B09_QR_Tracker_ROMO_326235_0003.pdf

PDF 130 KB Posted

Attached to
ROMO 326235 Rehabilitate Kawuneeche Visitor Center
Solicitation number
140P2026R0057
Issued by

About this file

This document is a Questions and Answers (Q&A) record for RFP 140P2026R0057 regarding rehabilitation work at the Kawuneeche Visitor Center in Rocky Mountain National Park. The procurement is a Total Small Business Set-Aside contract. The Q&A addresses 38 industry questions and corresponding government responses covering project scope, site access, staffing requirements, submission procedures, and technical specifications.

Key project details include: a second site visit scheduled for August 20, 2026 at 11:00 a.m.; contractor responsibility for procuring construction permits from Grand County, providing professional archeological monitoring during excavation, determining asbestos abatement scope based on hazard surveys and demolition plans, and writing the Historic Preservation Treatment Plan. The contractor must provide temporary office trailers for NPS staff relocation (limited to approximately 20 furniture pieces and standard office equipment), maintain snow removal within project site limits, and ensure weekly cleaning of temporary facilities. Required key personnel include a Project Manager, Superintendent, On-site Quality Control Specialist, On-site Safety Specialist, and Historic Preservation Treatment Specialist (all positions allow combined roles). The government will provide seed mix for revegetation and confirm that forest litter may be collected from the surrounding area. Project Experience submissions may cover projects completed within the last 10 years, with more recent experience rated more favorably. The Question Due Date was extended to August 26, with the Proposal Due Date remaining unchanged. Small business prime offerors receive maximum credit for Factor 6 without separate documentation, and all offerors must submit a Report on Limitation on Subcontracting form with their Business & Price Proposal.

View the file

Other files

File Type Posted
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part3_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part2_0005.pdf PDF
B09_QR_Tracker_ROMO_326235_9_4_26_0005.pdf PDF
Sol_140P2026R0057_Amd_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part2_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part3_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part1_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part1_0005.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_9_4_26_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part4_0005.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_26_0004.pdf PDF
Sol_140P2026R0057_Amd_0004.pdf PDF
BaselineScheduleReviewChecklist_Form_10-22-18_v508_0003.docx DOCX document
2nd_Site_Visit_Sign_in_Sheet_0003.pdf PDF
Sol_140P2026R0057_Amd_0003.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_21_0003.pdf PDF
B08_Solit_PSP_Vol_II_Deliverables_LmtOnSubconRpt_REQD_0003.xlsx XLSX spreadsheet
Sol_140P2026R0057_Amd_0002.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_19_0002.pdf PDF
B09_Attachment_5_Solit_PSP_Vol_I_Exp_REQD_0002.docx DOCX document
Contact_Procedures_Reminder_0002.docx DOCX document
B09_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD_0002.docx DOCX document
B09_QR_Tracker_ROMO_326235_0002.pdf PDF
B11_PreProposal_Conf_Slides_ROMO_325250_0001.pptx PPTX presentation
B09_Amendment_1_ROMO_KVC_326235_ContractPriceSchedule_Rev_1_8-5-26_0001.xlsx XLSX spreadsheet
B09_P2026R0057_SF30_QA_and_Clauses_8_13_0001.pdf PDF
Sol_140P2026R0057_Amd_0001.pdf PDF
B09_QR_Tracker_ROMO_326235_0001.pdf PDF
ROMO_326235__-_Virtual_PreBid_Conference_Transcription_0001.docx DOCX document
Prebid_sign_in_sheet_0001.pdf PDF
B09_Amendment_1_What_Evaluators_Will_Ask_for_Each_Factor_0001.docx DOCX document
Virtual_sign_in_sheet_0001.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part4.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part1.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part1.pdf PDF
B08_Attachment_10_ROMO_KVC_326235_CD_ContractPriceSchedule_BLANK.xlsx XLSX spreadsheet
Sol_140P2026R0057.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_II_BidBond.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part2.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part3.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part2.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part3.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_SubKPlan.pdf PDF
B08_Attachment_5_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_3_Wage_Determination.pdf PDF
B08_Attachment_4_Construction_Contract_Administration.pdf PDF
B08_P2026R0057_SF1442_and_Clauses_7_30_26.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Industry Question Government Response Amendment

1 Will the Exhibits be contracted prior to completion of the project and will coordination be required?

The exhibits will be installed after this project is complete. Exhibit team will do a site visit to confirm dimensions and installation during the construction period.

Amendment 0001, Issued 8/12/2026.

2 Has a Hazardous material survey been completed for the buildings? Yes, see appendix to the specifications.

Amendment 0001, Issued

8/12/2026.

3 What is the contractor responsibility for the staff relocation? Please refer to division 1 specifications.

Amendment 0001, Issued

8/12/2026.

4 Is there a Planned suspension of work for winter months? Please refer to division 1 specifications. This project will not have a winter shutdown.

Amendment 0001, Issued

8/12/2026.

5 Is this project subject to the new Revolutionary FAR Overhaul? Yes, this is subject to the new FAR Overhaul.

Amendment 0001, Issued

8/12/2026.

Additionally, given the nature of the rehabilitation work and the importance of understanding the existing conditions, we would like to request the opportunity to conduct an in-person walk-through of the Visitor Center and surrounding project site prior to the proposal due date. If an additional site visit can be accommodated, please let us know if there are any requirements or restrictions for scheduling the visit.

A 2nd site visit will be held on August 20, 2026 at 11am. We will not give the presentation at this meeting.

Amendment 0001, Issued

8/12/2026.

Sheet C0005 Temporary Facilities plan identifies trailers and storage within the construction area. Please confirm if these are for contractor use or NPS Use.

These trailers are for the relocated NPS staff. Contractor and contractor provided construction trailers will need to be accommodated within the limits of construction at the Kawuneeche Visitor Center shown on C004.

Amendment 0001, Issued 8/12/2026.

8 For bidding purposes can information be provided on what furniture and equipment will ned to be relocated for the temporary facilities.

See Appendix D to specifications. Office equipment (provided by NPS) is expected to be limited to typical equipment such as computers, printers, and task lighting. Additionally, please assume 20 furniture pieces (desk, bookshelf, etc.) that certain employees may elect to use during the interim period in the trailers.

Amendment 0001, Issued 8/12/2026.

9 Also Is all of this FF&E currently in the visitor center or is another location housing FF&E?

FFE for temporary visitor center and NPS office trailers will be provided by the contractor, see 01 50 00, 02 50 10 and Appendix D - Temporary Relocation Plan to the specifications.

Amendment 0001, Issued 8/12/2026.

10 Will there be another site visit with full access to the main building including offices for trade partners? A 2nd site visit will be held on August 20, 2026 at 11am. We will not give the presentation at this meeting.

Amendment 0002, Issued

8/19/2026.

11 Is there a specific asbestos abatement scope of work or is the GC to decide what is to be abated based on the demolition plans? Contractor to determine based on Hazardous Material Survey (Appendix B to specifications) and demo plans.

Amendment 0002, Issued

8/19/2026.

Will the Park Service provide the Archeological Monitor during Excavation activities, or will the Contractor be responsible for providing this service to the project?

The contractor shall provide professional archeological services that includes archeological monitoring to observe and document all excavation and ground disturbing activities. See 01 35 13.

Amendment 0002, Issued 8/19/2026.

13 The specification appears to the a performance specification. There are no products or manufactures specifically specified. Can this be confirmed please? We have a combination of specifications (performance, prescriptive, and refence) but mostly performance.

Amendment 0002, Issued

8/19/2026.

Is the contractor going to be responsible for writing and providing the Historic Preservation Treatment Plan or will the Architect of Record be providing that document?

Contractor's Historic Preservation Specialist to write.

Amendment 0002, Issued

8/19/2026.

15 Is the Park Service providing the Construction Permit? Or is the contractor expected to procure the permit from the Local AHJ. Grand County? Contractor to provide, see 01 31 00.

Amendment 0002, Issued

8/19/2026.

Will the Park Service provide the contractor with the environmental training video required for site personnel training or does the contractor have to develop this video themselves?

Contractor to provide.

Amendment 0002, Issued

8/19/2026.

17 Can the Park Service provide additional space for project trailers at the temporary housing location where the Visitor Center Temporary offices ? No.

Amendment 0002, Issued

8/19/2026.

Spec section references a trailer for the Contracting Officers Field Office – will this be required? If so, where will this be located? Is this a single wide or double wide trailer, spec states minimum 300 SF but doesn’t state maximum

Single wide trailer, needs to be located within the limits of construction. Given the paving, we did not locate the trailer as it may need to be moved. We would not require something larger than 300 SF.

Amendment 0002, Issued 8/19/2026.

19 How many offices are needed in the temporary trailers for the staff relocation? Please see Appendix D.

Amendment 0002, Issued

8/19/2026.

20 Is there a quantity of temporary furniture? How many offices/what furniture is needed? Please see Appendix D.

Amendment 0002, Issued

8/19/2026.

Is there a floor plan that can be provided for the temporary trailers? It looks like there is one office in the visitor’s station and the rest is open space please advise.

That is correct.

Amendment 0002, Issued

8/19/2026.

22 Is the contractor responsible for any cleaning or services of the temp trailers once the staff begin using it? See 01 50 00 for weekly cleaning requirements.

Amendment 0002, Issued

8/19/2026.

23 Is there a quantity or idea of what furniture will want to be kept/relocated? Or should we anticipate moving all existing furniture from the building See Appendix D to specifications. Office equipment (provided by NPS) is expected to be limited to typical equipment such as computers, printers, and task lighting. Additionally, please assume 20 furniture pieces (desk, bookshelf, etc.) that certain employees may elect to use

Amendment 0002, Issued 8/19/2026.

How many personnel are required for the prime contractor? A Superintendent, Quality Control Manager, and Site Safety? Can any of these positions act in dual capacity as 1 person?

•Project Manager (can combine with safety or historic preserva on) •Superintendent •On-site Quality Control Specialist (can combine with safety or historic preserva on) •On-site Safety Specialist (can be combined with other role) •Historic Preserva on Treatment Specialist/Firm (see specific requirement in the specifica on, this can combine other role)

Amendment 0002, Issued 8/19/2026.

Will the parks service maintain snow removal on trail ridge road for the duration of the project? Is the contractor is only responsible for any snow removal inside the project site? (visitors center parking lot)

See 01 11 00 1.10 H Snow management. Yes, snow removal is responsibility of contractor within limits of construction. The NPS will maintain highway 34. Please not that the Highway 34 (Trail Ridge Road) from the Colorado River Trailhead over the pass is closed from around October to May. Temporary facilities (both Visitor Contact and NPS Offices) will be maintained by NPS.

Amendment 0002, Issued 8/19/2026.

Section L In Instructions for the Submission of Offers and Other Information, Factor 2 – Key Personnel Experience calls for the following resumes to be submitted: Project Manager, Superintendent, On-Site Quality Control, On-Site Safety Specialist (Can be combined with other role) and Historic Preservation Treatment Specialist. This section also states in the first paragraph “Submit resumes for key personnel as identified in Section H of this solicitation and listed below. All personnel proposed are subject to substitution requirements contained in this solicitation.” Then in Section H under Special Requirement 5: Key Personnel it only lists the following positions: Project Manager, Job Site Superintendent, Job Site Quality Control, Job Site Safety Manager. There is no reference to the Historic Preservation Treatment Specialist in Section H. Can you please confirm if we are to sub a resume for the Historic Preservation Treatment Specialist and indicate if this person needs to be onsite any time work is taking place? Additionally, as is pertains to Key Personnel Experience, there does not appear to be any key requirements, such as education (i.e. Degree in Construction Management, Engineering, etc), time in role (i.e. min 5 years in role), or special certifications (i.e. OSHA 30, First Aid/CPR, USACE QCM Certificate, LEED, etc). Can the NPS please provide these requirements if they exist?

The Historic Preservation Specialist is defined in 01 35 91 as: “An experienced firm with the required certifications and training that can demonstrate through past performance that they are qualified to perform this work.” The specifications do not require an on-site presence and mention 10 years of relevant experience for supervisory roles. This can also be achieved by an individual on the contractors staff with experience. This can be a shared duty, please submit a resume (firm or individual).

For Key Personnel Experience, experience requirements are included in the specifications. You are current that it does not have specific educa onal, etc. requirements. •Project Manager (can combine with safety or historic preserva on)

•Superintendent •On-site Quality Control Specialist (can combine with safety or historic preserva on) •On-site Safety Specialist (can be combined with other role) •Historic Preserva on Treatment Specialist/Firm (see specific requirement in the specifica on, this can combine other role)

Amendment 0002, Issued 8/19/2026.

RFP 140P2026R0057 - ROMO-326235

Kauwaneeche Visitor Center

Section L In Instructions for the Submission of Offers and Other Information, Factor 3 – Project Experience states “Submit the attached "Project Experience Form” addressing specific experience aspects within the form for up to 4 relevant projects completed in the last 7 years. With this having very stringent requirements for Historic renovation Past Performance and being set-a-side for TSB, would the NPS please consider extending the Project Experience completion in the last 7 years to 10 years?

10 years is acceptable, but more recent will be rated more favorable.

Amendment 0002, Issued

8/19/2026.

In the File labeled B08_P2026R0057_SF1442_and_Clauses_7_30_26, page 62 of the PDF, FAR Clause 52.232-38 Submission of Electronic Funds Transfer Information with Offer (JUL 2023) it states “The offeror shall provide, with its offer, the following information that is required to make payment by electronic funds transfer (EFT) under any contract that results from this solicitation.” Then has 7 individual bullets of information we are to provide with our offer, to include, The name, address, and 9-digit Routing Transit Number of the offeror’s financial agent. & The offeror’s account number and the type of account (checking, savings, or lockbox). This is very unusual for us to provide this information with our offer and we always see it being submitted only after award. We are also concerned about transmitting this information via a non-secured portal or email. Was this FAR clause inserted by mistake and would the DOI/NPS allow for the offerors to omit this information from our proposals and submit only if awarded the contract?

Offerors may include routing information and submission of electronic funds at award.

Amendment 0002, Issued

8/19/2026.

Factor 4 – Past Performance requires offerors to submit the attached Past Performance Questionnaire, B08_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD.pdf. The rating fields displaying “Choose an item” do not appear to function in the provided PDF.

Please confirm whether evaluators may manually enter the applicable rating in each field.

An editable Word document will be uploaded in Amendment 2 Amendment 0002, Issued

8/19/2026.

Factor 3 – Project Experience requires offerors to submit the attached “Project Experience Form,” B08_Attachment_5_Solit_PSP_Vol_I_Exp_REQD. The provided PDF format offers limited space for complete responses and may create formatting constraints. Please confirm whether the Government can provide the Project Experience Form in an editable Word format to allow offerors to respond to the requested information accurately and completely.

An editable Word document will be uploaded in Amendment 2 Amendment 0002, Issued

8/19/2026.

31 Questions are in regard to the revegetation spec (32 92 00). Will the required seed mix for revegetation be provided? Yes, the seed mix will be provided by the government.

Amendment 0002, Issued

8/19/2026.

Questions are in regard to the revegetation spec (32 92 00). Will the forest litter be provided by NPS? Or can the forest litter be gathered from the surrounding area by the contractor?

Forest litter can be collected by the contractor in the area.

Amendment 0002, Issued

8/19/2026.

The contract documents reference a project DDC system in Section 01 50 00 and a building automation system in Section 01 91 14. However, Division 23 does not include a DDC/BAS specification, and M600/M700 indicate standalone programmable thermostats and Honeywell JADE W7220 economizer/DCV controls. Please confirm whether any HVAC equipment is required to be connected to a central DDC/BAS. If so, please identify whether the BAS is existing or new, the BAS manufacturer/system, required DDC controllers, network architecture, point requirements, and required integration scope.

The design intent was always to provide standalone thermostat controls for the new systems—no central controls system. So, the notes/description of the system controls intent in the mechanical drawings and Div 23 specs is correct.

Amendment 0003, Issued 8/21/2026.

B09_Amendment_1_What_Evaluators_Will_Ask_for_Each_Factor_0001 document – Factor 5 – Schedule bullet 2 states that “Is the schedule in accordance with the Baseline Schedule Review Checklist included in Section J.” However, this document does not appear to be present in Section J of the RFP. Please provide the schedule review checklist Attachment 10.

The Baseline Schedule Review Checklist has been added to Section J as Attachment 11. Offerors shall prepare their proposed baseline schedule in accordance with this checklist.

Amendment 0003, Issued 8/21/2026.

Factor 6 Small Business Participation - Please confirm whether small business Offerors are required to submit anything for Factor 6 – Small Business Participation. If so, please identify the specific information, or confirm if documentation is not required the small business prime offerors receive maximum credit.

Small business prime Offerors will receive the maximum score for Factor 6 and do not need to submit separate Small Business Participation documentation.

Amendment 0003, Issued 8/21/2026.

Business & Price Proposal states: “SUBCONTRACTING PERCENTAGE WORKSHEET: Complete and submit the attached ‘Report on Limitation on Subcontracting’ form. The form itself requests input of amounts paid; however, for solicitation purposes, input projected amounts based on your proposed pricing and that of your anticipated Subcontractors. Refer to Clause” However, the sentence ends at “Refer to Clause” without identifying the applicable clause. In addition, Section J does not identify a “Report on Limitation on Subcontracting” or Subcontracting Percentage Worksheet among the listed attachments. Section J lists Attachments 1 through 10, including the Volume II Subcontracting Plan as Attachment 9, but no Subcontracting Percentage Worksheet. Section M further states: “h. SUBCONTRACTING PERCENTAGE WORKSHEET (SET-ASIDE): This worksheet will be reviewed for completeness and correlation to proposed pricing.” Please confirm whether small business Offerors are required to submit the Subcontracting Percentage Worksheet / “Report on Limitation on Subcontracting” form. If required, please provide the referenced form and identify the applicable clause referenced in Section L.

As this procurement is a Total Small Business Set-Aside, all Offerors are required to submit the “Report on Limitations on Subcontracting” form (Subcontracting Percentage Worksheet) with their Volume II – Business & Price Proposal. The applicable clause is FAR 52.219 -14, Limitations on Subcontracting, and the form has now been added to Section J as Attachment 12. Offerors shall input projected amounts based on their proposed pricing and anticipated subcontractors.

Amendment 0003, Issued 8/21/2026.

Requirement 6 lists the KEY Trades as Mason, Mechanical. Electrical and other. Section L Factor 4 and Section M define Key Trade Subcontractors requiring signed LOCs as carpentry, mechanical, plumbing and concrete, no mason. Is a masonry LOC required and what is other?

The Key Trades requiring a Letter of Commitment are Carpentry, Mechanical, Plumbing, and Concrete Amendment 0003, Issued

8/21/2026.

We are asking for a bid date extension. The only site visit that subs attended was held on 8-20-2026 and as you can see from this list not a single subcontractor ask any questions to us as there was not enough time form site visit date until question due date.

The Question Due Date is extended until End of Day on Wednesday, August 26. The proposal Due Date remains August 31.

Amendment 0003, Issued

8/21/2026.

File details come from the government source that posted it. Updated .