WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
RSchwartz Image
P-242 ADAL Combat Rescue Helicopter Simulator Facility Issued for Construction 10 March 2023
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 20 QUALITY CONTROL
01 45 23.10 42 CERTIFICATIONS OF COMPLIANCE WITH ITALIAN LAWS
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 33 PRECAST STRUCTURAL CONCRETE
DI VI SI ON 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
PROJECT TABLE OF CONTENTS Page 1
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 32 14 CLAY TILE ROOFING OR REPAIR
07 41 63 FABRICATED ROOF PANEL ASSEMBLIES
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
09 97 13.00 40 STEEL COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 INTERIOR SIGNAGE
10 22 26.13 ACCORDION FOLDING PARTITIONS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
22 33 30.00 10 SOLAR WATER HEATING EQUIPMENT
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 2
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 20 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 35 43 60-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 41 00 AUDIO-VISUAL SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
31 31 16.13 CHEMICAL TERMITE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
PROJECT TABLE OF CONTENTS Page 3
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORMWATER UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as indicated in the attachment.
-- End of Document --
DOCUMENT 00 01 15 Page 1
1 Discipline Number
NAVFAC
Dwg No X of 226 Sheet Name Host Sheet Name
GENERAL
GENERAL G-001 14125381 1 COVER SHEET COPERTINA
GENERAL G-002 14125382 2 DRAWING INDEX INDICE DELLE TAVOLE
GENERAL G-003 14125383 3 DRAWING INDEX INDICE DELLE TAVOLE
GENERAL G-101 14125384 4 LIFE SAFETY - CODE ANALYSIS SICUREZZA - ANALISI DEI CODICI
GENERAL G-102 14125385 5 LIFE SAFETY - CODE ANALYSIS CONTINUED SICUREZZA - ANALISI DEI CODICI CONTINUATO
GENERAL G-110 14125386 6 LIFE SAFETY - CODE COMPLIANCE SITE PLAN SICUREZZA - PLANIMETRIA DEL SITO IN CONFORMITA' CON I CODICI
GENERAL G-111 14125387 7 LIFE SAFETY - FIRST FLOOR PLAN SICUREZZA - PLANIMETRIA PRIMO PIANO
HAZARDOUS MATERIALS
HAZARDOUS MATERIALS H-101 14125388 8 HAZMAT SAMPLES LOCATION UBICAZIONE CAMPIONI MATERIALI PERICOLOSI
HAZARDOUS MATERIALS H-102 14125389 9 ENVIRONMENTAL SOIL SAMPLING LOCATION UBICAZIONE PUNTI DI CAMPIONAMENTO AMBIENTALI TERRENI
GEOTECHNICAL
GEOTECHNICAL B-001 14125390 10 GEOTECHNICAL GENERAL NOTES NOTE GENERALI GEOTECNICA
GEOTECHNICAL B-101 14125391 11 FIELD EXPLORATION TEST LOCATION PLAN PIANTA CON UBICAZIONE PUNTI DI INDAGINE
GEOTECHNICAL B-301 14125392 12 GEOTECHNICAL CROSS SECTION, BORING LOGS AND RESULTS SEZIONE GEOTECNICA, STRATIGRAFIE E RISULTATI
CIVIL
CIVIL C-001 14125393 13 CIVIL - NOTES NOTE - CIVILIE
CIVIL C-002 14125394 14 CIVIL - NOTES NOTE - CIVILIE
CIVIL C-003 14125395 15 CIVIL - NOTES NOTE - CIVILIE
CIVIL C-004 14125396 16 CIVIL - LEGEND AND ABBREVIATIONS CIVILE - LEGENDA E ABBRAVIAZIONI
CIVIL C-005 14125397 17 OVERALL SITE PLAN MAPPA GENERALE DEL SITO
CIVIL V-101 14125398 18 EXISTING CONDITIONS PLAN PLANIMETRIA CONDIZIONI ESISTENTI
CIVIL V-102 14125399 19 EXISTING CONDITIONS PLAN PLANIMETRIA CONDIZIONI ESISTENTI
CIVIL CD101 14125400 20 SITE DEMOLITION PLAN PIANTA DI DEMOLIZIONE DEL SITO
CIVIL CD102 14125401 21 SITE DEMOLITION PLAN PIANTA DI DEMOLIZIONE DEL SITO
CIVIL CS101 14125402 22 SITE PLAN PLANIMETRIA DEL SITO
CIVIL CS102 14125403 23 SITE PLAN PLANIMETRIA DEL SITO
CIVIL CS501 14125404 24 SITE DETAILS CIVILE - DETTAGLI
CIVIL CS502 14125405 25 SITE DETAILS CIVILE - DETTAGLI
CIVIL CH101 14125406 26 HORIZONTAL CONTROL PLAN PIANO DI CONTROLLO ORIZZONTALE
CIVIL CH102 14125407 27 HORIZONTAL CONTROL PLAN PIANO DI CONTROLLO ORIZZONTALE
CIVIL CH501 14125408 28 HORIZONTAL CONTROL TABLE PIANO DI CONTROLLO ORIZZONTALE
CIVIL CU101 14125409 29 SITE UTILITY PLAN PLANIMETRIA UTENZE DEL SITO
CIVIL CU102 14125410 30 SITE UTILITY PLAN PLANIMETRIA UTENZE DEL SITO
CIVIL CU501 14125411 31 SITE UTILITY DETAILS DETTAGLI UTENZE DEL SITO
CIVIL CU502 14125412 32 SITE UTILITY DETAILS DETTAGLI UTENZE DEL SITO
CIVIL CU503 14125413 33 SITE UTILITY DETAILS DETTAGLI UTENZE DEL SITO
CIVIL CG101 14125414 34 SITE GRADING AND DRAINAGE PLAN PLANIMETRIA LIVELLAMENTO DEL TERRENO E DRENAGGIO
CIVIL CG102 14125415 35 SITE GRADING AND DRAINAGE PLAN PLANIMETRIA LIVELLAMENTO DEL TERRENO E DRENAGGIO
CIVIL CG201 14125416 36 STORM DRAINAGE PROFILES PROFILI DRENAGGIO ACQUE METEORICHE
CIVIL CG202 14125417 37 UTILITY PROFILES PROFILI DI UTILITA
CIVIL CG501 14125418 38 STORMWATER DETAILS DETTAGLI ACQUE METEORICHE
CIVIL CE001 14125419 39 EROSION AND SEDIMENT CONTROL NOTES NOTE CONTROLLO EROSIONE E SEDIMENTI
CIVIL CE001 14125420 40 EROSION AND SEDIMENT CONTROL NOTES NOTE CONTROLLO EROSIONE E SEDIMENTI
CIVIL CE101 14125421 41 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 PIANO DI CONTROLLO EROSIONE E SEDIMENTI FASE 1
CIVIL CE102 14125422 42 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 PIANO DI CONTROLLO EROSIONE E SEDIMENTI FASE 1
CIVIL CE111 14125423 43 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 PIANO DI CONTROLLO EROSIONE E SEDIMENTI FASE 2
CIVIL CE112 14125424 44 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 PIANO DI CONTROLLO EROSIONE E SEDIMENTI FASE 2
CIVIL CE501 14125425 45 EROSION AND SEDIMENT CONTROL DETAILS DETTAGLI CONTROLLO EROSIONE E SEDIMENTI
STRUCTURAL
STRUCTURAL S-001 14125426 46 STRUCTURAL GENERAL NOTES NOTE GENERALI STRUTTURALI
STRUCTURAL S-002 14125427 47 STRUCTURAL GENERAL NOTES NOTE GENERALI STRUTTURALI
STRUCTURAL S-003 14125428 48 WIND LOAD COMPONENT AND CLADDING CARICO DEL VENTO SU COMPONENTI E RIVESTIMENTI
STRUCTURAL S-101 14125429 49 FOUNDATION PLAN PIANTA FONDAZIONI
STRUCTURAL S-102 14125430 50 GROUND FLOOR FRAMING PLAN PIANTA STRUTTURALE PIANO TERRA
STRUCTURAL S-103 14125431 51 ROOF FRAMING PLAN PIANTA STRUTTURALE TETTO
STRUCTURAL S-104 14125432 52 SIMULATOR BAY ROOF FRAMING PLAN PIANTA STRUTTURALE TETTO SIMULATOR BAY
STRUCTURAL S-201 14125433 53 FACADE ELEVATIONS PROSPETTI
STRUCTURAL S-202 14125434 54 FACADE ELEVATIONS PROSPETTI
STRUCTURAL S-203 14125435 55 ELEVATION WALL PROSPETTO SETTI
STRUCTURAL S-204 14125436 56 ELEVATION WALL PROSPETTO SETTI
STRUCTURAL S-205 14125437 57 ELEVATION WALL PROSPETTO SETTI
STRUCTURAL S-206 14125438 58 ELEVATION WALL PROSPETTO SETTI
STRUCTURAL S-207 14125439 59 ELEVATION WALL PROSPETTO SETTI
STRUCTURAL S-301 14125440 60 STRUCTURAL SECTIONS SEZIONI STRUTTURALI
STRUCTURAL S-501 14125441 61 FOUNDATION DETAIL 01 DETTAGLIO FONDAZIONI 01
STRUCTURAL S-502 14125442 62 FOUNDATION DETAIL 02 DETTAGLIO FONDAZIONI 02
STRUCTURAL S-503 14125443 63 FOUNDATION DETAIL 03 DETTAGLIO FONDAZIONI 03
STRUCTURAL S-504 14125444 64 ROOF FRAMING DETAIL 01 DETTAGLIO STRUTTURALE TETTO 01
STRUCTURAL S-505 14125445 65 ROOF FRAMING DETAIL 02 DETTAGLIO STRUTTURALE TETTO 02
STRUCTURAL S-506 14125446 66 SIMULATOR BAY ROOF FRAMING DETAIL DETTAGLIO STRUTTURALE TETTO SIMULATOR BAY
STRUCTURAL S-507 14125447 67 FOUNDATION DETAILS DETTAGLI FONDAZIONE
STRUCTURAL S-508 14125448 68 STRUCTURAL DETAILS DETTAGLI STRUTTURALI
STRUCTURAL S-509 14125449 69 STRUCTURAL DETAILS DETTAGLI STRUTTURALI
STRUCTURAL S-510 14125450 70 STRUCTURAL DETAILS DETTAGLI STRUTTURALI
STRUCTURAL S-511 14125451 71 STRUCTURAL DETAILS. STEEL NODES / DETTAGLI STRUTTURALI. NODI IN ACCIAIO
STRUCTURAL S-512 14125452 72 STRUCTURAL DETAILS. STEEL NODES / DETTAGLI STRUTTURALI. NODI IN ACCIAIO
STRUCTURAL S-513 14125453 73 STRUCTURAL DETAILS. STEEL NODES DETTAGLI STRUTTURALI. NODI IN ACCIAIO
STRUCTURAL S-514 14125454 74 STRUCTURAL DETAILS. STEEL NODES / DETTAGLI STRUTTURALI. NODI IN ACCIAIO
STRUCTURAL S-515 14125455 75 STRUCTURAL DETAILS. STEEL NODES DETTAGLI STRUTTURALI. NODI IN ACCIAIO
DRAWING LIST
FY23 Project P-242 ADAL Combat Rescue Helicopter Simulator Facility
DRAWING LIST
ARCHITECTURE
ARCHITECTURE A-001 14125456 76 SYMBOLS & ABBREVIATIONS SIMBOLI E ABBREVIAZIONI
ARCHITECTURE A-002 14125457 77 GENERAL NOTES NOTE GENERALI
ARCHITECTURE A-003 14125458 78 TYPICAL FIXTURE MOUNTING HEIGHTS ALTEZZE TIPICHE DI MONTAGGIO DEGLI IMPIANTI
ARCHITECTURE AS101 14125459 79 ARCHITECTURAL - SITE PLAN PIANTA ARCHITETTONICA DEL SITO
ARCHITECTURE AD110 14125460 80 OVERALL - GROUND FLOOR DEMOLITION PLAN PIANTA DEMOLIZIONE PIANO TERRA - GENERALE
ARCHITECTURE AD111 14125461 81 DEMOLITION GROUND FLOOR PLAN PIANTA DEMOLIZIONE PIANO TERRA - AGGIUNTA
ARCHITECTURE AD121 14125462 82 ROOF DEMOLITION PLAN PIANTA DEMOLIZIONE COPERTURA
ARCHITECTURE A-110 14125463 83 OVERALL - GROUND FLOOR PLAN PLANIMETRIA PIANO TERRA - GENERALE
ARCHITECTURE A-111 14125464 84 ADDITION - GROUND FLOOR DIMENSION PLAN PLANIMETRIA QUOTATA PIANO TERRA - AGGIUNTA
ARCHITECTURE A-112 14125465 85 ADDITION - GROUND FLOOR PARTITIONS PLAN PIANTA TRAMEZZI PIANO TERRA - AGGIUNTA
ARCHITECTURE A-120 14125466 86 OVERALL - ROOF PLAN PIANTA DELLA COPERTURA - GENERALE
ARCHITECTURE A-121 14125467 87 ADDITION - ROOF PLAN PIANTA DELLA COPERTURA - AGGIUNTA
ARCHITECTURE A-122 14125468 88 FALL PROTECTION LAYOUT DISPOSIZIONE ANTICADUTA
ARCHITECTURE AR111 14125469 89 ADDITION - REFLECTED CEILING PLAN PIANTA DEL CONTROSOFFITTO - AGGIUNTA
ARCHITECTURE A-201 14125470 90 OVERALL - EXTERIOR ELEVATIONS PROSPETTI ESTERNI - GENERALE
ARCHITECTURE A-211 14125471 91 ADDITION - EXTERIOR ELEVATIONS PROSPETTI ESTERNI - AGGIUNTA
ARCHITECTURE A-212 14125472 92 ADDITION - EXTERIOR ELEVATIONS PROSPETTI ESTERNI - AGGIUNTA
ARCHITECTURE A-301 14125473 93 OVERALL - BUILDING SECTIONS SEZIONI DELL'EDIFICIO - GENERALE
ARCHITECTURE A-302 14125474 94 ADDITION - BUILDING SECTIONS SEZIONI DELL'EDIFICIO - AGGIUNTA
ARCHITECTURE A-311 14125475 95 WALL SECTIONS SETTI MURARI
ARCHITECTURE A-312 14125476 96 WALL SECTIONS SETTI MURARI
ARCHITECTURE A-401 14125477 97 ENLARGED PLANS PIANTE INGRANDITE
ARCHITECTURE A-402 14125478 98 SIMULATOR CLEARANCE SPAZIO PER IL SIMULATORE
ARCHITECTURE A-501 14125479 99 PLAN DETAILS DETTAGLI PIANTA
ARCHITECTURE A-511 14125480 100 SECTION DETAILS DETTAGLI SEZIONI
ARCHITECTURE A-512 14125481 101 SECTION DETAILS DETTAGLI SEZIONI
ARCHITECTURE A-513 14125482 102 SECTION DETAILS DETTAGLI SEZIONI
ARCHITECTURE A-514 14125483 103 SECTION DETAILS DETTAGLI SEZIONI
ARCHITECTURE A-601 14125484 104 PARTITION TYPES TIPI DI PARETI DIVISORIE
ARCHITECTURE A-611 14125485 105 DOOR SCHEDULE & TYPES SCHEMA E TIPI PORTE
ARCHITECTURE A-800 14125486 106 AIR BARRIER PLAN & SECTIONS PIANTA E SEZIONI DELLA BARRIERA D'ARIA
INTERIORS
INTERIORS IN001 14125487 107 INTERIOR FINISH AND SIGNAGE - NOTES AND SCHEDULES FINITURE INTERNE E SEGNALETICA - NOTE E PROSPETTI
INTERIORS IN101 14125488 108 ADDITION - INTERIOR FINISH - GROUND FLOOR PLAN FINITURE INTERNE PIANTA PIANO TERRA - AGGIUNTA
INTERIORS IG101 14125489 109 ADDITION - INTERIOR SIGNAGE - GROUND FLOOR PLAN SEGNALETICA INTERNA PIANTA PIANO TERRA - AGGIUNTA
INTERIORS IG501 14125490 110 SIGNAGE - DETAILS SEGNALETICA - DETTAGLI
INTERIORS IF111 14125491 111 ADDITION - INTERIOR FURNITURE - GROUND FLOOR PLAN ARREDI INTERNI - PIANTA PIANO TERRA - AGGIUNTA
FIRE PROTECTION
FIRE PROTECTION FA001 14125492 112 FIRE ALARM - GENERAL NOTES, ABBREVIATIONS, & SYMBOLS ALLARME INCENDIO - NOTE GENERALI, ABBREVIAZIONI E SIMBOLI
FIRE PROTECTION FA002 14125493 113 FIRE ALARM - SEQUENCE OF OPERATIONS ALLARME ANTINCENDIO - SEQUENZA DELLE OPERAZIONI
FIRE PROTECTION FA111 14125494 114 FIRE ALARM - FIRST FLOOR PLAN ALLARME ANTINCENDIO - PIANTA PRIMO PIANO
FIRE PROTECTION FA411 14125495 115 FIRE ALARM - AIR SAMPLING PLAN ALLARME ANTINCENDIO - PIANTA MONITORAGGIO ARIA
FIRE PROTECTION FA501 14125496 116 FIRE ALARM - DETAILS ALLARME ANTINCENDIO - DETTAGLI
FIRE PROTECTION FA701 14125497 117 FIRE ALARM - RISER DIAGRAM ALLARME ANTICENDIO - SCHEMA DEI MONTANTI
FIRE PROTECTION FX001 14125498 118 FIRE PROTECTION GENERAL NOTES, ABBREVIATIONS, & SYMBOLS PROTEZIONE ANTINCENDIO - NOTE GENERALI, ABBREVIAZIONI E SIMBOLI
FIRE PROTECTION FX111 14125499 119 FIRE PROTECTION - FIRST FLOOR PLAN PROTEZIONE ANTINCENDIO - PIANTA PIANO TERRA
FIRE PROTECTION FX411 14125500 120 FIRE PROTECTION - FIRE HOSE SYSTEM PROTEZIONE ANTINCENDIO - SISTEMA DI MANICHETTE ANTINCENDIO
FIRE PROTECTION FX501 14125501 121 FIRE PROTECTION - DETAILS PROTEZIONE ANTINCENDIO - DETTAGLI
PLUMBING
PLUMBING P-001 14125502 122 PLUM, GENERAL, LEGENDS, GENERAL NOTES & ABBREVIATIONS IS/SC, GENERALE, LEGENDE, NOTE GENERALI & ABBREVIAZIONI
PLUMBING P-002 14125503 123 PLUM, GENERAL, LEGENDS, GENERAL NOTES & ABBREVIATIONS IS/SC, GENERALE, LEGENDE, NOTE GENERALI & ABBREVIAZIONI
PLUMBING PL101 14125504 124 PLUM, FLOOR PLAN, PLUMBING, GROUND FLOOR IS/SC, PIANTA DEL PAVIMENTO, IDRICO-SANITARIO, PIANO TERRA
PLUMBING PW101 14125505 125 PLUM, FLOOR PLAN, SANITARY, GROUND FLOOR IS/SC, PIANTA DEL PAVIMENTO, SCARICHI, PIANO TERRA
PLUMBING P-301 14125506 126 PLUM, SECTION, MECHANICAL ROOM AND BOILER ROOM IS/SC, SEZIONE, CENTRALE TERMICA E LOCALE CALDAIA
PLUMBING PL401 14125507 127 PLUM, FLOOR PLAN, PLUMBING, ENLARGED PLAN IS/SC, IDRICO-SANITARIO, PIANTA DI DETTAGLIO
PLUMBING PW401 14125508 128 PLUM, FLOOR PLAN, SANITARY, ENLARGED PLAN IS/SC, PIANTA DEL PAVIMENTO, SCARICHI, PIANTA DI DETTAGLIO
PLUMBING P-501 14125509 129 PLUM, PLUMBING AND WASTE WATER DETAILS I IS/SC, DETTAGLI IDRICO-SANITARIO E SCARICHI I
PLUMBING P-502 14125510 130 PLUM, PLUMBING AND WASTE WATER DETAILS II IS/SC, DETTAGLI IDRICO-SANITARIO E SCARICHI II
PLUMBING P-601 14125511 131 PLUM, DIAGRAM, SCHEDULES IS/SC, DIAGRAMMI, ABACHI
PLUMBING P-602 14125512 132 PLUM, DIAGRAM, SCHEDULES IS/SC, DIAGRAMMI, ABACHI
PLUMBING P-603 14125513 133 PLUM, DIAGRAM, SCHEMATICS IS/SC, DIAGRAMMI, IDRICO-SANITARIO SCHEMATICI
PLUMBING P-604 14125514 134 PLUM, DIAGRAM, NATURAL GAS SCHEMATICS IS/SC, DIAGRAMMI, GAS METANO SCHEMATICI
PLUMBING PL901 14125515 135 PLUM, DIAGRAM, PLUMBING, ISOMETRIC DIAGRAM IS/SC, DIAGRAMMI, IDRICO-SAN, DIAGRAMMA ISOMETRICO
PLUMBING PW901 14125516 136 PLUM, DIAGRAM, SANITARY, ISOMETRIC DIAGRAM IS/SC, DIAGRAMMI, SCARICHI, DIAGRAMMA ISOMETRICO
MECHANICAL
X MECHANICAL M-001 14125517 137 MECH, GENERAL, LEGENDS, GENERAL NOTES & ABBREVIATIONS MEC, GENERALE, LEGENDE, NOTE GENERALI E ABBREVIAZIONI
X MECHANICAL M-002 14125518 138 MECH, GENERAL, LEGENDS, GENERAL NOTES & ABBREVIATIONS MEC, GENERALE, LEGENDE, NOTE GENERALI E ABBREVIAZIONI
X MECHANICAL M-003 14125519 139 MECH, GENERAL, LEGENDS AND ABBREVIATIONS MEC, GENERALE, LEGENDE E ABBREVIAZIONI
X MECHANICAL MH101 14125520 140 MECH, FLOOR PLAN, MECHANICAL PLAN, GROUND FLOOR MEC, PIANTA IMPIANTI MECCANICI, PIANO TERRA
X MECHANICAL MP101 14125521 141 MECH, FLOOR PLAN, MECHANICAL PIPING, GROUND FLOOR MEC, PIANTA IMPIANTI IDRONICI, PIANO TERRA
X MECHANICAL M-301 14125522 142 MECH, SECTION, MECHANICAL ROOM MEC, SEZIONE, CENTRALE TERMICA
X MECHANICAL M-302 14125523 143 MECH, SECTION, OFT SIMULATOR BAY MEC, SEZIONE, OFT SIMULATOR BAY
X MECHANICAL M-303 14125524 144 MECH, SECTION, IG ROOM MEC, SEZIONE, IG ROOM
X MECHANICAL M-401 14125525 145 MECH, FLOOR PLAN, MECHANICAL ROOM ,ENLARGE PLAN MEC, PIANTA IMPIANTI MECCANICI, PIANTA DI DETTAGLIO
X MECHANICAL M-402 14125526 146 MECH, FLOOR PLAN, BOILER ROOM, ENLARGE PLAN MEC, PIANTA IMPIANTI IDRONICI, LOCALE CALDAIA, PIANTA DI DETTAG
X MECHANICAL M-501 14125527 147 MECH, DETAILS I MEC, DETTAGLI I
X MECHANICAL M-502 14125528 148 MECH, DETAILS II MEC, DETTAGLI II
X MECHANICAL M-503 14125529 149 MECH, DETAILS III MEC, DETTAGLI III
X MECHANICAL M-504 14125530 150 MECH, DETAILS IV MEC, DETTAGLI IV
X MECHANICAL M-505 14125531 151 MECH, DETAILS V MEC, DETTAGLI V
X MECHANICAL M-506 14125532 152 MECH, DETAILS VI MEC, DETTAGLI VI
X MECHANICAL M-507 14125533 153 MECH, DETAILS VII MEC, DETTAGLI VII
X MECHANICAL M-508 14125534 154 MECH, DETAILS VIII MEC, DETTAGLI VIII
X MECHANICAL M-601 14125535 155 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-602 14125536 156 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-603 14125537 157 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-604 14125538 158 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-605 14125539 159 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-606 14125540 160 MECH, DIAGRAM, SCHEMATICS, PIPING MEC, DIAGRAMMI, SCHEMATICI, IDRONICO
X MECHANICAL M-607 14125541 161 MECH, DIAGRAM, SCHEMATICS, DUCTWORKS MEC, DIAGRAMMI, SCHEMATICI, CANALIZZAZIONI
X MECHANICAL M-608 14125542 162 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-609 14125543 163 MECH, DIAGRAM, SCHEDULES MEC, DIAGRAMMI, ABACHI
X MECHANICAL M-701 14125544 164 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-702 14125545 165 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-703 14125546 166 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-704 14125547 167 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-705 14125548 168 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-706 14125549 169 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-707 14125550 170 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
X MECHANICAL M-708 14125551 171 MECH, SEQUENCE OF OPERATIONS MEC, SEQUENZA DELLE OPERAZIONI
DRAWING LIST
ELECTRICAL
X ELECTRICAL E-001 14125552 172 ELEC, GENERAL, LEGENDS, GENERAL NOTES & ABBREVIATIONS IMPIANTO ELE, GEN, LEGENDE, NOTE GENERALI E ABBREVIAZIONI
X ELECTRICAL E-002 14125553 173 ELEC, GENERAL, LEGENDS, GENERAL NOTES & ABBREVIATIONS IMPIANTO ELE, GEN, LEGENDE, NOTE GENERALI E ABBREVIAZIONI
X ELECTRICAL ED101 14125554 174 ELEC, EXISTING CONDITIONS AND DEMOLITIONS, SITE PLAN IMPIANTO ELE, CONDIZIONI ESISTENTI E DEMOLIZIONI, PLANI DEL SITO
X ELECTRICAL ED102 14125555 175 ELEC, EXISTING CONDITIONS AND DEMOLITIONS, GROUND FLOOR IMPIANTO ELE, CONDIZ ESISTENTI E DEMOLIZIONI, PLANI AMP CAB ELE
X ELECTRICAL ES101 14125556 176 ELEC SITE, SITE PLAN SITO IMPIANTO ELETTRICO, PLANIMETRIA DEL SITO
X ELECTRICAL ES102 14125557 177 ELEC SITE, SITE PLAN. ACCESS TO PLOT SITO IMPIANTO ELE, PLANIMETRIA DEL SITO. ACCESSO ALL’AREA
X ELECTRICAL EL101 14125558 178 INT LIGHTING, FLOOR PLAN, GROUND FLOOR ILLUMINAZIONE INT, PLANIMETRIA, PRIMO PIANO
X ELECTRICAL EP101 14125559 179 INT POWER, FLOOR PLAN, GROUND FLOOR POTENZA INT, PLANIMETRIA, PRIMO PIANO
X ELECTRICAL EP102 14125560 180 INT POWER, FLOOR PLAN, FIRST FLOOR. CONTAINMENT POTENZA INT, PLANIMETRIA, PRIMO PIANO. CONTENIMENTO
X ELECTRICAL EG101 14125561 181 GROUNDING, GROUNDING FLOOR PLAN, GROUND FLOOR MESSA A TERRA, PLANIMETRIA MESSA A TERRA, PRIMO PIANO
X ELECTRICAL EG102 14125562 182 GROUNDING, LIGHTNING FLOOR PLAN, ROOF FLOOR MESSA A TERRA, PLANIMETRIA CORPI ILLUMINANTI, ATTICO
X ELECTRICAL EP401 14125563 183 INT POWER, FLOOR PLAN, ELECTRICAL, ENLARGED PLAN POTENZA INT, IMPIANTO ELE, PLANIMETRIA AMPLIATA CABINA ELE
X ELECTRICAL EP402 14125564 184 INT POWER, FLOOR PLAN, ELECTRICAL, MECH ROOM ENLARGUED PLAN POTENZA INT, IMPIANTO ELE, PLANIMETRIA AMPLIATA LOCALE TEC
X ELECTRICAL EP403 14125565 185 INT POWER, FLOOR PLAN, ELECTRICAL, IG ROOM ENLARGUED PLAN POTENZA INT, IMPIANTO ELE, PLANIMETRIA AMPLIATA LOCALE IG
X ELECTRICAL E-501 14125566 186 ELEC, DETAILS I IMPIANTO ELETTRICO, DETTAGLI I
X ELECTRICAL E-502 14125567 187 ELEC, DETAILS II IMPIANTO ELETTRICO, DETTAGLI II
X ELECTRICAL E-503 14125568 188 ELEC, DETAILS III IMPIANTO ELETTRICO, DETTAGLI III
X ELECTRICAL EL601 14125569 189 INT LIGHTING, SCHEDULES, LIGHTING ILLUMINAZIONE INT, SCHEDE, ILLUMINAZIONE
X ELECTRICAL EL602 14125570 190 INT LIGHTING, SCHEDULES, LIGHTING ILLUMINAZIONE INT, SCHEDE, ILLUMINAZIONE
X ELECTRICAL EL603 14125571 191 INT LIGHTING, SCHEDULES, LIGHTING ILLUMINAZIONE INT, SCHEDE, ILLUMINAZIONE
X ELECTRICAL E-610 14125572 192 ELEC, DIAGRAM, PANELBOARD SCHEDULE. GPP-02 IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. GPP-02
X ELECTRICAL E-601 14125573 193 ELEC, DIAGRAM, POWER RISER DIAGRAM IMPIANTO ELETTRICO, GRAFICO, SCHEMA DELLA COLONNA MONTANTE
X ELECTRICAL E-602 14125574 194 ELEC, DIAGRAM, GROUNDING DIAGRAM IMPIANTO ELETTRICO, GRAFICO, SCHEMA DELLA MESSA A TERRA
X ELECTRICAL E-603 14125575 195 ELEC, DIAGRAM, PANELBOARD SCHEDULE. MDB-01 400V IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. MDB-01 400V
X ELECTRICAL E-604 14125576 196 ELEC, DIAGRAM, PANELBOARD SCHEDULE. MDB-01 480V IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. MDB-01 480V
X ELECTRICAL E-605 14125577 197 ELEC, DIAGRAM, PANELBOARD SCHEDULE. MDB-01 208V IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. MDB-01 208V
X ELECTRICAL E-606 14125578 198 ELEC, DIAGRAM, PANELBOARD SCHEDULE. CCP-01 IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. CCP-01
X ELECTRICAL E-607 14125579 199 ELEC, DIAGRAM, PANELBOARD SCHEDULE. MCP-01 IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. MCP-01
X ELECTRICAL E-608 14125580 200 ELEC, DIAGRAM, PANELBOARD SCHEDULE. GPP-01 IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. GPP-01
X ELECTRICAL E-609 14125581 201 ELEC, DIAGRAM, PANELBOARD SCHEDULE. ITP-01 IMPIANTO ELE, GRAFICO, SCHEMA DEL QUADRO ELE. ITP-01
TELECOMMUNICATIONS
X TELECOMMUNICATIONS T-001 14125582 202 TELECOMMUNICATIONS - NOTES, SYMBOLS & ABBREVIATIONS TELECOMUNICAZIONI - NOTE, SIMBOLI E ABBREVIAZIONI
X TELECOMMUNICATIONS T-002 14125583 203 TELECOMMUNICATIONS - NOTES, SYMBOLS & ABBREVIATIONS TELECOMUNICAZIONI - NOTE, SIMBOLI E ABBREVIAZIONI
X TELECOMMUNICATIONS TS101 14125584 204 TELECOMMUNICATIONS - SITE PLAN TELECOMUNICAZIONI - PIANTA DEL SITO
X TELECOMMUNICATIONS T-110 14125585 205 TELECOMMUNICATIONS - FIRST FLOOR PLAN TELECOMUNICAZIONI - PIANTA PRIMO PIANO
X TELECOMMUNICATIONS T-401 14125586 206 TELECOMMUNICATIONS - ENLARGED PLANS TELECOMUNICAZIONI - PIANTE INGRANDITE
X TELECOMMUNICATIONS T-501 14125587 207 TELECOMMUNICATIONS - DETAILS TELECOMUNICAZIONI - DETTAGLI
X TELECOMMUNICATIONS T-502 14125588 208 TELECOMMUNICATIONS - DETAILS TELECOMUNICAZIONI - DETTAGLI
X TELECOMMUNICATIONS T-503 14125589 209
X TELECOMMUNICATIONS T-601 14125590 210 TELECOMMUNICATIONS - DIAGRAMS TELECOMUNICAZIONI - DIAGRAMMI
X TELECOMMUNICATIONS TY110 14125591 211 SECURITY - FIRST FLOOR PLAN SICUREZZA - PIANTA PRIMO PIANO
X TELECOMMUNICATIONS TY501 14125592 212 SECURITY - DETAILS SICUREZZA - DETTAGLI
AUDIOVISUAL
X AUDIOVISUAL TA001 14125592 213 AUDIOVISUAL LEGENDS AUDOVISIVO LEGGENDA
X AUDIOVISUAL TA002 14125593 214 AUDIOVISUAL LEGENDS AUDOVISIVO LEGGENDA
X AUDIOVISUAL TA003 14125594 215 AUDIOVISUAL DEVICE SCHEDULE AUDIOVISIVO ABACO DISPOSITIVI
X AUDIOVISUAL TA110 14125595 216 AUDIOVISUAL - GROUND FLOOR PLAN AUDIOVISIVO - PIANTA PIANO TERRA
X AUDIOVISUAL TA210 14125596 217 AUDIOVISUAL - GROUND FLOOR RCP AUDIOVISIVO - PIANTA PIANO TERRA CONTROSOFFITTI
X AUDIOVISUAL TA401 14125597 218 AUDIOVISUAL - ENLARGED PLANS AUDIOVISIVO - PIANTE INGRANDITE
X AUDIOVISUAL TA402 14125598 219 AUDIOVISUAL - ENLARGED PLANS AUDIOVISIVO - PIANTE INGRANDITE
X AUDIOVISUAL TA403 14125599 220 AUDIOVISUAL - ENLARGED PLANS AUDIOVISIVO - PIANTE INGRANDITE
X AUDIOVISUAL TA501 14125600 221 AUDIOVISUAL - DETAILS AUDIOVISIVO - DETTAGLI
X AUDIOVISUAL TA502 14125601 222 AUDIOVISUAL - DETAILS AUDIOVISIVO - DETTAGLI
X AUDIOVISUAL TA601 14125602 223 AUDIOVISUAL RISERS MONTANTI AUDIOVISIVI
X AUDIOVISUAL TA900 14125603 224 AUDIOVISUAL SYSTEM DIAGRAM SCHEMA DEL SISTEMA AUDIOVISIVO
X AUDIOVISUAL TA901 14125604 225 AUDIOVISUAL SYSTEM DIAGRAM SCHEMA DEL SISTEMA AUDIOVISIVO
X AUDIOVISUAL TA902 14125605 226 AUDIOVISUAL SYSTEM DIAGRAM SCHEMA DEL SISTEMA AUDIOVISIVO
Grand total: 226
SECTION 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan ; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes a one-story 870 gross square meter addition to an existing squadron operations facility to support beddown of the Combat Rescue Helicopter simulator, including removal/alteration of existing exterior walls, windows, doors, utilities, roof and incidental related work.
1.2.2 Location
The work is located at the Aviano Air Base, Italy , approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
SECTION 01 11 00 Page 1
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.6 GOVERNMENT-INSTALLED WORK
NAVFAC to provide information on HPO provided equipment to be installed under a different contract. Coordinate with the government for this work.
1.7 INSTALLATION COMMUNICATION (IC) COORDINATION REQUIREMENTS
1.7.1 IC Contractor Access
Allow the IC Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the IC Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the IC Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within the construction site.
Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
SECTION 01 11 00 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
11/ 11, CHG 14: 02/ 22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
ANSI/AHRI 210/240 (2008; Add 1 2011; Add 2 2012) Performance Rating of Unitary Air-Conditioning & Air-Source Heat Pump Equipment
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
FLORIDA ADMINISTRATIVE CODE (FAC)
FAC Chapter 15C-1 Department of Highway Safety and Motor Vehicles
INSTRUCTIONS AND STANDARDS FOR NAVBASE GUANTANAMO BAY CUBA
(COMNAVBASEGTMOINST)
11300.3 Base Energy Conservation Regulations
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 90A (2021) Standard for the Installation of Air Conditioning and Ventilating Systems
NFPA 101 (2021) Life Safety Code
NAVAL FACILITIES ENGINEERING AND EXPEDITIONARY WARFARE CENTER
(NAVFAC EXWC)
NFESC UG-2029-ENV (1998) Cross-Connection Control and Backflow Prevention Program Implementation at Shore Facilities, User's Guide
SECTION 01 14 00 Page 1
U.S. Code (USC)
8 USC 1101 Definitions
10 USC 6011 Navy Regulations
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2019) Structural Engineering
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)
24 CFR 3280 (2019) Manufactured Home Construction and Safety Standards
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. The following work is to be completed prior to initiation of construcion activities in all related project areas according to the Piano Sicurezza e Coordinamento: UXO survey and clearance certification through the 5th Reparto Division in Padova utilizing an approved Impresa Specializzata Bonifica Campi Minati (BCM) company meeting the requirements of LD 81/2008. Work must be carried out in compliance with Technical Directive GEN-BST 001 (2020). The initial request to perform the survey, the survey itself, and obtaining the clearance authorization is all to be performed by the Contractor, coordinating with the COR for submittal of any required documentation through the appropriate Government channels. Only once the clearance authorization is received can the Contractor proceed with working in the various project sites. The UXO search authorization request approval is estimated at a 30 day period, whereas the final clearance authorization is estimated at a 60 day period. Contractor shall provide proof of UXO Clearance Certification. .
b. The nearby buildings and utilities will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar
SECTION 01 14 00 Page 2 with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Regular working hours will consist of an 9 1/2 hour period , between 8 a.m. and 5:30 p.m., Monday through Friday , and 8 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.4.4 Occupied Building
The Contractor shall be working around anexisting building which is occupied. Do not enter the building without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the new and existing facility during the construction period.
The Government will remove and relocate other Government property in the areas of the building scheduled to receive work.
SECTION 01 14 00 Page 3
1.4.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.5 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II apply .
1.6 NAVFAC EURAFCENT REQUIREMENTS AND RESTRICTIONS
1.6.1 Building Entrance Restrictions
Contractor personnel are restricted from entering operational buildings or areas without the specific authorization of the Contracting Officer. To perform work, where "security escorts" are required for access to a facility, coordinate with the Contracting Officer for access to such facilities.
1.6.2 Public Release of Information
There must be no public release of information or photographs concerning any aspect of the materials or services relating to this contract or other documents resulting therefrom without the prior written approval of the Contracting Officer.
The Contractor agrees to insert the substance of above paragraph in each subcontract and purchase order generated for this contract.
1.6.3 Responsibility for Physical Security
The Contractor is responsible for physical security of construction materials, supplies, and equipment of every description (including property which may be Government furnished or owned) provided or utilized in the execution of this contract.
1.6.4 Employment
Should the continued employment of any person in connection with this contract, or any subcontract thereunder, be deemed by the Contracting Officer to be prejudicial to the interests of the Government, that person must immediately be removed from the work. In this connection the Contractor agrees that:
SECTION 01 14 00 Page 4
a. Cases which may involve disciplinary action against such persons, or the necessity of reassignment or termination of their services, shall be investigated, processed, reported and disposed of, as directed by the Contracting Officer.
b. Employment contracts of all persons employed in connection with this contract, or any subcontract thereunder shall include clauses containing the substance of this clause.
1.6.5 Compliance
Compliance with the foregoing provisions of this clause by subcontractors is the responsibility of the Contractor.
1.6.6 Cultural Resources
Cultural resources such as archaeological remains or villa remains may be uncovered during construction excavation operations on and off the Installation. If during excavations, suspected cultural remains are found, excavation operations must immediately cease and Contractor must notify the Contracting Officer who will contact the Installation Environmental office.
1.6.7 Unexploded Ordnance
The Contractor is advised that unexploded ordnance may exist in areas where excavation work is required. During the entire life of this Contract, perform both visual and electronic inspection of the work areas to prevent danger to personnel and loss of equipment from inadvertently exploding old ordnance.
During excavation work, use caution when unknown objects are encountered and thoroughly identify the object prior to removal. Upon discovery of suspected unexploded ordnance in the course of contract work, immediately clear the area and contact the Contracting Officer. Resultant exploratory and removal work may be subject to negotiations for a contract change in accordance with the Contract Clauses.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 5
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
11/ 20, CHG 2: 08/ 21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals Schedule of Prices ; G1.3 SCHEDULE OF
PRICES
1.3.1 Data Required
This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Within 30 calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Prices(construction Contract) as directed by the Contracting Officer. Schedule of Prices must have cost summarized and totals provided for each construction category. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.
1.3.2 Payment Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.
a. Primary Facilities Cost Breakdown:
SECTION 01 20 00 Page 1
Defined as work on the primary facilities out to the 1.5 m line. Work out to the 1.5 m line includes construction encompassed within a theoretical line 1.5 m from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 1.5 m line.
b. Supporting Facilities Cost Breakdown:
Defined as site work, including incidental work, outside the 1.5 m line.
1.3.3 Schedule Requirements for HVAC TAB
The field work requirements in Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC must be broken down in the Schedule of Prices and in the Construction Progress Documentation by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:
a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.
b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.
c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data must be collected for one seasonal condition (either summer or winter depending on project timing).
d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.
e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.
f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal
SECTION 01 20 00 Page 2 review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.
1.4 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This Contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
1.5 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the
EP 1110-1-8 .
1.6 CONTRACTOR'S INVOICE AND CONTRACT…