B08_Solit_PSP_Vol_II_Deliverables_LmtOnSubconRpt_REQD_0003.xlsx

XLSX spreadsheet 90 KB Posted

Attached to
ROMO 326235 Rehabilitate Kawuneeche Visitor Center
Solicitation number
140P2026R0057
Issued by

About this file

This file is a template for the Report on Limitations on Subcontracting, which is required for small business, 8(a), or other socio-economic set-aside service contracts (including construction) priced at or above $150,000. The template is designed to track prime contractor participation and subcontracting compliance throughout contract performance.

The template requires documentation of invoiced amounts categorized by prime contractor work, similarly situated subcontractors (SSS), and non-similarly situated subcontractors (NSS). Participation thresholds vary by service type: services (except construction) allow a maximum of 50% subcontracting to NSS; general construction allows 85% maximum; and construction by special trade contractors allow 75% maximum. The template calculates prime and SSS participation percentage and NSS subcontracting percentage to ensure compliance with FAR clause 52.219-3, 14, 27, 29, and 30. If NSS subcontracting exceeds the contractual threshold, the prime contractor must submit a written corrective action plan. The template provides fields to track cumulative invoiced amounts across all previous and current invoices, excluding material costs, with capacity to list multiple SSS and NSS vendors. This is a blank template document without specific contract values or performance data populated.

View the file

Other files

File Type Posted
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part3_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part2_0005.pdf PDF
B09_QR_Tracker_ROMO_326235_9_4_26_0005.pdf PDF
Sol_140P2026R0057_Amd_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part2_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part3_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part1_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Specifications_Bid_Revisions_Part1_0005.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_9_4_26_0005.pdf PDF
B09_ROMO_KVC_326235_Final_CD_Drawing_Set_Bid_Revisions_Part4_0005.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_26_0004.pdf PDF
Sol_140P2026R0057_Amd_0004.pdf PDF
BaselineScheduleReviewChecklist_Form_10-22-18_v508_0003.docx DOCX document
2nd_Site_Visit_Sign_in_Sheet_0003.pdf PDF
Sol_140P2026R0057_Amd_0003.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_21_0003.pdf PDF
B09_QR_Tracker_ROMO_326235_0003.pdf PDF
Sol_140P2026R0057_Amd_0002.pdf PDF
B09_P2026R0057_SF30_QA_and_Clauses_8_19_0002.pdf PDF
B09_Attachment_5_Solit_PSP_Vol_I_Exp_REQD_0002.docx DOCX document
Contact_Procedures_Reminder_0002.docx DOCX document
B09_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD_0002.docx DOCX document
B09_QR_Tracker_ROMO_326235_0002.pdf PDF
B11_PreProposal_Conf_Slides_ROMO_325250_0001.pptx PPTX presentation
B09_Amendment_1_ROMO_KVC_326235_ContractPriceSchedule_Rev_1_8-5-26_0001.xlsx XLSX spreadsheet
B09_P2026R0057_SF30_QA_and_Clauses_8_13_0001.pdf PDF
Sol_140P2026R0057_Amd_0001.pdf PDF
B09_QR_Tracker_ROMO_326235_0001.pdf PDF
ROMO_326235__-_Virtual_PreBid_Conference_Transcription_0001.docx DOCX document
Prebid_sign_in_sheet_0001.pdf PDF
B09_Amendment_1_What_Evaluators_Will_Ask_for_Each_Factor_0001.docx DOCX document
Virtual_sign_in_sheet_0001.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part4.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part1.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part1.pdf PDF
B08_Attachment_10_ROMO_KVC_326235_CD_ContractPriceSchedule_BLANK.xlsx XLSX spreadsheet
Sol_140P2026R0057.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_II_BidBond.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part2.pdf PDF
B02_Attatchment_2_26_0330_-_ROMO_KVC_326235_Final_CD_Drawing_Set_Part3.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part2.pdf PDF
B01_Attatchment_1_ROMO_KVC_326235_Final_CD_Specifications_update_Part3.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_SubKPlan.pdf PDF
B08_Attachment_5_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_3_Wage_Determination.pdf PDF
B08_Attachment_4_Construction_Contract_Administration.pdf PDF
B08_P2026R0057_SF1442_and_Clauses_7_30_26.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template for Contracts and Indi Report on Limitations on Subcontracting [Template Version 7/25/19]

This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000.

Contract Number:[Insert contract #]
Prime Contractor:[Insert prime contractor's company name]
Current Total Contract Price:[Insert the amount of the original contract + all excuted contract modifications]
Type of Set Aside:[Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.]
Period of PerformanceMM/DD/YYYY - MM/DD/YY
Type of Service (Required Participation):[Put an X in the applicable box below per clause 52.219-3, 14, 27,29,30]
1) Services (except construction). 50% maximum may be subcontracted to non-similary situated Subcontractors
2) General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors
3) Construction by special trade contractors. 75% maximum may be subcontracted to non-similary situated Subcontractors
Participartion Calculation as of the Current Invoice
Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.
1) Amount Invoiced by the Prime Contractor:$0
2) Portion of Amount Invoiced for All Similarly Situated Subcontractors (SSS)*$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0Add additional rows if more than 5 SSS
3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS)$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0Add additional rows if more than 5 NSS
4) Prime & SSS Participation %ERROR:#DIV/0!Modify formula if additional rows added above
5) % subcontracted to NSSERROR:#DIV/0!Modify formula if additional rows added above
* Similarly Situated Subcontractor (SSS): is a small business subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the prime contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)
** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS)/ Total amount invoiced by the Prime Contractor)
Corrective Action Plan
If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below:

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .