIS OF
DESIGN
MODEL
LOCATION SERVICE TYPE TOTAL
[CFM]
OA
[CFM]
ESP
[IN.
W.C.]
SPEED
[RPM]
POWER
[HP]
SIZE
[HP]
OAT DB
[°F]
EAT DB
[°F]
LAT DB
[°F]
INPUT @
SEA LEVEL
[MBH]
INPUT @
8841'
[MBH]
OUTPUT @
SEA LEVEL
[MBH]
OUTPUT
@ 8841'
[MBH]
TOTAL
CAPACITY
[MBH]
AFUE
VOLTAGE
[V]
PHASE FREQ.
[Hz]
MCA
[A]
MOCP
[A]
LENGTH
[IN]
WIDTH
[IN]
HEIGHT
[IN]
WEIGHT
[LB]
GF-1 TRANE S9X2C100D 115 - MECH/ELEC NORTH OFFICES DOWNFLOW 2150 115 0.5 1075 1 1 -17.7 63.4 93.4 65/100 46.8/72 63.1/96.8 45.4/69.7 69.7 95 120 1 60 14.1 15 28.75 21 34 145 1-8
GF-2 TRANE S9X2D120D 115 - MECH/ELEC EXHIBIT NO. 1 DOWNFLOW 2250 325 0.5 1075 1 1 -17.7 55.6 89.2 78/120 56.2/86.4 75.7/113.4 54.5/81.6 81.6 96 120 1 60 14.1 15 28.75 24.5 34 156 1-9
GF-3 TRANE S9X2C100D 115 - MECH/ELEC SOUTH OFFICES & CORRIDOR DOWNFLOW 1800 225 0.5 1075 1 1 -17.7 57.3 93.1 65/100 46.8/72 63.1/96.8 45.4/69.7 69.7 95 120 1 60 14.1 15 28.75 21 34 145 1-8
GF-4 TRANE S9X2C100U 106 - MECH RM. AUDITORIUM UPFLOW 1700 405 0.5 1075 1 1 -17.7 47.6 85.5 65/100 46.8/72 63.1/96.8 45.4/69.7 69.7 95 120 1 60 14.1 15 28.75 21 34 139 1-9
GF-5 TRANE S9X2B060U 106 - MECH RM. EXHIBIT NO. 2 UPFLOW 1000 180 0.5 1075 3/4 3/4 -17.7 52.6 91.5 39/60 28.1/43.2 37.8/58.3 27.2/42.0 42.0 96 120 1 60 10.3 15 28.75 17.5 34 122 1-9
GF-6 TRANE S9X2C100U 153 - MECH RM. COMFORT STATION UPFLOW 1200 300 0.5 1075 1 1 -17.7 46.6 100.4 65/100 46.8/72 63.1/96.8 45.4/69.7 69.7 96 120 1 60 13.3 15 28.75 21 34 145 1-8
NOTES
1. EXISTING TO REMAIN SUPPLY GRILLE. BALANCE TO CFM VALUE NOTED ON DRAWINGS.
2. OPPOSED BLADE DAMPER IN FACE OF GRILLE.
3. PROVIDE WITH GYPSUM BOARD MOUNTING FRAME FOR GYPSUM BOARD HARD LID CEILING/WALL - SEE PLAN.
4. PROVIDE WITH INTEGRAL BALANCING DAMPER.
5. BLADES PARALLEL WITH LONG DIMENSION.
6. PROVIDE WITH 1/4" WIRE MESH AT DUCT OPENING.
NOTES
1. PROVIDE WITH CONDENSATE PUMP.
• BASIS OF DESIGN MANUFACTURER: BLUE DIAMOND
2. POWERED BY OUTDOOR UNIT.
3. DISCONNECT BY DIVISION 26.
4. PROVIDE WITH WIRED THERMOSTAT.
5. ALL REFRIGERANT PIPING, INCLUDING VALVES, FITTINGS, AND CONNECTIONS, TO BE PROVIDED, SIZED, AND ROUTED PER MANUFACTURER'S RECOMMENDATIONS.
NOTES
1. PROVIDE WITH MANUFACTURER HAIL GUARDS.
2. PROVIDE 48" TALL FIELD FABRICATED OUTDOOR UNIT STAND.
3. PROVIDE WITH SINGLE POWER POINT CONNECTION
4. PROVIDE WITH FIELD-MOUNTED DISCONNECT BY E.C.
5. PROVIDE WITH LOW AMBIENT COOLING KIT OPERATION.
6. PROVIDE ALUMINUM JACKETING FOR ALL EXTERIOR REFRIGERANT PIPING.
7. PROVIDE WITH WIRED THERMOSTAT.
8. ALL REFRIGERANT PIPING, INCLUDING VALVES, FITTINGS, AND CONNECTIONS, TO BE PROVIDED, SIZED, AND ROUTED PER MANUFACTURER'S RECOMMENDATIONS.
NOTES
1. FAN SHALL BE INTERLOCKED WITH LIGHTS.
2. PROVIDE WITH BACKDRAFT DAMPER.
3. UNIT WEIGHT DOES NOT INCLUDE ACCESSORIES.
4. OIL RUBBED BRONZE AIRFOIL AND HARDWARE FINISH.
NOTES
1. TWO-STAGE HEATING. CAPACITY RATINGS ARE SHOWN AS "1ST STAGE/2ND STAGE".
2. PROVIDE WITH MERV 13 FILTER.
3. PROVIDE WITH 7-DAY PROGRAMMABLE THERMOSTAT. THERMOSTAT SHALL BE CAPABLE OF CONTROLLING GAS FURNACE HEATING AND FUTURE DIRECT EXPANSION COOLING.
4. PROVIDE WITH ECONOMIZER MIXING BOX WITH BOTTOM AND SIDE INLETS FOR RETURN AIR AND OUTSIDE AIR (OUTSIDE AIR DAMPER SHALL HAVE A LEAKAGE RATE 4 CFM/SQFT OR LESS @ 1 INCH PRESSURE).
• BASIS OF DESIGN MANUFACTURER: MICROMETL
5. PROVIDE WITH CONCENTRIC VENT KIT AND ROUTE UP THROUGH ROOF.
6. PROVIDE WITH ECONOMIZER FAULT DETECTION AND DIAGNOSTICS.
7. FILTER FRAME FOR 1" THROWAWAY FILTER IN RETURN AIR DUCT.
8. PROVIDE WITH CONDENSATE PUMP AND ACID NEUTRALIZATION KIT.
9. PROVIDE WITH CO2 SENSOR IN SPACE FOR DEMAND CONTROLLED VENTILATION. SEE FLOOR PLANS FOR SENSOR LOCATION. SEE SHEET M700 FOR DEMAND CONTROLLED VENTILATION SEQUENCE.
ELECTRIC HEATER SCHEDULE / SALIENT CHARACTERISTICS
GENERAL PERFORMANCE ELECTRICAL PHYSICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
LOCATION TYPE/MOUNTING AIRFLOW
[CFM]
OUTPUT
[BTU/H]
POWER
[kW]
VOLTAGE
[V]
PHASE FREQ.
[Hz]
LENGTH
[IN]
WIDTH
[IN]
HEIGHT
[IN]
WEIGHT
[LB]
EWH-1 QMARK CWH3504F 115 - MECH/ELEC RECESSED WALL 100 16,378 4.8 240 1 60 5" 15 3/4" 19 5/16" 22 1,2,3,4
NOTES
1. PROVIDE WITH INTEGRAL THERMOSTAT.
2. PROVIDE WITH INTEGRAL ELECTRICAL DISCONNECT .
3. PROVIDE WITH MANUFACTURER'S MOUNTING BRACKET AND HARDWARE.
4. WHITE FINISH.
RELIEF HOOD SCHEDULE / SALIENT CHARACTERISTICS
GENERAL PERFORMANCE PHYSICAL
NOTESTAG MANUFACTURER MODEL LOCATION SERVICE AIRFLOW
[CFM]
FREE AREA
[SF]
FACE VELOCITY
[FPM]
PRESSURE DROP
[IN. W.C.]
LENGTH
[IN]
WIDTH
[IN]
HEIGHT
[IN]
WEIGHT
[LB]
RH-1 GREENHECK FGR-32x44 ROOF RELIEF 6,200 10 634 0.097 63 51 31 164 1,2
NOTES
1. PROVIDE WITH MANUFACTURER STANDARD ROOF CURB.
2. 46.5"x34.5" ROOF OPENING.
GENERAL NOTE:
BASIS OF DESIGN PRODUCTS LISTED IN THE
SCHEDULES ESTABLISH THE QUALITIES AND
CHARACTERISTICS FOR THE EVALUATION OF
PRODUCT SUBSTITUTIONS BY THE CONTRACTING
OFFICER. QUALITIES AND CHARACTERISTICS ARE
LISTED FOR THE BASIS OF DESIGN PRODUCT IN THE
SCHEDULES AND/OR THE PROJECT SPECIFICATIONS.
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
M700
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 103 177
MECHANICAL
CONTROLS
SEQUENCES
FURNACE CONTROL SEQUENCE:
OCCUPIED MODE:
THE GAS FURNACE SHALL BE CONTROLLED BY A 7-DAY PROGRAMMABLE THERMOSTAT. THE SUPPLY FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS. THE PROGRAMMABLE THERMOSTAT SHALL CYCLE ON THE GAS
HEAT EXCHANGER AS REQUIRED TO MAINTAIN HEATING SETPOINT (70°F - ADJUSTABLE).
WHEN THE SUPPLY FAN RUNS, THE OUTSIDE AIR DAMPER SHALL OPEN TO PROVIDE THE SCHEDULE OUTSIDE AIR
TO THE SPACE.
WHEN THE OUTSIDE AIR TEMPERATURE IS ABOVE 70°F (ADJUSTABLE), THE ECONOMIZER MIXING BOX CONTROLLER SHALL MODULATE THE OA AUTOMATIC DAMPER OPEN AND THE RA AUTOMATIC DAMPER
OPEN/CLOSED AS REQUIRED TO MAINTAIN HEATING SETPOINT (70°F - ADJUSTABLE).
UNOCCUPIED MODE:
THE PROGRAMMABLE THERMOSTAT SHALL CYCLE ON THE SUPPLY FAN AND GAS HEAT EXCHANGER TO MAINTAIN THE UNOCCUPIED HEATING SETPOINT (55°F - ADJUSTABLE). THE OUTSIDE AIR DAMPERS SHALL REMAIN
CLOSED DURING UNOCCUPIED HOURS.
DEMAND CONTROLLED VENTILATION:
THE OUTSIDE AIR DAMPER SHALL BE CONTROLLED VIA THE ECONOMIZER/DCV CONTROL MODULE (BASIS OF
DESIGN - HONEYWELL JADE W7220).
WHEN SPACE CO2 SENSOR DETECTS CO2 LEVELS BELOW SETPOINT OF 1,100PPM (ADJUSTABLE), OUTSIDE AIR TO THE SPACE WILL BE AT THE VENTILATION MINIMUM SETPOINT (VENTMIN VALUE IN VENTILATION SETTINGS
TABLE BELOW).
WHEN SPACE CO2 SENSOR DETECTS CO2 LEVELS ABOVE SETPOINT OF 1,100PPM (ADJUSTABLE), OUTSIDE AIR TO THE SPACE WILL MODULATE UP TO THE VENTILATION MAXIMUM SETPOINT (VENTMAX VALUE IN VENTILATION
SETTINGS TABLE BELOW).
VENTILATION SETTINGS TABLE
EQUIP. TAG
GF-1
GF-2
GF-3
GF-4
GF-5
VENTMIN
[CFM]
VENTMAX
[CFM]
ECONOMIZER AND DEMAND CONTROL VENTILATION SEQUENCE OF OPERATION MATRIX
DCV
BELOW SETPOINT
ABOVE SETPOINT
OA GOOD TO
ECONOMIZE?
NO
YES
NO
YES
CALL FOR STAGE
1 HEATING
OFF
ON
ON
OFF
ON
ON
OFF
ON
ON
OFF
ON
ON
CALL FOR STAGE
2 HEATING
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
HEATING STAGE
1 OUTPUT
OFF
ON
ON
OFF
ON
ON
OFF
ON
ON
OFF
ON
ON
HEATING STAGE
2 OUTPUT
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OCCUPIED
VENTMIN
VENTMIN
VENTMIN
VENTMIN
VENTMIN
TO FULL-OPEN
VENTMIN
TO FULL-OPEN
VENTMIN
TO VENTMAX
VENTMIN
TO VENTMAX
VENTMIN
TO VENTMAX
VENTMIN
TO VENTMAX
VENTMIN
TO FULL-OPEN
VENTMIN
TO FULL-OPEN
UNOCCUPIED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED TO
FULL-OPEN
CLOSED TO
FULL-OPEN
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED TO
FULL-OPEN
CLOSED TO
FULL-OPEN
GF-1
GF-2
GF-3
GF-4
GF-5
GENERAL NOTES
A.
SYSTEM NOTES
Multi-Zone
Multi-Zone
Multi-Zone
Single Zone
Single Zone
As
(SQ. FT)
Ps
(People)
Ez
1.0
1.0
1.0
0.8
0.8
Vot
(CFM)
111.4
322.7
222.6
400.7
176.3
(CFM)
YES
YES
YES
YES
YES
NotesSystem Name and Number
ASHRAE 62.1 - 2019: Outside Air Calculations Summary
System
Type
System Floor Area
System Population
Average Air Distribution
Effectiveness
Outdoor Air Intake Flow (required by
62.1)
Outdoor Air Intake Flow
Provided (measured or design)
Outdoor air intake flow provided meets or exceeds
Vot?
MULTI-ZONE SYSTEM OUTSIDE AIR QUANTITY WAS CALCULATED USING THE SIMPLIFIED METHOD IN SECTION 6.4.2.3
THIS TABLE IS PROVIDED AS A CONDENSED SUMMARY OF THE CALCULATIONS FOR EACH SYSTEM. EACH SYSTEM'S OUTSIDE AIR QUANTITIES ARE CALCULATED USING THE VENTILATION RATE PROCEDURE OUTLINED IN SECTION 6.2 AND BASED ON THE SYSTEM TYPE
CLASSIFIED USING SECTIONS 6.2.2, 6.2.3, AND 6.2.4.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
/7
/2
:3 :0
P
M A u to d e sk
D o cs
-2
N
P S
R O
M O
K a w u n e e ch e V
C D
D -C
A w
O ta k/ R
O M
O K
V C
M e ch
-P lu m b .r vt
M800
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 104 177
MECHANICAL CALCS
AND COMCHECK
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
/7
/2
:3 :0
P
M A u to d e sk
D o cs
-2
N
P S
R O
M O
K a w u n e e ch e V
C D
D -C
A w
O ta k/ R
O M
O K
V C
M e ch
-P lu m b .r vt
M801
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 105 177
MECHANICAL CALCS
AND COMCHECK
PLUMBING ABBREVIATIONS
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
BLDG BUILDING
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CW COLD WATER
CWV COMBINATION WASTE AND VENT
Cx COMMISSIONING
(D) DEMOLISH
DIA DIAMETER
DFU DRAINAGE FIXTURE UNIT
(E) EXISTING
FD FLOOR DRAIN
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FPM FEET PER MINUTE
GPM GALLONS PER MINUTE
GW GREASE WASTE
GPM GALLON PER MINUTE
HW HOT WATER
HWC HOT WATER CIRCULATION
HT HEAT TRACE
ID INDIRECT DRAIN
I.D. INSIDE DIAMETER
LPG LIQUEFIED PETROLEUM GAS (PROPANE)
MAX MAXIMUM
MIN MINIMUM
(N) NEW
NG NATURAL GAS
NIC NOT IN CONTRACT
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
PSIA POUNDS PER SQUARE INCH (ABSOLUTE)
PSIG POUNDS PER SQUARE INCH (GAUGE)
(R) RELOCATED
RE:__ REFERENCE ____
REQ REQUIRED/REQUIREMENT
SF SQUARE FEET
STD STANDARD
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VENT
VTR VENT THRU ROOF
W WASTE
W.C. WATER COLUMN
WSFU WATER SUPPLY FIXTURE UNIT
PIPING SERVICES
NATURAL GAS
COLD WATER (CW)
HOT WATER (HW)
HOT WATER RECIRCULATION (HWC)
VENT (V)
WASTE ABOVE (W)
WASTE BELOW (W)
CONDENSATE ABOVE (CD)
GAS (G)
PLUMBING LEGEND
G
DRAWING NOTATION
NEW TO EXISTING
NEW WORK
EXISTING ITEMS
EXISTING ITEMS TO BE DEMOLISHED
PIPING SYSTEM COMPONENTS
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
UNION
FLEXIBLE CONNECTION
FLOOR DRAIN
FLOOR SINK
DRAIN VALVE
VENTURI TYPE
BALANCING VALVE
STRAINER
FLOW SENSOR
TEMPERATURE SENSOR
GRADE CLEAN OUT
FLOOR CLEAN OUT
WALL CLEAN OUT
AUTOMATIC AIR CENT
GAUGE
THERMOMETER
MANUAL AIR VENT
P&T TAP
IN LINE PUMP
METER
THERMOSTAT
PRESSURE SENSOR
T
P
S
FS
FCO
GCO
M
VALVES
GATE VALVE
BALL VALVE
PLUG VALVE
CHECK VALVE
2WAY ATC VALVE
3WAY ATC VALVE
PRESSURE REDUCING VALVE
SAFETY RELIEF VALVE
BACK FLOW PREVENTER
BALANCING VALVE
BUTTERFLY VALVE
THREE WAY CONTROL VALVE
PLUMBING NOTES
1. GENERAL
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS
SHALL BE REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION.
2. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY THE CONTRACTING OFFICER IF
ANY CONFLICTS OCCUR.
3. CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER FOR RESOLUTION OF ANY DISCREPANCIES, OMISSIONS, OR CLARIFICATIONS, BEFORE SOLICITATION DATE. IN THE EVENT THAT AN INTERPRETATION OF SOLICITATION DOCUMENTS IS NECESSARY AFTER THE SOLICITATION DATE, THE DECISION OF THE CONTRACTING OFFICER SHALL BE FINAL AND BINDING.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS OF ALL CHANGE ORDERS, WHICH THE CONTRACTING OFFICER HAS NOT APPROVED IN WRITING PRIOR TO THE EXECUTION OF THE ASSOCIATED
WORK.
5. IN THE CASE OF A CONFLICT, UNLESS OTHERWISE NOTED, KEYNOTES ON PLUMBING PLANS SHALL
SUPERCEDE ANY GENERAL NOTES ON THE PLANS.
6. ALL REMOVED EQUIPMENT SHALL REMAIN THE PROPERTY OF THE FEDERAL GOVERNMENT AND SHALL BE
STORED OR DISPOSED OF PER THE DIRECTION OF THE CONTRACTING OFFICER.
2. EXECUTION
1. ALL PLUMBING WORK SHALL COMPLY WITH LOCAL CODES AND ORDINANCES.
2. PITCH WASTE LINES NOT LESS THAN 1/4" PER FOOT. (UNLESS NOTED OTHERWISE).
3. RUN ALL PIPING ON WARM SIDE OF BUILDING INSULATION. PIPE INSULATION IS NOT CONSIDERED FREEZE
PROTECTION.
4. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS BETWEEN DISSIMILAR METALS, I.E., IRON VALVES AND
COPPER TUBING.
5. PROVIDE PIPE HANGERS OF THE SAME MATERIAL AS THE PIPING SYSTEM OR USE COATED HANGERS.
6. SET FLOOR DRAINS SO THAT TOP WILL BE SLIGHTLY LOWER THAN SURROUNDING FLOOR.
7. PROVIDE BALL VALVES AND UNIONS ON ALL LINES TO EQUIPMENT FOR ISOLATION AND REMOVAL.
8. PLUMBING CONTRACTOR SHALL CHECK OPERATION AND CONDITION OF ALL EXISTING PLUMBING EQUIPMENT WITHIN THE CONFINES OF THIS SPACE, AND PREPARE A WRITTEN LIST OF DEFICIENCIES IN EQUIPMENT OPERATION OR CONDITION. LIST SHALL BE SUBMITTED TO THE CONTRACTING OFFICER WITHIN 2 WEEKS OF
CONTRACT AWARD DATE.
9. THE CONTRACTOR SHALL X-RAY THE FLOOR AND OBTAIN CONTRACTING OFFICER APPROVAL BEFORE
CUTTING ANY FLOOR PENETRATIONS.
10. WHERE REMOVAL OR RELOCATION OF EXISTING FIXTURES OCCURS, CONTRACTOR SHALL REMOVE ALL WASTE
AND VENT BRANCH LINES NOT REQUIRED FOR NEW, OR REMAINING FIXTURE LOCATIONS.
11. PROVIDE ADHESIVE, MULTICOLOR PIPE LABELS FOR ALL SYSTEMS. PROVIDE EVERY 50 FEET, AND EVERY 25
FEET IN CONGESTED AREAS.
12. CONTRACTOR SHALL FLUSH ALL FLOOR DRAINS PRIOR TO TURNING OVER BUILDING OCCUPANCY TO THE
PARK.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P000
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 106 177
PLUMBING LEGENDS
AND NOTES
PLUMBING SHEET LIST
NUMBER SHEET NAME
P000 PLUMBING LEGENDS AND NOTES
P101 OVERALL DEMO PLUMBING FLOOR PLAN
P111 OVERALL PLUMBING FLOOR PLAN - DOMESTIC & GAS
P121 OVERALL PLUMBING FLOOR PLAN - WASTE & VENT
P300 PLUMBING SECTIONS
P400 PLUMBING DEMO ENLARGED PLANS
P401 PLUMBING ENLARGED PLANS
P500 PLUMBING DETAILS
P600 PLUMBING SCHEDULES
P800 PLUMBING CALCS AND COMCHECK
P900 PLUMBING WASTE AND VENT ISOMETRICS
APPLICABLE CODES:
2024 INTERNATIONAL MECHANICAL CODE (IMC)
2024 INTERNATIONAL BUILDING CODE (IBC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
2024 INTERNATIONAL FUEL GAS CODE (IFGC)
2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2024 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
ASHRAE 90.1-2022
ASHRAE 90.1-2022
NPS SUSTAINABILITY GUIDELINES
J
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
A
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
RR
RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
WILDERNESS
DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
JC
P400
P400
P400
P400
22.30
3/4"ø CW (E)
(E) HOSE BIBB
22.40
2"ø W (E)
1 1/2"ø CW (E)3/4"ø CW (E) 3/4"ø CW (E)
2"ø W (E)
4"ø W (E)
3/4"ø CW (E)
WASTE & VENTDOMESTIC & GAS
DOMESTIC & GAS WASTE & VENT
(E) HOSE BIBB
(E) WATER SERVICE
ENTRY TO ADMIN AREA
(E) GAS SERVICE UP
FROM BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
22.41
22.49
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P101
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 107 177
OVERALL DEMO
PLUMBING FLOOR
PLAN
GENERAL NOTES:
# KEYNOTES:
22.30 EXISTING WATER HEATER TO BE REMOVED. DISCONNECT
ELECTRICAL CONNECTIONS PRIOR TO REMOVAL.
DISCONNECT EXISTING HW AND CW CONNECTIONS AND
MAKE READY FOR CONNECTION TO NEW WATER HEATER.
SEE NEW WORK PLANS.
22.40 EXISTING GAS PIPING SHALL REMAIN. EXTEND EXISTING
GAS BRANCH PIPING AS NECESSARY TO CONNECT TO
NEW FURNACES.
22.41 EXISTING GAS METER SHALL REMAIN.
22.49 EXISTING GAS PIPING TO BE REMOVED IN MECHANICAL
ROOM. EXISTING BRANCH SHALL BE MADE READY FOR
RECONNECTION TO NEW PIPING.
SCALE AP101
1 OVERALL DEMO PLUMBING FLOOR PLAN
TRUE PLAN
1. SEE REFERENCED ENLARGED PLANS FOR
ADDITIONAL NOTES AND DETAILS IN VARIOUS
AREAS AS INDICATED.
80 168
ADO
A D
O A
D O
ADOADO
ADO ADO
J
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
A
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
RR
RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
WILDERNESS
DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
JC
3/4"ø CW (E)
3/4"ø CW (E)
3/4"ø CW (E)
3/4"ø CW (E) 3/4"ø CW
P401
P401
(E) HOSE BIBB (E) HOSE BIBB
EWH-2
KS-1A
22.10
22.41
22.42
22.42
EWC-1
3/4"ø CW
(E) WATER SERVICE
ENTRY BELOW GRADE
TO ADMIN AREA
(E) GAS SERVICE UP
FROM BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
3/4"ø CW
22.38
P401
P401
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P111
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 108 177
OVERALL PLUMBING
FLOOR PLAN -
DOMESTIC & GAS
# KEYNOTES:
22.10 ROUTE CW AND HW, AND EXTEND TO SERVE FIXTURES
SHOWN.
22.38 INSTALL PLUMBING EXPANSION TANK (PET-1) AS SHOWN
IN DETAIL 1/P500.
22.41 EXISTING GAS METER SHALL REMAIN.
22.42 EXTEND 3/4"G TO EACH FURNACE.
SCALE AP111
1 OVERALL PLUMBING FLOOR PLAN - DOMESTIC & GAS
TRUE PLAN
80 168
A D
O A
D O
ADOADO
ADO ADO
J
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
A
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
115RR
113RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
WILDERNESS
DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
JANITOR
MECH. RM
153WOMEN'S RR
MEN'S RR
JC
4"ø W (E)
2"ø W (E)
2"ø W (E)
2"ø W (E)
P401
P401
KS-1A
22.44
EWC-1
1 1/2"ø V
2"ø W
RE: CIVIL FOR CONTINUATION
RE: CIVIL FOR CONTINUATION
22.50
22.51
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P121
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 109 177
OVERALL PLUMBING
FLOOR PLAN - WASTE
& VENT
# KEYNOTES:
22.44 ROUTE WASTE TO CONNECT TO EXISTING. ROUTE ABOVE
SLAB IN CABINETRY IF POSSIBLE. VENT PIPING SHALL
CONNECT TO EXISTING.
22.50 PROVIDE HUB DRAIN FOR WATER HEATER T&P RELIEF.
22.51 VENT THRU WALL AT THIS LOCATION WITH DOWNTURNED
90 DEG ELBOW. PAINTED TO MATCH BUILDING EXTERIOR.
TERMINATION SHALL BE COVERED WITH 1/2" WIRE MESH.
SCALE AP121
1 OVERALL PLUMBING FLOOR PLAN - WASTE & VENT
TRUE PLAN
80 168
FIRST FLOOR
100' - 0"
JC
1 1/2"ø CW (E)
1 1/2"ø CW
EWH-1
RP-1
MS-1
3"ø W
2"ø V
3/4"ø HW
1/2"ø CW
3/4"ø HW
3/4"ø CW (E)
FIRST FLOOR
100' - 0"
L
JC
1 1/2"ø CW (E)
1 1/2"ø CW
EWH-1
PRV-1
FIRST FLOOR
100' - 0"
C B
2"ø CW
2"CW TO COMFORT
STATION FIXTURES
2"ø CW
2"ø CW
1 1/2"ø CW
(E)1-1/2"CW TO ADMIN WING
RPBP-1
RPBP-22"ø CW
PRV-2
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: D
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P300
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 110 177
PLUMBING SECTIONS
SCALE DP300
1 JANITOR'S CLOSET WATER ENTRY - SECTION AA
SCALE DP300
2 JANITOR'S CLOSET WATER ENTRY - SECTION BB
SCALE DP300
3 COMFORT STATION WATER ENTRY - SECTION AA
20 42
D
C
B
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
22.45
22.45
4"ø W (E)
2"ø W (E)
22.35
D
C
B
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
22.29
22.29
22.31
22.31
22.3222.32
22.32
22.33
22.34
22.36
22.35
L
M
8 9
RR
RR
JC
22.30
22.29
22.32 22.32
22.33
22.29
L
M
8 9
RR
RR
JC
GCO
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P400
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 111 177
PLUMBING DEMO
ENLARGED PLANS
# KEYNOTES:
22.29 EXISTING LAVATORY TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER PIPING AND MAKE READY
FOR CONNECTION TO NEW FIXTURE. SEE NEW WORK
PLANS FOR DETAILS.
22.30 EXISTING WATER HEATER TO BE REMOVED. DISCONNECT
ELECTRICAL CONNECTIONS PRIOR TO REMOVAL.
DISCONNECT EXISTING HW AND CW CONNECTIONS AND
MAKE READY FOR CONNECTION TO NEW WATER HEATER.
SEE NEW WORK PLANS.
22.31 EXISTING DRINKING FOUNTAIN TO BE REMOVED. REMOVE
EXISTING DOMESTIC WATER, SANITARY, AND VENT PIPING
BACK TO THE MAIN.
22.32 EXISTING WATER CLOSET TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER CONNECTIONS AND MAKE
READY FOR CONNECTION TO NEW FIXTURE. SEE NEW
WORK PLANS FOR DETAILS.
22.33 EXISTING URINAL TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER PIPING AND MAKE READY
FOR CONNECTION TO NEW FIXTURE. SEE NEW WORK
PLANS FOR DETAILS.
22.34 EXISTING WATER HEATER TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER AND GAS CONNECTIONS AND
MAKE READY FOR CONNECTION TO NEW WATER HEATER.
SEE NEW WORK PLANS FOR DETAILS.
22.35 EXISTING DRINKING FOUNTAIN TO BE REMOVED.
DOMESTIC WATER, SANITARY, AND VENT CONNECTIONS
SHALL BE MADE READY FOR RECONNECTION TO NEW
FIXTURE.
22.36 EXISTING WATER SERVICE ENTRY PIPING, VALVES, ETC.
TO BE REMOVED. SEE NEW WORK PLANS FOR NEW
CONFIGURATION OF WATER SERVICE ENTRY.
22.45 WASTE AND VENT PIPING TO LAVATORIES AND DRINKING
FOUNTAINS ARE SHOWN AS ASSUMPTIONS. CONTRACTOR
SHALL VERIFY ROUTING PRIOR TO BEGINNING WORK AND
NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES.
NEW WORK PIPING SHALL FOLLOW A SIMILAR ROUTING TO
EXISTING
SCALE BP400
2 ENLARGED DEMO PLUMBING FLOOR PLAN - WASTE & VENT - COMFORT STATION
SCALE BP400
1 ENLARGED DEMO PLUMBING FLOOR PLAN - DOMESTIC & GAS - COMFORT STATION
SCALE BP400
3 ENLARGED DEMO PLUMBING FLOOR PLAN - DOMESTIC & GAS - ADMIN RESTROOMS
SCALE BP400
4 ENLARGED DEMO PLUMBING FLOOR PLAN - WASTE & VENT - ADMIN RESTROOMS
TRUE PLAN
40 84
ADOADO
ADO ADO
ADOADO
ADO ADO
D
C
B
GWH-1
MEN'S RR
JANITOR
1"ø CW (E)
3/4"ø HW (E)
3/4"ø HW
22.12
RP-2
P300
UR-1UR-1UR-1
L-1AL-1A
L-1A
L-1A L-1A L-1A
MS-1
WC-1AWC-1 WC-1 WC-1WC-1
WC-1
WC-1A
2"ø CW
RPBP-1
RPBP-2
22.42
22.38
3/4"ø G (E)
EWC-2
PRV-2
D
B
JANITOR
152MEN'S RR
WOMEN'S RR
MECH. RM
4"ø W (E)
2"ø W (E)
4"ø W (E)
22.24
L-1A L-1A
L-1A
L-1A
L-1AL-1A
P300
UR-1UR-1UR-1
1 1/2"ø V (E)
FS-1
4"ø W
MS-1
4"ø W
WC-1 WC-1WC-1WC-1 WC-1A
WC-1A WC-1
FD-1 FD-1
FD-1
FD-1
FCO
VENT THRU
WALL WITH
ELBOW IN
SOFFIT
22.48
22.48
L
M
8 9
P300
RR
RR
JC
L-1AL-1A
WC-1A WC-1A
3/4"ø CW (E)
3/4"ø CW (E)
1 1/2"ø CW (E)
P300
EWH-1
1"ø CW (E)
RP-1
MS-1
MS-1
22.38
PRV-1
L
M
8 9
WC-1A
L-1A L-1A
WC-1A
RR
RR
JC
FD-1FD-1
MS-1
4"ø W (E)
3"ø W
22.39
EXISTING GRADE CLEANOUT
22.46
L
M
10 11 12
MECH. / ELEC.
GF-1 GF-2 GF-3
2"ø G (E)
3/4"ø G 3/4"ø G
3/4"ø G
H
GF-5
GF-4
MECH. RM
1"ø G (E)
1"ø G
3/4"ø G
3/4"ø G
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P401
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 112 177
PLUMBING ENLARGED
PLANS
SCALE BP401
1 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - COMFORT STATION
# KEYNOTES:
22.12 WATER PIPING CONTINUES TO SUPPLY. RE: CIVIL FOR
CONTINUATION.
22.24 WASTE PIPING TO DOWNSTREAM CONNECTION. RE: CIVIL
FOR CONTINUATION.
22.38 INSTALL PLUMBING EXPANSION TANK (PET-1) AS SHOWN
IN DETAIL 1/P500.
22.39 WATER HEATER P&T RELIEF AND DRAIN PAN DISCHARGE
SHALL BE ROUTED TO MOP SINK. SEE DETAIL 1/P500.
22.42 EXTEND 3/4"G TO EACH FURNACE.
22.46 3" VTR. UTILIZE EXISTING ROOF PENETRATION.
22.48 PROVIDE WALL CLEANOUT UNDER LAVATORY.
SCALE BP401
2 ENLARGED PLUMBING FLOOR PLAN - WASTE & VENT - COMFORT STATION
SCALE BP401
3 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - ADMIN RESTROOMS
SCALE BP401
4 ENLARGED PLUMBING FLOOR PLAN - WASTE & VENT - ADMIN RESTROOMS
TRUE PLANSCALE BP401
5 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - 115 MECH
SCALE BP401
6 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - 106 MECH
40 84
18 G A. G
ALVAN
IZED
D R
AIN
PAN
TO
BE A
M
IN
IM
U
M O
F 4" D
EEP
1-1/4" PAN
D
R
AIN
SEE PLAN
FO
R
ISC
H
AR
G
E LO
C
ATIO
N
HO
T W
ATER O
UT
SUSPEND P
AN F
RO
M
S
TRUCTURE
W
IT
H 1 /2
" T
HREADED R
O D
PRO
VID
E 3 /8
" N O
N-F
ERRO
US S
PACERS
BETW
EEN T
ANK A
ND P
AN
BALL V
ALVE (T
YP)
CO
LD W
ATER IN
1" A
IR
G
AP S
EPARATIO
N B
ETW
EEN T
/P O
UTLET A
ND P
AN
DIE
LECTRIC
U
NIO
NS
P&T R
ELIE
F V
ALVE S
PIL
L IN
TO
P
AN
W
ATER H
EATER
SEE P
LAN F
O R S
IZ
ES
SUPPO
RT T
HE W
ATER H
EATER A
IN
UM
UM
O F 1
" A
BO
VE T
HE B
O
TTO
O F T
HE P
AN U
SIN
G
A N
O N-
CO
M
BUSTIB
LE M
ATERIA
L
EXPANSIO
N T
ANK
CHECK V
ALVE (T
YP)
ANTI-S
IP
HO
N V
ACUUM
R
ELIE
F V
ALVE
HW
C R
ETURN
PRESSURE G
AUG
E
UNIO
N (T
YP)
THERM
O M
ETER
CIR
CUIT
S
ETTERY-S
TRAIN
ER
RECIR
CULATIO
N P
UM
P
1/2" TEMPERED WATER TO
FAUCET
1/2" CW SUPPLY W/
STOP VALVE1/2" HW SUPPLY W/
STOP VALVE
WASTE
FINISHED FLOOR
1/2" CW TO FAUCET
1/2" THERMOSTATIC
TEMPERING VALVE SET
AT 110° F
COUNTER
TAILPIECE
COUNTERTOP
FLOOR
SUPPLY STOP
HW HWC CW
CEILING
CIRCUIT SETTER
(0.5 GPM)
THERMOSTATIC
MIXING VALVE
(ASSE 1070)
TOTAL PIPE LENGTH BETWEEN HWC
CROSSOVER AND LAVATORY TO BE A
MAXIMUM OF 2 FEET PER IECC
BRASS CLEANOUT PLUG WITH
COUNTER SUNK HEAD & TRACTOR
GRATE COVER
FINISHED GRADE
16" SQUARE CONCRETE PAD, TROWEL
SMOOTH AND EDGE
1/8 CAST IRON BEND
CAST IRON WASTE LINE
1/8 BEND IF CLEANOUT OCCURS AT END OF LINE
WASTE LINE
STRAINER
BALL VALVE (TYP)
BALANCING VALVE
CHECK VALVE
PRESSURE GAUGE (TYP)
P & T PORT (TYP)
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE FOR FIRST TWO ON EACH
SIDE OF PUMP (SEE NOTE NO. 1)
FLEXIBLE
CONNECTION
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
FLOOR
HW TO FIXTURES
G
1" CW
PUMP
1"
THERMOMETER (TYP)
SEE PLAN FOR SIZE
CIRCUIT SETTER (TYP)
NEW 6" HOUSEKEEPING PAD
EXPANSION TANK
BALL VALVE (TYP)
DIELECTRIC FITTING
CHECK VALVE (TYP)
1/2"
HWC
1-1/4" PAN DRAIN. SEE PLAN FOR
DISCHARGE LOCATION
18 GAUGE GALVANIZED DRAIN PAN. TO BE
A MINIMUM OF 4" DEEP
ROUTE T&P RELIEF TO
DRAIN AND AIRGAP
GAS PIPE, SEE PLAN
FOR SIZE
GAS COCK
6" DIRT LEG
UNION (TYP)
18 G A. G
ALVANIZ
ED D
RAIN
P
AN T
O
B E A
IN
IM
UM
O F 4
" D
EEP
HO
T W
ATER O
UT
PRO
VID
E 3 /8
" N O
N-F
ERRO
US S
PACERS
BETW
EEN T
ANK A
ND P
AN
BALL V
ALVE (T
YP)
CO
LD W
ATER IN
DIE
LECTRIC
U
NIO
NS
P&T R
ELIE
F V
ALVE R
O
UTED T
O H
UB D
RAIN
W
ATER H
EATER
SEE P
LAN F
O R S
IZ
ES
EXPANSIO
N T
ANK
CHECK V
ALVE (T
YP)
ANTI-S
IP
HO
N V
ACUUM
R
ELIE
F V
ALVE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P500
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 113 177
PLUMBING DETAILS
NOT TO SCALEP500
1 JANITOR CLOSET - ELECTRIC WATER HEATER DETAIL
NOT TO SCALEP500
5 LOCAL MIXING VALVE DETAIL
NOT TO SCALEP500
7 LAVATORY HOT WATER RECIRCULATION
NOT TO SCALEP500
4 GRADE CLEANOUT DETAIL
NOT TO SCALEP500
6 HORIZONTAL IN-LINE PUMP DETAIL
NOT TO SCALEP500
3 GAS WATER HEATER DETAIL
NOT TO SCALEP500
2 BREAK ROOM - ELECTRIC WATER HEATER DETAIL
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P600
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 114 177
PLUMBING
SCHEDULES
PLUMBING FIXTURE SCHEDULE / SALIENT CHARACTERISTICS
FIXTURE ACCESSORIES INFO
NOTES
TAG DESCRIPTION
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN
MODEL FINISH
BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL FINISH GPM/GPF ELECTRICAL
EWC-1 ABA - ELECTRIC WATER COOLER HI/LO BOTTLE FILLER HAWS 1119.14P STAINLESS STEEL - - - - 120V/1PH 1,2,3,4
EWC-2 ABA - FREEZE RESISTANT HI/LO DRINKING FOUNTAIN
AND BOTTLE FILLER
HAWS 1117P STAINLESS STEEL - - - - 120V/1PH 1,2,3,4
FD-1 FLOOR DRAIN JAY R SMITH 2005Y NICKEL BRONZE - - - - - 5,6,8
FS-1 FLOOR SINK JAY R SMITH 3410-Y WHITE - ACID RESISTANT - - - - - 5,6,7,8
L-1A ABA - WALL MOUNTED LAVATORY AMERICAN STANDARD 0355.012 VITREOUS CHINA - WHITE AMERICAN
STANDARD
1340.227 CHROME 0.5 GPM - 9,10,11,12,13
MS-1 MOP SINK BASIN FIAT MSB2424 WHITE CHICAGO 445-897SRXKCCP CHROME 2.2 GPM - 14
RPBP-1 REDUCED PRESSURE BACKFLOW PREVENTER WATTS 009 BRONZE - - - - - 15
RPBP-2 REDUCED PRESSURE BACKFLOW PREVENTER WATTS 009 BRONZE - - - - - 15
S-1A ABA - SINGLE COMPARTMENT KITCHEN SINK AMERICAN STANDARD 20SB STAINLESS STEEL DELTA 9959-LS-DST CHROME 1.8 GPM - 16,17,18,19
UR-1 FLUSH VALVE URINAL AMERICAN STANDARD 6590.001 VITREOUS CHINA - WHITE AMERICAN
STANDARD
6063.013.002 CHROME 0.125 GPF - 20,21
WC-1 FLOOR MOUNTED FLUSH VALVE WATER CLOSET AMERICAN STANDARD 2234.001 VITREOUS CHINA - WHITE AMERICAN
STANDARD
6065.121.002 CHROME 1.28 GPF - 22,23,24
WC-1A ABA - FLOOR MOUNTED FLUSH VALVE WATER CLOSET AMERICAN STANDARD 3043.001 VITREOUS CHINA - WHITE AMERICAN
STANDARD
6065.121.002 CHROME 1.28 GPF - 22,23,24,25
PLUMBING FIXTURE CONNECTION SCHEDULE
GENERAL
NOTESTAG CW
[IN.]
HW
[IN.]
HWC
[IN.]
WASTE
[IN.]
VENT
[IN.]
EWC-1 1/2" - - 2" 1-1/2" -
EWC-2 1/2" - - 2" 1-1/2" -
FD-1 - - - SEE DWGS SEE DWGS -
FS-1 - - - SEE DWGS SEE DWGS -
L-1A 1/2" 1/2" 1/2" 1-1/2" 1-1/4" 1
MS-1 3/4" 3/4" 1/2" 3" 2" -
RPBP-1 2" - - - - -
RPBP-2 1-1/2" - - - - -
S-1A 1/2" 1/2" 1/2" 1-1/2" 1-1/4" -
UR-1 3/4" - - 2" 2" -
WC-1 1" - - 4" 2" -
WC-1A 1" - - 4" 2" -
GAS/ELECTRIC WATER HEATER SCHEDULE / SALIENT CHARACTERISTICS
GENERAL HEATING PHYSICAL ELECTRICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
INPUT @ SEA LEVEL
[BTU/H]
POWER
[kW]
RECOVERY
AT 90°F RISE
CAPACITY
[GAL]
HEIGHT
[IN]
DIAMETER
[IN.]
WEIGHT
[LB]
VOLTAGE
[V]
PHASE
EWH-1 AO SMITH DEL-20 - 2.5 11 20 22.25 21.75 73 240 1 1-2
EWH-2 AO SMITH DEL-10 - 2.5 11 10 18.25 18 54 240 1 1-2
GWH-1 AO SMITH BTX-80 76,000 - 95 50 71 27 225 120 1 3-6
PUMP SCHEDULE / SALIENT CHARACTERISTICS
GENERAL PERFORMANCE ELECTRICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
SYSTEM FLOW
[GPM]
HEAD
[FT]
POWER
[W]
RP-1 BELL & GOSSETT ECOCIRC+ 20-18 HOT WATER
CIRCULATION
1.5 15 70 1-2
RP-2 BELL & GOSSETT ECOCIRC+ 20-18 HOT WATER
CIRCULATION
3.5 15 70 1-2
NOTES
LAVATORIES
1. CONNECT HOT WATER RECIRCULATION TO HOT WATER LINE PER
2024 IECC TABLE C404.5.1.
NOTES
ELECTRIC WATER HEATER
1. PROVIDE WITH MAGNESIUM ANODE ROD
2. PROVIDE WITH EXPANSION TANK (PET-1)
GAS WATER HEATER
3. 3.5-14" W.C. GAS
4. PROVIDE WITH ACID NEUTRALIZATION KIT
5. 4" PVC INTAKE AND 4" VENT PER MANUFACTURER' RECOMMENDATIONS
6. PROVIDE WITH EXPANSION TANK (PET-1)
NOTES
DRINKING FOUNTAINS AND ELECTRIC WATER COOLERS
1. PROVIDE WITH CONCEALED FLOOR MOUNTED CARRIER (COORDINATE WITH WALL THICKNESS).
2. 17 GA. P-TRAP, LOOSE KEY ANGLE STOPS, STAINLESS STEEL BRAIDED SUPPLIES.
3. VANDAL PROOF.
4. PROVIDE WITH CANE DETECTION APRON TO BOTTOM OF HIGH FOUNTAIN.
FLOOR DRAINS AND SINKS
5. PROVIDE WITH TRAP GUARD.
6. MOUNT FLUSH WITH FLOOR.
7. 1/2 GRATE, DOME STRAINER.
8. BODY/CONNECTION MATERIAL TO MATCH WASTE PIPING.
LAVATORIES
9. 17 GA. P-TRAP, LOOSE KEY ANGLE STOPS, STAINLESS STEEL BRAIDED SUPPLIES.
10. PROVIDE MIXING VALVE UNDER FIXTURE. ASSE 1070 RATED.
• MANUFACTURER/MODEL BASIS OF DESIGN: LEONARD #270-LF
11. PROVIDE WITH P-TRAP AND SUPPLIES INSULATION KIT.
• MANUFACTURER/MODEL BASIS OF DESIGN: TRUEBRO #103 E-Z
12. PROVIDE WITH CONCEALED FLOOR MOUNTED CARRIER (COORDINATE WITH WALL THICKNESS).
13. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT.
MOP SERVICE BASIN
14. PROVIDE WITH HOSE AND HOSE BRACKET, MOP HANGER, SS WALL GUARD.
REDUCED PRESSURE BACKFLOW PREVENTER
15. PROVIDE WITH STRAINER.
NOTES
SINKS
16. 17 GA. P-TRAP, LOOSE KEY ANGLE STOPS, STAINLESS STEEL BRAIDED SUPPLIES.
17. PROVIDE MIXING VALVE UNDER FIXTURE. ASSE 1070 RATED.
• MANUFACTURER/MODEL BASIS OF DESIGN: LEONARD #270-LF
18. PROVIDE WITH P-TRAP AND SUPPLIES INSULATION KIT.
• MANUFACTURER/MODEL BASIS OF DESIGN: TRUEBRO #103 E-Z
19. 6" DEEP BOWL, REAR DRAIN LOCATION.
URINALS
20. PROVIDE WITH CONCEALED FLOOR MOUNTED CARRIER (COORDINATE WITH WALL THICKNESS).
21. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT.
WATER CLOSETS
22. LOOSE KEY ANGLE STOP, STAINLESS STEEL BRAIDED SUPPLIES.
23. FLUSHOMETER WATER CLOSET.
24. FLOOR MOUNTED WATER CLOSET WITH BOTTOM OUTLET.
25. PROVIDE FLUSH VALVE HANDLE ON OPEN SIDE OF FIXTURE AWAY FROM WALL FOR ABAAS
ACCESS.
NOTES
RECIRCULATION PUMP
1. LEAD FREE BRONZE
2. PROVIDE WITH AQUASTAT AND TIMECLOCK TO RUN DURING OCCUPIED HOURS
PLUMBING MISCELLANEOUS SCHEDULE / SALIENT CHARACTERISTICS
GENERAL
NOTES
TAG DESCRIPTION MANUFACTURER MODEL
PET-1 PLUMBING EXPANSION TANK ARMSTRONG AST-12 1
PRV-1 PRESSURE REDUCING VALVE WATTS LF25AUB-Z3 2
PRV-2 PRESSURE REDUCING VALVE WATTS LF25AUB-Z3 3
NOTES
PLUMBING EXPANSION TANKS
1. 3.3 GALLONS ACCEPTANCE VOLUME
PRESSURE REDUCING VALVES
2. 1-1/2" CONNECTION SIZE
3. 2" CONNECTION SIZE
GENERAL NOTE:
BASIS OF DESIGN PRODUCTS LISTED IN THE
SCHEDULES ESTABLISH THE QUALITIES AND
CHARACTERISTICS FOR THE EVALUATION OF
PRODUCT SUBSTITUTIONS BY THE CONTRACTING
OFFICER. QUALITIES AND CHARACTERISTICS ARE
LISTED FOR THE BASIS OF DESIGN PRODUCT IN THE
SCHEDULES AND/OR THE PROJECT SPECIFICATIONS.
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P800
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 115 177
PLUMBING CALCS AND
COMCHECK
COMFORT STATION
SANITARY DRAINAGE FIXTURE UNIT CALCULATION
(CALCULATIONS BASED ON IPC TABLE 709.1)
FIXTURE
WATER CLOSET, FLUSH VALVE
URINAL, FLUSH VALVE
LAVATORY
MOP SERVICE BASIN
DRINKING FOUNTAIN
FLOOR DRAIN
TOTAL
EXISTING 4" WASTE MAIN CAN ACCEPT A 180 DFU CAPACITY AT 1/8" PER FOOT SLOPE
NUMBER OF
INSTANCES
DFU UNITS
TOTAL LOAD
1.5
61.5
VISITOR CENTER + ADMIN WING
SANITARY DRAINAGE FIXTURE UNIT CALCULATION
(CALCULATIONS BASED ON IPC TABLE 709.1)
FIXTURE
WATER CLOSET, FLUSH VALVE
LAVATORY
SINK
MOP SERVICE BASIN
FLOOR DRAIN
TOTAL
EXISTING 4" WASTE MAIN CAN ACCEPT A 180 DFU CAPACITY AT 1/8" PER FOOT SLOPE
NUMBER OF
INSTANCES
DFU UNITS
TOTAL LOAD
COMFORT STATION
WATER SUPPLY FIXTURE UNIT CALCULATION (CALCULATIONS BASED ON IPC TABLE E103.3(2))
FIXTURE
WATER CLOSET (VALVE)
URINAL
LAVATORY
MOP SINK BASIN
DRINKING FOUNTAIN
HOSE BIB
TOTAL
117 WSFU TOTAL -> 72 GPM. THE NEW SERVICE IS 2" AND CAN HANDLE A MAXIMUM FLOW RATE OF 85 GPM.
NUMBER OF
INSTANCES
COLD (WSFU)
1.5
0.25
HOT (WSFU)
1.5
TOTAL LOAD (WSFU)
0.25
TOTAL LOAD (WSFU)
0.75
VISITOR CENTER + ADMIN WING
WATER SUPPLY FIXTURE UNIT CALCULATION (CALCULATIONS BASED ON IPC TABLE E103.3(2))
FIXTURE
WATER CLOSET (VALVE)
LAVATORY
KITCHEN SINK
MOP SINK BASIN
HOSE BIB
TOTAL
47 WSFU TOTAL -> 49 GPM. THE EXISTING SERVICE IS 1-1/2" AND CAN HANDLE A MAXIMUM FLOW RATE OF 50 GPM.
NUMBER OF
INSTANCES
COLD (WSFU)
1.5
HOT (WSFU)
1.5
TOTAL LOAD (WSFU)
TOTAL LOAD (WSFU)
GAS CALCULATIONS (LINE SIZING PER IFGC TABLE 402.4(2))
NEW GAS LINE CONNECTED LOAD
EQUIPMENT
(N) GWH-1
(N) GF-1
(N) GF-2
(N) GF-3
(N) GF-4
(N) GF-5
(N) GF-6
TOTAL LOAD (MBH)
TOTAL LOAD (CFH)
TOTAL EQUIVALENT LENGTH (FT)
SYSTEM DESIGN PRESSURE (PSI)
SYSTEM DESIGN PRESSURE DROP (IN. W.C.)
820 CFH WITH THE ABOVE DESIGN VARIABLES EQUALS A 2" GAS MAIN.
INPUT EACH AT SEA LEVEL (MBH)
INPUT EACH AT ALT (CFH)
LESS THAN 2
0.5
L-1A
L-1A L-1A
L-1A
L-1A
L-1A
1 1/4"ø W
2"ø W
1 1/4"ø W
1 1/4"ø W
2"ø W
1 1/2"ø V (E)
4"ø W (E)
2"ø W (E)
4"ø W
4"ø W
FS-1
MS-1
4"ø W
UR-1
UR-1
UR-1
WC-1
WC-1A
WC-1A
WC-1
WC-1
WC-1
WC-1
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
1 1/4"ø W 1 1/4"ø W
1 1/4"ø W
2"ø W
4"ø W
RE: P121 FOR CONTINUATION OF EXISTING.
3" VENT THRU WALL
WITH ELBOW IN
SOFFIT
EWC-2
FD-1
FD-1
FD-1
FD-1
FCO
(E)GCO
COMBO WASTE/VENT
2"ø V
2"ø W
1 1/4"ø V
2"ø V
WC-1A
WC-1A
L-1A
L-1AFD-1
FD-1
4"ø W (E)
2"ø W
3"ø V (E)
2"ø V (E)
3"ø W (E)
4"ø W (E)
3" VTR. TRANSITION FROM 2"V TO
3"V 18" BELOW ROOF PENETRATION.
MS-1
2"ø V
2"ø V
2"ø V
2"ø V
SEE P121 FOR
CONTINUATION
(E) FCO
EWC-1
2"ø W
1 1/2"ø V
RE: P121 FOR CONTINUATION
RE: P121 FOR CONTINUATION
KS-1A
2"ø W
1 1/2"ø V
EWH-2
2"ø W (E)
1 1/2"ø V (E)
RE: P121 FOR
CONTINUATION
RE: P121 FOR
CONTINUATION
HUB DRAIN FOR
WATER HEATER
T&P RELIEF
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P900
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 116 177
PLUMBING WASTE
AND VENT
ISOMETRICS
NOT TO SCALEP900
1 WASTE & VENT ISO - COMFORT STATION
NOT TO SCALEP900
2 WASTE & VENT ISO - ADMIN RESTROOMS
NOT TO SCALEP900
3 WASTE & VENT ISO - EXHIBIT ELECTRIC WATER COOLER
NOT TO SCALEP900
4 WASTE & VENT ISO - BREAK ROOM SINK
ELECTRICAL DEMOLITION REQUIREMENTS
THE BASIS OF THESE DRAWINGS WERE SITE OBSERVATIONS, ORIGINAL BUILDING DRAWINGS AND
VARIOUS OTHER SOURCES. EVERY ATTEMPT HAS BEEN MADE TO DOCUMENT THE ACTUAL
CONDITIONS. HOWEVER, THE CONTRACTOR SHALL CAREFULLY EXAMINE THE CONTRACT
DOCUMENTS AND THOROUGHLY BECOME FAMILIAR WITH THE BUILDING/NPS STANDARDS RELATING TO THE WORK. FAILURE TO DO SO WILL NOT RELIEVE THE CONTRACTOR OF THE OBLIGATIONS OF
THE CONTRACT.
THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF ANY MATERIALS OR APPARATUS BELIEVED TO BE INADEQUATE, UNSUITABLE, IN VIOLATION OF LAWS, ORDINANCES, RULES
OR REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
THE ELECTRICAL CONTRACTOR SHALL INCLUDE IN THEIR COST THE REMOVAL OF ALL EXISTING
ELECTRICAL DEVICES, CONDUITS, FIXTURES AND EQUIPMENT. DISCARD ALL EQUIPMENT AS
REQUIRED, UNLESS NOTED OTHERWISE.
EXISTING DEVICES NOT NOTED AS EXISTING (E) OR INDICATED ON PLANS SHALL REMAIN, AS THEY PRESENTLY EXIST. FOR DEMOLISHED DEVICES IN WALLS WHICH ARE TO REMAIN, THE ELECTRICAL CONTRACTOR SHALL INSTALL A BLANK FACE PLATE ON THE BACKBOX. FOR DEMOLISHED DEVICES INSTALLED IN THE FLOOR, THE ELECTRICAL CONTRACTOR SHALL CUT THE FLOOR BOX FLUSH WITH
THE FLOOR AND FILL WITH CONCRETE; COORDINATE WITH THE CONTRACTING OFFICER.
THE DEMOLITION OF SOME DEVICES MAY INTERRUPT POWER TO DEVICES DOWN STREAM. THE
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REWORKING THESE CIRCUITS TO MAINTAIN POWER
TO THE DOWN STREAM DEVICES WHICH WILL REMAIN.
ALL UNENERGIZED/DEMOLISHED CIRCUITRY SHALL HAVE THE CONDUCTORS REMOVED FROM THE
CONDUIT AND THE CONDUIT SHALL BE MARKED "EMPTY" WITH INDELIBLE MARKER.
HISTORIC MATERICAL CONSIDERATIONS
WOOD SLAT CEILING IN EXHIBIT HALL AREA IS A HISTORIC FABRIC AND SHALL NOT BE
CUT/DRILLED/PENETRATED UNDER ANY CIRCUMSTANCES WITHOUT SPECIFIC APPROVAL AND COORDINATION WITH THE CONTRACTING OFFICER. EVERY EFFORT HAS BEEN MADE TO ENSURE THAT SPECIFIC LOCATIONS REQUIRING NEW OPENINGS ARE IDENTIFIED SPECIFICALLY. PHASING OF INSTALLATION OF EQUIPMENT SHALL BE COORDINATED WITH RE-INSTALLATION OF THE HISTORIC MATERIALS TO AVOID UNNECESSARY OPENINGS
OR DAMAGE ASSOCIATED WITH THE CONSTRUCTABILITY OF THE SCOPE OF WORK.
ELECTRICAL GENERAL NOTES
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
AE DESIGN
DENVER, CO
1/ 8/
:5
8:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
N P
S R
O M
O K
A W
U E
E C
H E
V
IS
IT
O
R C
E N
T E
R
E
LE
C T
R
IC
A L.
rv t
E000
AE DESIGN
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
TW/RS/BJLV
JM/JEB/MS
01/16/2026 117 177
ELECTRICAL COVER
SHEET
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL NECESSARY FOR A
COMPLETE AND FUNCTIONING ELECTRICAL SYSTEM.
2. MATERIALS AND INSTALLATION SHALL COMPLY WITH CODES, LAWS AND ORDINANCES OF
FEDERAL, STATE AND LOCAL GOVERNING BODIES HAVING JURISDICTION. CODES FOR THIS
SCOPE OF WORK INCLUDE THE 2024 IBC AND IEBC, 2024 IECC, 2023 NEC, 2024 IFC, AND 2016
ASHRAE 90.1.
3. MATERIALS AND EQUIPMENT SHALL BE LISTED AND/OR LABELED BY U.L., ETL, CSA OR
ANOTHER RECOGNIZED TESTING LAB.
4. ALL WORK REQUIRED FOR THE INSTALLATION AS SHOWN ON DRAWINGS INCLUDING
LABOR, EQUIPMENT AND MATERIALS SHALL BE IN STRICT COMPLIANCE WITH THE BUILDING
STANDARDS, EXCEPT AS NOTED OTHERWISE.
5. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, GOVERNMENTAL FEES,
TAXES AND LICENSES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF
THE ELECTRICAL WORK.
6. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO GOVERNMENTAL AGENCIES AND
UTILITY COMPANIES SHOP DRAWINGS, WHICH ARE REQUIRED BY THESE AGENCIES, FOR
THEIR APPROVAL.
7. FOR ALL JOBS THAT INCLUDE DEMOLITION WORK BY THE ELECTRICAL CONTRACTOR,
DURING AND AFTER DEMOLITION, EC SHALL MAINTAIN CIRCUIT CONTINUITY TO ALL
EXISTING DEVICES THAT ARE TO REMAIN. EC SHALL REMOVE, RELOCATE, AND/OR
REWORK ANY CONDUIT AND WIRING TO FACILITATE THE NEW CONSTRUCTION SCOPE OF
WORK. FOR ALL LUMINAIRES THAT ARE EXISTING TO REMAIN OR EXISTING TO BE
RELOCATED, EC SHALL CLEAN LENSES AND REPLACE ALL EXTINGUISHED LAMPS, UON.
8. ALL MATERIALS, AND EQUIPMENT SHALL BE ERECTED, INSTALLED, CONNECTED, CLEANED,
ADJUSTED, TESTED, CONDITIONED, AND PLACED IN SERVICE IN ACCORDANCE WITH THE
MANUFACTURER'S DIRECTIONS AND RECOMMENDATIONS.
9. ALL CUTTING, DRILLING AND PATCHING OF MASONRY, STEEL OR IRON WORK BELONGING
TO THE BUILDING MUST BE DONE BY THIS CONTRACTOR IN ORDER THAT HIS WORK MAY BE
PROPERLY INSTALLED, BUT UNDER NO CONDITIONS MAY STRUCTURAL MEMBERS BE CUT,
EXCEPT AT THE DIRECTION OF THE CONTRACTING OFFICER.
10. ALL MATERIAL, EQUIPMENT, WIRING DEVICES, ETC. SHALL BE NEW, UNLESS SPECIFICALLY
INDICATED AS EXISTING TO BE REUSED.
11. THE CONTRACTOR SHALL PROVIDE NEW TYPE WRITTEN PANEL DIRECTORIES FOR ALL NEW
PANELS. PANELBOARD SHALL BE MARKED WHERE THE SOURCE OF POWER SUPPLY
ORIGINATES.
12. DO NOT SHARE NEUTRAL CONDUCTORS FOR MULTIWIRE BRANCH CIRCUITS. WHERE THE
E.C. PROPOSES THE USE OF SHARED NEUTRAL CONDUCTORS OR SHARED NEUTRAL
CONDUCTORS ARE REQUIRED (SUCH AS POWERED FURNITURE SYSTEMS), HANDLE TIES
SHALL BE PROVIDED ON THE CIRCUIT BREAKERS, WITH SHARED NEUTRALS, SUCH THAT IT
WILL SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED CONDUCTORS. ALL HANDLE TIES
ARE REQUIRED TO BE INDICATED ON THE PANELBOARD SHOP DRAWINGS.
13. SHOULD ACTUAL FIELD CONDITIONS REQUIRE INDICATED CIRCUIT DESIGNATIONS TO VARY, INDICATE THE CIRCUIT NUMBER USED ON THE "AS-BUILT" DRAWINGS.
14. ALL SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED IN THE FIELD BY THE ELECTRICAL
CONTRACTOR WITH THE MAXIMUM AVAILABLE FAULT CURRENT AS INDICATED WITHIN
THESE DOCUMENTS. THE FIELD MARKING(S) SHALL COMPLY WITH…
This is the start of the file's text. The full file is on GovTribe.