Text version
PM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
AS NOTED
XXX
AVIANO
AIR BASE
DD/MM/YY
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
JEBZZZZ
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M
BA
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
TO
R
F
AC
IL
IT
Y (P
2)
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
VI
R
G
IN
IA
B
EA
C
H , V
A
AT
LA
N
TI
C
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M S
CO
M
M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
FINAL SUBMISSION - 28 OCT 2022
PL
OT
TE
D
BY
\\m oo np a1 cl 1.
bk r.m ba ke rc or p.
co m \V
O L2
\P ro je ct s\
P -2
A vi an o
AB
H el o Si m ul at or
\0 5_
D el iv er ab le s\ D ra w in gs
\0
D W
G _C
AD
\0
C
_C iv il\ Sh ee t F ile s\
-C
-0
.d w g
/2
6/
:3 7:
P
M Fo m be lle , B ra nd on
GENERAL CIVIL NOTES / NOTE GENERALI INGEGNERIA CIVILE:
1. EXISTING SITE AND UTILITY INFORMATION OBTAINED FROM SURVEY PERFORMED BY ADASTRA
ENGINEERING (SEE SURVEY NOTES FOR MORE INFORMATION) AND SUPPLEMENTED FROM
DRAWINGS PROVIDED BY NAVFAC / LE INFORMAZIONI SUL SITO E SUI SOTTOSERVIZI SONO
STATE OTTENUTE DA SOPRALLUOGHI DA PARTE DI ADASTRA ENGINEERING (CONSULTARE LE
NOTE DI SOPRALLUOGO PER ULTERIORI INFORMAZIONI) COADIUVATE DA DISEGNI FORNITI DA
NAVFAC.
2. PRIOR TO BEGINNING CONSTRUCTION, VERIFY ALL DIMENSIONS AND DETAILS FOR THE
PROPOSED WORK INDICATED ON THE DRAWINGS / PRIMA DI INIZIARE I LAVORI DI COSTRUZIONE, VERIFICARE TUTTE LE DIMENSIONI E DETTAGLI INDICATI SULLE TAVOLE.
3. OBTAIN ALL NECESSARY PERMITS AND LICENSES REQUIRED / OTTENERE TUTTE LE NECESSARIE
AUTORIZZAZIONI E LICENZE.
4. COORDINATE AND SEQUENCE DEMOLITION AS DESCRIBED IN THE CONTRACT DOCUMENTS. ALL
MATERIAL GENERATED BY THE DEMOLITION WORK SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF PER BASE AND LOCAL REQUIREMENTS / COORDINARE E OPERARE IN SEQUENZA
LE OPERE DI DEMOLIZIONE COSÌ COME INDICATO NELLA DOCUMENTAZIONE CONTRATTUALE.
TUTTO IL MATERIALE GENERATO DALLE OPERE DI DEMOLIZIONE DOVRÀ ESSERE RIMOSSO DAL
SITO E PROCESSATO COME DA DISPOSIZIONI DI BASE E DISPOSIZIONI LOCALI.
5. REPAIR CONSTRUCTION RELATED DAMAGE TO EXISTING ENTRANCES, PAVEMENTS, EXISTING
STRUCTURES OR EXISTING FEATURES, OR EXISTING FEATURES THAT ARE INDICATED TO
REMAIN, AT NO ADDITIONAL COST TO THE GOVERNMENT / RIPARARE I DANNI CAUSATI DAI
LAVORI DI COSTRUZIONE A INGRESSI, PAVIMENTAZIONI, STRUTTURE E ELEMENTI PREESISTENTI O ELEMENTI INDICATI COME DA MANTENERE SENZA ULTERIORI SPESE A CARICO DEL GOVERNO.
6. MINOR HORIZONTAL AND VERTICAL ADJUSTMENTS MAY BE REQUIRED AND SHALL BE AT NO
ADDITIONAL COST TO THE GOVERNMENT. ANY ADJUSTMENTS TO THE PROPOSED ALIGNMENT
SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL /
POTREBBERO RIVELARSI NECESSARIE ALCUNE MINORI VARIAZIONI DI ALLINEAMENTO
ORIZZONTALE/VERTICALE, QUESTE NON SARANNO A CARICO DEL GOVERNO. QUALSIASI
VARIAZIONE ALL'ALLINEAMENTO PROPOSTO DOVRÀ ESSERE COMUNICATA AL RESPONSABILE
APPALTI PER REVISIONE E APPROVAZIONE.
7. COORDINATE FINISHED PAVEMENT GRADES WITH ELEVATIONS AND LOCATIONS OF EXISTING
ROADS AND SIDEWALKS / COORDINARE PENDENZA DI PAVIMENTAZIONI COMPLETATE CON
ELEVAZIONE E POSIZIONE DI STRADE E MARCIAPIEDI ESISTENTI.
8. PROVIDE UNIFORM (STRAIGHT) GRADE BETWEEN GRADE INDICATIONS SUCH AS SPOT
ELEVATIONS, FINISH GRADE CONTOURS AND INLET TOP ELEVATIONS / FORNIRE PENDENZA
UNIFORME (RETTILINEA) TRA LE INDICAZIONI DI PENDENZA QUALI PUNTI QUOTATI, CURVE DI
LIVELLO E QUOTA DI SOMMITA' DEGLI INGRESSI.
9. TOP OF INLETS AND MANHOLES SHOWN ARE APPROXIMATE ONLY. VERIFY EXACT ELEVATION
REQUIRED TO ENSURE STRUCTURE HEIGHT COMPLIES WITH THE PURPOSE OF THE STRUCTURE
AND CONFORMS WITH ADJACENT FINISHED GRADES / I LIVELLI RIPORTATI DI POZZETTI E TOMBINI
SONO APPROSSIMATIVI. VERIFICARE L'ESATTA ELEVAZIONE NECESSARIA IN MODO CHE
L'ALTEZZA STRUTTURALE SODDISFI LO SCOPO DELLA STRUTTURA E SIA IN LINEA CON LE
PENDENZE ADIACENTI.
10. DIMENSIONS AND COORDINATES SHOWN AT CURB ARE TO FACE OF CURB. UNLESS NOTED
OTHERWISE, ELEVATIONS SHOWN AT CURB INLETS ARE AT TOP OF INLET STRUCTURE AND SPOT
ELEVATIONS SHOWN AT DROP INLETS ARE AT TOP OF INLET GRATE / LE DIMENSIONI E LE
COORDINATE INDICATE NEI PRESSI DEI MARCIAPIEDI SI RIFERISCONO AI CORDOLI. IN MANCANZA DI ALTRE INDICAZIONI, LE ELEVAZIONI INDICATE NEI PRESSI DELLE BOCCHETTE DI SCARICO SI
RIFERISCONO ALLA PARTE SUPERIORE DELLE BOCCHETTE, E I PUNTI QUOTATI NEI PRESSI
DELLE CADITOIE SI RIFERISCONO ALLA PARTE SUPERIORE DELLA GRATA.
11. ALL AREAS, ON OR OFF THE SITE, WHICH ARE DISTURBED BY THIS CONSTRUCTION AND WHICH
ARE NOT PAVED OR BUILT UPON SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSIONS
AND SEDIMENTATION. ALL SLOPES EQUAL TO AND GRATER THAN 3H:1V SHALL BE STABILIZED
USING VEGETATIVE STABILIZATION WITH BLANKET MATTING / TUTTE LE SUPERFICI NON
PAVIMENTATE O NON COSTRUITE DENTRO E FUORI DEL SITO CHE SARANNO SOTTOPOSTE AGLI
EFFETTI DEL CANTIERE, DOVRANNO ESSERE ADEGUATAMENTE STABILIZZATE AL FINE DI
MANTENERE SOTTO CONTROLLO I PROCESSI DI EROSIONE E SEDIMENTAZIONE. TUTTE LE
SUPERFICI CON PENDENZE MAGGIORI O UGUALI A 3X:1Y DOVRANNO ESSERE STABILIZZATE PER
MEZZO DI VEGETAZIONE STABILIZZANTE E ANTI-EROSIVA.
12. GRADE UNPAVED AREAS IN ACCORDANCE WITH THE GRADING PLAN, PROFILES, AND SECTIONS.
UNLESS NOTED OTHERWISE, PROVIDE POSITIVE DRAINAGE TO PREVENT PONDING OF WATER.
DISTURBED AREAS SHALL MATCH GRADES OF EXISTING ADJACENT AREAS / PIANIFICARE LE
PENDENZE DELLE SUPERFICI NON PAVIMENTATE COERENTEMENTE CON LE PLANIMETRIE, I
PROFILI E LE SEZIONI. IN MANCANZA DI ALTRE INDICAZIONI, PIANIFICARE DRENAGGIO IN MODO DA EVITARE LA FORMAZIONE DI POZZE D'ACQUA. LA PENDENZA DELLE SUPERFICI SOGGETTE A
LAVORI DOVRÀ ESSERE COERENTE CON LA PENDENZA DELLE SUPERFICI ADIACENTI.
13. STAGING AREAS SHALL BE WITHIN THE LIMITS OF WORK. RELOCATE CONSTRUCTION TRAILERS
WITHIN THE LIMITS OF WORK TO ACCOMMODATE OTHER SITE ACTIVITIES. THE CONTRACTOR
SHALL BE RESPONSIBLE, AT ALL TIMES, FOR SITE PREPARATION, FENCING, ACCESS DRIVES AND
SITE MAINTENANCE. COORDINATE HAUL ROUTES WITH THE CONTRACTING OFFICER.
TEMPORARY WATER, SEWER AND ELECTRIC SERVICE WILL BE AVAILABLE ON SITE FOR
CONTRACTOR USE. MAKE PROVISIONS FOR ALL TEMPORARY UTILITIES AND USAGE FEES / LE
AREE DI SOSTA PER I VEICOLI DI CANTIERE DOVRANNO ESSERE COLLOCATE ALL'INTERNO DEI PERIMETRI DI CANTIERE. RIALLOCARE I MEZZI DI CANTIERE ALL'INTERNO DEI PERIMETRI DI
CANTIERE IN MODO DA ACCOMODARE LE ALTRE ATTIVITÀ DI SITO. L'APPALTATORE SARÀ
RESPONSABILE DURANTE TUTTA LA DURATA DEI LAVORI DEI COMPITI DI PREPARAZIONE
CANTIERE, TRANSENNAGGIO PERIMETRALE DEL CANTIERE, VIE DI ACCESSO AL CANTIERE E
MANUTENZIONE DELL'AREA DI CANTIERE. COORDINARE VIE DI ACCESSO AL CANTIERE CON
RESPONSABILE APPALTI. SUL SITO VERRANNO RESI FRUIBILI ALL'APPALTATORE ACQUA, ALLACCIO FOGNARIO ED ELETTRICITÀ PER TUTTA LA DURATA DEI LAVORI. STABILIRE I COSTI DI UTILIZZO IN SEDE
CONTRATTUALE.
14. SAWCUT PAVEMENT TO FORM EXTENTS OF PAVEMENT DEMOLITION. SAWCUT CURBING AT
NEAREST JOINT / TAGLIARE LA PAVIMENTAZIONE IN MODO DA DARE FORMA ALL'AREA DI
PAVIMENTAZIONE DA DEMOLIZIONE. TRONCARE CORDOLI AL GIUNTO PIÙ VICINO.
15. ACTUAL GROUNDWATER LEVELS DURING CONSTRUCTION MAY VARY. PROVIDE DEWATERING
WHEN GROUNDWATER IS ENCOUNTERED DURING CONSTRUCTION. PROVIDE MANUFACTURER
CALCULATED BUOYANCE ANALYSIS FOR ALL PERMANENT BELOW GRADE STRUCTURES. ALL
STRUCTURES MUST BE SUFFICIENTLY ANCHORED TOP PREVENT FLOTATION / LA SOGGIACENZA
REALE DURANTE I LAVORI DI COSTRUZIONE POTREBBE VARIARE. EFFETTUARE DRENAGGIO SE
SI DOVESSE INCONTRARE ACQUA SOTTERRANEA DURANTE I LAVORI. EFFETTUARE ANALISI DI
GALLEGGIAMENTO SECONDO INDICAZIONI DEL PRODUTTORE PER TUTTE LE STRUTTURE
INTERRATE PERMANENTI. TUTTE LE STRUTTURE INTERRATE DOVRANNO ESSERE
SUFFICIENTEMENTE ANCORATE PER PREVENIRE GALLEGGIAMENTO.
GENERAL UTILITY NOTES / NOTE GENERALI SOTTOSERVIZI:
1. ALL PIPE SIZES ARE IN MILLIMETERS UNLESS INDICATED OTHERWISE / TUTTE LE DIMENSIONI
DELLE TUBATURE SONO IN MILLIMETRI, SE NON INDICATO DIVERSAMENTE.
2. COORDINATE ALL BUILDING CONNECTIONS WITH BUILDING CONTRACTOR AND THE
INFORMATION PROVIDED ON MECHANICAL AND ELECTRICAL DRAWINGS / COORDINARE TUTTI GLI ALLACCI DEGLI EDIFICI CON L'APPALTATORE DELL'EDIFICIO E CON LE INFORMAZIONI FORNITE A
MEZZO DI DIAGRAMMI MECCANICI ED ELETTRICI.
3. CONTACT THE COR AND ALL ASSOCIATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES PRIOR TO COMMENCEMENT OF WORK / CONTATTARE IL COR E TUTTE LE AZIENDE GESTORI DEI SOTTOSERVIZI AL FINE DI IDENTIFICARE CORRETTAMENTE LA POSIZIONE
DEI SOTTOSERVIZI PRIMA DELL'INIZIO DEI LAVORI DI COSTRUZIONE.
4. COORDINATE ALL REQUIRED UTILITY SHUTDOWNS FOR UTILITY CONNECTIONS WITH THE COR /
COORDINARE TUTTE LE NECESSARIE CHIUSURE DEI SOTTOSERVIZI CON IL COR.
5. CONNECTION TO EXISTING WATER, SEWER, AND STORM MAINS WILL BE CONSTRUCTED IN
ACCORDANCE WITH ALL REQUIREMENTS OF ASSOCIATED UTILITY COMPANIES AND AGENCIES /
L'ALLACCIAMENTO AL SISTEMA DI TUBAZIONI PRINCIPALI PER ACQUA POTABILE, ACQUA REFLUA E ACQUA PIOVANA DOVRÀ ESSERE PIANIFICATO SEGUENDO TUTTI I REQUISITI STABILITI DAI
GESTORI.
6. COORDINATE AND PAY ALL UTILITY CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED
FOR THE UTILITY CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED
WITH CONNECTION CHARGES AND METERS / COORDINARE E PAGARE TUTTE LE SPESE DI
ALLACCIAMENTO E OTTENERE TUTTE LE AUTORIZZAZIONI NECESSARIE PER LA COSTRUZIONE E
ALLACCIAMENTO DEI SOTTOSERVIZI. CIÒ INCLUDE TUTTE LE SPESE RELATIVE A TASSE DI
ALLACCIAMENTO E CONTATORI.
7. SEE DETAIL SHEETS FOR TYPICAL PIPE TRENCH DETAIL / FARE RIFERIMENTO ALLE TAVOLE DI
SUPPORTO PER IL DETTAGLIO SULLA TIPICA TRINCEA DI TUBAZIONE.
8. THE MINIMUM DEPTH OF COVER FOR UTILITIES WILL BE AS FOLLOWS UNLESS INDICATED
OTHERWISE / LA PROFONDITÀ MINIMA DI COPERTURA PER LA POSA DEI SOTTOSERVIZI, IN
MANCANZA DI ALTRE INDICAZIONI, SARÀ LA SEGUENTE:
a. WATER: 0.76 METER / ACQUA POTABILE: 0,76 M
b. SANITARY SEWER LINE: 0.64 METER / SISTEMA FOGNARIO: 0,64 M
c. FIRE PROTECTION: 0.76 METER / PROTEZIONE INCENDI: 0,76 M
d. GAS LINE: 0.80 METER / GAS: 0,80 M
e. ELECTRICAL AND COMMUNICATION: 1 METER / ELETTRICITÀ E TELECOMUNICAZIONI: 1 M
f. ALL OTHER UTILITIES: 1 METER / TUTTI GLI ALTRI SOTTOSERVIZI: 1 M
9. ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND INSPECTION
METHODS DETAILED IN THE SPECIFICATIONS, WHICH MAY INCLUDE VIDEO CAMERA INSPECTION /
TUTTI I SOTTOSERVIZI SARANNO OGGETTO DEI REQUISITI METODICI PER TEST E ISPEZIONI
DETTAGLIATI NELLE SPECIFICHE TECNICHE, FRA CUI POTREBBE ESSERCI LA VIDEO-ISPEZIONE.
10. ANY CHANGES TO UTILITY DESIGN WILL BE APPROVED BY ENGINEER AND THE COR / OGNI
MODIFICA ALLA PIANIFICAZIONE DEI SOTTOSERVIZI SARÀ VALUTATA E APPROVATA
CONGIUNTAMENTE DA INGEGNERE E COR.
11. PROVIDE A MINIMUM NOTICE OF 15 WORKING DAYS FOR ALL REQUIRED UTILITY SHUT DOWNS
FOR UTILITY CONNECTIONS WITH THE COR. THE FIRE DEPARTMENT MUST BE NOTIFIED IF
CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION OF ANY WATER LINES OR
HYDRANTS ON THE PROJECT SITE OR ADJACENT SITES / FORNIRE AL COR UN PREAVVISO
MINIMO DI 15 GIORNI LAVORATIVI PER TUTTE LE NECESSARIE CHIUSURE DEI SOTTOSERVIZI. I VIGILI DEL FUOCO DOVRANNO ESSERE NOTIFICATI SE I LAVORI NECESSITERANNO DI CHIUSURE
O SCONNESSIONI DI QUALSIASI TUBATURA IDRICA O IDRANTE ALL'INTERNO DEL CANTIERE O
NELLE SUE VICINANZE.
12. ALL EXISTING UTILITIES MAY OR MAY NOT BE SHOWN IN THE EXACT LOCATION. UNDERGROUND
FACILITIES, STRUCTURES AND UTILITIES ARE SHOWN BASED ON INFORMATION PROVIDED BY
NAVFAC AND LOCATIONS OF ABOVE GROUND EVIDENCE, AND THEIR LOCATION MUST BE
CONSIDERED APPROXIMATE ONLY. DEPTH OF EXISTING UTILITIES SHOWN IN PROFILE WHERE
INVERTS ARE NOT DESCRIBED IN PLAN ARE ESTIMATED. OTHER UNDERGROUND FACILITIES,
STRUCTURES AND UTILITIES MAY EXIST. VERIFY LOCATION OF ALL FACILITIES, STRUCTURES
AND UTILITIES PRIOR TO CONSTRUCTION. DEPTH OF BURY OF EXISTING UTILITIES MUST BE
VERIFIED PRIOR TO BEGINNING ANY EXCAVATION. COORDINATE THE LOCATION OF UTILITIES
WITH CONTRACTING OFFICER BEFORE EXCAVATION / TUTTI I SOTTOSERVIZI ESISTENTI
POTREBBERO NON ESSERE ESATTAMENTE NELLA POSIZIONE INDICATA. LE INFORMAZIONI
SULLA POSIZIONE DEI SOTTOSERVIZI E DELLE STRUTTURE SOTTERRANEE SONO BASATE SU
DATI FORNITI DA NAVFAC E DA EVIDENZE SUPERFICIALI, E LA LORO POSIZIONE DEVE SEMPRE
ESSERE INTESA COME APPROSSIMATIVA. LA PROFONDITÀ DEI SOTTOSERVIZI INDICATA NELLE
TAVOLE DI PROFILO È STIMATA. ALTRE INFRASTRUTTURE E SOTTOSERVIZI NON INDICATI NELLE
PLANIMETRIE POTREBBERO ESISTERE. VERIFICARE LA POSIZIONE DI TUTTE LE
INFRASTRUTTURE, GLI EDIFICI E I SOTTOSERVIZI PRIMA DI PROCEDERE AI LAVORI. LA
PROFONDITÀ DI TRINCEA DEI SOTTOSERVIZI ESISTENTI DOVRÀ ESSERE VERIFICATA PRIMA DI
INIZIARE GLI SCAVI. COORDINARE LE INFORMAZIONI RELATIVE AL POSIZIONAMENTO DEI
SOTTOSERVIZI CON IL RESPONSABILE APPALTO PRIMA DELL'INIZIO DEGLI SCAVI.
13. DETERMINE LOCATION OF ANY EXISTING UTILITIES WITHIN THE LIMIT OF WORK THAT PROVIDE
SERVICE TO EXISTING STRUCTURES THAT WILL NOT BE DEMOLISHED. PROTECT AND MAINTAIN
CONTINUOUS UTILITY SERVICES TO THESE EXISTING STRUCTURES TO REMAIN EXCEPT FOR
OUTAGES APPROVED BY THE CONTRACTING OFFICER / DETERMINARE LA POSIZIONE DEI
SOTTOSERVIZI ALL'INTERNO DELL'AREA DI CANTIERE CHE FORNISCONO SERVIZIO AD ALTRE
STRUTTURE ESISTENTI CHE NON VERRANNO DEMOLITE. PROTEGGERE E MANTENERE IN
FUNZIONE QUESTI SOTTOSERVIZI, A MENO CHE LA LORO CHIUSURA NON SIA APPROVATA DAL
RESPONSABILE APPALTI.
14. WHERE A NEW UTILITY LINE CROSSES AN EXISTING UTILITY, DETERMINE THE EXACT LOCATION AND ELEVATION OF THE EXISTING UTILITY BY EXCAVATION OR TEST PITS. SEE SPECIFICATIONS
FOR ADDITIONAL EXCAVATION AND EXISTING UTILITY PROTECTION REQUIREMENTS / QUANDO
UNA NUOVA TUBATURA INCROCIA UN SOTTOSERVIZIO ESISTENTE, DETERMINARE L'ESATTA
POSIZIONE ED ELEVAZIONE DEL SOTTOSERVIZIO ESISTENTE TRAMITE SCAVO O SONDAGGI DI
SCAVO. CONSULTARE SPECIFICHE PER ULTERIORI REQUISITI DI SCAVO E DI PROTEZIONE
SOTTOSERVIZI.
15. PROTECT ALL EXISTING UTILITIES THAT ARE TO REMAIN IN SERVICE. VERIFY ELEVATIONS OF
NEW AND EXISTING STRUCTURE TOPS, INCLUDING VALVE BOX COVERS, WITH THE PLANS,
PROFILES AND CROSS SECTIONS. ADJUST ELEVATION OF ALL STRUCTURE TOPS AS NEEDED TO
MEET FINISH GRADE ELEVATIONS AND TO ENSURE THAT THE STRUCTURE CAN FUNCTION AS
REQUIRED. ALL TOPS IN PAVEMENT MUST BE SET FLUSH WITH, AND MATCH SLOPE OF, FINISH
GRADE / PROTEGGERE TUTTI I SOTTOSERVIZI ESISTENTI CHE DOVRANNO RIMANERE IN
SERVIZIO. VERIFICARE CON LE PLANIMETRIE, I PROFILI E LE SEZIONI TRASVERSALI,
L'ELEVAZIONE MASSIMA DI TUTTE LE STRUTTURE NUOVE E ESISTENTI, INCLUSI I COPERCHI DEI
POZZETTI. SISTEMARE SE NECESSARIO L'ELEVAZIONE MASSIMA DI TUTTE LE STRUTTURE IN
MODO DA RISPETTARE IL LIVELLAMENTO FINALE E DA CONSENTIRE ALLE STRUTTURE DI
FUNZIONARE CORRETTAMENTE. TUTTE LE PARTI ESPOSTE DELLE PAVIMENTAZIONI DOVRANNO
ESSERE A FILO CON, E ACCORDARSI ALLA PENDENZA DEL PIANO FINITO.
16. IMMEDIATELY REPAIR TO PRE-CONSTRUCTION CONDITION ANY ACTIVE UTILITIES DAMAGED
DURING CONSTRUCTION AND NOTIFY THE CONTRACTING OFFICER AND ANY APPROPRIATE
UTILITY COMPANIES OF THE DAMAGE / RIPRISTINARE IMMEDIATAMENTE QUALSIASI
SOTTOSERVIZIO ATTIVO DANNEGGIATO DURANTE I LAVORI, E NOTIFICARE DEL DANNO IL
RESPONSABILE APPALTI E L'EVENTUALE GESTORE DEL SOTTOSERVIZIO.
17. SANITARY SEWER PIPE, WATER LINES, FITTINGS, MANHOLES AND ACCESSORIES AND THE
INSTALLATION THEREOF, MUST COMPLY WITH THE LATEST STANDARDS AND SPECIFICATIONS OF
THE AMERICAN WATERWORKS ASSOCIATION (AWWA) AND ASTM STANDARDS AS WELL AS
ITALIAN TECHNICAL LEGISLATION AND UNI STANDARDS (WHICHEVER IS MORE STRINGENT) / LE TUBAZIONI SANITARIE, QUELLE PER L'ACQUA POTABILE, TUTTI I RACCORDI, I POZZETTI E GLI
ACCESSORI, E L'INSTALLAZIONE DI ESSI DOVRANNO RISPETTARE GLI ULTIMI STANDARD DI
AMERICAN WATERWORKS ASSOCIATION (AWWA) E DI ASTM. DOVRANNO INOLTRE ESSERE IN
LINEA CON LA LEGISLAZIONE TECNICA ITALIANA E GLI UNI STANDARDS (QUALSIASI REQUISITO
SIA PIÙ STRINGENTE).
18. LENGTHS AND ROUTING OF LINES INDICATED ON THE DRAWINGS FOR UTILITY SYSTEMS ARE
APPROXIMATE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT
ROUTING AND AMOUNT OF MATERIALS (SUCH AS PIPING, CONDUIT AND DUCTBANK) REQUIRED
TO PROVIDE A COMPLETE WORKING SYSTEM IN ACCORDANCE WITH THE INTENT OF THE
DRAWINGS. STATIONING GIVES HORIZONTAL LENGTHS ONLY / LE LUNGHEZZE E I PERCORSI
INDICATI DALLE PLANIMETRIE PER I SOTTOSERVIZI SONO APPROSSIMATIVI. SARÀ
RESPONSABILITÀ DELL'APPALTATORE DETERMINARE L'ESATTO PERCORSO E QUANTITÀ DI
MATERIALE (QUALE TUBAZIONE, CONDOTTO, CAVIDOTTO) NECESSARIO PER COSTRUIRE UN
SISTEMA FUNZIONANTE E COMPLETO SECONDO LE INDICAZIONI DI INTENTO FORNITE DALLE
PLANIMETRIE. LO STAZIONAMENTO FORNISCE ESCLUSIVAMENTE MISURE DI TIPO ORIZZONTALE.
19. PROVIDE MINIMUM 300 MILLIMETER VERTICAL SEPARATION AT ALL UTILITY CROSSINGS., FOR WATER AND SEWER CROSSINGS, SEE DETAILS / ATTUARE UNA SEPARAZIONE VERTICALE MINIMA
DI ALMENO 300 MM AGLI INCROCI DEI SOTTOSERVIZI. PER TUBAZIONI IDRICHE CONSULTARE
DETTAGLI.
20. SAWCUT AND REMOVE PAVEMENT AS REQUIRED TO ACCOMMODATE INSTALLATION OF NEW
UTILITY LINES. REPLACE PAVEMENT UPON COMPLETION OF UTILITY INSTALLATION, MATCH
EXISTING PAVEMENT SECTION AND GRADE / TRONCARE E RIMUOVERE PAVIMENTAZIONE COME
NECESSARIO PER DARE SPAZIO ALL'INSTALLAZIONE DI NUOVI SOTTOSERVIZI. RIMPIAZZARE LA
PAVIMENTAZIONE UNA VOLTA COMPLETATA L'OPERA, RIPRENDENDO LO STESSO MATERIALE E
PENDENZA DELLA PAVIMENTAZIONE ESISTENTE.
C-001
C
IV
IL
G
EN
ER
AL
N
O
TE
S
N O
TE
C
IV
IL
I
14125393 13 226
ISSUED FOR CONSTRUCTION – 10 MAR 2023
JMW
DPS
ACDBZZBRF
11/07/22
Approved by CDR Jonathan Horner, ROICC, via SAT-TO form
CHIEF ENG/ARCH
1684614
AS NOTED
XXX
AVIANO
AIR BASE
DD/MM/YY
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
JEBZZZZ
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M
BA
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
TO
R
F
AC
IL
IT
Y (P
2)
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
VI
R
G
IN
IA
B
EA
C
H , V
A
AT
LA
N
TI
C
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M S
CO
M
M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
FINAL SUBMISSION - 28 OCT 2022
PL
OT
TE
D
BY
\\m oo np a1 cl 1.
bk r.m ba ke rc or p.
co m \V
O L2
\P ro je ct s\
P -2
A vi an o
AB
H el o Si m ul at or
\0 5_
D el iv er ab le s\ D ra w in gs
\0
D W
G _C
AD
\0
C
_C iv il\ Sh ee t F ile s\
-C
-0
.d w g
/2
6/
:3 7:
P
M Fo m be lle , B ra nd on
WATER UTILITY NOTES / NOTE RELATIVE AL SOTTOSERVIZIO DI FORNITURA
IDRICA:
1. ALL WATERLINE AND ASSOCIATED DEVICES WORK MUST BE COORDINATED WITH THE
UTILITY OWNER / TUTTI I LAVORI RELATIVI ALLE LINEE IDRICHE E I DISPOSITIVI AD
ESSE RELATIVI DOVRANNO ESSERE COORDINATI CON IL GESTORE DEI SERVIZI IDRICI.
2. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL TEES, BENDS, OR
ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS, AND MANUFACTURER'S RECOMMENDATIONS. SEE DETAIL SHEETS
FOR TYPICAL THRUST BLOCK DETAIL / BLOCCHI REGGISPINTA E GIUNTI
ANTISFILAMENTO SONO NECESSARI AD OGNI TEE, CURVA O GOMITO DI TUBAZIONI
PRESSURIZZATE COME DA PLANIMETRIE, SPECIFICHE E RACCOMANDAZIONI DEL
PRODUTTORE. CONSULTARE LE TAVOLE DI SPECIFICA PER IL DETTAGLIO SUL TIPICO
BLOCCO.
3. WATER LINES WILL BE INSTALLED A MINIMUM OF 1 METER BEHIND THE EDGE OF
PAVEMENT OR FACE OF CURB UNLESS INDICATED OTHERWISE. SEE SPECIFICATIONS
FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR WATER PIPING / LE TUBATURE
IDRICHE, IN ASSENZA DI DIVERSE INDICAZIONI, SARANNO INSTALLATE AD ALMENO 1 M
E A MASSIMO 2 M DALL'ESTREMO DI PAVIMENTAZIONE O DAL LATO DEL CORDOLO.
4. FIRE HYDRANTS WILL BE INSTALLED A MINIMUM OF 1 METER AND A MAXIMUM OF 2
METERS FROM EDGE OF PAVEMENT OR FACE OF CURB AND A MINIMUM OF 300
MILLIMETERS FROM EDGE OF SIDEWALK UNLESS INDICATED OTHERWISE. A RADIUS
OF 1 METER AROUND HYDRANT WILL BE KEPT CLEAR FOR FIRE DEPARTMENT
ACCESS. AREA BETWEEN CURB AND HYDRANTS WILL BE KEPT CLEAR OF
OBSTRUCTIONS / GLI IDRANTI ANTIINCENDIO SARANNO INSTALLATI AD ALMENO 1 M E
A MASSIMO 2 M DALL'ESTREMO DI PAVIMENTAZIONE O DAL LATO DEL CORDOLO, E AD
ALMENO 300 MM DAL LATO DEL MARCIAPIEDE SE NON INDICATO DIVERSAMENTE.
SARÀ GARANTITA LIBERA UN'AREA DI RAGGIO 1 M DALL'IDRANTE PER CONSENTIRE
L'ACCESSO DA PARTE DEI VIGILI DEL FUOCO. LO SPAZIO FRA CORDOLO E IDRANTE
DOVRÀ ESSERE TENUTO LIBERO DA OGNI OSTRUZIONE.
5. COORDINATE THE INSTALLATION, TESTING, AND INSPECTION OF ALL DOMESTIC
WATER AND FIRE WATER SYSTEMS WITH THE ASSOCIATED UTILITY COMPANIES AND
AGENCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS ON WATER UTILITY
TESTING AND INSPECTION / COORDINARE L'INSTALLAZIONE, IL COLLAUDO E
L'ISPEZIONE DI TUTTI I SISTEMI DOMESTICI PER ACQUA POTABILE E ACQUA
ANTIINCENDIO CON LE RELATIVE AGENZIE E GESTORI DI TALI SERVIZI. CONSULTARE
LE SPECIFICHE PER ULTERIORI REQUISITI SUL COLLAUDO E L'ISPEZIONE DEI SISTEMI
DI FORNITURA IDRICA.
SANITARY UTILITY NOTES / NOTE RELATIVE AL SOTTOSERVIZIO DI
RACCOLTA ACQUE REFLUE:
1. ALL SANITARY SEWER LINE AND ASSOCIATED DEVICES WORK MUST BE COORDINATED
WITH THE UTILITY OWNER / TUTTI I LAVORI RELATIVI ALLE LINEE FOGNARIE E I
DISPOSITIVI AD ESSE RELATIVI DOVRANNO ESSERE COORDINATI CON IL GESTORE DEI
SERVIZI FOGNARI.
2. ALL SANITARY SEWER BUILDING CONNECTIONS ARE TO BE MADE USING 150
MILLIMETER LINES UNLESS INDICATED OTHERWISE / TUTTI GLI ALLACCIAMENTI TRA
SISTEMA FOGNARIO ED EDIFICI, IN ASSENZA DI ALTRE INDICAZIONI, DOVRANNO
PREVEDERE TUBATURE DI DIMENSIONE 150 MM.
3. ALL SANITARY LINES ARE TO BE LAID AT A UNIFORM SLOPE FROM THE BUILDING
CONNECTIONS TO THE CONNECTING SEWER AND BETWEEN UTILITY STRUCTURES /
TUTTE LE TUBAZIONI FOGNARIE DOVRANNO AVERE PENDENZA UNIFORME TRA I PUNTI
DI ALLACCIO E LA TUBAZIONE PRINCIPALE, E TRA DIVERSE STRUTTURE DI SERVIZIO.
4. SEWER LINES WILL BE INSTALLED A MINIMUM OF 3 METERS HORIZONTALLY FROM
ADJACENT WATER LINES UNLESS INDICATED OTHERWISE. SEE SPECIFICATIONS FOR
ADDITIONAL CLEARANCE REQUIREMENTS FOR SANITARY PIPING / IN ASSENZA DI
ALTRE INDICAZIONI, LE TUBAZIONI FOGNARIE DOVRANNO ESSERE INSTALLATE CON
UN MINIMO DI 3 M ORIZZONTALI DA ALTRE TUBAZIONI IDRICHE NEI DINTORNI.
CONSULTARE LE SPECIFICHE PER ULTERIORI REQUISITI DI SICUREZZA PER
L'INSTALLAZIONE DI TUBAZIONI FOGNARIE.
5. SEWER LINES WILL BE INSTALLED BELOW WATER LINES WITH A MINIMUM VERTICAL
SEPARATION OF 0.5 METERS UNLESS INDICATED OTHERWISE. WHERE SANITARY
SEWER WILL BE INSTALLED ABOVE WATER LINES, IT WILL BE ENCASED. SEE DETAILS.
/ LE TUBAZIONI FOGNARIE DOVRANNO ESSERE INSTALLATE AL DI SOTTO DI ALTRE
TUBAZIONI IDRICHE, PREVEDENDO IN ASSENZA DI ALTRE INFORMAZIONI UNA
SEPARAZIONE VERTICALE MINIMA PARI A 0,5 M. QUALORA LA TUBAZIONE FOGNARIA
SARÀ INSTALLATA AL DI SOPRA DI ALTRE TUBAZIONI IDRICHE, QUESTA DOVRÀ ESSERE
RIVESTITA. CONSULTARE LE SPECIFICHE.
6. IF MANHOLES ARE INDICATED ON SANITARY LINES, A 50 MILLIMETER DROP IN
ELEVATION BETWEEN THE INCOMING AND OUTGOING SEWER WILL BE PROVIDED IN
EACH MANHOLE UNLESS INDICATED OTHERWISE. FOR 90°-TYPE MANHOLE
ORIENTATIONS, THE MINIMUM DROP ACROSS MANHOLE CHANNELS IS 30
MILLIMETERS. INVERT FLOW CHANNELS WILL BE CONSTRUCTED TO PROVIDE
SMOOTH AND UNIFORM SLOPE WITH GRADUAL TRANSITION SECTIONS / QUALORA
DOVESSERO ESSERE INDICATI POZZETTI TRA TUBAZIONI FOGNARIE, IN ASSENZA DI
DIVERSE INDICAZIONI DOVRÀ ESSERE APPLICATO UN DISLIVELLO TRA TUBAZIONE IN
ENTRATA E DI USCITA DI ALMENO 50 MM. PER I POZZETTI CON ORIENTAMENTO A 90°, IL
DISLIVELLO TRA TUBAZIONE DI INGRESSO E USCITA SARÀ DI 30 MM. CANALI DI FLUSSO
INVERSO SARANNO COSTRUITI PER FORNIRE UNA PENDENZA UNIFORME CON SEZIONI
GRADUALI DI TRANSIZIONE.
7. PROVIDE ANY NECESSARY BYPASSING OR TANKER TRUCKS NEEDED DURING
SANITARY SEWER INSTALLATION TO ENSURE CONTINUOUS SERVICE / FORNIRE TUTTI I
BYPASS DI RETE E AUTOBOTTI NECESSARI DURANTE I LAVORI DI INSTALLAZIONE DEI
SOTTOSERVIZI FOGNARI, IN MODO DA GARANTIRE SERVIZIO ININTERROTTO AGLI
ALTRI UTENTI DELLA RETE.
8. ALL EXISTING STRUCTURES TO REMAIN THAT ARE BEING ALTERED OR ADJUSTED
WILL BE INSPECTED PRIOR TO WORK. STRUCTURES WILL BE REPLACED IF THE
STRUCTURE IS IN POOR CONDITION / TUTTE LE STRUTTURE ESISTENTI DA
MANTENERE CHE SARANNO SOTTOPOSTE AD ADATTAMENTI O ALTERAZIONI
DOVRANNO ESSERE ISPEZIONATE PRIMA DI POTER RIENTRARE IN SERVIZIO. LE
STRUTTURE DOVRANNO ESSERE RIMPIAZZATE SE GIUDICATE IN CATTIVE CONDIZIONI.
UTILITY STRUCTURE NOTES / NOTE RELATIVE ALLE STRUTTURE PER I
SERVIZI:
1. ALL UTILITY STRUCTURES ARE TO BE H-20 RATED UNLESS INDICATED OTHERWISE.
ALL AIRSIDE UTILITY STRUCTURES ARE TO BE AIRCRAFT RATED FOR SINGLE WHEEL
LOADING OF 20,500 KILOGRAMS / IN ASSENZA DI ALTRE INDICAZIONI, TUTTE LE
STRUTTURE PER I SERVIZI DOVRANNO ESSERE CONFORMI H-20. TUTTE LE
STRUTTURE DI SERVIZIO COLLOCATE NELL'AREA AIRSIDE DOVRANNO SUPPORTARE
AEROMOBILI NELLA CATEGORIA DI CARICO PER SINGOLA RUOTA PARI A 20.500 KG.
2. IF A MANHOLE IS LOCATED IN PAVEMENT AREAS, RIM ELEVATION WILL BE FLUSH WITH
FINAL GRADE. IF A MANHOLE IS LOCATED OUTSIDE OF PAVEMENT AREAS, RIM
ELEVATION WILL BE 150 MILLIMETERS ABOVE ADJACENT FINISH GRADE / SE UN
TOMBINO È COLLOCATO SU SUPERFICI PAVIMENTATE, LA SUPERFICIE DELLA GRATA
DOVRÀ ESSERE A RASO DELL'ESISTENTE PAVIMENTAZIONE. SE IL TOMBINO È
COLLOCATO FUORI DA SUPERFICI PAVIMENTATE, LA SUPERFICIE DELLA GRATA
DOVRÀ AVERE UN'ELEVAZIONE DI 150 MM RISPETTO ALLA SUPERFICIE DEL TERRENO.
3. COVERS AND CASTINGS OF MANHOLES AND STRUCTURES WILL BE STAMPED PER THE
APPROPRIATE UTILITY TYPE OR PER THE LOCAL STANDARDS / I COPERCHI E LE PARTI
IN FUSIONE DEI POZZETTI E DELLE STRUTTURE SARANNO CONTRASSEGNATE COME
PREVISTO PER IL TIPO DI SERVIZIO SPECIFICO O SULLA BASE DELLE NORME LOCALI.
4. COVERS AND CASTINGS WILL BE TAMPER-PROOF FOR STRUCTURES LOCATED IN
PEDESTRIAN AREAS, EASEMENT AREAS, AND AREAS WITH SPECIAL SECURITY
RESTRICTIONS / I COPERCHI E LE PARTI IN FUSIONE SARANNO A PROVA DI
MANOMISSIONE SE APPARTENGONO A STRUTTURE ALL'INTERNO DI ZONE PEDONALI,
SERVITÙ E ZONE CON PARTICOLARI RESTRIZIONI DI SICUREZZA.
5. ANY LIFT LOOPS FOR UTILITY STRUCTURES WILL BE GROUTED FLUSH AFTER
INSTALLATION / EVENTUALI ANELLI DI SOLLEVAMENTO PER LE STRUTTURE DI
SERVIZIO SARANNO STUCCATI A FILO DOPO L'INSTALLAZIONE.
6. PIPE MAY EXTEND 50 MILLIMETERS MAXIMUM BEYOND INTERIOR MANHOLE WALL / LE
TUBAZIONI POTRANNO ESTENDERSI PER UN MASSIMO DI 50 MM OLTRE LA PARETE
INTERNA DEL POZZETTO.
MANHOLE FRAME ADJUSTMENT NOTES / NOTE RELATIVE AL TELAIO DEL
POZZETTO:
1. AREA REQUIRING MANHOLE ADJUSTMENT WILL BE SAWCUT 300 MILLIMETERS
MINIMUM AROUND MANHOLE FRAME / NELLE ZONE IN CUI È NECESSARIO
L'ADEGUAMENTO DEI POZZETTI, IL TAGLIO VERRÀ EFFETTUATO A MIN 300 MILLIMETRI
INTORNO AL TELAIO DEL POZZETTO.
2. MANHOLE COVER AND FRAME WILL BE RAISED TO FINISH GRADE BY INSTALLING
PRECAST MANHOLE ADJUSTMENT RINGS AND LEVELING MORTAR / IL TELAIO E IL
COPERCHIO DEL POZZETTO SARANNO RIALZATI AL LIVELLO FINITO TRAMITE L'IMPIEGO
DI APPOSITI ANELLI ADATTATORI PREFABBRICATI E MALTA DA LIVELLAMENTO.
3. GRADE ADJUSTMENT AREA WILL BE BACKFILLED WITH EARLY STRENGTH PCC / L'AREA
DI ADEGUAMENTO DEL LIVELLO VERRÀ RIEMPITA DI CEMENTO PORTLAND CON
RESISTENZA INIZIALE.
PETROLEUM PRODUCTS / PRODOTTI A BASE DI PETROLIO:
1. ALL ON-SITE VEHICLES WILL BE MONITORED FOR PETROLEUM LEAKS AND WILL
RECEIVE PROPER PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF
LEAKAGE. PETROLEUM PRODUCTS WILL BE STORED IN TIGHTLY-SEALED CONTAINERS
THAT ARE CLEARLY LABELED. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER
DISCOVERY. WASTE OIL AND OTHER PETROLEUM PRODUCTS WILL NOT BE
DISCHARGED ONTO THE GROUND OR INTO WATER BODIES. PETROLEUM PRODUCTS
USED ON-SITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER
RECOMMENDATIONS / TUTTI I VEICOLI PRESENTI SUL SITO VERRANNO MONITORATI
PER PERDITE PETROLIFERE E RICEVERANNO MANUTENZIONE PREVENTIVA PER
RIDURRE IL RISCHIO DI PERDITE. I PRODOTTI A BASE DI PETROLIO DOVRANNO ESSERE
CONSERVATI IN CONTENITORI A TENUTA STAGNA CHIARAMENTE IDENTIFICATI. TUTTE
LE PERDITE APPENA SCOPERTE DOVRANNO ESSERE RIPULITE IMMEDIATAMENTE. I
RIFIUTI DI OLIO E ALTRI RIFIUTI A BASE DI PETROLIO NON DOVRANNO ESSERE
RILASCIATI SUL TERRENO O IN CORPI D'ACQUA. I PRODOTTI IN USO A BASE DI
PETROLIO DOVRANNO ESSERE MANEGGIATI SECONDO LE RACCOMANDAZIONI DEL
PRODUTTORE.
C-002
C
IV
IL
G
EN
ER
AL
N
O
TE
S
N O
TE
C
IV
IL
I
14125394
UTILITY CONTACT INFORMATION:
SANITARY SEWER / SOTTOSERVIZI FOGNARI:
SSGT. CAMILO GUZMAN
PHONE: +39-0434-30-8202
EMAIL: CAMILO.GUZMAN.1@US.AF.MIL
TSGT. EDWARD ADADE (SHOP)
PHONE: +39-0434-30-8202
EMAIL: EDWARD.ADADE.1@US.AF.MIL
WATER / ACQUA:
TSGT. EDWARD ADADE (SHOP)
PHONE: +39-0434-30-8202
EMAIL: EDWARD.ADADE.1@US.AF.MIL
ELECTRIC / ELETTRICITA':
MSGT. JONATHAN ATIMUA (SHOP)
PHONE: +39-0434-30-5701
EMAIL: JONATHAN.ATIMUA@US.AF.MIL
ANGELO ZANOT (MAINTENANCE ENGINEERING)
PHONE: +39-0434-30-7491
SIMON MITRI (ENGINEERING )
PHONE: +39-0434-30-4056
EMAIL: SIMON.MITRI.IT@US.AF.MIL
NATURAL GAS:
TSGT. EDWARD ADADE (SHOP)
PHONE: +39-0434-30-8202
EMAIL: EDWARD.ADADE.1@US.AF.MIL
FRANCESCO CACCIA (MAINTENANCE
ENGINEERING)
PHONE: 39-0434-30-5869
EMAIL: FRANCESCO.CACCIA.IT@US.AF.MIL
TELECOM / TELECOMUNICAZIONI:
MR. JASON ST CLAIR
PHONE: +39-0434-30-7526
EMAIL: JASON.ST_CLAIR.9.CTR@US.AF.MIL
FIRE ALARM SYSTEM COMPONENTS / COMPONENTI DEL
SISTEMA ANTI INCENDIO:
CLAUDIO TASSAN CASER (CONTRACT MANAGER)
PHONE: +39-0434-30-2350
EMAIL:
CLAUDIO.TASSAN_CASER.IT@US.AF.MIL
FIRE DEPARTMENT / DIPARTIMENTO VIGILI DEL FUOCO:
LUCIO FEDRIGO (FIRE DEPARTMENT)
PHONE: +39-0434-30-7530
EMAIL: LUCIO.FEDRIGO.1.IT@US.AF.MIL
(DATA)
(OPERATORE)
/ DESCRIZIONE DEL CAPOSALDO
/ IL CAPOSALDO e UBICATO SU UNA LASTRA DI
CEMENTO A NORT EST VICINO ALLA CLINICA DENTALE.
FOTO DI DETTAGLIO
FOTO PANORAMICA
UBICAZIONE DA GOOGLE EARTH
UBICAZIONE E DI DETTAGLIO
ISSUED FOR CONSTRUCTION – 10 MAR 2023
JMW
DPS
ACDBZZBRF
11/07/22
CHIEF ENG/ARCH
1684614
AS NOTED
XXX
AVIANO
AIR BASE
DD/MM/YY
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
JEBZZZZ
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M
BA
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
TO
R
F
AC
IL
IT
Y (P
2)
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
VI
R
G
IN
IA
B
EA
C
H , V
A
AT
LA
N
TI
C
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M S
CO
M
M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
FINAL SUBMISSION - 28 OCT 2022
PL
OT
TE
D
BY
\\m oo np a1 cl 1.
bk r.m ba ke rc or p.
co m \V
O L2
\P ro je ct s\
P -2
A vi an o
AB
H el o Si m ul at or
\0 5_
D el iv er ab le s\ D ra w in gs
\0
D W
G _C
AD
\0
C
_C iv il\ Sh ee t F ile s\
-C
-0
.d w g
/2
6/
:3 7:
P
M Fo m be lle , B ra nd on
ACCESS AND STAGING / ACCESSO E ALLESTIMENTO
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND
DELIVERIES ARE SUBJECT TO THE APPROVAL OF THE COR. IT MUST BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE COR AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE BASE / L'ACCESSO E LE VIE DI TRASPORTO PER TUTTO IL PERSONALE, I VEICOLI, LE ATTREZZATURE E LE CONSEGNE DELL'APPALTATORE SONO SOGGETTI ALL'APPROVAZIONE DEL COR. È RESPONSABILITÀ DELL'APPALTATORE COORDINARE I PERCORSI DI TRASPORTO AL DI FUORI DEL SITO CON IL RESPONSABILE APPROPRIATO CHE HA GIURISDIZIONE SUL PERCORSO INTERESSATO. LE VIE DI ACCESSO E I PERCORSI DI TRASPORTO SONO SOGGETTI A MODIFICHE SU INDICAZIONE DEL COR E
POSSONO CAMBIARE IN BASE AI REQUISITI OPERATIVI DELLA BASE.
2. CONTRACTOR MUST COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME / L'APPALTATORE DEVE COORDINARE LE ATTIVITÀ E MANTENERE TUTTI GLI ACCESSI E LE VIE DI TRASPORTO IN MODO DA CONSENTIRE L'ACCESSO DI EMERGENZA SENZA OSTACOLI A TUTTE LE AREE DEL PROGETTO E ALLE STRADE ESISTENTI IN QUALSIASI MOMENTO SENZA RITARDI NEI TEMPI DI
RISPOSTA DEI VEICOLI DI EMERGENZA E DI SICUREZZA.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR MUST NOTIFY THE COR, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE / SE LE VIE DI EMERGENZA DEVONO ESSERE CHIUSE A CAUSA DELLE ATTIVITÀ DI CANTIERE, L'APPALTATORE DEVE NOTIFICARE LA CHIUSURA AL COR, ALLA POLIZIA, ALL'AUTORITÀ
LOCALE DEI VIGILI DEL FUOCO E A TUTTI GLI ALTRI SERVIZI DI EMERGENZA.
4. CONTRACTOR MUST MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS / L'APPALTATORE DEVE MANTENERE QUOTIDIANAMENTE L'ACCESSO E LE VIE DI TRASPORTO LIBERE DA DETRITI CAUSATI DALLE ATTIVITÀ DI COSTRUZIONE.
5. CONTRACTOR MUST RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS
UNLESS COORDINATED OTHERWISE WITH THE COR / L'APPALTATORE DEVE LIMITARE TUTTE LE
OPERAZIONI ALLE AREE ALL'INTERNO DEI LIMITI DI COSTRUZIONE, A MENO CHE NON SIA STATO
COORDINATO DIVERSAMENTE CON IL COR.
6. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY CONSTRUCTION FENCING FOR THE DURATION
OF THE PROJECT. CONTRACTOR MUST COORDINATE REQUIRED RELOCATION OF FENCE DURING
CONSTRUCTION WITH CONTRACTING OFFICER / L'APPALTATORE È RESPONSABILE DELLA RECINZIONE
TEMPORANEA PER LA DURATA DEL PROGETTO. L'APPALTATORE DEVE COORDINARE CON IL
RESPONSABILE APPALTI IL NECESSARIO SPOSTAMENTO DELLA RECINZIONE DURANTE LA
COSTRUZIONE.
7. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING IS SUBJECT TO THE APPROVAL OF THE COR.
CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE COR AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE BASE / L'APPALTATORE È RESPONSABILE
DELLA CREAZIONE DI UN'AREA DI STAZIONAMENTO E DI STOCCAGGIO PER I MATERIALI E LE
ATTREZZATURE. L'UBICAZIONE DELL'AREA DI STAZIONAMENTO DELL'APPALTATORE È SOGGETTA ALL'APPROVAZIONE DEL COR. L'AREA DI STOCCAGGIO DELL'APPALTATORE È SOGGETTA A MODIFICHE
SU INDICAZIONE DEL COR E PUÒ CAMBIARE IN BASE AI REQUISITI OPERATIVI DELLA BASE.
8. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES
MUST BE PARKED IN THE STAGING AREA / QUANDO NON SONO IMPEGNATI NELLE ATTIVITÀ DI
COSTRUZIONE, LE ATTREZZATURE E I VEICOLI DELL'APPALTATORE DEVONO ESSERE PARCHEGGIATI
NELL'AREA DI STAZIONAMENTO.
9. CONTRACTOR MUST PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A PROFESSIONALLY
PAINTED SIGN, MEETING COR APPROVAL, TO DIRECT MATERIAL SUPPLIERS, EMPLOYEES, AND
DELIVERIES TO THE CONSTRUCTION SITE. THE SIGN MUST READ “CONSTRUCTION VEHICLES ONLY -
NO VENDORS ALLOWED” / L'APPALTATORE DEVE FORNIRE E INSTALLARE ALL'INGRESSO DELLA
COSTRUZIONE UN CARTELLO REALIZZATO A REGOLA D'ARTE, CONFORME ALL'APPROVAZIONE DEL COR, PER INDIRIZZARE I FORNITORI DI MATERIALI, I DIPENDENTI E LE CONSEGNE AL CANTIERE. IL
CARTELLO DEVE RECARE LA DICITURA "SOLO VEICOLI DA COSTRUZIONE - NON SONO AMMESSI
VENDITORI".
10. CONTRACTOR MUST PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE COR REGARDING
CONSTRUCTION DELIVERIES PRIOR TO THOSE DELIVERIES. DELIVERIES MUST BE SCHEDULED
MONDAY-FRIDAY, 8:00 AM TO 3:00 PM / L'APPALTATORE DEVE FORNIRE UN PREAVVISO MINIMO DI 48 ORE AL COR PER QUANTO RIGUARDA LE CONSEGNE. LE CONSEGNE DEVONO ESSERE PROGRAMMATE
DAL LUNEDÌ AL VENERDÌ, DALLE 8:00 ALLE 15:00.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO SEARCH BY SECURITY WHEN
ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND VALID PHOTO IDENTIFICATION PER BASE SECURITY REQUIREMENTS, AND ALL VEHICLES MUST HAVE
CURRENT AND VALID REGISTRATION AND INSURANCE / TUTTI I VEICOLI E IL PERSONALE
DELL'APPALTATORE SONO SOGGETTI A PERQUISIZIONI DA PARTE DELLA SICUREZZA PER ENTRARE NELLA BASE E POSSONO SUBIRE RITARDI. TUTTO IL PERSONALE DEVE ESSERE IN POSSESSO DI UN DOCUMENTO D'IDENTITÀ CON FOTO VALIDO E AGGIORNATO, SECONDO I REQUISITI DI SICUREZZA DELLA BASE, E TUTTI I VEICOLI DEVONO AVERE UNA CARTA DI CIRCOLAZIONE E UN'ASSICURAZIONE
VALIDE E AGGIORNATE.
12. ALL CONTRACTOR VEHICLES AND PERSONNEL MUST BE RESPONSIBLE FOR COORDINATING WITH THE
COR IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING SECURE
AREAS. THE COE MUST PROVIDE COORDINATION WITH THE BASE SECURITY OFFICE / TUTTI I VEICOLI E
IL PERSONALE DELL'APPALTATORE DEVONO COORDINARSI CON IL COR PER OTTENERE
L'AUTORIZZAZIONE DI SICUREZZA E IL BADGE PRIMA DI ACCEDERE ALLE AREE SICURE. IL COR DEVE
PROVVEDERE AL COORDINAMENTO CON L'UFFICIO DI SICUREZZA DELLA BASE.
13. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE CONTRACTOR MUST BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE COR / I PUNTI DI ACCESSO, LE VIE DI TRASPORTO, LE AREE DI SOSTA E QUALSIASI ALTRA AREA ALTERATA DALL'APPALTATORE DEVONO ESSERE RIPRISTINATI NELLE CONDIZIONI ORIGINALI O IN
CONDIZIONI MIGLIORI, IN MODO CONSIDERATO SODDISFACENTE DAL COR.
COORDINATION AND COMMUNICATION / COORDINAZIONE E COMUNICAZIONE
1. CONTRACTOR MUST APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE
APPROVAL OF THE COR, WHO MUST BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING
WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY
CONSTRUCTION SUPERINTENDENT MUST BE DESIGNATED THE RESPONSIBLE CONTRACTOR'S
REPRESENTATIVE WHO MUST BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
ALTERNATE REPRESENTATIVE, APPROVED BY THE COR, MUST BE PROVIDED. CONTRACTOR MUST
PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE COR PRIOR TO THE
START OF CONSTRUCTION ACTIVITIES / L'APPALTATORE DEVE NOMINARE UN SUPERVISORE PRIMARIO DEI LAVORI DI COSTRUZIONE, SOGGETTO ALL'APPROVAZIONE DEL COR, CHE DEVE ESSERE SEMPRE PRESENTE NEL CANTIERE DURANTE L'ORARIO DI LAVORO E ACCESSIBILE IN QUALSIASI MOMENTO MENTRE I LAVORI SONO IN CORSO. IL SUPERVISORE PRINCIPALE DEVE ESSERE DESIGNATO COME RAPPRESENTANTE DELL' APPALTATORE E DEVE ESSERE DISPONIBILE 24 ORE SU 24. QUANDO IL RAPPRESENTANTE PRINCIPALE DELL'APPALTATORE NON È DISPONIBILE SUL CANTIERE, DEVE ESSERE FORNITO UN RAPPRESENTANTE ALTERNATIVO, APPROVATO DAL COR. L'APPALTATORE DEVE FORNIRE I NOMI E LE INFORMAZIONI DI CONTATTO DEI RAPPRESENTANTI AL COR PRIMA DELL'INIZIO DELLE
ATTIVITÀ DI COSTRUZIONE.
2. CONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE COR. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR MUST BE REVIEWED AND APPROVED BY THE COR / L'APPALTATORE È RESPONSABILE DEL COSTANTE
COORDINAMENTO TRA GLI EVENTUALI SUBAPPALTATORI E IL COR. TUTTE LE ATTIVITÀ DI
COSTRUZIONE PIANIFICATE DALL'APPALTATORE DEVONO ESSERE ESAMINATE E APPROVATE DAL COR.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN
EMERGENCY / I SEGUENTI NUMERI DI EMERGENZA SONO FORNITI ALL'APPALTATORE:
a. EMERGENCY 113 / EMERGENZE 113
b. OWNER AS DIRECTED AT PRE-CONSTRUCTION MEETING / PROPRIETARIO COME INDICATO
DURANTE GLI INCONTRI DI PREPARAZIONE
c. OTHER CONTACTS AS DIRECTED AT PRE-CONSTRUCTION MEETING / ALTRI CONTATTI COME
CONCORDATO NEGLI INCONTRI DI PREPARAZIONE
TRAFFIC CONTROL / CONTROLLO DEL TRAFFICO
1. PRIOR TO CONSTRUCTION, CONTRACTOR MUST CORDON OFF THE CONSTRUCTION WORK AREA AND
ASSOCIATED ROADWAYS BY USING BARRICADES/TEMPORARY FENCING AS APPROVED BY THE COR
AND BASE AIR OPS / PRIMA DELLA PARTENZA DEI LAVORI, L'APPALTATORE DEVE DELIMITARE L'AREA DI
LAVORO E LE STRADE COLLEGATE UTILIZZANDO BARRICATE O RECINZIONI TEMPORANEE, COME
APPROVATO DAL COR E DAL COMANDO AEREO DELLA BASE.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES MUST BE MARKED WITH COMPANY DESIGNS,
INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. CONTRACTOR MUST PROVIDE EACH VEHICLE WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 1 METER SQUARE HAVING INTERNATIONAL ORANGE AND WHITE CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE / TUTTE LE ATTREZZATURE E I VEICOLI DA COSTRUZIONE DEVONO ESSERE CONTRASSEGNATI CON IL LOGO DELL'AZIENDA, LE INSEGNE O ALTRI SEGNI CHIARAMENTE VISIBILI. L'APPALTATORE DEVE FORNIRE A OGNI VEICOLO UNA BANDIERA ATTACCATA AL VEICOLO, DI ALMENO 1 METRO QUADRATO CON IL SIMBOLO INTERNAZIONALE A SCACCHI BIANCHI E ARANCIONI, IN MODO CHE LA BANDIERA SIA
FACILMENTE VISIBILE.
3. CONSTRUCTION EQUIPMENT MUST HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN
MOVING IN REVERSE / I VEICOLI DA CANTIERE DEVONO ESSERE DOTATI DI DISPOSITIVI DI
SEGNALAZIONE AUTOMATICA CHE EMETTANO UN SEGNALE ACUSTICO QUANDO SI MUOVONO IN
RETROMARCIA.
4. ONLY RUBBER-TIRE VEHICLES ARE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN / SULLE
PAVIMENTAZIONI ESISTENTI DA MANTENERE SONO AMMESSI SOLO VEICOLI CON PNEUMATICI IN
GOMMA.
5. NO PEDESTRIAN TRAFFIC IS ALLOWED INSIDE THE CONSTRUCTION LIMITS / NON È CONSENTITO IL
TRANSITO DEI PEDONI ALL'INTERNO DELL'AREA DI CANTIERE.
6. CONTRACTOR MUST PROVIDE A MINIMUM NOTICE OF 21 WORKING DAYS TO BASE AND THE COR FOR
ROAD CLOSURE PRIOR TO THE ROAD REQUIRING CLOSURE / L'APPALTATORE DEVE FORNIRE UN
PREAVVISO MINIMO DI 21 GIORNI LAVORATIVI ALLA BASE E AL COR PER LA CHIUSURA DI UNA STRADA
PRIMA DELLA CHIUSURA DELLA STESSA.
7. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE CONTRACTOR MUST REQUEST THE COR TO SCHEDULE AN INSPECTION. NO ROADWAY MUST BE RE-OPENED UNTIL THE COR HAS COMPLETED INSPECTION AND APPROVED THE RE-OPENING OF ACTIVE AREAS / PRIMA DI RIMUOVERE LE TRANSENNE E I DISPOSITIVI DI CONTROLLO DELLA VIABILITÀ, L'APPALTATORE DEVE RICHIEDERE AL COR DI EFFETTUARE UN'ISPEZIONE. NESSUNA STRADA DEVE ESSERE RIAPERTA
FINCHÉ IL COR NON HA COMPLETATO L'ISPEZIONE E APPROVATO LA RIAPERTURA DELLE AREE
INTERESSATE.
8. CONTRACTOR MUST ATTEND ANY SPONSOR-MANDATED VEHICLE OPERATOR OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) CONTROL TRAINING COURSE / L'APPALTATORE DEVE PARTECIPARE A TUTTI I CORSI DI FORMAZIONE PER OPERATORI DI VEICOLI O PER IL CONTROLLO DEI DETRITI/DANNI DA
OGGETTI ESTRANEI (FOD) RICHIESTI DALLO SPONSOR.
9. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION EQUIPMENT OR
TRAFFIC MUST BE REPAIRED TO RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL
CONDITION TO THE SATISFACTION OF THE COR / QUALSIASI DANNO ALLE STRADE E AI MARCIAPIEDI DA MANTENERE DOVUTO ALLE ATTREZZATURE DI CANTIERE O AL TRAFFICO, DEVE ESSERE RIPARATO PER RIPRISTINARLI ALLE LORO CONDIZIONI ORIGINALI IN MODO SODDISFACENTE PER IL COR.
EXCAVATION AND TRENCHES / SCAVI E TRINCEE
1. CONTRACTOR MUST COMPLY WITH THE MOST CURRENT EDITION OF OSHA REGULATIONS AND LOCAL
REGULATIONS AND LAWS CONCERNING EXCAVATION / L'APPALTATORE DEVE RISPETTARE LA
VERSIONE PIÙ AGGIORNATA DELLE NORMATIVE OSHA E LE NORMATIVE E LEGGI LOCALI IN MATERIA DI
SCAVI.
2. CONTRACTOR MUST BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING, AND
SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS FOR CONSTRUCTION / L'APPALTATORE È TENUTO A GARANTIRE CHE TUTTI GLI SCAVI, LE TRINCEE E LE PUNTELLATURE SIANO ESEGUITI IN MODO CONFORME ALLE NORMATIVE LOCALI E ALLE NORMATIVE PER I LAVORI DI
COSTRUZIONE DELL'"OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION" (OSHA).
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE MUST BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE COR / LE TRINCEE E GLI
SCAVI APERTI NEL CANTIERE DEVONO ESSERE SEGNALATI IN MODO EVIDENTE CON BARRICATE
ARANCIONI CON LUCI ROSSE LAMPEGGIANTI CONSIDERATE ACCETTABILI DAL COR.
4. CONTRACTOR MUST PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE COR AND ASSOCIATED UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION / L'APPALTATORE DEVE FORNIRE UN PREAVVISO MINIMO DI 48 ORE AI GESTORI DI SOTTOSERVIZI E ALLE AGENZIE PRIMA DI
PROCEDERE A QUALSIASI SCAVO.
5. CONTRACTOR MUST HAVE A PROCESSED AND APPROVED WORK CLEARANCE REQUEST PRIOR TO ANY
EXCAVATION / L'APPALTATORE DEVE AVERE UN' AUTORIZZAZIONE AL LAVORO ELABORATA E
APPROVATA PRIMA DI QUALSIASI SCAVO.
6. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED / PUÒ ESSERE
NECESSARIO IL DRENAGGIO DELLE TRINCEE DI SERVIZIO E DI ALTRI SCAVI.
7. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING THEREIN.
AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED / APRIRE SOLO LE TRINCEE PER LE QUALI IL MATERIALE È DISPONIBILE E PRONTO PER ESSERE POSATO. APPENA POSSIBILE DOPO IL POSIZIONAMENTO DEL
MATERIALE E L'APPROVAZIONE DEL LAVORO, RIEMPIRE E COMPATTARE LE TRINCEE COME
SPECIFICATO.
OTHER SAFETY REQUIREMENTS / ALTRE PRESCRIZIONI DI SICUREZZA
1. CONTRACTOR MUST MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS, AND EM385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL, LATEST EDITION / L'APPALTATORE DEVE MANTENERE PRATICHE DI SICUREZZA CONFORMI AI REGOLAMENTI DELLA "OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION" (OSHA) E AL MANUALE
DEI REQUISITI DI SICUREZZA E SALUTE EM385-1-1, NELLA SUA ULTIMA EDIZIONE.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT / È RESPONSABILITÀ DELL'APPALTATORE OTTENERE E PAGARE TUTTI I PERMESSI, LE TASSE E LE LICENZE APPLICABILI PER LA COSTRUZIONE E
LE ATTREZZATURE.
3. THE CONTRACTOR MUST PERFORM ON-SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS IMMEDIATELY / L'APPALTATORE DEVE ESEGUIRE ISPEZIONI DEL SITO PER TUTTA LA DURATA DEL PROGETTO E PORRE IMMEDIATAMENTE RIMEDIO A QUALSIASI PROBLEMA DI
SICUREZZA.
4. THERE MUST NOT BE ANY PERMANENT WASTE SITES ON BASE PROPERTY. ANY TEMPORARY WASTE AREA MUST BE APPROVED BY THE COR AND MUST BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF THE COR / NELLA
PROPRIETÀ DELLA BASE NON DEVONO ESSERE PRESENTI DEPOSITI PERMANENTI DI RIFIUTI.
QUALSIASI AREA TEMPORANEA PER I RIFIUTI DEVE ESSERE APPROVATA DAL COR E DEVE ESSERE MANTENUTA IN CONDIZIONI ADEGUATE. LA RIMOZIONE DEI RIFIUTI CHE NON SONO MANTENUTI
CORRETTAMENTE È SOGGETTA ALLA DISCREZIONE DEL COR.
5. CONTRACTOR MUST COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED EQUIPMENT WITH THE COR / L'APPALTATORE DEVE COORDINARE LA RICOLLOCAZIONE DI QUALSIASI APPARECCHIATURA
DI PROPRIETÀ DEL GOVERNO CON IL COR.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH LOCAL AUTHORITIES
AND SUBMITTING DOCUMENTS FOR PERMITTING FOR EROSION, SEDIMENT CONTROL, AND
STORMWATER POLLUTION PREVENTION / L'APPALTATORE È RESPONSABILE DEL COORDINAMENTO DI
TUTTI I REQUISITI CON LE AUTORITÀ LOCALI E DELLA TRASMISSIONE DEI DOCUMENTI DI
AUTORIZZAZIONE PER IL CONTROLLO DELL'EROSIONE E DEI SEDIMENTI E PER LA PREVENZIONE
DELL'INQUINAMENTO DELLE ACQUE METEORICHE.
7. EROSION CONTROL DEVICES MUST BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER
RUNOFF. SEE DRAWING EROSION AND SEDIMENT CONTROL PLAN AND DETAIL SHEETS FOR
REQUIREMENTS / I DISPOSITIVI DI CONTROLLO DELL'EROSIONE DEVONO ESSERE UTILIZZATI PER LE VIE DI ACCESSO E DI TRANSITO, PER L'AREA DI STAZIONAMENTO E PER TUTTI I DEPOSITI DI
MATERIALE, SE NECESSARIO, PER CONTROLLARE L'EROSIONE E IL DEFLUSSO DELLE ACQUE
METEORICHE. PER I REQUISITI SI VEDANO I DISEGNI DEL PIANO DI CONTROLLO DELL'EROSIONE E DEI
SEDIMENTI E LE SCHEDE DI DETTAGLIO.
8. STOCKPILED MATERIAL MUST BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS / IL MATERIALE STOCCATO DEVE ESSERE IMMOBILIZZATO IN MODO DA
EVITARE EVENTUALI MOVIMENTI DOVUTI ALLE CONDIZIONI DEL VENTO.
CONTINUED ON C-004 / CONTINUA SU C-004.
C-003
C
IV
IL
G
EN
ER
AL
N
O
TE
S
N O
TE
C
IV
IL
I
14125395 15 226
ISSUED FOR CONSTRUCTION – 10 MAR 2023
JMW
DPS
ACDBZZBRF
11/07/22
CHIEF ENG/ARCH
1684614
AS NOTED
XXX
AVIANO
AIR BASE
DD/MM/YY
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
JEBZZZZ
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M
BA
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
TO
R
F
AC
IL
IT
Y (P
2)
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
VI
R
G
IN
IA
B
EA
C
H , V
A
AT
LA
N
TI
C
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M S
CO
M
M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
FINAL SUBMISSION - 28 OCT 2022
PL
OT
TE
D
BY
124.2
Wx
FWx
SSx
SDx
EXISTING CONTOUR / PROFILO ESISTENTE
EXISTING WATER LINE / LINEA ACQUA ESISTENTE
EXISTING FIREWATER LINE / LINEA ACQUA
ANTINCENDIO ESISTENTE
EXISTING SANITARY SEWER WITH MANHOLE /
FOGNATURA SANITARIA ESISTENTE CON POZZETTO
EXISTING STORM DRAIN WITH CATCH BASIN /
SCARICO ACQUE PIOVANE ESISTENTE CON BACINO
DI RACCOLTA
Eux
Gx
EXISTING BURIED ELECTRIC LINE / LINEA ELETTRICA
INTERRATA ESISTENTE
EXISTING NATURAL GAS LINE / LINEA GAS NATURALE
ESISTENTE
D
Cux
EXISTING BURIED COMMUNICATIONS LINE WITH
MANHOLE / LINEA DI COMUNICAZIONE INTERRATA
ESISTENTE CON MAHOLE
EXISTING STORM DRAIN MANHOLE / POZZETTO
SCARICO ACQUA PIOVANA ESISTENTE
EXISTING FIRE HYDRANT / IDRANTE ESISTENTE
EXISTING SITE LIGHTING / ILLUMINAZIONE SITO
ESISTENTE
GRASS AREA / AREA PRATO
EXISTING CONCRETE PAVING / PAVIMENTAZIONE IN
CALCESTRUZZO ESISTENTE
EXISTING GREEN PAVERS / PAVIMENTAZIONE VERDE
ESISTENTE
EXISTING TREE / ALBERO ESISTENTE
SD
G
SAN
PROPOSED STORM DRAIN WITH CATCH BASIN / SCARICO
ACQUE PIOVANE PROPOSTO CON BACINO DI RACCOLTA
PROPOSED BURIED COMMUNICATIONS LINE WITH
MANHOLE / LINEA COMUNICAZIONI INTERRATA
PROPOSTA CON POZZETTO
PROPOSED NATURAL GAS LINE / LINEA GAS NATURALE
PROPOSTA
PROPOSED SANITARY SEWER WITH MANHOLE /
FOGNATURA SANITATIA PROPOSTA CON POZZETTO
C
CB
PROPOSED CONTOUR / PROFILO PROPOSTO
CHAIN LINK FENCE / RETE METALLICA
PROPOSED GRASS AREA / AREA
PRATO PROPOSTA
\\m oo np a1 cl 1.
bk r.m ba ke rc or p.
co m \V
O L2
\P ro je ct s\
P -2
A vi an o
AB
H el o Si m ul at or
\0 5_
D el iv er ab le s\ D ra w in gs
\0
D W
G _C
AD
\0
C
_C iv il\ Sh ee t F ile s\
-C
-0
.d w g
/2
6/
:3 7:
P
M Fo m be lle , B ra nd on
@ AT / A
ABA ARCHITECTURAL BARRIERS ACT / LEGGE SULLE BARRIERE ARCHITETTONICHE
ABC AGGREGATE BASE COURSE / CORSO BASAMENTO AGGREGATI
AC ACRE / ACRO
ADA AMERICANS WITH DISABILITIES ACT / LEGGE SUGLI AMERICANI CON DISABILITÀ
AGGR AGGREGATE / AGGREGATO
ARS AIR RESERVE STATION / STAZIONE CON RISERVA D’ARIA
ATFP ANTI-TERRORISM/FORCE PROTECTION / ANTITERRORISMO/PROTEZIONE DELLE FORZE
B/C…