Attch. 33 O&M Services Price Workbook (blank template)_updatedNov2026.xlsx
XLSX spreadsheet 47 KB Posted
- Solicitation number
- 191BWC26R0009
About this file
This is a blank pricing template for Operation and Maintenance Services for the Southbay Inland Wastewater Treatment Plant (SBIWTP) under federal solicitation 191BWC26R0009. The template is designed for offerors to submit cost proposals for two operational capacity levels: 25 Million Gallons Per Day (MGD) and 10 MGD, with pricing structured across a base year and four option years, plus a 60-day phase-in transition period.
The contract period begins June 1, 2027, with the base year running through May 31, 2028, followed by four one-year option periods extending through May 31, 2032. The 60-day phase-in period runs April 1, 2027 through May 31, 2027. Offerors must provide detailed cost breakdowns organized by labor, materials, and equipment across specified line items including direct labor and salaries, fringe benefits, vehicle and fleet expenses, office supplies, chemicals (ferric chloride, sodium hypochlorite, sodium hydroxide, anionic polymer, cationic polymer, sulfuric acid, and water softener salt), laboratory services, repairs and maintenance, sediment removal, capital expenditure repairs, asset management software, SCADA systems, and permits and licenses. The template requires offerors to propose reasonable annual inflation or escalation rates for each option year and to provide detailed assumptions and markups in their price proposal narrative. Additional submission requirements include personnel salary breakdowns, repairs and maintenance cost estimates, and chemical expense details. An 8 percent tax and variable overhead and profit percentages must be calculated and applied to all cost estimates.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| OFFEROR: | |
| Date: | |
| 191BWC26R0009 | |
| SCOPE OF WORK: Operation and Maintenance Services for SBIWTP | |
| SUMMARY OF CLIN COSTS |
| CLIN | Period | Dates | Cost |
| 001 | Base Year - 25MGD | June 1, 2027 - May 31, 2028 | $0.00 |
| 002 | Base Year - 10MGD | June 1, 2027 - May 31, 2028 | $0.00 |
| 003 | 1st Option Year - 25MGD | June 1, 2028 - May 31, 2029 | $0.00 |
| 004 | 1st Option Year - 10MGD | June 1, 2028 - May 31, 2029 | $0.00 |
| 005 | 2nd Option Year - 25MGD | June 1, 2029 - May 31, 2030 | $0.00 |
| 006 | 2nd Option Year - 10MGD | June 1, 2029 - May 31, 2030 | $0.00 |
| 007 | 3rd Option Year - 25MGD | June 1, 2030 - May 31, 2031 | $0.00 |
| 008 | 3rd Option Year - 10MGD | June 1, 2030 - May 31, 2031 | $0.00 |
| 009 | 4th Option Year - 25MGD | June 1, 2031 - May 31, 2032 | $0.00 |
| 010 | 4th Option Year - 10MGD | June 1, 2031 - May 31, 2032 | $0.00 |
| 011 | Phase-In | April1, 2027 - May 31, 2027 | $0.00 |
| Total | $0.00 |
Instructions: The 25MGD and 10MGD template is setup for the base year and the option years have a rate of inflation added. Offerors shall determine their reasonable inflation/escalation rate per year and explain their proposed value in the price proposal narrative. Offerors may add or revise line items as needed to show the full breakdown of their costs. Provide all assumptions and proposed markups in the price proposal narrative.
25MGD Cost Estimate
| SCOPE OF WORK: Operation and Maintenance Services for SBIWTP | ||
| 25 MGD O&M | ||
| Base Period June 1, 2027 through May 31, 2028 |
| ITEM | DESCRIPTION | QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||
| unit $ | Total | unit $ | Total | unit $ | Total | |||||
| 1 | Direct Labor/ Salaries |
2 Fringe Benefits
| 3 | Vehicle/Fleet Expenses |
| Fuel |
4 Office Supplies
| 5 | Chemicals | |
| Ferric Chloride | tons | |
| Sodium Hypochloride | gal | |
| Sodium Hydroxide | tons | |
| Anionic Polymer | lbs | |
| Cationic Polymer | lbs | |
| Sulfuric Acid | gal | |
| Water Softener Salt | tons |
6 Laboratory Services
7 Repairs and Maintenance
8 Canyon Collectors/Sediment Removal/Trash removal
9 Capital Expenditure Repairs
10 Asset Management Software 0.00 0.00
11 SCADA 0.00
12 Permits, Licenses 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00
13 Sub Contract Costs
14 Insurance and Bonds
| Sub Total | ||||
| Overhead % Enter proposed rate under QTY | 0.00 | |||
| Taxes @ 8% | 8.0% | 0.00 | ||
| Sub Total | 0.00 | |||
| Profit % Enter proposed rate under QTY | 0.00 | |||
| Grand Total | $0.00 | |||
| Enter Proposed Inflation | ||||
| 1ST YEAR OPTION - Add % increase | $0.00 | 2029 | ||
| 2ND YEAR OPTION - Add % increase | $0.00 | 2030 | ||
| 3RD YEAR OPTION - Add % increase | $0.00 | 2031 | ||
| 4TH YEAR OPTION - Add % increase | $0.00 | 2032 |
Add'l 10MGD Cost Estimate
| SCOPE OF WORK: Operation and Maintenance Services for SBIWTP | ||
| 10 MGD O&M | ||
| Base Period June 1, 2027 through May 31, 2028 |
| ITEM | DESCRIPTION | QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||
| unit $ | Total | unit $ | Total | unit $ | Total | |||||
| 1 | Direct Labor/ Salaries |
2 Fringe Benefits
| 3 | Vehicle/Fleet Expenses |
| Fuel |
4 Office Supplies
| 5 | Chemicals | |
| Ferric Chloride | tons | |
| Sodium Hypochloride | gal | |
| Sodium Hydroxide | tons | |
| Anionic Polymer | lbs | |
| Cationic Polymer | lbs | |
| Sulfuric Acid | gal | |
| Water Softener Salt | tons |
6 Laboratory Services
7 Repairs and Maintenance
8 Canyon Collectors/Sediment Removal/Trash removal
9 Capital Expenditure Repairs
10 Asset Management Software 0.00 0.00
11 SCADA 0.00
12 Permits, Licenses 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00
13 Sub Contract Costs
14 Insurance and Bonds
| Sub Total | ||||
| Overhead % | 0.0% | 0.00 | ||
| Taxes @ 8% | 8.0% | 0.00 | ||
| Sub Total | 0.00 | |||
| Profit % | 0.0% | 0.00 | ||
| Grand Total | $0.00 | |||
| Enter Proposed Inflation | ||||
| 1ST YEAR OPTION - Add % increase | $0.00 | 2029 | ||
| 2ND YEAR OPTION - Add % increase | $0.00 | 2030 | ||
| 3RD YEAR OPTION - Add % increase | $0.00 | 2031 | ||
| 4TH YEAR OPTION - Add % increase | $0.00 | 2032 |
Phase-In Cost Estimate
| SCOPE OF WORK: Operation and Maintenance Services for SBIWTP | ||
| 60-Day Phase-In Transition Period | ||
| April 1, 2027 through May 31, 2027 |
| ITEM | DESCRIPTION | QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||
| unit $ | Total | unit $ | Total | unit $ | Total | |||||
| 1 | Direct Labor/ Salaries |
2 Fringe Benefits
| 3 | Vehicle/Fleet Expenses Mobilization |
| Fuel |
4 Office Supplies Mobilization
5 Asset Management Software Setup
9 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00
10 Sub Contract Costs
11 Insurance and Bonds
| Sub Total | ||
| Overhead % | 0.0% | 0.00 |
| Taxes @ 8% | 8.0% | 0.00 |
| Sub Total | 0.00 | |
| Profit % | 0.0% | 0.00 |
| Grand Total | $0.00 |
Salaries, Personnel breakdown
| okl |
| Instructions: Provide a breakdown of Personnel and Salaries. This does not count against or affect the vendor's ratings. |
Repairs & Maint. breakdown
Instructions: Provide a Repairs and Maintenance Avg cost, to the best of your knowledge. This does not count against or affect the vendor's ratings.
REF. Chemicals List Breakdown
| REFERENCE | ||
| Annual Chemical Expenses~ 35MGD | ||
| Location, Chemical | Dose | Approximate Consumption per year |
| H2S Control, Ferric Chloride | 9.5 mg/l | 204,588 gal |
| CEPT, Ferric Chloride | *14.9 mg/l | 329,088 gal |
| CEPT, Anionic Polymer | *0.20 mg/l | 7,248 |
| Belt Press, Cationic Polymer | 12.67 lbs/ton | 888,468 gal |
| Belt Press, Lime | 0.0 lbs/ton | 0.0 tons |
| Odor Control, Sodium Hypochlorite | >575 mv | 196,272 gal |
| Odor Control, Sodium Hydroxide | >9.0 pH | 13,932 gal |
| Odor Control, Sulfuric Acid | <4.0 pH | 960 gal |
| Reclaim Water Chlorine | 0.0 mg/l | 0 gal |
REF. Labs. Sampling svcs.
| REFERENCE |
| See Attachment 23 |