Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation number
191BWC26R0009
Issued by

About this file

This is a Statements of Submittal (SOMs) register that outlines all required submissions for the Operations and Maintenance Services contract for the Southbay Wastewater Treatment Plant (SBIWTP). The register details 21 distinct submittal requirements spanning planning documents, operational procedures, inspection records, reports, and compliance documentation. Key initial submissions due within 15-30 days of award include a Phase-In Plan, Preventative Maintenance Plan (PMP), personnel certifications and licenses, Site Safety Plan, Laboratory Quality Control & Management Plan, and Continuity of Operations Plan (COOP). Within 180 days of award, the contractor must verify and update Standard Operating Procedures (SOPs) transferred from the previous operator and conduct a physical inventory of real property. Additional one-time submissions include a Sequence of Operations (SOO) manual and SCADA documentation, and As-Builts as needed.

The register establishes ongoing monthly and annual reporting obligations requiring the contractor to maintain daily plant logs and records, submit monthly Operations & Maintenance reports by the 15th of each month documenting influent/effluent quality and quantity, sludge production, chemical storage and dosage, maintenance tasks, and network maintenance activities, and provide annual Condition & Risk Assessment Reports, 5-Year Capital Plans, and Deferred Maintenance & Repair Reports due by September 30 and January 15 respectively. Daily canyon collector inspections with monthly photo submissions and compliance with all NPDES permit requirements are also mandated. The contractor is responsible for maintaining all records for five years, with originals retained at the facility's Operations Office.

View the file

Other files

File Type Posted
191BWC26R0009 0001.pdf PDF
Attch. 28 Temporary_Dewatering_Narrative.pdf PDF
Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf PDF
Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf PDF
Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf PDF
Attch. 33 O&M Services Price Workbook (blank template).xls XLS spreadsheet
Attch. 29 Screw Press Map and Drawings.pdf PDF
FY27 SBIWTP OM PWS REV 1 10.19.26.pdf PDF
Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf PDF
Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf PDF
Attch. 16 Plans Drawings Request Instructions.docx DOCX document
Attch. 25 Client Authorization Letter.docx DOCX document
191BWC26R0009 OM SBIWTP Services.pdf PDF
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 23 LAB SAMPLING QTY.xlsx XLSX spreadsheet
Attch. 04.a. GiantKelpVariance_09.11.26.pdf PDF
Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf PDF
Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf PDF
Attch. 05 List-of-Permits.pdf PDF
Attch. 24 OEP-SBIWTP(2026).pdf PDF
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 05 List-of-Permits.docx DOCX document
Attah. 01 PWS SBIWTP O&M Services.pdf PDF
Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.docx DOCX document
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 FY26 IBWC Condition Assessment Report.pdf PDF
Attch. 26 Past Performance Questionnaire.pdf PDF
Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2025.pdf PDF
Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOMS

SUBMITTAL REGISTER (SOMs)
CONTRACT NO.
TITLE AND LOCATIONSPECIFICATION SECTION
A C T I V I T Y

N O

TYPE OF SUBMITTALCLASSI-
FICATIONGOVTCONTRACTOR
SCHEDULE DATESGOVERNMENT

ACTION

SPECIFICATION/PWS PARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDFrequencyD A T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
S T A T E M E N T S
R E P O R T S
C E R T I F I C A T E S
S A M P L E
R E C O R D S
INFORMATION ONLYGOVERNMENT APPROVAL NEEDEDREVIEWERSUBMIT dateAPPROVAL NEEDED BYMATERIAL NEEDED BYDate RcvdDate sent to KTRREMARKS
2Solicitation, PWS 1.1.1Phase-In Planoncexto be provided with Proposal
3PWS 1.3.13Preventative Maintenance Plan (PMP)once, reviewed annuallyxNLT 30 SEP
PWS 1.5.1Preventative Maintenance & Inspection Program (PMI)
4PWS1.1.1Certifications, Licenses of personnelonce, update as neededxto be provided 15 days after award
5PWS 3.2Physical Inventory of Real Property to be maintanedinitialxinventory to be conducted 90 days after award
6PWS 4.7Site Safety Planonce, and update as neededxCOR to Safety Officeto be provided 15 days after award
7PWS 2.0 & 4.5Laboratory Quality Control & Management Planonce and update as neededxCOR to Env. Officeto be provided with proposal
8PWS 1.1.1 & 4.6.3Continuity of Operations Plan (COOP)once, and update as neededxCORto be provided within 30 days after award
10PWS 1.3.11SOPs Standard Operating Proceduresonce, and update as neededxNLT 30 SEPTransfer ownership from previous operator to new operator, Physical Location in Ops. Office at SBIWTP, new operator to verify SOPs and provide an update within 180 days of contract award
11PWS 1.2.3Canyon collector daily inspections, with photosmonthlyxNLT 15th of mo.submit with Monthly Report
12PWS 1.2.2Plant Log, Record keeping logsdailyxContractor shall maintain records for 5 years and originals
13PWS 1.3.6Condition & Risk Assessment ReportannuallyxNLT 30 SEP
14PWS 1.3.75 Year Capital PlanannuallyxNLT 30 SEP
15PWS 1.3.12Deferred Maintenance & Repair ReportannuallyxNLT 15 JAN
16PWS 1.3.3Monthly O&M Reportsmonthlyxto include influent effulent wwtp quality and qty., qty. of sludge produced, chemicals stored and dosage, repairs and maintenance tasks performed, pending modifications too, also include admin network maintenance performed
18PWS 1.2.4 & 4.2.1.1 &1.3.10Admin Network Cybersecurity Program
19PWS 4.2.1.1Sequence of Operations (SOO) manual, SCADAonce and update as neededx
20PWS 1.3.9As-Builtsas neededx
21NPDES & PWS 1.3.2All reports required under NPDES Monitor & Program Requirements, Attachment E