This document is an informational specification regarding temporary sludge dewatering equipment and operations at the Santa Barbara Integrated Wastewater Treatment Plant (SBIWTP) during planned facility rehabilitation.

The SBIWTP currently operates a screw press and auxiliary mobile conveyor supplementing the belt filter press for sludge dewatering, located at the south end of the existing Sludge Dewatering Building. The existing Sludge Dewatering Facility, Lime Stabilization Facility, and Truck Loading Facility are scheduled for major rehabilitation beginning in the second half of 2027, with an anticipated 30-month construction duration. Prior to rehabilitation commencement, the Construction Contractor must install a second temporary screw press and auxiliary mobile conveyor and provide a comprehensive service and maintenance agreement for this equipment throughout the rehabilitation period. During rehabilitation, sludge dewatering will operate exclusively with polymer totes configured for the screw press units, with no bulk polymer provisions available. Upon final completion and commissioning of the rehabilitation work, the temporary screw press units will be removed from service and replaced with the new permanent bulk dewatering polymer facility. Additional location maps and detailed drawings of the temporary equipment configuration are available in the referenced attachment, Screw Press Map and Drawings.pdf.

View the file

Other files

File Type Posted
191BWC26R0009 0001.pdf PDF
Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf PDF
Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf PDF
Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf PDF
Attch. 33 O&M Services Price Workbook (blank template).xls XLS spreadsheet
Attch. 29 Screw Press Map and Drawings.pdf PDF
FY27 SBIWTP OM PWS REV 1 10.19.26.pdf PDF
Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf PDF
Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf PDF
Attch. 16 Plans Drawings Request Instructions.docx DOCX document
Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 25 Client Authorization Letter.docx DOCX document
191BWC26R0009 OM SBIWTP Services.pdf PDF
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 23 LAB SAMPLING QTY.xlsx XLSX spreadsheet
Attch. 04.a. GiantKelpVariance_09.11.26.pdf PDF
Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf PDF
Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf PDF
Attch. 05 List-of-Permits.pdf PDF
Attch. 24 OEP-SBIWTP(2026).pdf PDF
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 05 List-of-Permits.docx DOCX document
Attah. 01 PWS SBIWTP O&M Services.pdf PDF
Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.docx DOCX document
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 FY26 IBWC Condition Assessment Report.pdf PDF
Attch. 26 Past Performance Questionnaire.pdf PDF
Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2025.pdf PDF
Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sludge Dewatering During Construction

Temporary Dewatering Equipment

Currently, the SBIWTP has a screw press and auxiliary mobile conveyor that is supplementing the belt filter press process for sludge dewatering. The screw press is located at the south end of the existing Sludge Dewatering Building. Refer to the attachment, Screw Press Map and Drawings.pdf, for a location map and drawings of the temporary screw press and auxiliary mobile conveyor.

The existing Sludge Dewatering Facility, Lime Stabilization Facility, and Truck Loading

Facility are planned to undergo major rehabilitation as part of Phase 1 construction, anticipated to begin during the second half of 2027. The duration of the rehabilitation work is expected to be approximately a 30-month period. Permanent sludge dewatering equipment becomes available upon final completion and commissioning of said work.

Prior to the commencement of rehabilitation activities, the Construction Contractor will install a second temporary screw press and auxiliary mobile conveyor. The Construction

Contractor will provide a service and maintenance agreement for the second temporary screw press throughout the rehabilitation period.

During the rehabilitation period, there will be no provisions for use of bulk polymer for sludge dewatering. The screw press units are configured to use polymer totes.

When the sludge dewatering facility rehabilitation is complete, the screw press units will be removed from service and the new bulk dewatering polymer facility placed in service.

File details come from the government source that posted it. Updated .