This document is a capital improvement project summary for the Santa Bernabe Integrated Wastewater Treatment Plant (SBIWTP) detailing urgent repair and rehabilitation work to restore performance and add operational redundancy.

The project encompasses 14 major action items totaling $45,944,795 in costs. Key repairs include replacement of deteriorated Cement-Lined Ductile Iron piping and flow meters ($1,791,532, completed 8/17/2021); emergency maintenance and cleaning of Primary Settling Tanks #1-4 and #1-5 due to excess inflows ($1,782,473 and $2,384,511, completed 7/28/2023 and 8/14/2023); repair and design of Junction Box #1 ($5,793,110, completed 8/10/2023); rehabilitation of Underground Storage and Treatment Tanks #1&2 ($2,979,490, awarded 9/29/2023, completion expected Summer 2026); installation of backup pumps, motors, and influent pumps for post-storm Hilary redundancy ($3,992,690 and $1,908,000, completed 9/29/2023 and 3/25/2024 with an $197,543 electrical modification awarded 8/9/2024); rehabilitation of Belt Filter Presses #1-4 ($4,668,046, awarded 5/10/2024, completion Summer 2026); and major Grit Facility replacement ($7,560,323, awarded 3/29/2025, estimated completion October 2026). Additional work includes Grit Chamber cleaning ($439,065, completed 2/16/2024), Hollister Street Pump Station repairs ($161,000, completed 8/2/2024), Silva Drain and Del Sol Line replacement ($1,287,012, completed 4/21/2025), and Hollister and Goats Pump Station rehabilitation ($11M, awarded October 2026, currently in progress). Projects have been awarded between August 2021 and October 2026, with most completed or on schedule through Summer 2026.

View the file

Other files

File Type Posted
191BWC26R0009 0001.pdf PDF
Attch. 28 Temporary_Dewatering_Narrative.pdf PDF
Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf PDF
Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf PDF
Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf PDF
Attch. 33 O&M Services Price Workbook (blank template).xls XLS spreadsheet
Attch. 29 Screw Press Map and Drawings.pdf PDF
FY27 SBIWTP OM PWS REV 1 10.19.26.pdf PDF
Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf PDF
Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf PDF
Attch. 16 Plans Drawings Request Instructions.docx DOCX document
Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 25 Client Authorization Letter.docx DOCX document
191BWC26R0009 OM SBIWTP Services.pdf PDF
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 23 LAB SAMPLING QTY.xlsx XLSX spreadsheet
Attch. 04.a. GiantKelpVariance_09.11.26.pdf PDF
Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf PDF
Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf PDF
Attch. 05 List-of-Permits.pdf PDF
Attch. 24 OEP-SBIWTP(2026).pdf PDF
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 05 List-of-Permits.docx DOCX document
Attah. 01 PWS SBIWTP O&M Services.pdf PDF
Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.docx DOCX document
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 FY26 IBWC Condition Assessment Report.pdf PDF
Attch. 26 Past Performance Questionnaire.pdf PDF
Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.pdf PDF
Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Urgent repairs at SBIWTP to restore performance and add redundancy in process:

ACTION DESCRIPTION COST DATE

AWARDED NOTES

Repair Influent flow meter and associated piping and valves

Replace deteriorated Cement- Lined Ductile Iron (CLDI) piping and flow meter

$1,791,532 8/17/2021 Completed

Clean PSTs #1-4 Emergency Maintenance due to excess trash and sediment from excess inflows from MX

$1,782,473 7/28/2023 Completed

Repair Junction Box #1 Design and construction $5,793,110 8/10/2023 Complete

Rehab PSTs #1-5 Emergency Maintenance due to trash and sediment from excess inflows from MX

$2,384,511 8/14/2023 Completed

USST Valves and Piping Replacement Rehab USST #1&2 $2,979,490 9/29/2023 Complete by Summer 2026

Backup Pumps & Motors For redundancy after TS Storm Hilary

$3,992,690 9/29/2023 Completed

$197,543 8/9/2024 Modification for required electrical work

Clean Grit Chambers Emergency Maintenance due to trash and sediment from excess inflows from MX

$439,065 2/16/2024 Completed

4 Backup Influent Pumps For redundancy after TS Storm Hilary $1,908,000 3/25/2024 Completed

Rehab Belt Filter Presses #1-4

Rapid deterioration caused by sand in sludge $4,668,046 5/10/2024 Complete by Summer 2026

Hollister Street Pump Station Repairs

Clean out surge tanks filled with sediment and perform electrical repairs

$161,000 8/2/2024 Completed

Rehab Grit Facility Replace grit classifiers, gallery, Blowers, piping/valves and other components

$7,560,323 3/29/2025 Estimated completion October 2026

Replacement of Silva Drain and conveyance lines to JB2 & Replacement of Del Sol Line

Replace collector structure and conveyance line to JB2, install 4 manholes

$1,287,012 4/21/2025 Completed

Rehab Hollister and Goats Pump Station

Replace Surge Arrestor system, Pumps, Odor Control, and electrical systems

$11M October

In progress

Total = $45,944,795