This document is a Construction Security Plan for the South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation & Expansion Project, located at 2995 Clearwater Way, San Diego, CA 92154 (Project #191BWC24C0008). The plan, dated July 6, 2026, establishes security procedures and controls for PCL's construction operations, personnel, equipment, materials, temporary facilities, and work areas. PCL maintains overall responsibility for site security throughout the project duration and will implement the plan upon mobilization through Final Completion and Contract Closeout.

The security program includes perimeter fencing with controlled access gates around designated laydown and staging areas outside the existing project perimeter fence, supplemented by temporary security fencing and high-security locks maintained by PCL (with emergency keys provided to U.S. Section International Boundary and Water Commission Security and Safety Division). Personnel access is controlled through PCL Job Site Access badging system and designated turnstiles, with identification measures including colored hard hats with individual names, orientation stickers, and active site badges. The plan mandates an unarmed security guard during working hours for access point monitoring, delivery coordination, and visitor management. Construction vehicles and deliveries enter through designated gates, while Operations & Maintenance personnel maintain continuous access through existing operational access gates. The plan establishes visitor procedures including sign-in requirements, parking in designated areas, and completion of safety orientations. Additional requirements include security signage installation, incident reporting procedures following SD.I.10011-M-2 Serious Incident Reporting standards, prohibited activities (threats, theft, vandalism, unauthorized entry), after-hours security measures with locked gates and secured containers, coordination with IBWC and Customs and Border Protection, semiannual emergency preparedness training (including active shooter response), and periodic security inspections with notification to IBWC SSD and designated personnel. The Site Logistics Plan diagram illustrates access routes, parking areas, laydown yards, craft worker access paths, and security fence locations throughout the facility.

View the file

Other files

File Type Posted
Offeror Questions_thru20261119.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2026.pdf PDF
Attch. 33 O&M Services Price Workbook (blank template)_updatedNov2026.xlsx XLSX spreadsheet
191BWC26R0009 0004.pdf PDF
Attch. 01 PWS SBIWTP O&M Services 20261125.pdf PDF
Attch. 21 Wage Determination CA2015-5635 Rev32 20260908.pdf PDF
191BWC26R0009-0003.pdf PDF
191BWC26R0009 0002.pdf PDF
191BWC26R0009 0001.pdf PDF
Attch. 28 Temporary_Dewatering_Narrative.pdf PDF
Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf PDF
Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf PDF
Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf PDF
Attch. 33 O&M Services Price Workbook (blank template).xls XLS spreadsheet
Attch. 29 Screw Press Map and Drawings.pdf PDF
FY27 SBIWTP OM PWS REV 1 10.19.26.pdf PDF
Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf PDF
Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf PDF
Attch. 16 Plans Drawings Request Instructions.docx DOCX document
Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 25 Client Authorization Letter.docx DOCX document
191BWC26R0009 OM SBIWTP Services.pdf PDF
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 23 LAB SAMPLING QTY.xlsx XLSX spreadsheet
Attch. 04.a. GiantKelpVariance_09.11.26.pdf PDF
Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf PDF
Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf PDF
Attch. 05 List-of-Permits.pdf PDF
Attch. 24 OEP-SBIWTP(2026).pdf PDF
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 05 List-of-Permits.docx DOCX document
Attah. 01 PWS SBIWTP O&M Services.pdf PDF
Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.docx DOCX document
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 FY26 IBWC Condition Assessment Report.pdf PDF
Attch. 26 Past Performance Questionnaire.pdf PDF
Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf PDF
Attch. 02 FY26 SBIWTP O&M QASP.pdf PDF
Attch. 09 SBIWTP Capital Project List as of September 2025.pdf PDF
Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Security Plan

SBIWTP Rehabilitation & Expansion

Construction Security Plan i Date: 07/06/2026

CONSTRUCTION SECURITY PLAN

Project #: 191BWC24C0008

Project Name: SBIWTP Rehabilitation & Expansion

2995 Clearwater Way, San Diego, CA 92154

Construction Security Plan ii Date: 07/06/2026

Table of Contents

1.0 Purpose

2.0 Site Security Responsibilities

3.0 Perimeter Fencing & Gate Control

4.0 Personnel & Visitor Access Control Procedures

5.0 Protection of Material, Tools, & Equipment

6.0 Coordination with Existing IBWC and O&M Security Operations

7.0 Department of Homeland Security & Border Security Coordination

8.0 After Hours Security Measures

9.0 Incident Reporting Procedures

10.0 Security Signage & Restricted Access Requirements

11.0 Workplace Violence & Prohibited Activities

12.0 Plan Maintenance & Updates

13.0 Security Inspections

Construction Security Plan 1 Date: 07/06/2026

1.0 PURPOSE

This Construction Security Plan has been prepared to satisfy the requirements of Section 00.24.00.01, Procurement Scope, and Section 00.73.63.01, Security Requirements, for the South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Project. The purpose of this Plan is to establish security procedures and controls applicable to PCL’s construction operations, personnel, equipment, materials, temporary facilities, and work areas under PCL's care, custody, or control. The existing SBIWTP facility will remain under the operational control of the Owner, who maintains site security and access control measures for the operating plant. PCL will coordinate with the Owner to ensure construction activities are conducted in accordance with site security requirements and will be responsible for securing construction work areas, laydown yards, temporary facilities, construction equipment, and materials associated with the Work. The objective of this Plan is to prevent theft, vandalism, unauthorized access, and other security risks that could impact construction activities, project assets, or ongoing facility operations. The construction security program will be implemented upon mobilization and maintained through Final Completion and Contract Closeout.

2.0 SITE SECURITY RESPONSIBILITIES

PCL shall maintain overall responsibility for construction site security throughout the duration of the project.

PCL shall provide adequate security measures to protect personnel, the worksite, equipment, materials, and temporary facilities affected by PCL’s scope of work. PCL is responsible for securing the worksite, equipment, and materials from theft, vandalism, and unauthorized entry. Clear and visible security signage shall be installed on permanent and temporary fencing, as applicable, at locations and intervals sufficient to ensure visibility and communicate site access restrictions to personnel and public.

Security responsibilities include:

• Implementing and maintaining the Construction Security Plan

• Coordinating security requirements with IBWC, Veolia/Operations & Maintenance personnel, and other project stakeholders

• Maintaining controlled site access points and visitor management procedures

• Protecting construction in scope areas from theft, vandalism, and unauthorized entry

• Maintaining secure laydown areas, material storage locations, and temporary facilities

• Investigating and reporting security related incidents, as it relates to this project

• Maintaining the security program throughout construction and through Contract Closeout

SECURITY ROLES & RESPONSIBILITES

Project Manager

• Overall accountability for implementation and administration of the Construction Security Plan

• Coordinate security requirements with the Owner, IBWC representatives, IBWC SSD representative, and project stakeholders

Project Superintendent

Construction Security Plan 2 Date: 07/06/2026

• Manage daily security operations and implementation of site security controls

• Coordinate installation and maintenance of temporary fencing, gates, turnstiles, signage, and access control systems

• Ensure identified security deficiencies are promptly addressed and corrected

• Coordinate with IBWC SSD on security related matters and incident response activities

HSE Manager / HSE Supervisor

• Conduct periodic security inspections and audits

• Monitor compliance with site access control requirements

• Investigate security incidents and document corrective actions

• Support security awareness, training, and communication efforts

• Ensure personnel receive security related training and awareness information during onboarding, including workplace violence prevention and reporting procedures

Emergency preparedness training shall be conducted semiannually and consist of one tabletop exercise and one emergency drill. Emergency drill scenarios include active shooter response and other site security related emergencies to reinforce personnel awareness and preparedness.

Security Guard (Unarmed)

• Provide monitoring of designated access points during working hours

• Verify personnel and visitor authorization prior to site entry

• Assists with delivery coordination and visitor management

• Report suspicious activity and security concerns to project supervision

Employees and Subcontractors

• Comply with all project access control, badging, and security requirements

• Report unauthorized individuals, theft, vandalism, suspicious activity, or security concerns

• Secure tools, equipment, and materials at the end of each work shift

• PCL will conduct tailgating spot checks; IBWC SSD may also perform spot checks of access control compliance

PCL will provide an unarmed security guard during normal working hours to support site access control, delivery coordination, visitor management, and monitor construction entrances.

Project supervision, safety personnel, subcontractors, suppliers, and all workers share responsibility for maintaining a secure work environment and reporting security concerns.

3.0 PERIMETER FENCING & GATE CONTROL

Construction access shall be secured using temporary construction fencing at perimeter entrances per the Site Logistics Plan. Temporary fencing will supplement existing facility security systems. Turnstiles shall be utilized to provide personnel accountability and controlled site entry for PCL subs and not intended for Plant Operations Traffic.

Construction Security Plan 3 Date: 07/06/2026

PERIMETER FENCING & GATE CONTROL REQUIREMENTS

• Temporary fencing shall be installed around designated laydown area located outside the existing project perimeter fence to control access and secure stored materials

• Temporary fence and gate configurations shall be coordinated with project logistics requirements and approved site logistics plans

• Controlled access points shall be established at designated project entrances, as shown on the drawings

• PCL installed gates shall remain secure when not actively in use, gates to be secured with high security lock and key system maintained by PCL (a key will be provided to USIBWC SSD for emergencies or authorized access)

• The gates serving the west lot shall accommodate Customs and Border Protection (CBP) lock to allow CBP access to the area when needed

• Security signage shall be installed at primary entrances, restricted access locations, and other areas as necessary to communicate site requirements and restrictions

Key security measures include:

• Temporary perimeter fencing shall be installed around the designated laydown and staging area located outside the existing project fence

• Security fencing around designated material storage and laydown area located outside the existing project perimeter fence

• Controlled construction access gates at shown locations

• Locked gates during nonworking hours

• Restricted access to authorized personnel only

• Coordination with existing IBWC and Operations & Maintenance security systems

PERSONNEL ACCESS TURNSTILES

Personnel access will be controlled through designated turnstile utilizing the PCL Job Ste Access badging system. Site logistics planning for the project includes controlled access utilizing turnstile entry points and badge verification for all PCL personnel, subcontractors, vendors, and visitors accessing the construction site for PCL related activities. The badging system provides real time access monitoring through a centralized dashboard, allowing project management personnel to track and verify who is onsite, maintain workforce accountability, and support emergency response procedures.

DELIVERY AND EQUIPMENT GATES

Construction vehicles, deliveries, and vendors shall enter through designated construction access gates.

Deliveries will be verified at site entry prior to accessing work areas and laydown yards. During working hours, the assigned security guard and project personnel will monitor access points and coordinate deliveries. The project logistics strategy includes controlled delivery access through designated entry locations.

PLANT OPERATIONS ACCESS

PCL shall maintain continuous vehicle and personnel access for IBWC representatives, Veolia, Operations & Maintenance personnel, operations staff, emergency responders, chemical deliveries, and other authorized users throughout construction activities. Operations traffic shall continue to enter and exit the facility through the existing operational access gate. Any temporary closures or access

Construction Security Plan 4 Date: 07/06/2026 restrictions affecting normal operations shall be coordinated in advance with the IBWC Contracting Officer’s Representative and facility representatives.

4.0 PERSONNEL & VISITOR ACCESS CONTROL

PROCEDURES

SBIWTP is a constrained and fenced facility. Site access is controlled by private onsite security administered by IBWC Field Office and IBWC Operations & Maintenance Contractor. In addition, PCL will control construction access through a dedicated temporary construction gate/entrance and will coordinate construction access requirements throughout duration of the project.

All personnel, subcontractors, suppliers, consultants, inspectors, and visitors shall comply with project access control requirements, security procedures, posted signage, and directions provided by project personnel.

PERSONNEL ACCESS

Personnel access shall be managed through the PCL Job Site Access system and project access control procedures.

Requirements for site access include:

• Completion of project onboarding and site orientation requirements

• Verification of required training, certifications, and project documentation

• Issuance and use of approved project credentials

• Badge verification through designated turnstile access points

• Compliance with all project safety and security requirements

Personnel identification measures will be implemented to determine authorized project personnel and support access control throughout the project site. PCL craft personnel will be identified by designated colored hard hats displaying individual’s name, in addition to possessing active site access badges issued through PCL Job Site Access system. Subcontractor personnel will be issued approved site access badges and will have PCL site specific orientation stickers indicating completion of project onboarding requirements. All personnel are required to visibly display assigned identification onsite and present credentials upon request. Representative examples of badges, hard hat markings, orientation stickers, and other identifications methods will be included in this plan to assist USIBWC SSD in verifying authorized personnel.

DELIVERY ACCESS

Deliveries shall be direct through designated construction access gates identified in the current Site Logistics Plan.

Delivery drivers shall:

• Comply with project access control procedures and site security requirements

• Follow directions provided by project personnel, security personnel, and posted signage

• Remain within authorized delivery areas unless otherwise directed

• Coordinate delivery activities with designated project representatives when required

Construction Security Plan 5 Date: 07/06/2026

Access may be restricted or delayed if site conditions, security requirements, or operational constraints necessitate additional controls.

PARKING & SITE ACCESS

Parking shall be by authorization only and restricted to designated parking areas identified in the current Site Logistics Plan. Parking locations may be adjusted as construction activities progress. All personnel shall comply with posted signage, current logistics plans, and direction provided by the Project Team.

Parking is prohibited within:

• Active work zones – parking restricted company vehicles and construction equipment

• Emergency access routes

• Fire lanes

• Equipment staging areas

• Material laydown areas

• Areas identified as “No Parking” or other restricted locations

PCL staff shall park in designated parking areas adjected to the PCL Site Office. Craft personnel are to utilize designated craft parking areas and approved access routes. Subcontractors shall coordinate parking requirements with project supervision prior to mobilization. Visitor parking shall be in designated areas as shown in the Site Logistics Plan.

Maintaining designated parking and access routes is essential to preserving emergency access, supporting ongoing plant operations, and minimizing interference with construction activities.

AUTHORIZED AFTER HOURS VEHICLE PARKING

PCL does not currently anticipate performing 24-hour construction operations and does not plan to have personnel parking inside the plant fence line on a 24-hour basis. Should project conditions require 24-hour staffing or authorized private vehicles to remain onsite after normal working hours, PCL will provide a vehicle log to IBWC site security and night shift operations personnel. The log will include the make, color, and license plate number of all authorized vehicles utilizing onsite parking within the plant fence line.

VISITOR ACCESS

Visitors shall access the project site through the primary entrance located at the northwest corner of the facility and follow all instruction provided by project personnel, security personnel, and posted signage.

Upon arrival, visitors shall:

1. Contact designated project personnel for entry authorization

2. Parking in the designated Visitor Parking Areas located at the west edge of the gravel lot, as identified in the Site Logistics Plan

3. Report to the Site Office/Trailer located near the northwest vehicle gate

4. Sign in through the visitor management process

5. Complete a site specific safety orientation, as required

Visitors shall not park within construction staging areas, contractor parking areas, materials laydown yards, access roads, or emergency lanes. Personal vehicles are not permitted beyond designated parking locations unless specifically authorized by project management.

Construction Security Plan 6 Date: 07/06/2026

While onsite, visitors shall:

• Wear all required PPE

• Remain under the supervision of an authorized escort unless otherwise approved by site management

• Comply with project safety requirements, security procedures, and operational restrictions

• Remain within authorized areas only

Failure to comply with site access, visitor management, parking, or security requirements may result in removal from the project site and revocation of access privileges.

5.0 PROTECTION OF MATERIAL, TOOLS, & EQUIPMENT

PCL to implement reasonable measures to protect project materials, tools, equipment, and temporary facilities from theft, vandalism, misuse and unauthorized removal.

Security measures include:

• Controlled access to laydown and storage areas

• Locking of storage containers, job boxes, and site offices when unattended

• Secure storage of valuable materials and equipment

• Equipment key control procedures

• Inventory management and routine inspections of laydown and storage areas

• Appropriate temporary lighting as necessary

Workers and subcontractors shall secure tools and equipment at the completion of each shift.

6.0 COORDINATION WITH EXISTING IBWC AND O&M

SECURITY OPERATIONS

The SBIWTP is an active wastewater treatment facility that remains operational 24/7. Veolia personnel and future Operations & Maintenance contractors will continue to operate and maintain the facility throughout construction activities.

PCL shall coordinate security activities with:

• IBWC Field Office

• Existing onsite private security personnel

• Veolia/Operations & Maintenance personnel

• Future Operations & Maintenance contractors

The security program shall be initiated and coordinated with the Government’s existing security system at mobilization and maintained throughout the duration of construction.

Construction Security Plan 7 Date: 07/06/2026

Construction activities to be planned to maintain plant operations and required facility access while preventing unauthorized access into active construction areas.

7.0 DEPARTMENT OF HOMELAND SECURITY &

BORDER SECURITY COORDINATION

Because the facility is located adjacent to the international border, PCL shall coordinate with IBWC, customs and Border Protection, and other federal stakeholders as required.

If personnel from Department of Homeland Security or Customs and Border Protection direct construction activities to stop due to security concerns in the area, PCL personnel shall immediately comply with the directive, secure the affected work area, and coordinate with the Contracting Officer’s Representative regarding additional actions required. Work shall not resume until authorization is provided by Department of Homeland Security, Customs and Border Protection, and/or the Contracting Officer’s Representative.

In the event Customs and Border Patrol needs to be contacted for onsite activity within the SBIWTP site, communication with CBP will be routed through the Construction Inspector or Arcadis Field Office.

8.0 AFTER HOURS SECURITY MEASURES

PCL does not currently anticipate providing dedicated after hours security personnel.

Most construction laydown areas, storage yards, and work zones will be located within secured fenced areas protected by existing IBWC security controls and project installed security fencing. During nonworking hours, security measures will include:

• Locked construction access gates

• Secured perimeter fencing

• Locked storage containers and site offices

• Equipment lockout and key control measures

• Controlled storage of valuable materials and equipment

• Coordination with existing IBWC and Operations and Maintenance site security personnel

Permanent or dedicated security lighting is not anticipated as part of this plan. However, PCL will continuously monitor site conditions and provide temporary lighting, when necessary, to support safe operations, maintain visibility, and enhance security at all construction project related areas during periods of darkness or reduced visibility.

Should project conditions, owner requirements, or security incidents warrant additional protections measures, PCL will evaluate and implement supplemental security controls as necessary.

9.0 INCIDENT REPORTING PROCEDURES

Any theft, vandalism, unauthorized entry, property damage, suspicious activity, security breach, or other security related incident shall be reported immediately to project supervision.

The following actions shall be taken:

1. Secure the affected area and protect personnel

2. Notify the Superintendent, Project Manager, and Site Safety Representative

Construction Security Plan 8 Date: 07/06/2026

3. Notify IBWC representative as required

4. Preserve evidence and document incident details

5. Conduct and investigation and implement corrective actions

Project incident reporting procedures require prompt notification, documentation, investigation, and corrective action. Incidents shall be processed through established project reporting systems and communicated to required project stakeholders within applicable reporting timelines. Reporting timelines will vary depending on the severity of the incident, but will follow SD.I.10011-M-2 Serious Incident Reporting.

10.0 SECURITY SIGNAGE & RESTRICTED ACCESS

REQUIREMENTS

PCL to implement entry controls that notify personnel and visitors of construction activities, required PPE, restricted areas, and hazards associated with entering the worksite.

Security signage shall be installed at site entrances, fencing, gates, parking areas, and restricted access locations, as appropriate.

Signage may include:

• PPE Requirements

• No Trespassing

• Authorized Personnel Only

• Construction Area – No Unauthorized Entry

• Visitor Check In Required

• Visitors Report to Site Office

• Entry Identification Signs

• Restricted Access Area

• Emergency Contact Information

• Traffic Control Signage

• Hazard WARNING Signage

• Hard Hat Area

• Additional signage identified by Project Management based on project specific requirements

11.0 WORKPLACE VIOLENCE & PROHIBITED ACTIVITIES

The following activities are prohibited on the project:

• Threats, intimidation, harassment, fighting, or disorderly conduct

• Theft, vandalism, criminal activity, or destruction of property

• Unauthorized entry into restricted or secured areas

• Circumvention of established access control procedures

Violations of project security requirements may result in removal from the project site, disciplinary action, revocation of site access privileges, and notification of law enforcement agencies when appropriate.

Reporting will follow SD.I.10011-M-2 Serious Incident Reporting.

Construction Security Plan 9 Date: 07/06/2026

12.0 PLAN MAINTENANCE & UPDATES

This Construction Security Plan shall be implemented at mobilization, maintained throughout construction, and remain in effect through Contract Closeout. Any revisions required due to project phasing, security conditions, owner directives, regulatory requirements, or operational constraints shall be incorporated into future revisions of the plan.

13.0 SECURITY INSPECTIONS

Periodic security inspections shall be conducted to verify compliance with project security requirements and identify opportunities for corrective actions. PCL shall notify IBWC SSD and Jason Oliver when security inspections are scheduled.

Construction Security Plan 10 Date: 07/06/2026

All PCL salary, PCL craftworkers, and Subcontractors will receive an Orientation sticker after going through PCL's extensive safety orientation.

All PCL salary, PCL craftworkers, and Subcontractors will receive a badge.

All field personnel will be wearing a Type 2 hardhat. PCL personnel hard hats will have a PCL emblem on the on the front.

SBIWTP SITE LOGISTICS PLAN

LEGENDPCL SITE OFFICE

CLIENT SITE OFFICE

FIRE HYDRANT

MAINTENANCE BUILDING

OFFICE PARKING

OVERNIGHT PARKING

LAYDOWN AREA

CLIENT SITE OFFICE PARKING

FUTURE PCL SITE OFFICE

SDGE TEMP POWER DROP METER

RESTROOMS

STORAGE CONTAINERS

OPERATIONS MAINTENANCE LAYDOWN

SECONDARY ACCESS GATE

(NORMALLY CLOSED)

PLANT OPERATIONS TRUCK ROUTE

LEGEND

STOCKPILE EMPTY TRUCK WAITING YARD

CONSTRUCTION DELIVERY ACCESS ROUTE

SECURITY FENCE

POWERLINES

STORAGE & LAYDOWN

STOCKPILE

VEOLIA METAL & TRASH

CONCRETE & PUMP WASHOUT

PLANT & EMERGENCY ACCESS ROUTEMAIN GATE

SUBCONTRACTOR SITE OFFICES

PCL CRAFT PARKING

TEMPORARY GATE

SEWER TIE-IN

CONSTRUCTION ACCESS GATE

TEMPORARY SECURITY FENCE

GUARD SHACK, TURNSTILE, & ACCESS GATE

PCL LAYDOWN YARD

BORDER PATROL ACCESS ROAD

FOREMAN OFFICE

HEADWORKS EXCAVATION

LAYDOWN ACCESS ROUTE

CRAFT WORKER ACCESS PATH