B-34 Mechanical.pdf

PDF 8 MB Posted

Attached to
Renovate Building #34 to Correct FCA Deficiencies
Solicitation number
36C24921R0010
Issued by

About this file

This solicitation is for renovation services to correct deficiencies at Building 34 of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The solicitation seeks general contracting and associated mechanical, electrical, and plumbing work. Services include ductwork replacement, unit heater and air handler installation, and piping replacement for the heating hot water system. The period of performance is 720 calendar days. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration. The total project value is estimated at $6.2 million. The response due date is July 24, 2020, with award anticipated by October 2020.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIPE TURN UP (UP)

PIPE TURN DOWN (DN)

MECHANICAL PIPING LEGEND

REFRIGERANT LIQUID

CONDENSATE DRAIN PIPINGCD

NAME OF PROJECT: VA MOUNTAIN HOME, BUILDING 34 RENOVATION

ADDRESS: 809 LAMONT STREET & VETERANS WAY

JOHNSON CITY, TN 37604

PROPOSED USE: OFFICE

GROSS BUILDING AREA: 55,717 SF

METHOD OF COMPLIANCE: PRESCRIPTIVE

ASHRAE CLIMATE ZONE: 4A

MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT.

EXTERIOR DESIGN CONDITIONS:

WINTER DRY BULB: 13.5°F

SUMMER DRY BULB: 90.2°F

RELATIVE HUMIDITY: MCWB 71.8°F

INTERIOR DESIGN CONDITIONS:

WINTER DRY BULB: 70°F

SUMMER DRY BULB: 75°F

RELATIVE HUMIDITY: 50% R.H.

BUILDING HEATING LOAD: 595 MBH

MECHANICAL SPACING CONDITIONING SYSTEM

DESCRIPTION OF UNIT: HEATING HOT WATER, SPLIT SYSTEM COOLING

HEATING EFFICIENCY: SEE SCHEDULES

COOLING EFFICIENCY: SEE SCHEDULES

HEAT OUTPUT OF SYSTEMS: SEE SCHEDULES

COOLING OUTPUT OF SYSTEMS: SEE SCHEDULES

MECHANICAL CODE SUMMARY

DESIGNATION DESCRIPTION

EXISTING EQUIPMENT/DUCTWORK TO REMAIN

EXISTING/DEMOLITION/NEW

LEGEND

EXISTING EQUIPMENT/DUCTWORK TO BE

DEMOLISHED OR RELOCATED

NEW

(EQUIPMENT, DUCTWORK, PIPING, ETC.)

BEGINNING OR END OF NEW WORK -OR- CONNECT TO

EXISTING

MECHANICAL GENERAL NOTES

COORDINATION DRAWINGS

DUCT SEALING REQUIREMENTS

DUCT PRESSURE CLASS REQUIREMENTS

PRESSURE CLASSDUCT SYSTEM

2.0" PRESSURE CLASSLOW PRESSURE SUPPLY

LOW PRESSURE RETURN

LOW PRESSURE EXHAUST

GENERAL ITEMS

A. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO BECOME

FAMILIARIZED WITH THE EXISTING CONDITIONS.

B. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH HVAC

DRAWING OF THIS SET. SEE EACH DRAWING FOR SPECIFIC NOTES

APPLICABLE TO THAT DRAWING.

C. OVERHEAD PIPING AND DUCTWORK IN SPACES WITHOUT HUNG CEILINGS

SHALL BE RUN AS CLOSE TO ROOF DECK AS PRACTICAL, AS CLOSE TO

PARALLEL JOISTS AS POSSIBLE AND ABOVE LIGHTING FIXTURES TO CONCEAL

PIPING.

D. OVERHEAD DUCTWORK AND PIPING IN SPACES WITH CEILINGS SHALL BE

CONCEALED UNLESS OTHERWISE NOTED.

E. COORDINATE LOCATION OF CEILING MOUNTED HVAC ACCESSORIES WITH

REFLECTED CEILING PLAN, LIGHTING FIXTURE LAYOUT AND ACCESSORIES

INSTALLED BY OTHER TRADES SO AS TO PRESENT A NEAT AND ATTRACTIVE

INSTALLATION THROUGHOUT THE ENTIRE BUILDING.

F. EQUIPMENT ON THE ROOF SHALL BE INSTALLED SO AT LEAST 10 FEET OF

CLEARANCE SHALL BE MAINTAINED BETWEEN EQUIPMENT AND THE ROOF

EDGE.

G. ARRANGE PIPING AND DUCTWORK, PARTICULARLY ABOVE CEILING AS

REQUIRED TO CLEAR STRUCTURE, DUCTS, CONDUITS, ETC. ALLOWING SPACE

FOR PIPE HANGERS, ACCESS TO VALVES, FILTERS, AND MAINTENANCE OF

EQUIPMENT.

H. EQUIPMENT WITH FILTERS SHALL BE INSTALLED SO THAT FILTERS CAN BE

EASILY REMOVED AND REPLACED.

I. CONTRACTOR SHALL VERIFY REFRIGERANT PIPE SIZES WITH EQUIPMENT

MANUFACTURER FOR THE INDICATED INSTALLATION.

J. COORDINATE LOCATION AND INSTALLATION OF EQUIPMENT WITH OTHER

TRADES.

K. DO NOT SCALE DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR EXACT

LOCATIONS OF DOORS, WINDOWS, ETC.

L. THERMOSTATS SHALL BE LOCATED IN THE ROOMS INDICATED. INSTALL AT 48"

ABOVE FINISH FLOOR.

M. PIPING, DUCTWORK, VENTS, ETC., EXTENDING THROUGH EXTERIOR WALLS

AND ROOF SHALL BE FLASHED AND COUNTER FLASHED IN A WEATHERPROOF

MANNER.

N. EXTEND DRAIN LINES AS INDICATED. ROUTING SHALL NOT INTERFERE WITH

PASSAGEWAYS AND MAINTENANCE. DRAINS FROM AIR CONDITIONING

CONDENSATE DRAIN PANS SHALL BE TRAPPED. SLOPE CONDENSATE DRAIN

PIPING AT 1/8" PER FOOT. VERIFY INVERT IS ESTABLISHED AFTER AIR

HANDLING UNIT IS INSTALLED BUT PRIOR TO DUCTWORK INSTALLATION.

O. PIPING AND DUCTWORK INSULATION SHALL RUN CONTINUOUSLY THROUGH

NON-RATED FLOORS, WALLS, ROOF AND PARTITIONS, UNLESS OTHERWISE

INDICATED.

P. FOR LOCATION OF MOTOR STARTERS, SEE ELECTRICAL DRAWINGS.

Q. PROVIDE REFRIGERANT SUCTION RISER TRAPS ON EVERY 10 FEET VERTICAL

RISE PER MANUFACTURER'S WRITTEN INSTRUCTIONS. SIZE REFRIGERANT

PIPING PER MANUFACTURER'S INSTRUCTIONS.

R. NO PIPING SHALL BE SMALLER THAN 3/4" UNLESS OTHERWISE NOTED.

S. PROVIDE UNION OR FLANGED CONNECTIONS AT EACH PIECE OF EQUIPMENT

AND ON BOTH SIDES OF CONTROL VALVES AND PRESSURE REGULATING

VALVES. PROVIDE SHUT-OFF VALVES ON BOTH SIDES OF AUTOMATIC

VALVES.

T. PIPING SHALL BE SUPPORTED IN ACCORDANCE WITH THE SPECIFICATIONS.

ADDITIONAL SUPPORTS OR HANGERS SHALL BE ADJACENT TO ELBOWS TO

PREVENT WEIGHT OF PIPING BEING PLACED ON EQUIPMENT.

SHEET METAL

A. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE

WITH THE LATEST EDITION OF SMACNA'S "HVAC DUCT CONSTRUCTION

STANDARDS - METAL AND FLEXIBLE."

B. PROVIDE BEARING PLATES AND OTHER NECESSARY REINFORCEMENTS AT

DUCTWORK SUPPORTS TO ENSURE THAT DUCT INSULATION MAINTAINS

REQUIRED "R" VALUES.

C. PROVIDE INTERNAL SOUND ABSORPTIVE DUCT LINING FOR EXTENT NOTED.

DUCT DIMENSIONS ARE CLEAR INSIDE DUCT LINING DIMENSIONS.

D. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR REQUIRED

FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE FOLLOWING:

1. DAMPER MOTORS AND/OR MOTOR OPERATED DAMPERS

2. FILTERS

3. FIRE DAMPERS AND SMOKE DAMPERS

4. SMOKE DETECTORS

E. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF STRAIGHT

DUCTWORK OFF THE SUPPLY AIR FAN DISCHARGE BEFORE ANY TAKEOFFS

OR ELBOWS.

F. PROVIDE EXTENDED VOLUME DAMPER CONTROL RODS SO THAT HANDLES

ARE WELL CLEAR OF DUCT INSULATION.

A. A MEETING SHALL BE ARRANGED BY THE GENERAL CONTRACTOR AND TAKE PLACE PRIOR TO

THE G.C. STARTING THE COORDINATION DRAWINGS. THIS MEETING SHALL INCLUDE AT A

MINIMUM THE G.C., ARCHITECT, OWNER'S REPRESENTATIVE, AND ENGINEERS SUCH THAT WE

CAN CONFIRM THE REQUIREMENTS OF THE COORDINATION DRAWINGS PRIOR TO THEM BEING

SUBMITTED.

B. M.C. SHALL COORDINATE WITH THE G.C. AND OTHER TRADES SO THAT THE FOLLOWING LISTS

OF ITEMS CAN BE INDICATED ON A COMMON SET OF PLANS. FLOOR PLANS AND SECTIONS ARE

TO BE DRAWN TO SCALE IN ALL CONGESTED AREAS (SUCH AS CORRIDORS, CHASES, AND

EQUIPMENT ROOMS) AND SPECIFIC AREAS NOTED IN THESE DOCUMENTS. THESE SHALL BE

SUBMITTED COLLECTIVELY FROM ALL DISCIPLINES INTO ONE OVERALL DOCUMENT FOR REVIEW

BY THE ENGINEER ON AN AS NEEDED BASIS OR WHERE SPECIFICALLY DIRECTED WITHIN THE

CONTRACT DOCUMENTS. THESE COORDINATION DRAWINGS SHALL BE SUBMITTED FOR REVIEW

PRIOR TO ANY OTHER INDIVIDUAL PRODUCT DATA OR FABRICATION DRAWINGS. SHOW THE

FOLLOWING AT A MINIMUM:

1. CEILING

2. FLOOR

3. ROOF OR FLOOR DECKING ABOVE

4. STRUCTURAL ELEMENTS

5. LIGHT FIXTURES

6. LARGE ELECTRICAL OR TELECOM CONDUITS AND/OR PULL BOXES

7. HVAC DUCTWORK

8. HVAC EQUIPMENT ABOVE CEILING, INDICATING SERVICE CLEARANCES

9. HVAC PIPING

10. PLUMBING PIPING

11. SPRINKLER PIPING

12. MOUNTING RACKS AND SUPPORT ASSEMBLIES FOR ASSOCIATED PIPING/DUCTWORK

C. IT IS IMPORTANT TO NOTE THAT DUCTWORK/PIPING/CABLE TRAY, ETC. CANNOT BE FABRICATED, UNTIL THE COORDINATION DRAWINGS HAVE BEEN COMPILED, SUBMITTED, AND APPROVED. ANY

MATERIAL PROCUREMENT OR INSTALLATION WORK COMMENCED PRIOR TO APPROVAL IS TAKEN

AT THE RISK OF THE CONTRACTOR AND MAY HAVE TO BE MODIFIED/MOVED AT THEIR COST.

A. ALL DUCTWORK SHALL BE SEALED IN ACCORDANCE WITH SEAL CLASS "A"

B. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, WALL PENETRATIONS,

AND DUCT CONNECTIONS. PRESSURE SENSITIVE TAPE SHALL NOT BE USED

AS THE PRIMARY SEALANT, UNLESS IT HAS BEEN CERTIFIED TO COMPLY WITH

UL-181A OR UL181B BY AN INDEPENDENT TESTING LABORATORY AND THE

TAPE IS USED IN ACCORDANCE WITH THAT CERTIFICATION.

C. LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE DIRECTION OF AIRFLOW.

TRANSVERSE JOINTS ARE CONNECTIONS OF TWO DUCT SECTIONS ORIENTED

PERPENDICULAR TO AIRFLOW. DUCT WALL PENETRATIONS ARE OPENINGS

MADE BY ANY SCREW FASTENER, PIPE, ROD, OR WIRE. SPIRAL LOCK SEAMS IN

ROUND DUCTS NEED NOT BE SEALED. ALL OTHER CONNECTIONS ARE

CONSIDERED TRANSVERSE JOINTS, INCLUDING BUT NOT LIMITED TO SPIN-INS,

TAPS AND OTHER BRANCH CONNECTIONS, ACCESS DOORS FRAMES AND

JAMBS, DUCT CONNECTIONS TO EQUIPMENT, ETC.

EQUIPMENT SUBSTITUTIONS

DESIGNATION DESCRIPTION

TEST AND BALANCE NOTE

MC IS RESPONSIBLE FOR TEST AND BALANCE OF ALL

SYSTEMS (INCLUDING EXISTING TO REMAIN EQUIPMENT)

TO ACHIEVE AIR AND WATER FLOWS INDICATED ON THESE

CONSTRUCTION DOCUMENTS.

BIDS CONCERNING THE USE OF SUBSTITUTE PRODUCTS MUST BE ACCOMPANIED BY COMPLETE

SPECIFICATIONS AND PERFORMANCE CHARACTERISTICS COVERING THESE PRODUCTS ALONG

WITH AVAILABLE TEST DATA AND EXPERIENCE RECORDS THAT MAY BE HELPFUL TO THE

ENGINEER IN EVALUATING THE QUALITY AND/OR SUITABILITY OF THE PROPOSED PRODUCTS,

INCLUDING:

A. COMPARISON OF THE QUALITIES OF THE PROPOSED SUBSTITUTION WITH THAT SPECIFIED.

B. CHANGES REQUIRED IN OTHER ELEMENTS OF THE WORK BECAUSE OF THE SUBSTITUTION.

C. EFFECT ON THE CONSTRUCTION SCHEDULE.

D. COST DATA COMPARING THE PROPOSED SUBSTITUTION WITH THE PRODUCT SPECIFIED.

E. AVAILABILITY OF MAINTENANCE SERVICE, AND SOURCE OF REPLACEMENT MATERIALS.

F. A REQUEST FOR A SUBSTITUTION CONSTITUTES A REPRESENTATION THAT THE CONTRACTOR:

1. HAS INVESTIGATED THE PROPOSED PRODUCT AND DETERMINED THAT IT IS EQUAL TO OR

SUPERIOR IN ALL RESPECTS TO THAT SPECIFIED.

2. WILL PROVIDE THE SAME WARRANTIES OR BONDS FOR THE SUBSTITUTION AS FOR THE

PRODUCT SPECIFIED.

3. WILL COORDINATE THE INSTALLATION OF AN ACCEPTED SUBSTITUTION INTO THE WORK,

AND TO MAKE THE WORK COMPLETE IN ALL RESPECTS.

4. WAIVES ALL CLAIMS FOR ADDITIONAL COSTS, UNDER HIS RESPONSIBILITY, WHICH MAY

SUBSEQUENTLY BECOME APPARENT.

5. ABSORB ALL COSTS INCURRED BY THE SUBSTITUTION WHEN AFFECTING OTHER TRADES,

INCLUDING BUT NOT LIMITED TO ELECTRICAL, STRUCTURAL AND ARCHITECTURAL, ETC.

6. ABSORB ANY COST INCURRED BY THE ARCHITECT/ENGINEER IN REVIEW OF THE

SUBSTITUTED PRODUCT IF THE ACCEPTANCE OF THE SUBSTITUTED ITEM CREATES THE

NEED FOR SYSTEM MODIFICATION AND/OR REDESIGN, OR IF THE SUBSTITUTING

CONTRACTOR EXHIBITS NEGLIGENCE IN HIS SUBSTITUTING PROCEDURE THUS

SUBMITTING INFERIOR, MISAPPLIED OR MISSIZED EQUIPMENT. IN THE EVENT OF

ADDITIONAL ENGINEERING COSTS, THE BILLING STRUCTURE SHALL BE AGREED UPON

PRIOR TO REVIEW BY ALL INVOLVED PARTIES.

G. WHERE MORE THAN ONE MAKE OR NAME IS MENTIONED AS BEING ACCEPTABLE, IT SHALL BE

UNDERSTOOD THAT ONLY THE NAME OR MAKE REFERRING TO THE MANUFACTURER'S MODEL

NUMBERS OR SIZES SHALL BE CONSIDERED THE "SPECIFIED STANDARD". IT SHALL BE

FURTHER UNDERSTOOD THAT OTHER MAKES AND NAMES, EVEN THOUGH MENTIONED, HAVE

NOT BEEN CHECKED FOR DETAIL AND THAT THEIR SIZE AND ARRANGEMENT ARE THE

CONTRACTOR'S RESPONSIBILITY THE SAME AS A PROPOSED SUBSTITUTE ITEM.

H. THE INTENT OF THIS SECTION IS TO MAKE THE SPECIFICATIONS OPEN TO ALL AVAILABLE

MAKES OF MATERIAL AND APPARATUS DURING THE BIDDING PERIOD. SUBSTITUTIONS WILL

ONLY BE ALLOWED TO BE SUBMITTED FOR PRE-APPROVAL TO THE ENGINEER UP TO TEN

DAYS PRIOR TO BID OPENING. THE SUBSTITUTIONS WILL BE REVIEWED AT THAT TIME BY THE

ENGINEER WITH REASONABLE PROMPTNESS. SUBSTITUTION MATERIALS AND EQUIPMENT

WILL ONLY BE INCORPORATED INTO THE PROJECT IF THE ENGINEER PRE-APPROVES THE

INTENT OF THE SHOP DRAWING(S) AND LISTS THE MANUFACTURER'S MAKE AND MODEL ON

AN OFFICIAL WRITTEN AND DISTRIBUTED ADDENDUM. NO SUBSTITUTIONS WILL BE REVIEWED

BY THE ENGINEER DURING CONSTRUCTION.

RL

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

2-POSITION MOTORIZED

BUTTERFLY VALVE

BUTTERFLY VALVE

UNION

DIRECTION OF FLOW

FULL PORT BALL VALVE

CHECK VALVE

Y-STRAINER

2.0" PRESSURE CLASS

2.0" PRESSURE CLASS

VARIABLE FREQUENCY DRIVE

(VFD) NOTE

ALL VARIABLE FREQUENCY DRIVES (VFD'S) SHALL COMPLY

WITH IEEE 519-2993. SUPPLIER TO PROVIDE DISTORTION

ANALYSIS. ALL VFD'S MUST BE FROM SAME MANUFACTURER.

LOW PRESSURE OUTDOOR AIR 2.0" PRESSURE CLASS

RELATIVE HUMIDITYRH

RETURN AIRRA

PRESSURE DROPPD

OUTDOOR AIROA

MINIMUM CIRCUIT AMPACITYMCA

MECHANICAL CONTRACTORM.C.

1000 BTU PER HOURMBH

MAXIMUMMAX

LEAVING AIR TEMPERATURELAT

DEGREES FAHRENHEIT°F

ENERGY EFFICIENCY RATIOEER

DIGITAL OUTPUTDO

CUBIC FEET PER MINUTECFM

BUILDING AUTOMATION SYSTEMBAS

AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASHRAE

ANALOG OUTPUTAO

SUPPLY AIR

NOISE CRITERIA

MAXIMUM OVER CURRENT PROTECTION

INCHES WATER GAUGE (PRESSURE)

FINS PER INCH

FULL LOAD AMPS

SA

NC

MOCP

EXTERNAL STATIC PRESSURE

ALARM

AIR HANDLING UNIT

ABOVE FINISHED FLOOR

ACCESS DOOR

IN. WG.

FPI

FLA

ESP

AL

AHU

AFF

AD

AMERICAN SOCIETY OF HEATING,

REFRIGERATING, AND AIR CONDITIONING

ENGINEERS

ASME

MECHANICAL ABBREVIATIONS

DESCRIPTIONDESIGNATION

ENTERING AIR TEMPERATUREEAT

SENSIBLESENS

EXHAUST FANEF

WET BULB TEMPERATUREWB

DRY BULB TEMPERATUREDB

ELECTRICAL CONTRACTORE.C.

UNIT HEATERUH

CONTROLS CONTRACTORC.C.

DIFFERENTIAL PRESSUREDP

VARIABLE FREQUENCY DRIVEVFD

EXPANSION TANKET

UNLESS NOTED OTHERWISEUNO

HORSEPOWERHP

SUPPLY AIR DUCT WITH TURNING VANES TURNING

UP/DOWN

DESIGNATION DESCRIPTION

RETURN AIR DUCT WITH TURNING VANES TURNING

UP/DOWN

MITERED 90 ELBOW WITH TURNING VANES

EXHAUST AIR DUCT WITH TURNING VANES TURNING

UP/DOWN

MECHANICAL SYMBOL LEGEND

DD

MANUAL VOLUME DAMPER WITH EXTENDED CONTROL ROD

CEILING MOUNTED SUPPLY DIFFUSER

CEILING MOUNTED RETURN GRILLE

CEILING MOUNTED EXHAUST GRILLE

DUCT SMOKE DETECTOR ASSEMBLY (INCLUDING SAMPLING

TUBE AND SHUTDOWN RELAY) PROVIDED AND WIRED BY E.C.,

INSTALLED BY M.C. INSTALLATION PER SECTION 907.3.1 OF

THE 2018 INTERNATIONAL FIRE CODE

DUCTLESS CONDENSING UNITDCU

DUCTLESS SPLIT SYSTEMDSS

DEDICATED OUTDOOR AIR UNITDOAU

SUSPENDED PIPE ON TRAPEZE NOT REQUIRED 13.1.4.5

DUCTWORK NOT REQUIRED

NOT REQUIRED

13.1.4.5NOT REQUIRED

NOT REQUIRED 13.1.4.5

13.1.4.5

13.1.4.5

13.1.4.5NOT REQUIRED

NOT REQUIRED

NOT REQUIREDCOMPONENT SUPPORTS

WALL MOUNTED

FLOOR MOUNTED

COMPONENT IDENTIFICATION

COMPONENT IMPORTANCE FACTOR (Ip)

SEISMIC DESIGN CATEGORY: C

RISK CATEGORY: II

SEISMIC AND WIND REQUIREMENTS

FOR MECHANICAL SYSTEMS

COMPONENT CERTIFICATION

SUSPENDED NON DUCTILE PIPING

(CAST IRON, PLASTIC, CERAMIC)

SUSPENDED DUCTILE PIPING

(STEEL, AL, CU, ETC.)

13.1.4.5

13.2.2

INFORMATION FOR IBC-2018 / ASCE 7-16

A. PER 2018 INTERNATIONAL BUILDING CODE, MECHANICAL EQUIPMENT AND

COMPONENTS, INCLUDING THEIR SUPPORTS AND ATTACHMENTS, SHALL BE

DESIGNED FOR SEISMIC FORCES IN ACCORDANCE WITH CHAPTER 13 OF

ASCE 7-16.

B. USE TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR

EACH COMPONENT.

C. FOR ALL COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENT

SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED BY A REGISTERED

DESIGN PROFESSIONAL.

SEISMIC RESTRAINT

REQUIREMENT

ASCE 7-16

REFERENCE

1.0

MEDIUM PRESSURE CONDENSATEMPR

MEDIUM PRESSURE STEAMMPS

REFRIGERANT SUCTIONRS

EXISTING PIPING TO BE DEMOLISHED

PIPING MATERIAL SCHEDULE

MATERIALAPPLICATION

POLYPROPYLENE (SDR 9)HEATING HOT WATER (MAIN PIPING)

HEATING HOT WATER

(EQUIPMENT RUNOUTS)

MAKEUP WATER

CROSS-LINKED POLYETHYLENE (PEX-A)

POLYPROPYLENE (SDR 7.4)

NOTES:

1. ALL POLYPROPYLENE AND PEX-A PIPING USED FOR HEATING HOT WATER

PIPING SHALL MEET THE FOLLOWING MINIMUM REQUIREMENTS:

A. MAXIMUM OPERATING TEMPERATURE: 200°F

B. MAXIMUM OPERATING PRESSURE: 125 PSI AT 180°F

2. ALL POLYPROPYLENE AND PEX-A FITTINGS SHALL BE SUPPLIED BY THE SAME

MANUFACTURER AS THE PIPING AND SHALL BE INSTALLED TO MATCH THE

APPLICATION LISTED ABOVE.

3. THE CONTRACTOR SHALL PROVIDE THE VA WITH A NEW POLYPROPYLENE

PIPE JOINING TOOL AT THE COMPLETION OF THE PROJECT. THE

POLYPROPYLENE PIPING TOOL SHALL BE PROVIDED WITH ALL

APPURTENANCES REQUIRED TO WORK ON THE RANGE OF PIPE SIZES USED

ON THIS PROJECT.

4. THE CONTRACTOR SHALL PROVIDE THE VA WITH A NEW PEX-A PIPE JOINING

TOOL AT THE COMPLETION OF THE PROJECT. THE PEX-A PIPING TOOL SHALL

BE PROVIDED WITH ALL APPURTENANCES REQUIRED TO WORK ON THE

RANGE OF PIPE SIZES USED ON THIS PROJECT.

5. REFER TO SPECIFICATION 23 22 13 FOR INFORMATION REGARDING

ACCEPTABLE PIPING MATERIALS FOR STEAM AND CONDENSATE PIPING.

HVAC CONDENSATE DRAIN PVC (SCHEDULE 40)

CROSS-LINKED POLYETHYLENE (TYPE A)PEX-A

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

/2

/2

:1

:1

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-M-001

MECHANICAL - GENERAL NOTES AND

LEGENDS

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 91 149

Revisions: Date:

07/24/2020

5 5

9 9

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:0

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD101

MECHANICAL - LOWER LEVEL - AREA

A DUCTWORK PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 92 149

KEYNOTES:

1 DEMOLISH EXISTING SPLIT SYSTEM AIR HANDLING UNIT AND ALL CORRESPONDING SUPPLY AND RETURN DUCTWORK AS

SHOWN. DEMOLISH EXISTING POWER CONNECTION TO THE AIR HANDLER UNIT. REFER TO SHEET MD201 FOR MORE

INFORMATION REGARDING AHU PIPING DEMOLITION.

2 DEMOLISH EXISTING GROUND-MOUNTED SPLIT SYSTEM CONDENSING UNIT AND ASSOCIATED CONCRETE HOUSEKEEPING PAD. REFER TO SHEET MD201 FOR MORE INFORMATION REGARDING CONDENSING UNIT PIPING

DEMOLITION.

3 DEMOLISH EXISTING RETURN AIR GRILLE AND ASSOCIATED RETURN DUCTWORK.

4 DEMOLISH EXISTING SIDEWALL RETURN GRILLE AND RETURN DUCTWORK BACK TO THE AIR HANDLER AS SHOWN.

5 DEMOLISH EXISTING BATHROOM EXHAUST GRILLE AND ASSOCIATED DUCTWORK AND EXHAUST FAN.

6 DEMOLISH EXISTING OUTDOOR AIR INTAKE LOUVER AND DUCTWORK. EXISTING SIDEWALL LOUVER OPENING TO REMAIN AND M.C. TO COORDINATE WITH G.C. FOR INSTALLATION OF BLANK OFF PANEL IN EXISTING OUTDOOR AIR INTAKE

LOUVER OPENING.

7 DEMOLISH EXISTING GROUND-MOUNTED EXHAUST FAN, EQUIPMENT CURB, AND ASSOCIATED DUCTWORK.

8 DEMOLISH EXISTING GROUND-MOUNTED PENTHOUSE GRAVITY INTAKE VENTILATOR AND ASSOCIATED DUCTWORK.

9 DEMOLISH EXISTING DARK ROOM EXHAUST GRILLES AND CONNECTED EXHAUST FAN AND DUCTWORK.

1/8" = 1'-0"1

MECHANICAL - LOWER LEVEL - AREA A DUCTWORK PLAN - DEMOLITION

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER AND CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF ALL ASSOCIATED CONSTRUCTION

DEBRIS.

3. ALL DUCTWORK SHOWN AND EQUIPMENT SHOWN WITH DASHED LINES SHALL BE DEMOLISHED.

4. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED POWER AND CONTROL WIRING AND

ALL OTHER APPURTENANCES REQUIRED FOR COMPLETE SYSTEM DEMOLITION.

1 2

6 6

9 9

1 2

2 2

4 4

4 4

4 4 4

4 4

4 4 4

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:1

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD111

MECHANICAL - FIRST FLOOR - AREA A

DUCTWORK PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 93 149

KEYNOTES:

1 DEMOLISH EXISTING CIRCULAR CONCENTRIC SUPPLY DIFFUSER. M.C. TO COORDINATE WITH G.C. FOR INFILL OF EXISTING CEILING PENETRATION. REFER

TO SHEET MD121 FOR MORE INFORMATION.

2 DEMOLISH EXISTING CIRCULAR CONCENTRIC SUPPLY DIFFUSER. EXISTING PENETRATION TO REMAIN AND BE REUSED FOR NEW DUCTWORK PENETRATION.

REFER TO SHEETS MH111 AND MH121 FOR MORE INFORMATION.

3 EXISTING PLENUM RETURN GRILLE TO REMAIN.

4 DEMOLISH EXISTING 12x12 SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK DROP. EXISTING DUCT PENETRATION THROUGH CEILING/ATTIC FLOOR TO

REMAIN.

5 DEMOLISH EXISTING SUPPLY AIR DUCTWORK DROP FROM ATTIC TO FIRST FLOOR AS SHOWN.

6 DEMOLISH EXISTING SUPPLY AIR DUCTWORK DROP FROM ATTIC AND SIDEWALL SUPPLY GRILLE AS SHOWN.

7 DEMOLISH EXISTING RETURN AIR DUCTWORK DROP FROM ATTIC AND PLENUM RETURN GRILLE AS SHOWN.

8 DEMOLISH EXISTING SIDEWALL TRANSFER GRILLE.

9 DEMOLISH EXISTING STEAM RADIATOR.

10 DEMOLISH EXISTING WINDOW AIR CONDITIONER.

11 DEMOLISH EXISTING INLINE EXHAUST FAN AND ALL CONNECTED EXHAUST AIR DUCTWORK AND GRILLES. DEMOLISH EXISTING SIDEWALL EXHAUST LOUVER

ABOVE DOORWAY. M.C. TO COORDINATE WITH G.C. FOR INFILL OF EXISTING LOUVER.

12 DEMOLISH EXISTING SUPPLY AIR DUCTWORK AND SUPPLY DIFFUSERS FROM EXISTING LABORATORY MAKEUP AIR UNIT AS SHOWN. REFER TO SHEETS

MD112 AND MD121 FOR MORE INFORMATION.

13 DEMOLISH EXISTING RETURN AIR DUCTWORK AND RETURN GRILLES FROM HORIZONTAL AIR HANDLING UNIT LOCATED IN THE WORKSHOP AREA. REFER TO

SHEET MD112 FOR MORE INFORMATION.

14 DEMOLISH EXISTING SIDEWALL EXHAUST FAN IN WINDOW OPENING. M.C. TO COORDINATE WITH G.C. FOR INFILL/REPLACEMENT OF EXISTING WINDOW.

15 DEMOLISH EXISTING MAKEUP AIR DUCTWORK AND SIDEWALL DUCT OPENING IN WINDOW OPENING. M.C. TO COORDINATE WITH G.C. FOR

INFILL/REPLACEMENT OF EXISTING WINDOW.

16 DEMOLISH EXISTING ABANDONED OVERHEAD DUCTWORK.

17 DEMOLISH EXISTING AIR CURTAIN WITH INTEGRAL ELECTRIC RESISTANCE HEATING COIL.

1/8" = 1'-0"1

MECHANICAL - FIRST FLOOR - AREA A DUCTWORK PLAN - DEMOLITION

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER

AND CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF

ALL ASSOCIATED CONSTRUCTION DEBRIS.

3. ALL DUCTWORK SHOWN AND EQUIPMENT SHOWN WITH DASHED LINES SHALL BE

DEMOLISHED.

4. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED

POWER AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR

COMPLETE SYSTEM DEMOLITION.

FD

3 3

4 4

5 5

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

B

KEYPLAN

TRUE NORTH

/2

/2

:1

:2

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD112

MECHANICAL - FIRST FLOOR - AREA B

DUCTWORK PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 94 149

KEYNOTES:

1 DEMOLISH EXISTING HORIZONTAL AIR HANDLING UNIT AND ALL ASSOCIATED DUCTWORK AND CONTROLS LOCATED ABOVE THE

WORKSHOP AREA. DEMOLISH ALL CONNECTED SUPPLY DIFFUSERS AND RETURN GRILLES AS SHOWN.

2 DEMOLISH EXISTING SUPPLY AIR DUCTWORK DROP FROM LABORATORY MAKEUP AIR UNIT. DEMOLISH ALL CONNECTED SUPPLY AIR DUCTWORK AND SUPPLY DIFFUSERS AS SHOWN. REFER TO SHEET MD121 FOR MORE INFORMATION.

3 DEMOLISH EXISTING DECOMMISSIONED LABORATORY FUME HOOD AND CONNECTED EXHAUST DUCTWORK.

4 DEMOLISH EXISTING SUPPLY AND RETURN AIR DUCTWORK DROPS FROM VERTICAL AIR HANDLING UNIT LOCATED ON THE SECOND FLOOR. DEMOLISH ALL ASSOCIATED DUCTWORK, DIFFUSERS, AND GRILLES AS SHOWN. REFER TO SHEET MD121 FOR

MORE INFORMATION.

5 DEMOLISH EXISTING SUSPENDED STEAM UNIT HEATER AND CONTROLS. REFER TO SHEET MD212 FOR MORE INFORMATION

REGARDING PIPING DEMOLITION.

6 DEMOLISH EXISTING RELIEF AIR DUCTWORK AND ROOFTOP TURBINE VENTILATOR IN WORKSHOP AREA AS SHOWN. M.C. TO

COORDINATE WITH G.C. FOR INFILL OF EXISTING ROOF PENETRATION.

7 DEMOLISH SIDEWALL EXHAUST FAN IN WINDOW OPENING. M.C. TO COORDINATE WITH G.C. FOR INFILL/REPLACEMENT OF

EXISTING WINDOW.

8 DEMOLISH EXISTING WINDOW AIR CONDITIONER.

9 DEMOLISH EXISTING AIR CURTAIN WITH INTEGRAL ELECTRIC RESISTANCE HEATING COIL.

10 DEMOLISH EXISTING SUSPENDED STEAM RADIATOR AND ASSOCIATED PIPING.

1/8" = 1'-0"1

MECHANICAL - FIRST FLOOR - AREA B DUCTWORK PLAN - DEMOLITION

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER AND CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF ALL ASSOCIATED CONSTRUCTION

DEBRIS.

3. ALL DUCTWORK SHOWN AND EQUIPMENT SHOWN WITH DASHED LINES SHALL BE DEMOLISHED.

4. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED POWER AND CONTROL WIRING AND

ALL OTHER APPURTENANCES REQUIRED FOR COMPLETE SYSTEM DEMOLITION.

6 7

8 8

9 9

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

B

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:3

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD121

MECHANICAL - ATTIC/SECOND FLOOR

DUCTWORK PLANS - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 95 149

KEYNOTES:

1 DEMOLISH EXISTING LABORATORY MAKEUP AIR UNIT AND CONNECTED SUPPLY AIR DUCTWORK

DOWN TO FIRST FLOOR. DEMOLISH EXISTING POWER AND CONTROL WIRING CONNECTED TO

MAKEUP AIR UNIT.

2 DEMOLISH EXISTING GAS-FIRED VERTICAL AIR HANDLING UNIT AND CONNECTED SUPPLY AND

RETURN AIR DUCTWORK DOWN TO FIRST FLOOR. DEMOLISH EXISTING POWER AND CONTROL

WIRING TO AHU.

3 DEMOLISH EXISTING DECOMMISSIONED LABORATORY FUME HOOD EXHAUST FAN, DUCTWORK,

AND ROOF TERMINATION. M.C. TO COORDINATE WITH G.C. FOR INFILL OF EXISTING ROOF

PENETRATION.

4 DEMOLISH EXISTING STEAM RADIATOR. REFER TO SHEET MD221 FOR INFORMATION REGARDING

PIPING DEMOLITION.

5 DEMOLISH EXISTING OUTDOOR AIR INTAKE LOUVER FOR MAKEUP AIR UNIT.

6 DEMOLISH EXISTING AIR HANDLING UNIT, AHU-3. DEMOLISH ALL CONNECTED SUPPLY AND

RETURN AIR DUCTWORK AS SHOWN. DEMOLISH ALL ASSOCIATED POWER AND CONTROL WIRING.

7 DEMOLISH EXISTING AIR HANDLING UNIT, AHU-4. DEMOLISH ALL CONNECTED SUPPLY AND

RETURN AIR DUCTWORK AS SHOWN. DEMOLISH ALL ASSOCIATED POWER AND CONTROL WIRING.

8 DEMOLISH EXISTING OUTDOOR AIR DUCTWORK AND ASSOCIATED GRAVITY PENTHOUSE

VENTILATOR.

9 DEMOLISH EXISTING RELIEF AIR DUCTWORK AND ASSOCIATED GRAVITY PENTHOUSE VENTILATOR.

1/8" = 1'-0"1

MECHANICAL - ATTIC DUCTWORK PLAN - DEMOLITION

1/8" = 1'-0"2

MECHANICAL - SECOND FLOOR DUCTWORK PLAN - DEMOLITION

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER

AND CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF

ALL ASSOCIATED CONSTRUCTION DEBRIS.

3. ALL DUCTWORK SHOWN AND EQUIPMENT SHOWN WITH DASHED LINES SHALL BE

DEMOLISHED.

4. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED

POWER AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR

COMPLETE SYSTEM DEMOLITION.

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:3

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD201

MECHANICAL - LOWER LEVEL - AREA

A PIPING PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 96 149

KEYNOTES:

1 DEMOLISH EXISTING AIR HANDLING UNIT AND CONNECTED STEAM AND STEAM CONDENSATE

PIPING. DEMOLISH EXISTING STEAM CONDENSATE RECEIVER NEXT TO AHU IN MECHANICAL

ROOM.

2 DEMOLISH EXISTING GROUND-MOUNTED SPLIT SYSTEM CONDENSING UNIT AND

REFRIGERANT PIPING. DEMOLISH EXISTING POWER AND CONTROL WIRING.

3 DEMOLISH EXISTING STEAM AND STEAM CONDENSATE PIPING AS SHOWN. DEMOLISH ALL

CONNECTED STEAM UNIT HEATERS AND TERMINAL EQUIPMENT.

4 DEMOLISH EXISTING GROUND-MOUNTED EXHAUST FAN. REFER TO SHEET MD101 FOR

INFORMATION REGARDING DUCTWORK DEMOLITION.

5 DEMOLISH EXISTING GROUND-MOUNTED PENTHOUSE GRAVITY INTAKE VENTILATOR. REFER

TO SHEET MD101 FOR INFORMATION REGARDING DUCTWORK DEMOLITION.

1/8" = 1'-0"1

MECHANICAL - LOWER LEVEL DEMOLITION PIPING PLAN - AREA A

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER

AND CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF

ALL ASSOCIATED CONSTRUCTION DEBRIS.

3. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED

POWER AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR

COMPLETE SYSTEM DEMOLITION.

34-MP401

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

B

KEYPLAN

TRUE NORTH

/2

/2

:1

:3

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD202

MECHANICAL - LOWER LEVEL - AREA

B PIPING PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 97 149

KEYNOTES:

1 REFER TO SHEET MP401 FOR ENLARGED DEMOLITION PLAN IN MECHANICAL ROOM.

2 DEMOLISH EXISTING GROUND-MOUNTED SPLIT SYSTEM CONDENSING UNIT. DEMOLISH ALL REFRIGERANT

PIPING FROM CONDENSING UNIT UP TO SECOND FLOOR AIR HANDLING UNIT.

3 DEMOLISH ALL EXISTING STEAM AND STEAM CONDENSATE PIPING. DEMOLISH ALL CONNECTED STEAM

UNIT HEATERS AND TERMINAL EQUIPMENT.

1/8" = 1'-0"1

MECHANICAL - LOWER LEVEL DEMOLITION PIPING PLAN - AREA B

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER AND CONTROL

WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF ALL ASSOCIATED

CONSTRUCTION DEBRIS.

3. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED POWER AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR COMPLETE SYSTEM DEMOLITION.

4 4

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:4

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD211

MECHANICAL - FIRST FLOOR - AREA A

PIPING PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 98 149

KEYNOTES:

1 DEMOLISH EXISTING STEAM AND STEAM CONDENSATE PIPING IN PIPE CHASE UP TO ATTIC.

2 DEMOLISH EXISTING AIR CURTAIN WITH INTEGRAL ELECTRIC RESISTANCE HEATING COIL.

DEMOLISH EXISTING AIR CURTAIN POWER CIRCUIT.

3 DEMOLISH EXISTING WINDOW AIR CONDITIONER.

4 DEMOLISH EXISTING STEAM RADIATOR AND CONNECTED STEAM PIPING.

1/8" = 1'-0"1

MECHANICAL - FIRST FLOOR DEMOLITION PIPING PLAN - AREA A

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER

AND CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF

ALL ASSOCIATED CONSTRUCTION DEBRIS.

3. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED

POWER AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR

COMPLETE SYSTEM DEMOLITION.

1 1

5 5

6 6

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

B

KEYPLAN

TRUE NORTH

/2

/2

:1

:5

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD212

MECHANICAL - FIRST FLOOR - AREA B

PIPING PLAN - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 99 149

KEYNOTES:

1 DEMOLISH EXISTING SUSPENDED STEAM UNIT HEATER AND CONNECTED STEAM PIPING. DEMOLISH UNIT

HEATER POWER AND CONTROL WIRING.

2 DEMOLISH EXISTING WINDOW AIR CONDITIONER.

3 DEMOLISH EXISTING SIDEWALL EXHAUST FAN IN WINDOW OPENING. M.C. TO COORDINATE WITH G.C. FOR

INFILL/REPLACEMENT OF EXISTING WINDOW.

4 DEMOLISH EXISTING AIR CURTAIN WITH INTEGRAL ELECTRIC RESISTANCE HEATING COIL.

5 DEMOLISH EXISTING DECOMMISSIONED LABORATORY FUME HOOD. REFER TO SHEET MD112 FOR

INFORMATION REGARDING EXHAUST DUCTWORK DEMOLITION.

6 DEMOLISH EXISTING STEAM AND STEAM CONDENSATE PIPING FROM FIRST FLOOR UP TO SECOND FLOOR.

7 DEMOLISH EXISTING SUSPENDED RADIATOR AND ASSOCIATED STEAM AND CONDENSATE PIPING.

1/8" = 1'-0"1

MECHANICAL - FIRST FLOOR DEMOLITION PIPING PLAN - AREA B

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER AND CONTROL

WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF ALL ASSOCIATED

CONSTRUCTION DEBRIS.

3. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED POWER AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR COMPLETE SYSTEM DEMOLITION.

4 4

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:0

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MD221

MECHANICAL - ATTIC/SECOND FLOOR

PIPING PLANS - DEMOLITION

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 100 149

KEYNOTES:

1 DEMOLISH EXISTING LABORATORY MAKEUP AIR UNIT AND CONNECTED REFRIGERANT AND

STEAM PIPING.

2 DEMOLISH EXISTING VERTICAL AIR HANDLING UNIT AND REFRIGERANT PIPING.

3 DEMOLISH EXISTING STEAM RADIATOR AND CONNECTED STEAM PIPING.

4 DEMOLISH EXISTING AIR HANDLING UNIT AND CONNECTED STEAM PIPING AS SHOWN.

5 DEMOLISH EXISTING ROOFTOP CONDENSING UNIT AND ASSOCIATED REFRIGERANT PIPING.

6 DEMOLISH EXISTING CONDENSATE DRAIN PIPING FROM AHU-4.

1/8" = 1'-0"1

MECHANICAL - ATTIC DEMOLITION PIPING PLAN - AREA A

1/8" = 1'-0"2

DEMOLITION - 02 SECOND FLOOR PIPING DEMOLITION - AREA B

GENERAL NOTES:

1. DEMOLITION OF EXISTING UNITS INCLUDES THE REMOVAL OF ALL ASSOCIATED POWER AND

CONTROL WIRING.

2. M.C. SHALL COORDINATE WITH THE ABATEMENT CONTRACTOR FOR THE REMOVAL OF ALL

ASSOCIATED CONSTRUCTION DEBRIS.

3. DEMOLITION OF EQUIPMENT SHOWN SHALL INCLUDE THE REMOVAL OF ASSOCIATED POWER

AND CONTROL WIRING AND ALL OTHER APPURTENANCES REQUIRED FOR COMPLETE SYSTEM

DEMOLITION.

ROOM

CORRIDOR

COMM CLOSET

ROOM

102b

ROOM

FOYER

ROOM

ROOM

PORCH 1

PORCH 2

STAIRS

ELEC

1 1 1 1

1 1

1 1

11 1 1

DEDUCT ALTERNATE: REFER TO SPECIFICATION 01 00 00

GENERAL REQUIREMENTS FOR MORE INFORMATION.

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:3

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MH111

MECHANICAL - FIRST FLOOR - AREA A

DUCTWORK PLAN

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 101 149

1/8" = 1'-0"1

MECHANICAL - FIRST FLOOR - AREA A DUCTWORK PLAN

KEYNOTES:

1 NEW DUCTWORK DROP FROM ATTIC SPACE. TERMINATE DUCTWORK DROP WITH EXPANDED WIRE MESH, PER DETAIL ON M-702.

2 EXISTING PLENUM RETURN GRILLE TO REMAIN.

3 INSTALL NEW SUSPENDED HYDRONIC UNIT HEATER WITH LOW VOLTAGE THERMOSTAT.

40x2030x2020x16 ø ø ø ø x x

22x12

22x12 ø ø ø ø

10ø

10ø

30x16 ø ø ø ø

18x14

UH-2-8

UH-2-7 UH-2-6 UH-2-5

UH-2-4

UH-2-3UH-2-2UH-2-1

12x12

12x12

AHU-1

AHU-2

DD

DD

6 6

7 7 7

DEDUCT ALTERNATE: REFER TO SPECIFICATION 01 00 00

GENERAL REQUIREMENTS FOR MORE INFORMATION.

DD

DD

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/2

/2

:1

:4

A

M C

U s e rs \M

C o rr e a

\D o c u m e n ts \R e v it F ile s \M

E P

R m c o rr e a a m e -p c .c o m

.r v t

34-MH121

MECHANICAL - ATTIC DUCTWORK

PLAN

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FFR MJC 102 149

1/8" = 1'-0"1

MECHANICAL - ATTIC DUCTWORK PLAN

KEYNOTES:

1 INSTALL NEW FOUR-PIPE CENTRAL STATION VAV AIR HANDLING UNIT IN ATTIC SPACE. AIR HANDLING UNIT SHALL HAVE HOT

WATER PREHEAT COIL AND A CHILLED WATER COOLING COIL. PROVIDE UNIT WITH DIRECT DIGITAL CONTROL (DDC)

INTERFACE TO TIE INTO THE NEW DDC SYSTEM.

2 ROUTE NEW DUCTWORK THROUGH EXISTING DUCTWORK PENETRATION. M.C. TO COORDINATE WITH G.C. FOR INFILL OF

ANNULAR SPACE BETWEEN EXISTING OPENING AND NEW DUCTWORK.

3 ROUTE NEW DUCTWORK THROUGH EXISTING DUCTWORK PENETRATION. INCREASE EXISTING OPENING SIZE AS REQUIRED

TO FIT NEW DUCTWORK.

4 ROUTE NEW DUCTWORK DOWN TO FIRST FLOOR. CREATE NEW DUCTWORK PENETRATION OPENING IN EXISTING FLOOR.

5 EXISTING PLENUM RETURN GRILLE TO REMAIN AND BE REUSED.

6 ROUTE NEW RETURN DUCTWORK INTO EXISTING PENTHOUSE. TERMINATE DUCTWORK WITH EXPANDED WIRE MESH, PER DETAIL ON SHEET M-702. INSTALL A DUCT SMOKE DETECTOR AT THE MAIN RETURN DUCT FOR EACH AIR HANDLER.

7 INSTALL NEW SUSPENDED HYDRONIC UNIT HEATER WITH UNIT MOUNTED THERMOSTAT.

1" HWR

2 1/2" HWS

1 1/2" HWR

2 1/2" HWS

2" HWS

2" HWR

2" HWS2" HWR

2" HWR

2 1/2" HWS

1 1

1 1

ROOM

ELECTRICAL

ROOM

HVAC

CORRIDOR

ROOM

CORRIDOR

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

ROOM

TRANS VAULT

UH-0-1

UH-0-8

UH-0-2 UH-0-3 UH-0-4

UH-0-5

UH-0-6

UH-0-7

UH-0-9

UH-0-10

1" HWS 1" HWR 1" HWS 1" HWR

1" HWR

1" HWS 1" HWR

1" HWS 1" HWR

1" HWS

1" HWR 1" HWS

1" HWR

1" HWS

1" HWR

1" HWS

3/4" HWR

3/4" HWS

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .