Attch. 05 List-of-Permits.pdf

PDF 102 KB Posted

Attached to
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation number
191BWC26R0009
Issued by

About this file

This document is a list of permits and fees required for the operation of the South Bay International Wastewater Treatment Plant and related facilities. The plant must maintain multiple permits from various regulatory agencies, with annual fees totaling approximately $101,570 based on FY2019 starting costs. The primary expense is the State Water Resources Control Board (SWRCB) NPDES Order No. R9-2023-0009 Annual Permit Fee for Wastewater Discharge Requirements at $93,010.00. Additional Air Pollution Control District (APCD) permits are required for three operational locations: South Bay WITP ($2,282.00), Hollister ($1,095.00), and Goat Canyon ($1,095.00), each with multiple associated permit numbers. The County of San Diego Hazardous Materials fees apply to all three locations, totaling $2,593.00.

Two permits have no known invoices: the SWRCB Annual Permit fee for stormwater and the Multi Sector General Permit (MSGP) under NPDES No. CAS000001 for stormwater discharges associated with industrial activities. The permits listed include specific order and record numbers from state and local regulatory agencies, with cost data primarily referenced from FY2019. This comprehensive permit portfolio is necessary to maintain compliance with federal, state, and county environmental and hazardous materials regulations for wastewater treatment operations.

View the file

Other files

File Type Posted
191BWC26R0009 0001.pdf PDF
Attch. 28 Temporary_Dewatering_Narrative.pdf PDF
Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf PDF
Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf PDF
Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf PDF
Attch. 33 O&M Services Price Workbook (blank template).xls XLS spreadsheet
Attch. 29 Screw Press Map and Drawings.pdf PDF
FY27 SBIWTP OM PWS REV 1 10.19.26.pdf PDF
Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf PDF
Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf PDF
Attch. 16 Plans Drawings Request Instructions.docx DOCX document
Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 25 Client Authorization Letter.docx DOCX document
191BWC26R0009 OM SBIWTP Services.pdf PDF
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 23 LAB SAMPLING QTY.xlsx XLSX spreadsheet
Attch. 04.a. GiantKelpVariance_09.11.26.pdf PDF
Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf PDF
Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf PDF
Attch. 24 OEP-SBIWTP(2026).pdf PDF
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 05 List-of-Permits.docx DOCX document
Attah. 01 PWS SBIWTP O&M Services.pdf PDF
Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.docx DOCX document
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 FY26 IBWC Condition Assessment Report.pdf PDF
Attch. 26 Past Performance Questionnaire.pdf PDF
Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2025.pdf PDF
Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Bay International Wastewater Treatment Plant List of Permits and Fees

1. SWRCB (NPDES Order No. R9-2023-0009) Annual Permit Fee for Wastewater Discharge

Requirements_ starting costs at – $93,010.00

2. SWRCB Annual Permit fee for Storm water – no known invoice

3. APCD Permits

APCD1994-SITE-08957

APCD2000-PTO-930929

APCD2008-PTO-979285

APCD2011-PTO-000934

to operate at SBWITP (FY2019) starting costs at – $2,282.00

4. APCD Permits

ACPD2003-SITE-04827

APCD2008-PTO-979284

APCD2001-PTO-950901

to operate at Hollister (FY2019) starting costs – $1,095.00

5. APCD Permits

APCD2003-SITE-04826

APCD2008-PTO-979283

APCD2001-PTO-950900

to operate at Goat Canyon (FY2019) starting costs – $1,095.00

6. County of San Diego Hazardous Materials fee for SBIWTP

Record Number - DEH2002-HUPFP-137704 - (FY2019) starting costs – $1,640.00

7. County of San Diego Hazardous Materials fee for Hollister (FY2019) starting costs – $484.00

8. County of San Diego Hazardous Materials fee for Goat Canyon (FY2019) starting costs – $469.00

9. Multi Sector General Permit (MSGP): ORDER WQ 2014-0057-DWQ, AS AMENDED BY ORDER WQ

2015-0122-DWQ & ORDER WQ 2018-0028-DWQ - GENERAL PERMIT FOR STORM WATER

DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES ORDER NPDES NO. CAS000001 - no known invoice

File details come from the government source that posted it. Updated .