B-34 Electrical.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24921R0010
About this file
This document outlines a federal contract opportunity from the Department of Veterans Affairs to renovate Building 34. The solicitation number is 36C24921R0010 and seeks to correct deficiencies identified in the Federal Capital Assets report. The opportunity type is a solicitation to renovate Building 34 and address outstanding issues noted in the assessment of federal capital assets for the building. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The document provides relevant details about the federal agency involved, purpose and location of the renovations, and solicitation number for interested parties to respond to the contract opportunity.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
DESCRIPTIONTYPE
A
AC
AF
AFC
AFF
AFG
BFC
C
EF
EC
ETBD
ETR
ETBR
EWC
FA
FAAP
FACP
AMPERE
ALTERNATING CURRENT
AMPERE FRAME
ABOVE FINISHED COUNTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
BELOW FINISHED CEILING
CONDUIT
EXHAUST FAN
ELECTRICAL CONTRACTOR
G OR GND
GF OR GFI
KVA
KW
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
EXISTING TO BE RELOCATED
ELECTRIC WATER COOLER
FIRE ALARM
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
GROUND
GROUND FAULT INTERRUPTER
KILOVOLT AMPERES
KILOWATTS
AIC AMPERE INTERRUPTING CURRENT
AMP AMPERE
ARA AREA OF RESCUE ASSISTANCE
AT AMPERE TRIP
AWG AMERICAN WIRE GAUGE
CCT CIRCUIT
CCT BRKR CIRCUIT BREAKER
CR CARD READER
CT CURRENT TRANSFORMER
FPN FUSE/TRIP PER NAMEPLATE
FVNR FULL VOLTAGE NON-REVERSING
HID HIGH INTENSITY DISCHARGE
HOA HAND OFF AUTO
IG ISOLATED GROUND
INTERCOM INTERCOMMUNICATION
J-BOX JUNCTION BOX
GC GENERAL CONTRACTOR
CLG CEILING
GEN GENERATOR
ATS AUTOMATIC TRANSFER SWITCH
BET BUILDING ENTRANCE TERMINAL
MCB
MLO
NEC
Ø OR PH
R
REF
RTU
UON
V
W
WP
MAIN CIRCUIT BREAKER
MAIN LUG ONLY
PHASE
RELOCATED DEVICE
REFRIGERATOR
ROOFTOP UNIT
UNLESS OTHERWISE NOTED
VOLT(S)
WATTS OR WIRE
WEATHERPROOF
P POLE
MCC MOTOR CONTROL CENTER
MD MOTION DETECTOR
MIC MICROPHONE
MOCP MAXIMUM OVERCURRENT PROTECTION
NATIONAL ELECTRICAL CODE
N OR NEUT NEUTRAL
NTS NOT TO SCALE
OC ON CENTER
OL OVERLOAD
PA PUBLIC ADDRESS
PB PUSHBUTTON SWITCH
PNL PANELBOARD
RVNR REDUCED VOLTAGE NON-REVERSING
SPD SURGE PROTECTION DEVICE
SWBD SWITCHBOARD
TTB TELEPHONE TERMINAL BOARD
TC TIME CLOCK
TS TIME SWITCH
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VFD VARIABLE FREQUENCY DRIVE
VSD VARIABLE SPEED DRIVE
XFMR TRANSFORMER
Z IMPEDANCE
WG WIRE GUARD
PC PLUMBING CONTRACTOR
SPKR SPEAKER
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
SOG SLAB ON GRADE
LV LOW VOLTAGE
MSB MAIN SWITCH BOARD
NIC NOT IN CONTRACT
ABBREVIATIONS
DESCRIPTIONTYPEA. ALL WORK SHALL CONFORM TO THE LATEST NATIONAL ELECTRICAL CODE, STATE
CODE, & LOCAL AUTHORITY REQUIREMENTS.
B. THE CONTRACTOR SHALL VISIT THE PREMISES AND THOROUGHLY FAMILIARIZE
THEMSELVES WITH ALL DETAILS OF THE WORK AND WORKING CONDITIONS. VERIFY ALL
FIELD CONDITIONS INCLUDING LOCATION OF UTILITY LINES, STRUCTURES, AND ADVISE
THE ENGINEER OF ANY DISCREPANCY THAT MAY PREVENT OR HINDER THE SPECIFIED
WORK FROM BEING COMPLETED.
C. THE CONTRACTOR SHALL STUDY THE STRUCTURE AND FINISH CONDITIONS AFFECTING
THEIR WORK AND SHALL COORDINATE THEIR WORK ACCORDINGLY. THE CONTRACTOR
SHALL PROVIDE ALL ACCESSORIES, HANGERS, AND ANCHORS AS NECESSARY TO MEET
SUCH CONDITIONS WITHOUT ANY ADDITIONAL COST TO THE COR.
D. PRIOR TO ACCOMPLISHING ANY WORK IN ANY AREA, ALL WORK SHALL BE PLANNED AND
COORDINATED WITH OTHER TRADES AND THE COR. ALL CONDUITS SHALL BE
INSTALLED CONCEALED, UON. THE CONDUIT ROUTING SHALL BE COORDINATED WITH
DUCT WORK, AND OTHER OBSTACLES SO AS TO PROVIDE THE MOST EFFICIENT AND
AESTHETICALLY PLEASING INSTALLATION.
E. PROPERLY SUPPORT ALL WORK AND EQUIPMENT INSTALLED UNDER THIS CONTRACT.
STUDY ALL DRAWINGS, MANUFACTURER'S INSTRUCTIONS, UL LISTINGS, AND CATALOG
DATA TO DETERMINE HOW EQUIPMENT ACCESSORIES AND RELATED ITEMS ARE TO BE
SUPPORTED, MOUNTED, OR SUSPENDED. PROVIDE ALL BOLTS, INSERTS, BRACKETS,
SPACERS, STRUCTURAL SUPPORTS, AND ACCESSORIES FOR PROPER SUPPORT OF
EQUIPMENT FURNISHED UNDER THIS CONTRACT.
F. PROVIDE GREEN EQUIPMENT GROUNDING CONDUCTOR WITH ALL FEEDER AND BRANCH
CIRCUITS.
G. MOUNTING HEIGHTS INDICATED ARE TO THE CENTER OF THE DEVICE, OR EQUIPMENT
UNLESS NOTED OTHERWISE. RECEPTACLE AND DATA/TELEPHONE OUTLET SHOWN
ADJACENT ON DRAWING SHALL BE MOUNTED 6" APART ON CENTER HORIZONTALLY.
CONTRACTOR SHALL NOT INSTALL J-BOXES, OUTLETS, DEVICES, ETC. BACK TO BACK
FOR NEW OR RENOVATION WORK.
H. COORDINATE ALL DEVICES AND OUTLETS ABOVE, OR BELOW WITH CASEWORK
INSTALLATION AND THE ARCHITECT IN ORDER TO POSITION AT THE PROPER LOCATION
AND THE HEIGHT.
I. THE CONTRACTOR SHALL USE THE ARCHITECTURAL PLANS FOR EXACT DIMENSIONS.
DO NOT SCALE THESE PLANS.
J. COORDINATE MOUNTING HEIGHT AND LOCATION OF ALL WALL MOUNTED EQUIPMENT
WITH ARCHITECTURAL ELEVATIONS.
K. THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. THE ELECTRICAL INSTALLATION
SHALL BE FULLY COORDINATED WITH ALL OTHER TRADES PRIOR TO ROUGH-IN
BETWEEN THE ELECTRICAL WIRING AND DEVICES AND ARCHITECTURAL, STRUCTURAL,
PLUMBING, MECHANICAL AND FIRE PROTECTION WORK.
L. RECEPTACLES LOCATED WITHIN 6'-0" OF A WATER SOURCE SHALL BE GFI TYPE.
GENERAL NOTES
ELECTRICAL ENERGY CODE SUMMARY
(STATE ENERGY CODE, LATEST EDITION ADOPTED)
ELECTRICAL SYSTEM AND EQUIPMENT:
METHOD OF COMPLIANCE:
STATE ENERGY CODE: (X) PRESCRIPTIVE ( ) PERFORMANCE
LUMINAIRE SCHEDULE:
LAMP TYPE REQUIRED IN LUMINAIRE
NUMBER OF LAMPS IN LUMINAIRE
BALLAST TYPE USED IN THE LUMINAIRE
NUMBER OF BALLASTS IN LUMINAIRE
TOTAL WATTAGE PER LUMINAIRE
TOTAL INTERIOR WATTAGE ALLOWED VS. SPECIFIED
EXTERIOR LIGHTING ZONE
TOTAL EXTERIOR WATTAGE ALLOWED VS. SPECIFIED
EXTERIOR LUMINAIRES >100 WATTS MUST HAVE A
MINIMUM EFFICACY OF 60 LUMENS/WATT
PROJECT TOTAL SQUARE FOOTAGE:
STATE ENERGY CODE ADDITIONAL PRESCRIPTIVE COMPLIANCE SUMMARY:
MUST COMPLY WITH ONE OF THE FOLLOWING SECTIONS:
( ) 506.2.1 MORE EFFICIENT MECHANICAL EQUIPMENT
(X) 506.2.2 REDUCED LIGHTING POWER DENSITY
( ) 506.2.3 ENERGY RECOVERY VENTILATION SYSTEMS
( ) 506.2.4 HIGHER EFFICIENCY SERVICE WATER HEATING
( ) 506.2.5 ON-SITE SUPPLY OF RENEWABLE ENERGY
( ) 506.2.6 AUTOMATIC DAYLIGHTING CONTROL SYSTEM
CALCULATION ABOVE INCLUDES REDUCED LIGHTING POWER DENSITY
SEE LUMINAIRE SCHEDULE
SEE LUMINAIRE SCHEDULE
SEE LUMINAIRE SCHEDULE
SEE LUMINAIRE SCHEDULE
SEE LUMINAIRE SCHEDULE
40,000 VS 6,000
N/A N/A
53,819 SQFT
TYPE DESCRIPTION
SURFACE OR PENDANT MOUNTED LIGHT FIXTURE. REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.
EXIT LIGHT FIXTURE WITH BATTERY BACK-UP. ARROW, WHEN INDICATED, INDICATES DIRECTION. PROVIDE FACES AS INDICATED ON DRAWINGS. CONNECT TO A CONSTANT HOT CONDUCTOR AHEAD OF LOCAL SWITCH OR RELAY. REFER
TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.
DUPLEX CONVENIENCE RECEPTACLE 20A, 120V, MOUNT 18" AFF, UON. SUBSCRIPT 'GFI' INDICATES GROUND FAULT
INTERRUPTING TYPE.
DUPLEX CONVENIENCE RECEPTACLE, GROUND FAULT INTERRUPTING TYPE WITH WEATHERPROOF WHILE IN USE
ENCLOSURE, 20A, 120V, MOUNT 18" AFF, UON.
SURFACE OR PENDANT MOUNTED EMERGENCY LIGHT FIXTURE WITH BATTERY BACK-UP, BATTERY CONNECTED TO A CONSTANT HOT CONDUCTOR AHEAD OF SWITCHING. REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL
INFORMATION.
WP
WALL MOUNTED EMERGENCY LIGHT FIXTURE WITH BATTERY BACK-UP, BATTERY CONNECTED TO A CONSTANT HOT CONDUCTOR AHEAD OF SWITCHING. COORDINATE EXACT MOUNTING HEIGHT WITH ARCHITECT PRIOR TO ROUGH-IN.
REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.
SWITCH, 20A, 120/277V, MOUNT 46" AFF, UON.
NO SUBSCRIPT DENOTES SINGLE POLE SWITCH.
SUBSCRIPT '3' DENOTES THREE-WAY SWITCH.
SUBSCRIPT '4' DENOTES FOUR-WAY SWITCH.
SUBSCRIPT 'D' DENOTES DIMMER SWITCH. COMPATIBLE WITH ASSOCIATED LIGHT FIXTURE.
EQUIPMENT CONNECTION, AS NOTED. REFER TO EQUIPMENT CONNECTION SCHEDULE.
XXX
208/120 VOLT, SURFACE MOUNTED PANELBOARD
DESIGNATION AS NOTED. REFER TO PANEL
SCHEDULES FOR ADDITIONAL INFORMATION.
208/120 VOLT, RECESSED MOUNTED PANELBOARD
XXX
1LA-3
(FOR
EXAMPLE)
BRANCH CIRCUIT, OR FEEDER WIRING, RUN IN CONDUIT AND CIRCUIT HOMERUN TO PANELBOARD INDICATED. SINGLE PHASE CIRCUIT SHALL CONTAIN 1 #12 PHASE CONDUCTOR, 1 #12 NEUTRAL CONDUCTOR AND 1 #12 GROUNDING CONDUCTOR IN 3/4" CONDUIT, MINIMUM. CONDUCTORS LARGER THAN #12, AND CONDUIT LARGER THAN 3/4", SHALL BE AS INDICATED. WHERE "MULTIPLE PHASED" ELECTRICAL LOADS ARE REQUIRED, PROVIDE ADDITIONAL PHASE AND NEUTRAL CONDUCTORS AS INDICATED. MULTIPLE SINGLE PHASE CONDUCTORS MAY BE GROUPED TOGETHER IN A COMMON CONDUIT AS ALLOWED AND IN ACCORDANCE WITH THE NEC. CONTRACTOR SHALL PROVIDE ADDITIONAL "SWITCH LEG" CONDUCTORS, AS REQUIRED TO ACHIEVE FIXTURE CONTROL INDICATED ON PLANS. PROVIDE DEDICATED NEUTRAL CONDUCTOR FOR EACH SINGLE POLE CIRCUIT BREAKER. GROUNDING CONDUCTORS SHALL BE SHARED IN ACCORDANCE WITH AND AS ALLOWED BY THE NEC.
WHEN SHOWN DASHED, IT SHALL DENOTE WIRING UNDERGROUND OR ABOVE TILE CEILING OF FLOOR BELOW. CONDUITS SHOWN ARE DIAGRAMMATIC ONLY AND DO NOT REPRESENT ACTUAL CONDUIT ROUTING UNLESS SPECIFICALLY NOTED.
CONTRACTOR TO DETERMINE CONDUIT ROUTING IN THE FIELD.
SYMBOL LEGEND
GFI
CCTV CAMERA. SUBSCRIPT DENOTES CAMERA TYPE. PROVIDE 4-11/16" SQUARE BY 2-1/18" DEEP J-BOX WITH 1" EMPTY CONDUIT WITH PULL STRING STUBBED ABOVE ACCESSIBLE CEILING. CAMERAS PROVIDED AND INSTALLED BY OWNER.
'C1' = PTZ CAMERA W/CORNER MOUNT - OC#H4iRPTZ-DP45-WP
'C2' = PTZ CAMERA W/CORNER MOUNT - OC#H4PTZ-DP30
'C3' = H4SL CAMERA W/PENDANT MOUNT - OC#H4SL-D01-IR
AP WIRELESS ACCESS POINT
DATA OUTLET MOUNTED 18" AFF, UON. DATA CABLES AND DEVICES BY OTHERS, 4-11/16" SQUARE BY 2-1/18" DEEP J-BOX WITH SINGLE GANG PLASTER RING. PROVIDE WITH 1" CONDUIT STUB-OUT ABOVE ACCESSIBLE CEILING, UON.
DATA OUTLET MOUNTED 46" AFF, UON. DATA CABLES AND DEVICES BY OTHERS, 4-11/16" SQUARE BY 2-1/18" DEEP J-BOX WITH SINGLE GANG PLASTER RING. PROVIDE WITH 1" CONDUIT STUB-OUT ABOVE ACCESSIBLE CEILING, UON.
JUNCTION BOX, PROVIDE STANDARD 4-11/16" SQUARE BY 2-1/18" DEEP J-BOX, UON.
COORDINATE MOUNTING HEIGHT WITH ARCHITECT PRIOR TO ROUGH-IN.
J
SPECIAL PURPOSE RECEPTACLE. CONFIRM EXACT NEMA CONFIGURATION AND REQUIREMENTS WITH EQUIPMENT BEING INSTALLED. COORDINATE BREAKER SIZE, WIRE SIZE AND NUMBER WITH CORD AND PLUG OF EQUIPMENT. MOUNT 18" AFF, UON.
DISCONNECT SWITCH/FUSED DISCONNECT.
J
QUADRUPLEX CONVENIENCE RECEPTACLE, 20A, 120V, MOUNT 18" AFF, UON.
OUTDOOR PHOTOCELL, MOUNT ON ROOF FACING NORTH.
PE
WALL MOUNTED LIGHT FIXTURE. COORDINATE EXACT MOUNTING HEIGHT WITH ARCHITECT PRIOR TO
ROUGH-IN. REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.
CARD READER, PROVIDE APPROPRIATE SIZED BOX, MOUNT 46" AFF WITH 3/4" EMPTY CONDUIT WITH PULLSTRING TO JUNCTION BOX ABOVE CEILING. PROVIDE CONDUIT FROM JUNCTION BOX ABOVE CEILING TO DOOR JAMB FOR ELECTRIC LOCKS/STRIKE. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH OWNER/SECURITY CONTRACTOR PRIOR TO
ROUGH-IN. EQUIPMENT AND WIRING BY OTHERS.
CR
TELECOMMUNICATIONS TERMINATION BACKBOARD - 3/4" THICK X 8' HIGH X LENGTH PER PLANS, A/C GRADE MOUNTED WITH THE A SIDE FACING OUT, UON. BACKBOARD SHALL BE FIRE RATED AND PAINTED WITH WHITE FIRE RETARDANT PAINT ON BOTH SIDES & ALL EDGES. CONTRACTOR SHALL NOT PAINT OVER ANY FIRE RETARDANT STAMPING ON THE PLYWOOD.
TTB
TELECOMMUNICATIONS STYLE COPPER GROUND BAR WITH STAND-OFF INSULATORS. PROVIDE #3/0G, 1-1/4"C., BACK TO SERVICE GROUND.TMGB
CONDUIT SLEEVE
SEISMIC AND WIND REQUIREMENTS
FOR ELECTRICAL SYSTEMS
INFORMATION FOR IBC-2015/ASCE 7-10
A. ALL ROOF CURBS/ROOF RAILS INCLUDING THEIR ATTACHMENT TO THE EQUIPMENT AND
STRUCTURE MUST BE EVALUATED FOR WIND LOADING. WHERE SEISMIC RESTRAINT IS REQUIRED, THE MORE DEMANDING FORCE OF WIND AND SEISMIC MUST BE USED. SEE SEISMIC INFORMATION CONTAINED IN THE STRUCTURAL DRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN
CATEGORY.
B. SEE EQUIPMENT SCHEDULES AND DETAILS FOR SPECIFIC COMPONENT IMPORTANCE FACTOR
DESIGNATIONS.
C. USE APPLICABLE TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH
MECHANICAL COMPONENT.
D. FOR ALL COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENT SUPPORTS AND
ATTACHMENTS SHALL BE DESIGNED BY A REGISTERED DESIGN PROFESSIONAL.
E. WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR THE INSTALLATION OF EQUIPMENT UNDER THIS CONTRACT MUST BE DESIGNED BY THE SEISMIC ENGINEER. DO NOT
POUR ANY HOUSEKEEPING PADS PRIOR TO THE RECEIPT OF THE SEISMIC SUBMITTAL.
F. SEISMIC RESTRAINTS FOR CONDUIT, CABLE TRAY AND BUS DUCT MUST BE SHOWN ON LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINT LOCATIONS ALONG WITH ACCOMPANYING DETAILS AND
CALCULATIONS.
COMPONENT
CERTIFICATION
NOT REQUIRED
13.1.4.3NOT REQUIRED
NOT REQUIRED
NOT REQUIRED
NOT REQUIREDCOMPONENT SUPPORTS
WALL MOUNTED
FLOOR MOUNTED
ROOF MOUNTED
COMPONENT
IDENTIFICATION
SEISMIC
RESTRAINT
REQUIREMENT
ASCE 7-05
REFERENCE
1.0
COMPONENT IMPORTANCE FACTOR (Ip)
SEISMIC DESIGN CATEGORIES C
NOT REQUIREDSUSPENDED EQUIPMENT
CABLE TRAY/ BUS DUCT
TRAPEZED CONDUIT
NOT REQUIRED
SINGLE CONDUIT NOT REQUIRED
PENDANT, LAY-IN & CAN
LIGHTS REQUIRED
REQUIRED
RESTRAIN ALL
SEISMIC
RESTRAINT
REQUIREMENT
ASCE 7-05
REFERENCE
>2"
(SEE NOTES 1 & 2)
REQUIRED
1.5
13.1.4.3
13.1.4.3
13.1.4.3
13.1.4.3
13.1.4.3
13.1.4.3
13.2.2
SEE NOTE 4
13.1.4.3
13.1.4.3
13.6.5
13.1.4.3
13.1.4.3
13.6.8.2b
13.2.2
SEE NOTE 4
GENERAL NOTES:
1. ALL NON-STEEL CONDUIT (I.E. - PVC) MUST BE RESTRAINED.
2. RESTRAINT IS NOT REQUIRED IF SUSPENDED 12 IN. OR LESS FROM THE STRUCTURE AND THE
HANGERS ARE DETAILED TO AVOID SIGNIFICANT BENDING OF THE HANGERS AND THEIR
ATTACHMENTS AND PROVISIONS ARE MADE FOR CONDUIT TO ACCOMMODATE EXPECTED
DEFLECTIONS.
3. COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURERS AT TIME OF
SUBMITTAL FOR REVIEW BY ENGINEER OF RECORD.
4. THE RESTRAINT OF PENDANT, LAY-IN & RECESSED DOWN LIGHTS IS GOVERNED BY "CISCA-04 FOR
SEISMIC ZONES" (CEILINGS AND INTERIOR SYSTEMS CONSTRUCTION ASSOCIATION).
TC-8-CH13-48-R8
13.6.8.3.1
RESTRAIN IF ANY
CONDUIT ON TRAPEZE
>2" RESTRAIN IF
TOTAL WEIGHT OF
CONDUIT ON TRAPEZE
> 10 LBS/FT
(SEE NOTE 2)
RESTRAIN ALL
RESTRAIN ALL
RESTRAIN ALL
RESTRAIN ALL
Drawing Title
Approved: Associate Director
Project Title
Date
Location
Checked
Building Number
Project Number:
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Dwg. of o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans
Health
Administration Approved: Chief of Staff
Approved: Infection Control
Approved: Chief Engineer
Approved: Safety Officer
Approved: Chief, Police & Security
GHD Cons Services, Inc.
Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202
Phone: 704-342-4910 www.ghd.com
GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211
Phone: 316-265-9367 www.glmv.com
AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202
Phone: 704-295-4263 www.ame-pc.com
STRATA Architecture, Inc.
Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108
Phone: 816-474-0900 www.strata-arch.com
Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603
Phone: 828-315-9962 www.atriaxgroup.com
/2
/2
:2
:3
A M
C
U se rs \m th ra ilk ill
\D o c u m e n ts \M
E P
R a m e e n g in e e rs
.r v t
34-E-001
ELECTRICAL - GENERAL NOTES AND
LEGENDS
Renovate Building 34 to Correct FCA Deficiencies
James H. Quillen VAMC Mountain Home, TN
621-18-102
07/24/2020 SBT GMT 117 149
Revisions: Date:
07/24/2020
ATS
O S
O S
O S
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
J
J
ATS
D-34B-0-11-EEP-1
D-34B-09-EEP
D-34B-0-1-EEP-C
D-34B-0-1-EEP-B
D-34B-0-1-EEP-A
D-34B-0-1-EEP
D-34B-0-EEP
D-34B-0-EEP-1
D-34B-0-11-EEP
D-34A-0-6
D-34-0-EEP-3
D-34A-0-11
D-34B-0-13-EEP
SWBD 34-SB-A DEMOLITION AREA 1
D-34B-0-SB2
PULL BOX
D-34B-ATS
FAN
HTR
AHU
AHU
C1
C2
C1
C4
C5
C6 C3
ETR ETR
C7
EF EF
EF
EF
CKT
LOCATION
CIRCUIT NAME
STREET LIGHTS
LIFT
STREET LIGHTS
OLD PANEL NEW PANEL
D-34B-0-13-EEP-1
D-34B-0-13-EEP-21,23,25
D-34B-0-B-1 D-34B-0-B-2,4,6
D-34B-0-11-EEP-21,23 D-34B-0-B-3,5
C1
C2
GEN HTR.
TANK MON
TANK ALARM
OUTSIDE LTS
OUTSIDE LTS
C3
D34-0-EEP-1-7,9
D34-0-EEP-1-13
D34-0-EEP-1-15
D34-0-EEP-1-2
D34-0-EEP-1-12
D-34B-0-B-14,16 D-34B-0-B-13 D-34B-0-B-15 D-34B-0-B-18 D-34B-0-B-20
ELEV. CKT
FREIGHT ELEV
D-34B-0-1-EEP-A-3
D-34B-0-1-EEP-A-7,9,11
D-34B-0-B-8 D-34B-0-B-7,9,11
C4
REAR GATE
OUT BLOG
D-34A-0-11-1,3,5 D-34A-0-11-17
D-34A-0-A-1,3,5 D-34A-0-A-2
C5
SUMP PUMP
STREET LIGHTS
D-34B-0-11-EEP-8
D-34B-0-11-EEP-9
D-34B-0-B-10 D-34B-0-B-22,24,26
C6
GAZEBO SWBD-34-SB-A SWBD-34B-A-9C7
NOTE: INTERCEPT EXISTING CIRCUITS SHOWN IN THIS LOCATION AND EXTEND OVER TO NEW PANEL AS SHOWN, MATCH CONDUIT AND WIRE. FIELD VERIFY EXACT
CIRCUIT NUMBER AND NUMBER OF CIRCUITS TO BE RE-FED.
Drawing Title
Approved: Associate Director
Project Title
Date
Location
Checked
Building Number
Project Number:
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Dwg. of o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans
Health
Administration Approved: Chief of Staff
Approved: Infection Control
Approved: Chief Engineer
Approved: Safety Officer
Approved: Chief, Police & Security
GHD Cons Services, Inc.
Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202
Phone: 704-342-4910 www.ghd.com
GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211
Phone: 316-265-9367 www.glmv.com
AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202
Phone: 704-295-4263 www.ame-pc.com
STRATA Architecture, Inc.
Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108
Phone: 816-474-0900 www.strata-arch.com
Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603
Phone: 828-315-9962 www.atriaxgroup.com
A
KEYPLAN
TRUE NORTH
/2
/2
:2
:0
A M
C
U se rs \m th ra ilk ill
\D o c u m e n ts \M
E P
R a m e e n g in e e rs
.r v t
34-ED101
ELECTRICAL - LOWER LEVEL
DEMOLITION PLAN - AREA A
Renovate Building 34 to Correct FCA Deficiencies
James H. Quillen VAMC Mountain Home, TN
621-18-102
07/24/2020 SBT GMT 118 149
ELECTRICAL GENERAL NOTES - DEMO
L THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL PCB CONTAINING EQUIPMENT SUCH AS
BALLASTS, TRANSFORMERS, AND POTTING COMPOUNDS THROUGH PROPER AUTHORITIES.
M THE CONTRACTOR SHALL REMOVE ALL ELECTRICAL DEVICES, FIXTURES, WIRING, AND ROUGH-IN IN WALLS, FLOORS OR CEILINGS TO BE DEMOLISHED. THE CONTRACTOR SHALL REMOVE EXISTING ELECTRICAL
DEVICES, LIGHTING FIXTURES, SYSTEMS DEVICE, ASSOCIATED WIRING, AND CONDUIT BACK TO SOURCE OR NEAREST DEVICE TO REMAIN, UNLESS OTHERWISE NOTED. IF EXISTING CIRCUIT HAS DOWNSTREAM DEVICES
TO REMAIN, CONTRACTOR SHALL REFEED THESE ITEMS ACCORDINGLY THROUGH ALTERNATE PATH.
N THE ELECTRICAL CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING CONDUIT AND THE WIRING WILL HAVE TO BE RE-ROUTED, RELOCATED, OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL
WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL LOCATION OF THE CONDUIT AND WIRING SHALL BE
PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER.
O PRIOR TO ANY DEACTIVATION AND RELOCATION OF DEMOLITION WORK, ARRANGE A CONFERENCE WITH ARCHITECT AND THE OWNER'S REPRESENTATIVE IN THE FIELD TO INSPECT EACH OF THE ITEMS TO BE
DEACTIVATED, REMOVED OR RELOCATED. CARE SHALL BE TAKEN TO PROTECT ALL EQUIPMENT DESIGNATED TO BE RELOCATED AND REUSED OR TO REMAIN OPERATION AND BE INTEGRATED WITH THE NEW SYSTEMS.
P CONTRACTOR SHALL INSPECT AND IDENTIFY ANY CONDUIT AND/OR CONDUCTORS THAT MAY BE EMBEDDED IN WALLS TO BE DEMOLISHED OR LOCATED IN THE DEMOLITION AREA AND RELOCATE THESE TO NEW LOCATION
PRIOR TO THE START OF DEMOLITION. BID PRICE SHALL INCLUDE CONDUIT AND CONDUCTORS AND LABOR
FOR ANY THAT MUST BE REMOVED OR RELOCATED.
Q NO WORK IN HATCHED AREAS. E.C. TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING CONSTRUCTION.
R ALL WORK SHOWN LIGHT AND SOLID IS EXISTING TO REMAIN. ALL WORK SHOW BOLD AND/OR DASHED IS
EXISTING TO BE DEMOLISHED.
S DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO THE NEW LOCATION AS INDICATED ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S). DEVICES/EQUIPMENT NOTED AS ETBR ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S) INDICATES THE NEW LOCATION FOR THE
RELOCATED EXISTING DEVICE/EQUIPMENT.
ELECTRICAL GENERAL NOTES - DEMO
A IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO
ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL, ETC. PLANS FOR WORK
SHOWN TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED.
B WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY
STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT.
C THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS
REQUIRED TO PREVENT DAMAGE.
D THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION
DEBRIS GENERATED. TAKE CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES.
E THE CONTRACTOR SHALL COORDINATE/SCHEDULE ALL POWER INTERRUPTIONS WITH THE OWNER AND
POWER COMPANY IN WRITING.
F WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL REMAINING OPENINGS IN THE SLAB/WALL SHALL BE FILLED IN BY THE CONTRACTOR TO MATCH ADJACENT.
G REMOVE ALL MISCELLANEOUS ELECTRICAL, FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED
FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER.
H THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT.
I THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS, AND STAIRS.
J THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE.
K THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL FLUORESCENT AND HID LAMPS. THE CONTRACTOR SHALL PROVIDE VERIFICATION OF PROPER LAMP DISPOSAL UPON OWNER
REQUEST.
KEYNOTES:
1 REMOVE ALL ELECTRICAL WITHIN THE DEMOLITION BOUNDARY UON. DISCONNECT
AND REMOVE ALL CONDUIT, PANELS, FEEDERS, DISCONNECTS, DEVICES, WIRE,
ETC. IN IT'S ENTIRETY UNO.
2 REMOVE ALL EXISTING TELECOMMUNICATIONS WITHIN THE DEMOLITION
BOUNDARY COMPLETELY BACK TO THE EXISTING TELECOM ROOM ON THE FIRST
FLOOR, UON. DISCONNECT AND REMOVE ALL CONDUIT, JUNCTION BOXES, JACKS,
OUTLET PLATES, CABLES, ETC. IN IT'S ENTIRETY, UNO.
3 DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, CONDUIT
AND WIRE BACK TO SOURCE FOR HVAC EQUIPMENT.
4 PULLBOX. FIELD VERIFY IF REQUIRED TO REMAIN. IF NOT, REMOVE IT AND
ASSOCIATED CONDUIT CONDUIT AND WIRES BACK TO SOURCE.
5 EXISTING METERING EQUIPMENT SHALL REMAIN.
6 EXISTING PULLBOX FOR SERVICE FEEDERS SHALL REMAIN.
7 EXISTING SERVICE FEEDERS SHALL REMAIN.
8 EXISTING PANEL TO REMAIN AND RE-FED FROM NEW SWITCHBOARD. RE-USE
EXISTING FEEDER, EXTEND AND RECONNECT AS REQUIRED. MATCH CONDUIT AND
WIRE. PANEL SHALL BE RENAMED TO 'D-34B-0-A'.
1/8" = 1'-0"1
ELECTRICAL - LOWER LEVEL DEMOLITION PLAN - AREA A
AP
AP
AP
AP
AP AP
AP
JJ
D-34A-0-2
D-34-0-EEP-2
D-34A-0-4-A
D-34A-0-4-B
D-34-A-0-5-B
D-34A-0-5-C
DEMOLITION AREA 1
HIGH TEMP ALARM SIGN
PUMPS
PUMPS
CONTROLS
PUMPS
FAN
FAN
TO
SERVICE
X/F
C9
C8
C7
CKT
LOCATION
CIRCUIT NAME
LIFT
JOCKEY PUMP
PAINT BOOTH
OLD PANEL NEW PANEL
D-34-0-EEP-2-19,21,23
D-34-0-EEP-2-26,28,30
D-34A-0-B-1,3,5 D-34A-0-B-2,4,6
D-34A-0-2-2,4,6 D-34A-0-D-1,3,5
C8
C9
NOTE: INTERCEPT EXISTING CIRCUITS SHOWN IN THIS LOCATION AND EXTEND OVER TO NEW PANEL AS SHOWN, MATCH CONDUIT AND WIRE. FIELD VERIFY EXACT
CIRCUIT NUMBER AND NUMBER OF CIRCUITS TO BE RE-FED.
Drawing Title
Approved: Associate Director
Project Title
Date
Location
Checked
Building Number
Project Number:
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Dwg. of o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans
Health
Administration Approved: Chief of Staff
Approved: Infection Control
Approved: Chief Engineer
Approved: Safety Officer
Approved: Chief, Police & Security
GHD Cons Services, Inc.
Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202
Phone: 704-342-4910 www.ghd.com
GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211
Phone: 316-265-9367 www.glmv.com
AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202
Phone: 704-295-4263 www.ame-pc.com
STRATA Architecture, Inc.
Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108
Phone: 816-474-0900 www.strata-arch.com
Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603
Phone: 828-315-9962 www.atriaxgroup.com
B
KEYPLAN
TRUE NORTH
/2
/2
:2
:1
A M
C
U se rs \m th ra ilk ill
\D o c u m e n ts \M
E P
R a m e e n g in e e rs
.r v t
34-ED102
ELECTRICAL - LOWER LEVEL
DEMOLITION PLAN - AREA B
Renovate Building 34 to Correct FCA Deficiencies
James H. Quillen VAMC Mountain Home, TN
621-18-102
07/24/2020 SBT GMT 119 149
KEYNOTES:
1 REMOVE ALL ELECTRICAL WITHIN THE DEMOLITION BOUNDARY UON. DISCONNECT
AND REMOVE ALL CONDUIT, PANELS, FEEDERS, DISCONNECTS, DEVICES, WIRE,
ETC. IN IT'S ENTIRETY UNO.
2 REMOVE ALL EXISTING TELECOMMUNICATIONS WITHIN THE DEMOLITION
BOUNDARY COMPLETELY BACK TO THE EXISTING TELECOM ROOM ON THE FIRST
FLOOR, UON. DISCONNECT AND REMOVE ALL CONDUIT, JUNCTION BOXES, JACKS,
OUTLET PLATES, CABLES, ETC. IN IT'S ENTIRETY, UNO.
3 DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, CONDUIT
AND WIRE BACK TO SOURCE FOR HVAC EQUIPMENT.
4 DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, CONDUIT
AND WIRE BACK TO SOURCE FOR WALK-IN COOLER.
5 PULLBOX. FIELD VERIFY IF REQUIRED TO REMAIN. IF NOT, REMOVE IT AND
ASSOCIATED CONDUIT CONDUIT AND WIRES BACK TO SOURCE.
6 EXISTING PULLBOX FOR SERVICE FEEDERS SHALL REMAIN.
7 EXISTING SERVICE FEEDERS SHALL REMAIN.
8 FIELD VERIFY IF EXISTING CONDUITS ARE TO REMAIN. IF NOT, REMOVE CONDUITS
AND FEEDERS BACK TO SOURCE.
1/8" = 1'-0"1
ELECTRICAL - LOWER LEVEL DEMOLITION PLAN - AREA B
ELECTRICAL GENERAL NOTES - DEMO
L THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL PCB CONTAINING EQUIPMENT SUCH AS
BALLASTS, TRANSFORMERS, AND POTTING COMPOUNDS THROUGH PROPER AUTHORITIES.
M THE CONTRACTOR SHALL REMOVE ALL ELECTRICAL DEVICES, FIXTURES, WIRING, AND ROUGH-IN IN WALLS, FLOORS OR CEILINGS TO BE DEMOLISHED. THE CONTRACTOR SHALL REMOVE EXISTING ELECTRICAL
DEVICES, LIGHTING FIXTURES, SYSTEMS DEVICE, ASSOCIATED WIRING, AND CONDUIT BACK TO SOURCE OR NEAREST DEVICE TO REMAIN, UNLESS OTHERWISE NOTED. IF EXISTING CIRCUIT HAS DOWNSTREAM DEVICES
TO REMAIN, CONTRACTOR SHALL REFEED THESE ITEMS ACCORDINGLY THROUGH ALTERNATE PATH.
N THE ELECTRICAL CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING CONDUIT AND THE WIRING WILL HAVE TO BE RE-ROUTED, RELOCATED, OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL
WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL LOCATION OF THE CONDUIT AND WIRING SHALL BE
PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER.
O PRIOR TO ANY DEACTIVATION AND RELOCATION OF DEMOLITION WORK, ARRANGE A CONFERENCE WITH ARCHITECT AND THE OWNER'S REPRESENTATIVE IN THE FIELD TO INSPECT EACH OF THE ITEMS TO BE
DEACTIVATED, REMOVED OR RELOCATED. CARE SHALL BE TAKEN TO PROTECT ALL EQUIPMENT DESIGNATED TO BE RELOCATED AND REUSED OR TO REMAIN OPERATION AND BE INTEGRATED WITH THE NEW SYSTEMS.
P CONTRACTOR SHALL INSPECT AND IDENTIFY ANY CONDUIT AND/OR CONDUCTORS THAT MAY BE EMBEDDED IN WALLS TO BE DEMOLISHED OR LOCATED IN THE DEMOLITION AREA AND RELOCATE THESE TO NEW LOCATION
PRIOR TO THE START OF DEMOLITION. BID PRICE SHALL INCLUDE CONDUIT AND CONDUCTORS AND LABOR
FOR ANY THAT MUST BE REMOVED OR RELOCATED.
Q NO WORK IN HATCHED AREAS. E.C. TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING CONSTRUCTION.
R ALL WORK SHOWN LIGHT AND SOLID IS EXISTING TO REMAIN. ALL WORK SHOW BOLD AND/OR DASHED IS
EXISTING TO BE DEMOLISHED.
S DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO THE NEW LOCATION AS INDICATED ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S). DEVICES/EQUIPMENT NOTED AS ETBR ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S) INDICATES THE NEW LOCATION FOR THE
RELOCATED EXISTING DEVICE/EQUIPMENT.
ELECTRICAL GENERAL NOTES - DEMO
A IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO
ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL, ETC. PLANS FOR WORK
SHOWN TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED.
B WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY
STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT.
C THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS
REQUIRED TO PREVENT DAMAGE.
D THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION
DEBRIS GENERATED. TAKE CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES.
E THE CONTRACTOR SHALL COORDINATE/SCHEDULE ALL POWER INTERRUPTIONS WITH THE OWNER AND
POWER COMPANY IN WRITING.
F WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL REMAINING OPENINGS IN THE SLAB/WALL SHALL BE FILLED IN BY THE CONTRACTOR TO MATCH ADJACENT.
G REMOVE ALL MISCELLANEOUS ELECTRICAL, FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED
FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER.
H THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT.
I THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS, AND STAIRS.
J THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE.
K THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL FLUORESCENT AND HID LAMPS. THE CONTRACTOR SHALL PROVIDE VERIFICATION OF PROPER LAMP DISPOSAL UPON OWNER
REQUEST.
J
J
J
AP
AP
AP
AP
AP
AP
AP
AP
OS
OS
OS
AP
APAP
AP
AP
AP
AP
AP
J
J
J
J
J
I D-34B-0-5-EEP
34-101-C
34-101-A
D-34B-0-4-EEP
DEMOLITION AREA 1
34B-1-11-EEP
34B-2-11-EEP
34-101-B
IRM
LIFT
TO GAZEBO
TO PUMP HOUSE
PE
IC
EF EF
Drawing Title
Approved: Associate Director
Project Title
Date
Location
Checked
Building Number
Project Number:
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Dwg. of o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans
Health
Administration Approved: Chief of Staff
Approved: Infection Control
Approved: Chief Engineer
Approved: Safety Officer
Approved: Chief, Police & Security
GHD Cons Services, Inc.
Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202
Phone: 704-342-4910 www.ghd.com
GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211
Phone: 316-265-9367 www.glmv.com
AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202
Phone: 704-295-4263 www.ame-pc.com
STRATA Architecture, Inc.
Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108
Phone: 816-474-0900 www.strata-arch.com
Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603
Phone: 828-315-9962 www.atriaxgroup.com
A
KEYPLAN
TRUE NORTH
/2
/2
:2
:2
A M
C
U se rs \m th ra ilk ill
\D o c u m e n ts \M
E P
R a m e e n g in e e rs
.r v t
34-ED111
ELECTRICAL - FIRST FLOOR
DEMOLITION PLAN - AREA A
Renovate Building 34 to Correct FCA Deficiencies
James H. Quillen VAMC Mountain Home, TN
621-18-102
07/24/2020 SBT GMT 120 149
KEYNOTES:
1 REMOVE ALL ELECTRICAL WITHIN THE DEMOLITION BOUNDARY UON. DISCONNECT AND REMOVE
ALL CONDUIT, PANELS, FEEDERS, DISCONNECTS, DEVICES, WIRE, ETC. IN IT'S ENTIRETY UNO.
2 EXISTING TELECOMMUNICATIONS RACKS, EQUIPMENT AND CABLING IN THE EXISTING TELECOM
ROOM TO REMAIN, UON. CONTRACTOR SHALL PROTECT ALL EQUIPMENT DURING
CONSTRUCTION, AND ALL EQUIPMENT SHALL REMAIN ACTIVE AT ALL TIMES.
3 REMOVE ALL EXISTING TELECOMMUNICATIONS WITHIN THE DEMOLITION BOUNDARY
COMPLETELY BACK TO THE EXISTING TELECOM ROOM ON THE FIRST FLOOR, UON. DISCONNECT
AND REMOVE ALL CONDUIT, JUNCTION BOXES, JACKS, OUTLET PLATES, CABLES, ETC. IN IT'S
ENTIRETY, UNO.
4 DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, CONDUIT AND WIRE BACK
TO SOURCE FOR HVAC EQUIPMENT.
5 FIELD VERIFY IF EXISTING FEEDER SERVES GAZEBO. THIS FEEDER SHALL REMAIN AND SHALL BE
RE-FED FROM NEW PANEL.
6 EXISTING FEEDER TO PUMP HOUSE TO REMAIN.
7 EXISTING DECORATIVE PENDANT LIGHT FIXTURE SHALL BE REMOVED AND TURNED OVER TO
OWNER.
1/8" = 1'-0"1
ELECTRICAL - FIRST FLOOR DEMOLITION PLAN - AREA A
ELECTRICAL GENERAL NOTES - DEMO
L THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL PCB CONTAINING EQUIPMENT SUCH AS
BALLASTS, TRANSFORMERS, AND POTTING COMPOUNDS THROUGH PROPER AUTHORITIES.
M THE CONTRACTOR SHALL REMOVE ALL ELECTRICAL DEVICES, FIXTURES, WIRING, AND ROUGH-IN IN WALLS, FLOORS OR CEILINGS TO BE DEMOLISHED. THE CONTRACTOR SHALL REMOVE EXISTING ELECTRICAL
DEVICES, LIGHTING FIXTURES, SYSTEMS DEVICE, ASSOCIATED WIRING, AND CONDUIT BACK TO SOURCE OR NEAREST DEVICE TO REMAIN, UNLESS OTHERWISE NOTED. IF EXISTING CIRCUIT HAS DOWNSTREAM DEVICES
TO REMAIN, CONTRACTOR SHALL REFEED THESE ITEMS ACCORDINGLY THROUGH ALTERNATE PATH.
N THE ELECTRICAL CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING CONDUIT AND THE WIRING WILL HAVE TO BE RE-ROUTED, RELOCATED, OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL
WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL LOCATION OF THE CONDUIT AND WIRING SHALL BE
PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER.
O PRIOR TO ANY DEACTIVATION AND RELOCATION OF DEMOLITION WORK, ARRANGE A CONFERENCE WITH ARCHITECT AND THE OWNER'S REPRESENTATIVE IN THE FIELD TO INSPECT EACH OF THE ITEMS TO BE
DEACTIVATED, REMOVED OR RELOCATED. CARE SHALL BE TAKEN TO PROTECT ALL EQUIPMENT DESIGNATED TO BE RELOCATED AND REUSED OR TO REMAIN OPERATION AND BE INTEGRATED WITH THE NEW SYSTEMS.
P CONTRACTOR SHALL INSPECT AND IDENTIFY ANY CONDUIT AND/OR CONDUCTORS THAT MAY BE EMBEDDED IN WALLS TO BE DEMOLISHED OR LOCATED IN THE DEMOLITION AREA AND RELOCATE THESE TO NEW LOCATION
PRIOR TO THE START OF DEMOLITION. BID PRICE SHALL INCLUDE CONDUIT AND CONDUCTORS AND LABOR
FOR ANY THAT MUST BE REMOVED OR RELOCATED.
Q NO WORK IN HATCHED AREAS. E.C. TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING CONSTRUCTION.
R ALL WORK SHOWN LIGHT AND SOLID IS EXISTING TO REMAIN. ALL WORK SHOW BOLD AND/OR DASHED IS
EXISTING TO BE DEMOLISHED.
S DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO THE NEW LOCATION AS INDICATED ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S). DEVICES/EQUIPMENT NOTED AS ETBR ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S) INDICATES THE NEW LOCATION FOR THE
RELOCATED EXISTING DEVICE/EQUIPMENT.
ELECTRICAL GENERAL NOTES - DEMO
A IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO
ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL, ETC. PLANS FOR WORK
SHOWN TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED.
B WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY
STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT.
C THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS
REQUIRED TO PREVENT DAMAGE.
D THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION
DEBRIS GENERATED. TAKE CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES.
E THE CONTRACTOR SHALL COORDINATE/SCHEDULE ALL POWER INTERRUPTIONS WITH THE OWNER AND
POWER COMPANY IN WRITING.
F WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL REMAINING OPENINGS IN THE SLAB/WALL SHALL BE FILLED IN BY THE CONTRACTOR TO MATCH ADJACENT.
G REMOVE ALL MISCELLANEOUS ELECTRICAL, FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED
FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER.
H THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT.
I THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS, AND STAIRS.
J THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE.
K THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL FLUORESCENT AND HID LAMPS. THE CONTRACTOR SHALL PROVIDE VERIFICATION OF PROPER LAMP DISPOSAL UPON OWNER
REQUEST.
FD
AP
CR
AP
CR
AP
AP
AP
J
J
J
J CR
CR
AP
AP
CR
CR
OS
OS
AP
AP
AP
OS
AP
AP
CR
J
AP
CR
D-34A-1-3
D-34-1-2
D34-A-1-7
D34-A-1-8 D34-A-1-4
D34A-1-8-EEP
D-34B-1-8-EEP
DEMOLITION AREA 1
FAN
GFI
HOOD
D34-A-0-5
Drawing Title
Approved: Associate Director
Project Title
Date
Location
Checked
Building Number
Project Number:
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Dwg. of o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans
Health
Administration Approved: Chief of Staff
Approved: Infection Control
Approved: Chief Engineer
Approved: Safety Officer
Approved: Chief, Police & Security
GHD Cons Services, Inc.
Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202
Phone: 704-342-4910 www.ghd.com
GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211
Phone: 316-265-9367 www.glmv.com
AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202
Phone: 704-295-4263 www.ame-pc.com
STRATA Architecture, Inc.
Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108
Phone: 816-474-0900 www.strata-arch.com
Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603
Phone: 828-315-9962 www.atriaxgroup.com
B
KEYPLAN
TRUE NORTH
/2
/2
:2
:2
A M
C
U se rs \m th ra ilk ill
\D o c u m e n ts \M
E P
R a m e e n g in e e rs
.r v t
34-ED112
ELECTRICAL - FIRST FLOOR
DEMOLITION PLAN - AREA B
Renovate Building 34 to Correct FCA Deficiencies
James H. Quillen VAMC Mountain Home, TN
621-18-102
07/24/2020 SBT GMT 121 149
KEYNOTES:
1 REMOVE ALL ELECTRICAL WITHIN THE DEMOLITION BOUNDARY UON. DISCONNECT
AND REMOVE ALL CONDUIT, PANELS, FEEDERS, DISCONNECTS, DEVICES, WIRE,
ETC. IN IT'S ENTIRETY UNO.
2 REMOVE ALL EXISTING TELECOMMUNICATIONS WITHIN THE DEMOLITION
BOUNDARY COMPLETELY BACK TO THE EXISTING TELECOM ROOM ON THE FIRST
FLOOR, UON. DISCONNECT AND REMOVE ALL CONDUIT, JUNCTION BOXES, JACKS,
OUTLET PLATES, CABLES, ETC. IN IT'S ENTIRETY, UNO.
3 DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, CONDUIT
AND WIRE BACK TO SOURCE FOR HVAC EQUIPMENT.
4 DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, CONDUIT
AND WIRE BACK TO SOURCE FOR WALK-IN COOLER.
5 EXISTING LIFT SHALL REMAIN AND REFED FROM NEW PANEL.
6 EXISTING GENERATOR SHALL REMAIN.
7 EXISTING LAB UNITS SHALL BE REMOVED AND ALL ASSOCIATED EQUIPMENT, WIRE
AND CONDUIT BACK TO SOURCE.
1/8" = 1'-0"1
ELECTRICAL - FIRST FLOOR DEMOLITION PLAN - AREA B
ELECTRICAL GENERAL NOTES - DEMO
L THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL PCB CONTAINING EQUIPMENT SUCH AS
BALLASTS, TRANSFORMERS, AND POTTING COMPOUNDS THROUGH PROPER AUTHORITIES.
M THE CONTRACTOR SHALL REMOVE ALL ELECTRICAL DEVICES, FIXTURES, WIRING, AND ROUGH-IN IN WALLS, FLOORS OR CEILINGS TO BE DEMOLISHED. THE CONTRACTOR SHALL REMOVE EXISTING ELECTRICAL
DEVICES, LIGHTING FIXTURES, SYSTEMS DEVICE, ASSOCIATED WIRING, AND CONDUIT BACK TO SOURCE OR NEAREST DEVICE TO REMAIN, UNLESS OTHERWISE NOTED. IF EXISTING CIRCUIT HAS DOWNSTREAM DEVICES
TO REMAIN, CONTRACTOR SHALL REFEED THESE ITEMS ACCORDINGLY THROUGH ALTERNATE PATH.
N THE ELECTRICAL CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING CONDUIT AND THE WIRING WILL HAVE TO BE RE-ROUTED, RELOCATED, OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL
WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL LOCATION OF THE CONDUIT AND WIRING SHALL BE
PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER.
O PRIOR TO ANY DEACTIVATION AND RELOCATION OF DEMOLITION WORK, ARRANGE A CONFERENCE WITH ARCHITECT AND THE OWNER'S REPRESENTATIVE IN THE FIELD TO INSPECT EACH OF THE ITEMS TO BE
DEACTIVATED, REMOVED OR RELOCATED. CARE SHALL BE TAKEN TO PROTECT ALL EQUIPMENT DESIGNATED TO BE RELOCATED AND REUSED OR TO REMAIN OPERATION AND BE INTEGRATED WITH THE NEW SYSTEMS.
P CONTRACTOR SHALL INSPECT AND IDENTIFY ANY CONDUIT AND/OR CONDUCTORS THAT MAY BE EMBEDDED IN WALLS TO BE DEMOLISHED OR LOCATED IN THE DEMOLITION AREA AND RELOCATE THESE TO NEW LOCATION
PRIOR TO THE START OF DEMOLITION. BID PRICE SHALL INCLUDE CONDUIT AND CONDUCTORS AND LABOR
FOR ANY THAT MUST BE REMOVED OR RELOCATED.
Q NO WORK IN HATCHED AREAS. E.C. TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING CONSTRUCTION.
R ALL WORK SHOWN LIGHT AND SOLID IS EXISTING TO REMAIN. ALL WORK SHOW BOLD AND/OR DASHED IS
EXISTING TO BE DEMOLISHED.
S DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO THE NEW LOCATION AS INDICATED ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S). DEVICES/EQUIPMENT NOTED AS ETBR ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S) INDICATES THE NEW LOCATION FOR THE
RELOCATED EXISTING DEVICE/EQUIPMENT.
ELECTRICAL GENERAL NOTES - DEMO
A IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO
ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL, ETC. PLANS FOR WORK
SHOWN TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED.
B WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY
STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT.
C THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS
REQUIRED TO PREVENT DAMAGE.
D THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION
DEBRIS GENERATED. TAKE CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES.
E THE CONTRACTOR SHALL COORDINATE/SCHEDULE ALL POWER INTERRUPTIONS WITH THE OWNER AND
POWER COMPANY IN WRITING.
F WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL REMAINING OPENINGS IN THE SLAB/WALL SHALL BE FILLED IN BY THE CONTRACTOR TO MATCH ADJACENT.
G REMOVE ALL MISCELLANEOUS ELECTRICAL, FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED
FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER.
H THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT.
I THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS, AND STAIRS.
J THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO
PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE.
K THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL FLUORESCENT AND HID LAMPS. THE CONTRACTOR SHALL PROVIDE VERIFICATION OF PROPER LAMP DISPOSAL UPON OWNER
REQUEST.
D-34B-2-6-EEP-16,18
D-34-B-2-6-EEP
DEMOLITION AREA 1 2
C10
CKT
LOCATION
CIRCUIT NAME
EXIST. CKT
EXIST. CKT
EXIST. CKT
EXIST. CKT
EXIST. CKT
EXIST. CKT
EXIST. CKT
EXIST. CKT
OLD PANEL NEW PANEL
C10
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-6-EEP
D-34B-2-A-1 D-34B-2-A-3 D-34B-2-A-5 D-34B-2-A-2 D-34B-2-A-4 D-34B-2-A-6 D-34B-2-A-8
D-34B-2-A-10
NOTE: INTERCEPT EXISTING CIRCUITS SHOWN IN THIS LOCATION AND EXTEND OVER TO NEW PANEL AS SHOWN, MATCH CONDUIT AND WIRE. FIELD VERIFY EXACT
CIRCUIT NUMBER AND NUMBER OF CIRCUITS TO BE RE-FED.
Drawing Title
Approved: Associate Director
Project Title
Date
Location
Checked
Building Number
Project Number:
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Dwg. of o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans
Health
Administration Approved: Chief of Staff
Approved: Infection Control
Approved: Chief Engineer
Approved: Safety Officer
Approved: Chief, Police & Security
GHD Cons Services, Inc.
Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202
Phone: 704-342-4910 www.ghd.com
GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211
Phone: 316-265-9367 www.glmv.com
AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202
Phone: 704-295-4263 www.ame-pc.com
STRATA Architecture, Inc.
Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108
Phone: 816-474-0900 www.strata-arch.com
Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603
Phone: 828-315-9962 www.atriaxgroup.com
A
KEYPLAN
TRUE NORTH
/2
/2
:2
:3
A M
C
U se rs \m th ra ilk ill
\D o c u m e n ts \M
E P
R a m e e n g in e e rs
.r v t
34-ED121
ELECTRICAL - SECOND FLOOR / ATTIC
DEMOLITION PLAN - AREA A
Renovate Building 34 to Correct FCA Deficiencies
James H. Quillen VAMC Mountain Home, TN
621-18-102
07/24/2020 SBT GMT 122 149
KEYNOTES:
1 REMOVE ALL ELECTRICAL WITHIN THE DEMOLITION BOUNDARY UON. DISCONNECT AND REMOVE
ALL CONDUIT, PANELS, FEEDERS, DISCONNECTS, DEVICES, WIRE, ETC. IN IT'S ENTIRETY UNO.
2 REMOVE ALL EXISTING TELECOMMUNICATIONS WITHIN THE DEMOLITION BOUNDARY COMPLETELY
BACK TO THE EXISTING TELECOM ROOM ON THE FIRST FLOOR, UON. DISCONNECT AND REMOVE
ALL CONDUIT, JUNCTION BOXES, JACKS, OUTLET PLATES, CABLES, ETC. IN IT'S ENTIRETY, UNO.
1/8" = 1'-0"1
ELECTRICAL - SECOND FLOOR / ATTIC DEMOLITION PLAN - AREA A
ELECTRICAL GENERAL NOTES - DEMO
L THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL PCB CONTAINING EQUIPMENT SUCH AS
BALLASTS, TRANSFORMERS, AND POTTING COMPOUNDS THROUGH PROPER AUTHORITIES.
M THE CONTRACTOR SHALL REMOVE ALL ELECTRICAL DEVICES, FIXTURES, WIRING, AND ROUGH-IN IN WALLS, FLOORS OR CEILINGS TO BE DEMOLISHED. THE CONTRACTOR SHALL REMOVE EXISTING ELECTRICAL
DEVICES, LIGHTING FIXTURES, SYSTEMS DEVICE, ASSOCIATED WIRING, AND CONDUIT BACK TO SOURCE OR NEAREST DEVICE TO REMAIN, UNLESS OTHERWISE NOTED. IF EXISTING CIRCUIT HAS DOWNSTREAM DEVICES
TO REMAIN, CONTRACTOR SHALL REFEED THESE ITEMS ACCORDINGLY THROUGH ALTERNATE PATH.
N THE ELECTRICAL CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING CONDUIT AND THE WIRING WILL HAVE TO BE RE-ROUTED, RELOCATED, OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL
WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL LOCATION OF THE CONDUIT AND WIRING SHALL BE
PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER.
O PRIOR TO ANY DEACTIVATION AND RELOCATION OF DEMOLITION WORK, ARRANGE A CONFERENCE WITH ARCHITECT AND THE OWNER'S REPRESENTATIVE IN THE FIELD TO INSPECT EACH OF THE ITEMS TO BE
DEACTIVATED, REMOVED OR RELOCATED. CARE SHALL BE TAKEN TO PROTECT ALL EQUIPMENT DESIGNATED TO BE RELOCATED AND REUSED OR TO REMAIN OPERATION AND BE INTEGRATED WITH THE NEW SYSTEMS.
P CONTRACTOR SHALL INSPECT AND IDENTIFY ANY CONDUIT AND/OR CONDUCTORS THAT MAY BE EMBEDDED IN WALLS TO BE DEMOLISHED OR LOCATED IN THE DEMOLITION AREA AND RELOCATE THESE TO NEW LOCATION
PRIOR TO THE START OF DEMOLITION. BID PRICE SHALL INCLUDE CONDUIT AND CONDUCTORS AND LABOR
FOR ANY THAT MUST BE REMOVED OR RELOCATED.
Q NO WORK IN HATCHED AREAS. E.C. TO MAINTAIN ALL CIRCUITS IN THIS AREA DURING CONSTRUCTION.
R ALL WORK SHOWN LIGHT AND SOLID IS EXISTING TO REMAIN. ALL WORK SHOW BOLD AND/OR DASHED IS
EXISTING TO BE DEMOLISHED.
S DEVICES/EQUIPMENT NOTED AS ETBR ON THE DEMOLITION PLAN(S) SHALL BE REMOVED AND RELOCATED TO THE NEW LOCATION AS INDICATED ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S). DEVICES/EQUIPMENT NOTED AS ETBR ON THE NEW LIGHTING/POWER/SYSTEMS PLAN(S) INDICATES THE NEW LOCATION FOR THE
RELOCATED EXISTING DEVICE/EQUIPMENT.
ELECTRICAL GENERAL NOTES - DEMO
A IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO
ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL, ETC. PLANS FOR WORK
SHOWN TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED.
B WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY
STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT.
C THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS
REQUIRED TO PREVENT DAMAGE.
D THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION
DEBRIS GENERATED. TAKE CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES.
E THE CONTRACTOR SHALL COORDINATE/SCHEDULE ALL POWER INTERRUPTIONS WITH THE OWNER AND
POWER COMPANY IN…