Attch. 33 O&M Services Price Workbook (blank template)_updatedNov2026.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation number
191BWC26R0009
Issued by

About this file

This is a blank pricing template for Operation and Maintenance Services for the Southbay Inland Wastewater Treatment Plant (SBIWTP) under federal solicitation 191BWC26R0009. The template is designed for offerors to submit cost proposals for two operational capacity levels: 25 Million Gallons Per Day (MGD) and 10 MGD, with pricing structured across a base year and four option years, plus a 60-day phase-in transition period.

The contract period begins June 1, 2027, with the base year running through May 31, 2028, followed by four one-year option periods extending through May 31, 2032. The 60-day phase-in period runs April 1, 2027 through May 31, 2027. Offerors must provide detailed cost breakdowns organized by labor, materials, and equipment across specified line items including direct labor and salaries, fringe benefits, vehicle and fleet expenses, office supplies, chemicals (ferric chloride, sodium hypochlorite, sodium hydroxide, anionic polymer, cationic polymer, sulfuric acid, and water softener salt), laboratory services, repairs and maintenance, sediment removal, capital expenditure repairs, asset management software, SCADA systems, and permits and licenses. The template requires offerors to propose reasonable annual inflation or escalation rates for each option year and to provide detailed assumptions and markups in their price proposal narrative. Additional submission requirements include personnel salary breakdowns, repairs and maintenance cost estimates, and chemical expense details. An 8 percent tax and variable overhead and profit percentages must be calculated and applied to all cost estimates.

View the file

Other files

File Type Posted
Offeror Questions_thru20261119.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2026.pdf PDF
191BWC26R0009 0004.pdf PDF
Attch. 01 PWS SBIWTP O&M Services 20261125.pdf PDF
Attch. 21 Wage Determination CA2015-5635 Rev32 20260908.pdf PDF
Attch. 32 0131 20260720 PCL Construction Security Plan.pdf PDF
191BWC26R0009-0003.pdf PDF
191BWC26R0009 0002.pdf PDF
191BWC26R0009 0001.pdf PDF
Attch. 28 Temporary_Dewatering_Narrative.pdf PDF
Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf PDF
Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf PDF
Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf PDF
Attch. 33 O&M Services Price Workbook (blank template).xls XLS spreadsheet
Attch. 29 Screw Press Map and Drawings.pdf PDF
FY27 SBIWTP OM PWS REV 1 10.19.26.pdf PDF
Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf PDF
Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf PDF
Attch. 16 Plans Drawings Request Instructions.docx DOCX document
Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 25 Client Authorization Letter.docx DOCX document
191BWC26R0009 OM SBIWTP Services.pdf PDF
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 23 LAB SAMPLING QTY.xlsx XLSX spreadsheet
Attch. 04.a. GiantKelpVariance_09.11.26.pdf PDF
Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf PDF
Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf PDF
Attch. 05 List-of-Permits.pdf PDF
Attch. 24 OEP-SBIWTP(2026).pdf PDF
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 05 List-of-Permits.docx DOCX document
Attah. 01 PWS SBIWTP O&M Services.pdf PDF
Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.docx DOCX document
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 FY26 IBWC Condition Assessment Report.pdf PDF
Attch. 26 Past Performance Questionnaire.pdf PDF
Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2025.pdf PDF
Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

OFFEROR:
Date:
191BWC26R0009
SCOPE OF WORK: Operation and Maintenance Services for SBIWTP
SUMMARY OF CLIN COSTS
CLINPeriodDatesCost
001Base Year - 25MGDJune 1, 2027 - May 31, 2028$0.00
002Base Year - 10MGDJune 1, 2027 - May 31, 2028$0.00
0031st Option Year - 25MGDJune 1, 2028 - May 31, 2029$0.00
0041st Option Year - 10MGDJune 1, 2028 - May 31, 2029$0.00
0052nd Option Year - 25MGDJune 1, 2029 - May 31, 2030$0.00
0062nd Option Year - 10MGDJune 1, 2029 - May 31, 2030$0.00
0073rd Option Year - 25MGDJune 1, 2030 - May 31, 2031$0.00
0083rd Option Year - 10MGDJune 1, 2030 - May 31, 2031$0.00
0094th Option Year - 25MGDJune 1, 2031 - May 31, 2032$0.00
0104th Option Year - 10MGDJune 1, 2031 - May 31, 2032$0.00
011Phase-InApril1, 2027 - May 31, 2027$0.00
Total$0.00

Instructions: The 25MGD and 10MGD template is setup for the base year and the option years have a rate of inflation added. Offerors shall determine their reasonable inflation/escalation rate per year and explain their proposed value in the price proposal narrative. Offerors may add or revise line items as needed to show the full breakdown of their costs. Provide all assumptions and proposed markups in the price proposal narrative.

25MGD Cost Estimate

SCOPE OF WORK: Operation and Maintenance Services for SBIWTP
25 MGD O&M
Base Period June 1, 2027 through May 31, 2028
ITEMDESCRIPTIONQTYUNITLABORMATERIALEQUIPMENTTOTAL
unit $Totalunit $Totalunit $Total
1Direct Labor/ Salaries

2 Fringe Benefits

3Vehicle/Fleet Expenses
Fuel

4 Office Supplies

5Chemicals
Ferric Chloridetons
Sodium Hypochloridegal
Sodium Hydroxidetons
Anionic Polymerlbs
Cationic Polymerlbs
Sulfuric Acidgal
Water Softener Salttons

6 Laboratory Services

7 Repairs and Maintenance

8 Canyon Collectors/Sediment Removal/Trash removal

9 Capital Expenditure Repairs

10 Asset Management Software 0.00 0.00

11 SCADA 0.00

12 Permits, Licenses 0.00 0.00

Sub Total 0.00 0.00 0.00 0.00

13 Sub Contract Costs

14 Insurance and Bonds

Sub Total
Overhead % Enter proposed rate under QTY0.00
Taxes @ 8%8.0%0.00
Sub Total0.00
Profit % Enter proposed rate under QTY0.00
Grand Total$0.00
Enter Proposed Inflation
1ST YEAR OPTION - Add % increase$0.002029
2ND YEAR OPTION - Add % increase$0.002030
3RD YEAR OPTION - Add % increase$0.002031
4TH YEAR OPTION - Add % increase$0.002032

Add'l 10MGD Cost Estimate

SCOPE OF WORK: Operation and Maintenance Services for SBIWTP
10 MGD O&M
Base Period June 1, 2027 through May 31, 2028
ITEMDESCRIPTIONQTYUNITLABORMATERIALEQUIPMENTTOTAL
unit $Totalunit $Totalunit $Total
1Direct Labor/ Salaries

2 Fringe Benefits

3Vehicle/Fleet Expenses
Fuel

4 Office Supplies

5Chemicals
Ferric Chloridetons
Sodium Hypochloridegal
Sodium Hydroxidetons
Anionic Polymerlbs
Cationic Polymerlbs
Sulfuric Acidgal
Water Softener Salttons

6 Laboratory Services

7 Repairs and Maintenance

8 Canyon Collectors/Sediment Removal/Trash removal

9 Capital Expenditure Repairs

10 Asset Management Software 0.00 0.00

11 SCADA 0.00

12 Permits, Licenses 0.00 0.00

Sub Total 0.00 0.00 0.00 0.00

13 Sub Contract Costs

14 Insurance and Bonds

Sub Total
Overhead %0.0%0.00
Taxes @ 8%8.0%0.00
Sub Total0.00
Profit %0.0%0.00
Grand Total$0.00
Enter Proposed Inflation
1ST YEAR OPTION - Add % increase$0.002029
2ND YEAR OPTION - Add % increase$0.002030
3RD YEAR OPTION - Add % increase$0.002031
4TH YEAR OPTION - Add % increase$0.002032

Phase-In Cost Estimate

SCOPE OF WORK: Operation and Maintenance Services for SBIWTP
60-Day Phase-In Transition Period
April 1, 2027 through May 31, 2027
ITEMDESCRIPTIONQTYUNITLABORMATERIALEQUIPMENTTOTAL
unit $Totalunit $Totalunit $Total
1Direct Labor/ Salaries

2 Fringe Benefits

3Vehicle/Fleet Expenses Mobilization
Fuel

4 Office Supplies Mobilization

5 Asset Management Software Setup

9 0.00 0.00

Sub Total 0.00 0.00 0.00 0.00

10 Sub Contract Costs

11 Insurance and Bonds

Sub Total
Overhead %0.0%0.00
Taxes @ 8%8.0%0.00
Sub Total0.00
Profit %0.0%0.00
Grand Total$0.00

Salaries, Personnel breakdown

okl
Instructions: Provide a breakdown of Personnel and Salaries. This does not count against or affect the vendor's ratings.

Repairs & Maint. breakdown

Instructions: Provide a Repairs and Maintenance Avg cost, to the best of your knowledge. This does not count against or affect the vendor's ratings.

REF. Chemicals List Breakdown

REFERENCE
Annual Chemical Expenses~ 35MGD
Location, ChemicalDoseApproximate Consumption per year
H2S Control, Ferric Chloride9.5 mg/l204,588 gal
CEPT, Ferric Chloride*14.9 mg/l329,088 gal
CEPT, Anionic Polymer*0.20 mg/l7,248
Belt Press, Cationic Polymer12.67 lbs/ton888,468 gal
Belt Press, Lime0.0 lbs/ton0.0 tons
Odor Control, Sodium Hypochlorite>575 mv196,272 gal
Odor Control, Sodium Hydroxide>9.0 pH13,932 gal
Odor Control, Sulfuric Acid<4.0 pH960 gal
Reclaim Water Chlorine0.0 mg/l0 gal

REF. Labs. Sampling svcs.

REFERENCE
See Attachment 23