Attachment K - 1684614dwg14of16.pdf
PDF 6 MB Posted
- Attached to
- P242 Combat Rescue Helicopter Simulator Facility Federal contract opportunity
- Solicitation number
- N6247023R0003
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GL GL
GI GI
LC LC
POWER DISTRIBUTION LEGEND /
LEGENDA DISTRIBUZIONE ENERGIA ELETTRICA
DOUBLE RECEPTACLE:
-TYPE L BIPASSO 230V 10/16A 50Hz 1P+N+G -SHUCKO BIPASSO 230V 10/16A 50Hz 1P+N+G
WALL MOUNTED MOUNT 450 AFF UON /
DOPPIA PRESA:
-TIPO L BIPASSO 230V 10/16A 50Hz 1P+N+G -SHUCKO BIPASSO 230V 10/16A 50Hz 1P+N+G
SUPPORTO A PARETE 450 AFF UON
SINGLE RECEPTACLE SHUCKO BIPASSO 10/16A 230V 50-60Hz FOR A/V
EQUIPMENT. MOUNT 450 AFF UON. C FOR CEILING MOUNTING, F FOR
FLOOR MOUNTING /
PRESA SINGOLA SHUCKO BIPASSO 10/16A 230V 50-60Hz PER
APPARECCHI A/V. MONTAGGIO 450 AFF UON. C PER MONTAGGIO A
SOFFITTO, F PER MONTAGGIO A PAVIMENTO
SINGLE RECEPTACLE TYPE NEMA 15-R 20A 100-125 VAC 60Hz. MOUNT 450
AFF UON /
PRESA SINGOLA TIPO NEMA 15-R 20A 100-125 VAC 60Hz. MONTAGGIO 450
AFF UON
SINGLE SWITCHED RECEPTACLE TYPE L 10/16A 230 VAC. MOUNT 450 AFF
UON. SURFACE MOUNTED/ IP55 ENCLOSURE /
PRESA SINGOLA COMMUTATA TIPO L 10/16A 230 VAC. MONTAGGIO 450
AFF UON. MONTAGGIO A SUPERFICIE/ CUSTODIA IP55
S
ELECTRICAL DISTRIBUTION PANEL /
QUADRO DI DISTRIBUZIONE ELETTRICO
MAIN ELECTRICAL PATHWAY - PERFORATED CABLING TRAY /
PERCORSO ELETTRICO PRINCIPALE - PASSACAVI FORATO
MAIN ELECTRICAL PATHWAY - CONDUIT WITHIN RAISED FLOOR /
PERCORSO ELETTRICO PRINCIPALE - CONDOTTO ELETTRICO
NEL PIANO RIALZATO
LIGHTNING & BONDING LEGEND /
LEGENDA SU FULMINI E LEGAMI
EQUIPOTENTIAL LIGHTNING CONDUCTOR. 95mm2 BARE STRANDED COPPER
CABLE /
PARAFULMINI. 95mm2 C CAVI IN RAME A TREFOLI NUDI
EQUIPOTENTIAL CONDUCTOR - BURIED INSTALL, UON. 95mm2 BARE STRANDED
COPPER CABLE /
CONDUTTORE EQUIPOTENZIALE - INSTALLAZIONE INTERRATA, UON. CAVO IN
RAME INTRECCIATO DA 95mm2
MEBB: MAIN EQUIPOTENTIAL BONDING BAR.
EBB: EQUIPOTENTIAL BONDING BAR.
TMGB: TELECOMMUNICATION MAIN GROUNDING BAR. /
MEBB: BARRA DI COLLEGAMENTO EQUIPOTENZIALE PRINCIPALE.
EBB: BARRA DI COLLEGAMENTO EQUIPOTENZIALE.
TMGB: MESSA A TERRA PRINCIPALE DI TELECOMUNICAZIONE.
RING GROUNDING ELECTRODE - BURIED AT 1200mm BELOW FINISHED GRADE.
95mm2 BARE STRANDED COPPER CABLE / ANELLO DI TERRA A 1200mm AL DI SOTTO DEL LIVELLO FINITO. CONDUTTORE DI RAME NUDO DA 95mm2 SE NON ALTRIMENTI INDICATO.
GROUNDING ROD WITHIN MANHOLE. LENGTH: 3000mm / DIAMETER: 19mm / MESSA A TERRA ALL'INTERNO DEL POZZETTO DI LUNGHEZZA 3000mm / DIAMETRO: 19mm
AIR TERMINATION. HEIGHT: 600mm. DIA.:15mm COPPER / SISTEMA DI CAPTAZIONE. ALTEZZA: 600 mm. DIA.:15mm
RAME
95mm2 BARE COPPER DOWN WIRE / 95mm2 FILO DI RAME NUDO DISCENDENTE
3P 60
DISCONNECT SWITCH. 230V OR 400V AS REQUIRED
3P = Nº OF POLES. 60 = SWITCH RATING, 40 = FUSE RATING (NF
INDICATES NON-FUSIBLE). DISCONNECT SWITCH MUST BE LOCKABLE IN
THE OFF POSITION /
DISCONNETTERE INTERRURRORE. 230V O 400V COME RICHIESTO
3P = Nº DI POLI. 60 = GRADO INTERRUTTORE, 40 = GRADO FUSIBILE (NF
INDICA NON FUSIBILE). L'INTERRUTTORE DI SCOLLEGAMENTO DEVE
ESSERE LUCCHETTABILLE IN POSIZIONE OFF
E ELECTRICAL DIRECT CONNECTION, 230V 1-PHASE OR 400V 3-PHASE /
COLLEGAMENTO ELETTRICO DIRETTO, 230V MONOFASE O 400V TRIFASE
FREQUENCY CONVERTER 50-60Hz, 400VAC / CONVERTITORE DI FREQUENZA 50-60Hz, 400VAC
DRY TYPE TRANSFORMER 3-PHASE /
TRANSFORMATORE
QUADRUPLE RECEPTACLE:
-2 No. TYPE L BIPASSO 230V 10/16A 50Hz 1P+N+G -2 No. SHUCKO BIPASSO 230V 10/16A 50Hz 1P+N+G
WALL MOUNTED MOUNT 450 AFF UON /
PRESA QUADRUPLA:
-2 Nr. TIPO L BIPASSO 230V 10/16A 50Hz 1P+N+G -2 Nr. SHUCKO BIPASSO 230V 10/16A 50Hz 1P+N+G
SUPPORTO A PARETE 450 AFF UON
G SINGLE RECEPTACLE TYPE L 10/16A 230 VAC 50Hz IN BOX WITH 16A, 10mA
GROUND FAULT INTERRUPTER. MOUNT 450 AFF UON /
PRESA SINGOLA TIPO L 10/16A 230 VAC 50Hz DA INCASSO CON INTERRUTORE DIFFERENZIALE SALVAVITA 16A, 10mA. MONTAGGIO 450
AFF UON
ELECTRICAL POWER BOX /
SCATOLA ELETTRICA DI POTENZA
LIGHTING LEGEND /
LEGENDA ILLUMINAZIONE
RECESSED DIRECT LED TROFFER FIXTURE /
APPARECCHIO DA INCASSO PER LED TROFFER
SUSPENDED HIGH BAY INDUSTRIAL FIXTURE /
APPARECCCHIO INDUSTRIALE HIGH BAY SOSPESO
RECESSED DOWNLIGHT LED FIXTURE /
ILLUMINAZIONE LED ULTRASOTTILE DA INCASSO
LED EMERGENCY LIGHTING UNIT (FOR OFT SIMULATOR BAY) /
UNITA' DI ILLUMINAZIONE LED DI EMEREGENZA ( AREA ADIBITA AL
SIMULATORE OFT)
OUTDOOR LED WALL PACK WITH EMERGENCY GROUP /
LAMPADA DA ESTERNO A LED WALL PACK CON GRUPPO DI EMERGENZA
OCCUPANCY SENSOR /
SENSORE DI PRESENZA
SINGLE POLE LOW VOLTAGE SWITCH /
INTERRUTTORE UNIPOLARE
3-WAY LOW VOLTAGE SWITCH /
DEVIATORE UNIPOLARE
RECESSED DIRECT LED TROFFER FIXTURE WITH EMERGENCY GROUP /
APPARECCHIO DA INCASSO PER LED TROFFER CON GRUPPO DI EMERGENZA
SURFACE/SUSPENDED LED ENCLOSED AND GASKETED FIXTURE /
APPARECCHIO LED DA SUPERFICIE/SOSPESO INCASSATO SIGILLATO CON
GUARNIZIONE
SURFACE/SUSPENDED LED ENCLOSED AND GASKETED FIXTURE WITH
EMERGENCY /
APPARECCHIO LED DA SUPERFICIE/SOSPESO INCASSATO SIGILLATO
CON GUARNIZIONE PER EMERGENZA
SWITCHES LEGEND /
LEGENDA INTERRUTTORI
SINGLE POLE LOW VOLTAGE SWITCH WITH DIMMER /
INTERRUTTORE UNIPOLARE A BASSA TENSIONE CON DIMMER
DIMMABLE RECESSED DIRECT LED TROFFER FIXTURE /
APPARECCHIO DA INCASSO DIMMERABILE PER LED TROFFER
EXIT SIGN, CEILING SURFACE OR PENDANT MOUNTED. SHADED PORTION
INDICATES FACE(S). DIRECTIONAL ARROW(S) AS SHOWN /
SEGNALE DI USCITA, A SOFFITTO O A SOSPENSIONE. LA PARTE
OMBREGGIATA INDICA LA/E FACCIATA/E. FRECCE DIREZIONALI COME
OUTDOOR LED FLOOD LUMINAIRE /
APPARECCHI DI ILLUMINAZIONE A LED PER ESTERNI
DUCTBANK WITH EXISTING LOW VOLTAGE LINES /
CAVIDOTTO CON LINEE IN BASSA TENSIONI ESISTENTI
NEW DUCTBANK FOR LOW VOLTAGE LINES /
CAVIDOTTO PER LINEE IN BASSA TENSIONI
MANHOLE (WITH ROD) /
POZZETO ISPEZIONABILE (CON DISPERSORE)
SITE LEGEND /
LEYENDA ESTERNO
SINGLE ARM LIGHTING POLE AND FIXGRURE H=7,00M /
PALO A 1 BRACCIO PER IL PARAHEGGIO H=7,00M
ONE LINE DIAGRAM LEGEND /
LEGENDA DEL DIAGRAMMA A UNA RIGA
DRY TYPE TRANSFORMER 3-PHASE /
TRASFORMATORE INTERNO 3-FASE
ELECTRICAL INTERLOCK /
BLOCCO ELETTRICO
FIREMAN POWER-OFF BUTTON /
PULSANTE DI SPEGNIMENTO DI EMERGENZA
MOLDED CASE CIRCUIT BREAKER /
INTERRUTTORE MAGNETOTERMICO
UPS
DISCONNECTOR /
INTERRUTTORE
UPS UNIT WITH BATTERY RACKS /
UNITA' UPS CON PORTABATTERIE
FREQUENCY CONVERTER 50-60Hz 400VAC / CONVERTITORE DI FREQUENZA 50-60Hz 400VAC
KILOWATT / VOLT / AMP METER. 3 PHASE /
MISURATORE KILOWATT / VOLT / AMP. TRIFASE
kWh V / A
ADDITIONAL ABBREVIATIONS /
ABBREVIAZIONI AGGIUNTIVE
A.F.F.
A.F.G.
A.R.F.
AHU
AVDTT
BLDG
CB
CKT
CLM
EBB
EC
EQUIP
EXIST
FACP
GFI
GND
LPS
MCB
MDB
MNS
MTG HT
NIC
NTS
PDU
PNL
RECEPT
REQ'D
SWEC
UON
UPS
WP
XMFR
ABOVE FINISHED FLOOR /
DAL PAVIMENTO FINITO
ABOVE FINISHED GRADE /
SOPRA IL LIVELLO FINITO
ABOVE RAISED FLOOR /
SOPRA IL PAVIMENTO RIALZATO
AIR HANDLING UNIT /
UNITA´TRATTAMENTO ARIA
AVIONICS DESKTOP TRAINER /
AVIONICS DESKTOP TRAINER
BUILDING /
EDIFICIO
CIRCUIT BREAKER /
INTERRUTTORE AUTOMATICO
CIRCUIT /
CIRCUITO
CONTROL LOADING MOTION /
CONTROLLO DEL MOVIMENTO DI CARICO
EQUIPOTENTIAL BONDING BAR /
SBARRA DI TERRA ELETTRICA
EMPTY CONDUIT /
CONDOTTO VUOTO
EQUIPMENT /
EQUIPAGGIAMENTO
EXISTING /
ESISTENTI
FIRE ALARM CONTROL PANEL /
PANNELLO DI CONTROLLO ALLARME ANTINCENDIO
GROUND FAULT INTERRUPTER /
INTERRUTTORE DIFFERENZIALE
GROUND /
TERRA
LIGHTNING PROTECTION SYSTEM /
SISTEMA DI PROTEZIONE CONTRO I FULMINI
MAIN CIRCUIT BREAKER /
INTERRUTTORE AUTOMATICO PRINCIPALE
MAIN DISTRIBUTION BOARD /
PANNELLO DI DISTRIBUZIONE PRINCIPALE
MASS NOTIFICATION SYSTEM /
SISTEMA DI NOTIFICA DI MASSA
MOUNTING HEIGHT /
ALTEZZA DI MONTAGGIO
NOT IN CONTRACT /
NON IN CONTRATTO
NOT TO SCALE /
NO SCALA
POWER DEVICE UNIT /
UNITÀ DISPOSITIVO DI POTENZA
PANELBOARD /
PANNELLO DI CONTROLLO
RECEPTACLE /
CONTENITORE
REQUIRED /
RICHIESTO
SIMULATOR WEAPONS EQUIPMENT CABINET /
SIMULATOR WEAPONS EQUIPMENT CABINET
UNLESS OTHERWISE NOTED /
SE NON DIVERSAMENTE INDICATO
UNINTERRUPTIBLE POWER SUPPLY /
UNINTERRUPTIBLE POWER SUPPLY
INDICATES WEATHERPROOF EQUIPMENT /
EQUIPAGGIAMENTO ANTI INTEMPERIE
TRANSFORMER /
TRASFORMATORE
EPR
XLPE
ACB
MCCB
EMT
ETHILENE PROPYLENE RUBBER /
GOMM ETILENE PROPILENE
CROSS-LINKED POLYETHYLENE /
POLIETILENE RETICOLATO
AIR CIRCUIT BREAKER /
INTERRUTTORE APERTO
MOULDED CASE CIRCUIT BREAKER /
INTERRUTTORE SCATOLATO
ELECTRICAL METALLIC TUBE /
TUBO ELETTRICO METALLICO
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:3
EL
EC
, G
EN
ER
AL
, L
EG
EN
D
S, G
EN
ER
AL
N
O
TE
S
A B
BR
EV
IA
TI
O N
S
RFAMJNHLL
E-001
IM
PI
AN
TO
E
LE
, G
EN
, L
EG
EN
D
E, N
O
TE
G
EN
ER
AL
I E A
BB
RE
VI
AZ
IO
N
I
14125552
SEK
Approved by CDR Jonathan Horner, ROICC, via SAT-TO form
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:3
EL
EC
, G
EN
ER
AL
, L
EG
EN
D
S, G
EN
ER
AL
N
O
TE
S
A B
BR
EV
IA
TI
O N
S
RFAMJNHLL
E-002
IM
PI
AN
TO
E
LE
, G
EN
, L
EG
EN
D
E, N
O
TE
G
EN
ER
AL
I E A
BB
RE
VI
AZ
IO
N
I
14125553
SEK
GENERAL SHEET NOTES / NOTE GENERALI
1 THESE GENERAL ELECTRICAL NOTES APPLY TO ELECTRICAL DRAWINGS IN THIS SET. SHEET
SPECIFIC NOTES ARE INDICATED ON EACH SHEET UNDER GENERAL SHEET NOTES. / LE
PRESENTI NOTE GENERALI SULL'IMPIANTO ELETTRICO SI APPLICANO AI DISEGNI ELETTRICI
DEL PRESENTE FASCICOLO. LE NOTE SPECIFICHE DELLA SCHEDA SONO INDICATE IN
CIASCUN FOGLIO SOTTO LE NOTE GENERALI.
2 SEE GENERAL SHEETS FOR ADDITIONAL ABBREVIATIONS AND GENERAL SYMBOLS. / VEDERE I
FOGLI GENERALI PER ULTERIORI ABBREVIAZIONI E SIMBOLI GENERALI.
3 ELECTRICAL LAYOUTS ARE SCHEMATIC ONLY. CONTRACTOR TO PROVIDE ANY ADDITIONAL
DROPS, RISES, OR OFFSETS REQUIRED FOR A COMPLETE INSTALLATION. COORDINATE
EXACT ROUTING OF WORK WITH ALL OTHER TRADES AND OBSTRUCTIONS. / I LAYOUT
DELL'IMPIANTO ELETTRICO SONO SOLO SCHEMATICI. L'APPALTATORE È TENUTO A FORNIRE
LE DIRAMAZIONI IN SALITA E IN DISCESA, O GLI OFFSET AGGIUNTIVI NECESSARI PER
UN'INSTALLAZIONE COMPLETA. COORDINARE L'ESATTA DISPOSIZIONE CON TUTTI GLI ALTRI
LAVORI E OPERAZIONI.
4 SOME SYMBOLS INDICATED ON THIS LEGEND SHEET MAY NOT APPEAR ON THE DRAWINGS. /
ALCUNI SIMBOLI INDICATI SU QUESTO FOGLIO DI LEGENDE POTREBBERO NON ESSERE
PRESENTI NEI DISEGNI.
5 SEISMIC BRACING FOR CABLE TRAYS AND CONDUITS WILL BE PROVIDED BASED ON THE
SEISMIC DESIGN CATEGORY. / IL RINFORZO SISMICO PER LE PASSARELLE PORTACAVI E I TUBI
PROTETTIVI SARÀ FORNITO IN BASE ALLA CATEGORIA DI PROGETTAZIONE SISMICA.
6 CONTRACTOR TO COORDINATE AND PROVIDE ACCESS PANELS FOR ALL COMPONENTS
INSTALLED IN INACCESSIBLE AREAS THAT MAY REQUIRE MAINTENANCE. / L'APPALTATORE
DEVE COORDINARE E PREVEDERE PANNELLI DI ACCESSO PER TUTTI I COMPONENTI
INSTALLATI IN ZONE INACCESSIBILI E CHE POTREBBERO RICHIEDERE MANUTENZIONE.
7 PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
A COMPLETE AND OPERABLE ELECTRICAL SYSTEM AS INDICATED ON THE DRAWINGS, AS
SPECIFIED, AND AS REQUIRED BY CODE. ALL MATERIALS SHALL BE NEW AND OF GOOD
QUALITY. ALL WORK SHALL BE INSTALLED IN A NEAT AND ORDERLY MANNER. / FORNIRE TUTTI I MATERIALI, LE ATTREZZATURE ED ESEGUIRE TUTTE LE OPERAZIONI DI LAVORO NECESSARIE
PER INSTALLARE UN IMPIANTO ELETTRICO COMPLETO E FUNZIONANTE COME INDICATO NEI
DISEGNI E COME SPECIFICATO E RICHIESTO DAL CODICE. TUTTI I MATERIALI DEVONO ESSERE
NUOVI E DI BUONA QUALITÀ. IL LAVORO DOVRÀ ESSERE ESEGUITO IN MODO ORDINATO E
PULITO.
8 INSTALL ALL ELECTRICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, MAINTENANCE REQUIREMENTS, CONTRACT
DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS. / INSTALLARE TUTTE LE
APPARECCHIATURE ELETTRICHE E QUELLE ACCESSORIE IN CONFORMITÀ DELLE
RACCOMANDAZIONI DEL PRODUTTORE, DEI REQUISITI DI MANUTENZIONE, DELLA
DOCUMENTAZIONE CONTRATTUALE E DEI CODICI E REGOLAMENTI APPLICABILI.
9 IF A CONFLICT EXISTS WITHIN THE DRAWINGS AND SPECIFICATIONS, THE REQUIEREMENTS IN
THE SPECIFICATIONS SHALL APPLY. ITEMS SHOWN ON DRAWINGS, BUT NOT SPECIFIED,
SHALL APPLY AND BE FURNISHED AND INSTALLED BY THE CONTRACTOR. IF AN ITEM SHOWN
ON THE DRAWINGS, BUT IS NOT INCLUDED IN THE SPECIFICATIONS, PROVIDE ITEM OF A
QUALITY LEVEL CONSISTENT WITH THE GENERAL QUALITY LEVEL OF THE CONTRACT
REQUIREMENTS. BRING CONFLICTS BETWEEN DRAWINGS AND SPECIFICATIONS TO THE
ATTENTION OF THE ENGINEER IMMEDIATELY FOR CLARIFICATION. / IN CASO DI DISCREPANZA TRA I DISEGNI E LE SPECIFICHE, SI APPLICHERANNO I REQUISITI DELLE SPECIFICHE. GLI
ELEMENTI INDICATI NEI DISEGNI, MA NON SPECIFICATI, DEVONO ESSERE FORNITI E
INSTALLATI DALL'APPALTATORE. SE UN ELEMENTO È INDICATO NEI DISEGNI, MA NON È
INCLUSO NELLE SPECIFICHE, FORNIRE UN ELEMENTO QUALITATIVAMENTE COERENTE CON IL
LIVELLO DI QUALITÀ GENERALE DEI REQUISITI DEL CONTRATTO. LE DISCREPANZE TRA I
DISEGNI E LE SPECIFICHE DEVONO ESSERE RIFERITI IMMEDIATAMENTE AL TECNICO DI
COMPETENZA.
10 TYPICAL DETAILS THROUGHOUT THE DRAWING SET SHALL APPLY FOR ALL APPLICABLE
CONDITIONS, EVEN IF NOT SPECIFICALLY SHOWN OR REFERENCED./ TYPICAL DETAILS
THROUGHOUT THE DRAWING SET SHALL APPLY FOR ALL APPLICABLE CONDITIONS, EVEN IF
NOT SPECIFICALLY SHOWN OR REFERENCED. / I DETTAGLI STANDARD DEI DISEGNI SI
APPLICANO A TUTTE LE CONDIZIONI APPLICABILI, ANCHE SE NON SPECIFICAMENTE MOSTRATI
O CITATI.
11 ELECTRICAL DATA IS APPROXIMATED FOR BIDDING PURPOSES. CONTRACTOR IS
RESPONSIBLE FOR PROVIDING ELECTRIC CONNECTIONS PER MANUFACTURER'S
REQUIREMENTS ON SELECTED EQUIPMENT. / I DATI DELL'IMPIANTO ELETTRICO SONO
APPROSSIMATIVI AI FINI DELL'OFFERTA. L'APPALTATORE È RESPONSABILE DELLA FORNITURA
DI COLLEGAMENTI ELETTRICI SECONDO I REQUISITI DEL PRODUTTORE PER LE
APPARECCHIATURE SELEZIONATE.
12 THE CONTRACTOR SHALL REPAIR ALL UTILITIES AND ELECTRICAL COMPONENTS DAMAGED
DURING THE WORKS. / L'APPALTATORE È TENUTO A RIPARARE TUTTI GLI IMPIANTI E I
COMPONENTI ELETTRICI DANNEGGIATI DURANTE I LAVORI.
13 THE CONTRACTOR SHALL COORDINATE THE WORK, INCLUDING NEW EQUIPMENT
CONNECTIONS AND POWER OUTAGES, WITH THE CLIENT TO MINIMIZE THE IMPACT OF CLIENT
OPERATIONS. / L'APPALTATORE DOVRÀ COORDINARE IL LAVORO CON IL CLIENTE , COMPRESI
I COLLEGAMENTI DELLE NUOVE APPARECCHIATURE E LA DISALIMENTAZIONE, PER RIDURRE
AL MINIMO L' IMPATTO SULLE OPERAZIONI DEL CLIENTE.
14 ELECTRICAL WORKS WILL BE PERFORMED FOLLOWING A PROGRAMMED POWER OUTAGE
SCHEDULE ACCORDING TO THE NEEDS OF THE CLIENT. / I LAVORI ELETTRICI SARANNO
ESEGUITI SECONDO UN PIANO DI DISALIMENTAZIONE PROGRAMMATA IN BASE ALLE
ESIGENZE DEL CLIENTE.
15 WHERE A NEW-TO-EXISTING CONNECTION IS REQUIRED, THE CONTRACTOR SHALL PROVIDE
ALL MATERIALS AND LABOR REQUIRED TO MAKE THE CONNECTION. / NEL CASO IN CUI SIA
NECESSARIO UN COLLEGAMENTO DA NUOVO A ESISTENTE, L'APPALTATORE DOVRÀ FORNIRE
TUTTI I MATERIALI E LA MANODOPERA NECESSARI PER ESEGUIRE IL COLLEGAMENTO.
APPLICABLE CODES / CODICI DA APPLICARE
USE THE CURRENT (LATEST EDITION) CODES, STANDARDS, AND GUIDELINES LISTED BELOW.
WHERE COMPLIANCE WITH TWO OR MORE CODE/STANDARDS/GUIDELINES IS SPECIFIED, AND THE
CODES/STANDARDS/GUIDELINES ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS FOR
MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST STRINGENT
REQUIREMENTS. / UTILIZZARE I CODICI, LE NORME E LE LINEE GUIDA ATTUALI (ULTIMA EDIZIONE) ELENCATI DI SEGUITO. IN CASO DI CONFORMITÀ CON DUE O PIÙ CODICI/NORME/LINEE GUIDA CHE
PREVEDONO REQUISITI DIVERSI O CONTRASTANTI PER LE QUANTITÀ MINIME O I LIVELLI DI
QUALITÀ, RISPETTARE I REQUISITI PIÙ SEVERI.
WHERE APPLICABLE, PROVIDE MATERIALS AND EQUIPMENT WITH STAMPS OR SEALS OF ARI,
ASME, UL OR ASTM. PERFORM TESTS IN THE PRESENCE OF THE GOVERMENT UNLESS
OTHERWISE WAIVED IN WRITING. / FORNIRE, OVE APPLICABILE, MATERIALI E ATTREZZATURE CON
TIMBRI O SIGILLI ARI, ASME, UL O ASTM. ESEGUIRE LE PROVE IN PRESENZA
DELL'AMMINISTRAZIONE, SALVO DIVERSA DEROGA SCRITTA.
CODES:
• INTERNATIONAL BUILDING CODE (IBC) (2018 EDITION)
• NATIONAL ELECTRIC CODE (NEC)
• UFC 3-501-01 ELECTRICAL ENGINEERING
• UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS
• UFC 3-530-01 INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS
• UFC 3-540-01 ENGINE-DRIVEN GENERATOR SYSTEMS FOR PRIME AND STANDBY POWER
APPLICATIONS
• UFC 3-575-01 LIGHTNING AND STATIC ELECTRICITY PROTECTION SYSTEMS
• CEI 64-8
• ASHRAE 90.1-2010
• ASHRAE 189.1-2011
• IEEE C2
/ CODICI:
• CODICE EDILIZIO INTERNAZIONALE (IBC) (EDIZIONE 2018)
• CODICE ELETTRICO NAZIONALE (NEC)
• UFC 3-501-01 PROGETTAZIONE ELETTRICA
• UFC 3-520-01 IMPIANTI ELETTRICI INTERNI
• UFC 3-530-01 SISTEMI E CONTROLLI DI ILLUMINAZIONE INTERNA ED ESTERNA
• UFC 3-540-01 SISTEMI DI GENERATORI A MOTORE PER APPLICAZIONI DI ALIMENTAZIONE
PRIMARIA E DI EMERGENZA
• UFC 3-575-01 SISTEMI DI PROTEZIONE CONTRO I FULMINI E CONTRO L'ELETTRICITÀ STATICA
• CEI 64-8
• ASHRAE 90.1-2010
• ASHRAE 189.1-2011
• IEEE C2
DN
xL
D
C
F
H
E x6 x7 x8 x9 x10 x11 x12 x13 xK xJ xH xG xF
4 5 6 xM
A
B xE xD xC x5x4x3x2x1
G
I
1 1 1 1
ED102
A1
40 128 16
1:200
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:3
EL
EC
, E
XI
ST
IN
G C
O
ND
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N S, S
IT
E
PL
AN
RFAMJNHLL
ED101
IM
PI
AN
TO
E
LE
, C O
ND
IZ
IO
N
I E
SI
ST
EN
TI
E
D
EM
O
LI
ZI
O
N I, PL
AN
I D
EL
S
IT
O
14125554
SEK
SCALE: 1 : 200A1
ELEC, EXISTING CONDITIONS AND DEMOLITIONS, FIRST FLOOR
IMPIANTO ELETTRICO, CONDIZIONI ESISTENTI E DEMOLIZIONI, PRIMO PIANO
SHEET KEYNOTES / NOTE CHIAVE
1 REMOVE GROUND PIT, INCLUDING EARTHING RODS AND BARE COPPER BURIED
WIRE CONNECTIONS. / RIMUOVERE IL POZZETTO DI TERRA, COMPRESE LE ASTE
DI TERRA E GLI ATTACCHI IN RAME NUDO INTERRATI.
2 REMOVE PANEL FP-01. INCLUDING POWER SUPPLY LINES FROM ELECTRICAL
PANEL TO EQUIPMENT. / RIMUOVERE IL QUADRO FP-01. COMPRESE LE LINEE DI
ALIMENTAZIONE DAL QUADRO ELETTRICO ALLE APPARECCHIATURE.
3 REMOVE BURIED ELECTRICAL LINES, INCLUDING CONDUIT FROM ELECTRICAL
PANEL TO EXISTING HANDHOLE . / RIMOZIONE DELLE LINEE ELETTRICHE
INTERRATE, COMPRESE LE GUAINE DAL QUADRO ELETTRICO AL POZZETTO
ESISTENTE.
4 REMOVE VERTICAL ELECTRICAL CABLE TRAY FROM MDB. MAINTAIN
ELECTRICAL CABLING FROM MDB. REMOVE LEFT METALLIC PLATE FROM MDB
PANEL. / RIMUOVERE LA PASSARELLA PORTACAVI VERTICALE DA MDB.
MANTENERE IL CABLAGGIO ELETTRICO DA MDB. RIMUOVERE LA PIASTRA
METALLICA SINISTRA DAL QUADRO MDB.
5 EXISTING OUTDOOR LIGHTING FIXTURE TO BE KEPT. / DISPOSITIVI DI
ILLUMINAZIONE ESTERNA ESISTENTI DA MANTENERE.
6 EXISTING OUTDOOR LIGHTING BURIED LINE TO BE KEPT. / LINEA INTERRATA
PER ILLUMINAZIONE ESTERNA ESISTENTE DA MANTENERE.
7 EXISTING PANEL DB-11 IN BUILDING 73003 TO BE KEPT. / PANNELLO DB-11
ESISTENTE NELL'EDIFICIO 73003 DA MANTENERE.
8 BUILDING 73003. / EDIFICIO 73003.
x11 x12
1 23
MDB
ATS
DB1DB2
SCALE:SCALE:
0.40 1.20.8 1.6
1:20
20.2
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:3
EL
EC
, E
XI
ST
IN
G C
O
ND
IT
IO
NS
A
ND
D
EM
O
LI
TI
O N
S, G
R O
UN
D
F
LO
O R
RFAMJNHLL
ED102
IM
PI
AN
TO
E
LE
, C O
ND
Z
ES
IS
TE
N
TI
E
D
EM
O
LI
ZI
O
NI
, P
LA
N
I A M
P C
AB
E
LE
14125555
SEK
SHEET KEYNOTES / NOTE CHIAVE
1 RELOCATE EXISTING VERTICAL TRAY AND CABLING 600MM TO THE LEFT OF ITS
CURRENT LOCATION. / SPOSTARE LA PASSERELLA VERTICALE E IL CABLAGGIO
ESISTENTI 600MM A SINISTRA RISPETTO ALLA POSIZIONE ATTUALE.
2 REMOVE LEFT SIDE METALLIC PLATE OF MAIN DISTRIBUTION BOARD. /
RIMUOVERE PIASTRA METALLICA LATO SINISTRO DEL PANNELLO DI
DISTRIBUZIONE PRINCIPALE.
3 INCREASE THE LENGTH OF THE TRENCH BY 600MM TO THE LEFT. / ALLUNGARE LO
SCAVO DI 600MM VERSO SINISTRA.
4 THE GENERAL CONTRACTOR MUST UPGRADE THE RATING OF THE DISTRIBUTION
BUS IN THE EXISTING MDB TO 1000A. FOR THIS PURPOSE, THE GC SHALL
DISMANTLED AND DISPOSE THE EXISTING HORIZONTAL BUS AND REPLACE IT
WITH THE UPGRADED 1000 A MODEL INCLUDING ALL REQUIRED ANCILLARIES AND
TESTS. COORDINATE THE POWER OUTAGE WITH THE CONTRACTING OFFICER.
CONTRACTOR SHALL VERIFY BREAKING CAPACITY OF ALL CIRCUIT BREAKERS AT
THE MDB TO ENSURE THAT ARE ABOVE SHORT CIRCUIT CURRENT AND REPLACE
THOSE NOT COMPLYING. / L’APPALTATORE DEVE AGGIORNARE IL VALORE DELLA
CORRENTE NOMINALE DELLA SBARRA DI DISTRIBUZIONE NEL MDB ESISTENTE A
1000A. A TAL FINE, L’APPALTATORE DOVRÀ SMONTARE E SMALTIRE LA SBARRA
ORIZZONTALE ESISTENTE E SOSTITUIRLA CON IL MODELLO AGGIORNATO DA 1000
A, COMPRESI TUTTI GLI ACCESSORI E I TEST RICHIESTI. COORDINARE
L'INTERRUZIONE DELL'ALIMENTAZIONE CON LA STAZIONE APPALTANTE.
L'APPALTATORE DOVRÀ VERIFICARE IL POTERE DI INTERRUZIONE DI TUTTI GLI
INTERRUTTORI DEL MDB PER ASSICURARSI CHE SIANO AL DI SOPRA DELLA
CORRENTE DI CORTOCIRCUITO E SOSTITUIRE QUELLI NON CONFORMI.
SCALE: 1 : 20A1
ELEC, EXISTING CONDITIONS AND DEMOLITIONS, ELECTRICAL ROOM BLDG.7300
IMPIANTO ELETTRICO, CONDIZIONI ESISTENTI E DEMOLIZIONI, CABINA ELETTRICA EDIFICIO 7300
GENERAL SHEET NOTES / NOTE GENERALI
1 ROOM LAYOUT CAN DIFFER FROM CURRENT INSTALATIONS. CONTRACTOR
SHALL CONFIRM ACTUAL DIMENSIONS AND LOCATION OF CABINETS AND
TRAYS. / LA CONFIGURAZIONE DELLA SALA PUÒ RISULTARE DIVERSA DALLA DISPOSIZIONE
ATTUALE. L’APPALTATORE DOVRÀ CONFERMARE LE DIMENSIONI REALI E L’UBICAZIONE DI
ARMADIETTI E RIPIANI.
SWITCHGEAR ROOM
D
C
F
H
E x6 x7 x8 x9 x10 x11 x12 x13 xK xJ xH xG xF
4 5 6 xM
A
B xE xD xC x5x4x3x2x1
G
I
400 x 100mm 2610mm
400 x 100mm 2610mm
400 x 100mm 2786mm
400 x 100mm 2786mm
400 x 100mm 2786mm
400 x 100mm 2786mm
400 x 100mm 2654mm
400 x 100mm 2610mm
ED102
A1
COMPUTER / IG /
COMPUTER /IG
SIMULATOR MX / TOOL
STORAGE / ICS
SUPPORT /
SIMULATORE MX /
MAGAZZINO
STRUMENTI /
SUPPORTO ICS
MULTI-PURPOSE
ROOM A / SALA
MULTIFUNZIONE A
OFT SIMULATOR BAY /
BAIA SIMULATORE
OFT
SPARES STORAGE
ROOM / LOCALE
STOCCAGGIO RICAMBI
MISSION PLANNING /
LIBRARY /
PIANIFICAZIONE
MISSIONE /
BIBLIOTECA
ELECTRICAL /
ELETTRICA
MECHANICAL /
MECCANICA
BOILER / CALDAIA
UNISEX LATRINE /
SERVIZI IGIENICI
UNISEX
JAN / SERVIZIO071
AVDTT / AVDTT
MAINTENANCE OFFICE
/ UFFICIO
MANUTENZIONE
CORRIDOR /
CORRIDOIO
TELECOM / TELECOM
EP402
A1
40 128 16
1:200
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:4
EL
EC
S
IT
E, S
IT
E
PL
AN
RFAMJNHLL
ES101
SI
TO
IM
PI
AN
TO
E
LE
TT
RI
C O
, P
LA
N
IM
ET
RI
A D
EL
S
IT
O
14125556
SEK
SCALE: 1 : 200A1
ELEC SITE, SITE PLAN
SITO IMPIANTO ELETTRICO, PLANIMETRIA DEL SITO
GENERAL SHEET NOTES / NOTE GENERALI
1 ROOM LAYOUT CAN DIFFER FROM CURRENT INSTALATIONS. CONTRACTOR
SHALL CONFIRM ACTUAL DIMENSIONS AND LOCATION OF CABINETS AND
TRAYS. / LA CONFIGURAZIONE DELLA SALA PUÒ RISULTARE DIVERSA DALLA DISPOSIZIONE
ATTUALE. L’APPALTATORE DOVRÀ CONFERMARE LE DIMENSIONI REALI E L’UBICAZIONE DI
ARMADIETTI E RIPIANI.
SHEET KEYNOTES / NOTE CHIAVE
1 CONNECTION TO EXISTING SWITCHBOARD FOR NORMAL LOADS. /
COLLEGAMENTO AL QUADRO DI CONTROLLO ESISTENTE PER I CARICHI
NORMALI.
2 ELECTRICAL ROOM IN BLDG. 7300. / CABINA ELETTRICA DELL'EDIFICIO 7300.
3 CABLE TRAY TO BE COORDINATED WITH EXISTING FACILITIES OF BUILDING 7300.
/ PASSERELLA PORTA-CAVI DA COORDINARE CON LE STRUTTURE ESISTENTI
DELL'EDIFICIO 7300.
4 2NO. 100MM DIAMETER CONDUIT FOR ELECTRICAL SUPPLY OF CHILLER AND
SPLIT UNITS BURIED AT LEAST 650MM UNDER FLOOR LEVEL. / 2NO. TUBO
DIAMETRO 100MM PER ALIMENTAZIONE ELETTRICA DEL REFRIGERATORE E
UNITÀ SPLIT INTERRATO AD ALMENO 650MM AL DI SOTTO DEL LIVELLO DEL
PAVIMENTO.
5 600X600 MM HANDHOLE. / PORTELLO 600X600MM.
6 FP-01 EXISTING PANELBOARD OUTDOOR LIGHTING TO BE RELOCATED. / FP-01
ILLUMINAZIONE ESTERNA DEL QUADRO ESISTENTE DA RIPOSIZIONARE.
7 ELECTRICAL LINES FOR EXISTING OUTDOOR LIGHTING NEED TO BE RELOCATED
TO THE NEW LOCATION OF FP-01. / LE LINEE ELETTRICHE PER L'ILLUMINAZIONE
ESTERNA ESISTENTE DEVONO ESSERE TRASFERITE NELLA NUOVA POSIZIONE DI
FP-01.
8 100MM DIAMETER CONDUIT FOR ELECTRICAL SUPPLY OF EXTERIOR LIGHTING. /
TUBO DIAMETRO 100MM PER L’ALIMENTAZIONE ELETTRICA DELL’ILLUMINAZIONE
ESTERNA.
9 EXISTING OUTDOOR LIGHTING FIXTURE TO BE KEPT. / DISPOSITIVI DI
ILLUMINAZIONE ESTERNA ESISTENTI DA MANTENERE.
10 EXISTING OUTDOOR LIGHTING BURIED LINE TO BE KEPT. / LINEA INTERRATA PER
ILLUMINAZIONE ESTERNA ESISTENTE DA MANTENERE.
11 EXISTING PANEL DB-11 IN BUILDING 73003 TO BE KEPT. / PANNELLO DB-11
ESISTENTE NELL'EDIFICIO 73003 DA MANTENERE.
12 BUILDING 73003. / EDIFICIO 73003.
13 64MM DIAMETER CONDUIT FOR ELECTRICAL SUPPLY OF CHILLER AND SPLIT
UNITS BURIED AT LEAST 650MM UNDER FLOOR LEVEL. / TUBO DIAMETRO 64MM
PER ALIMENTAZIONE ELETTRICA DEL REFRIGERATORE E UNITÀ SPLIT
INTERRATO AD ALMENO 650MM AL DI SOTTO DEL LIVELLO DEL PAVIMENTO.
14 1Ø50MM PVC RIGID CONDUIT. / CONDOTTA IN PVC RIGIDA 1Ø50MM.
M1
M1
M1
40 128 16
1:200
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:4
EL
EC
S
IT
E, S
IT
E
PL
AN
. A C
CE
SS
T O
P
LO
T
RFAMJNHLL
ES102
SI
TO
IM
PI
AN
TO
E
LE
, P
LA
NI
M
ET
RI
A D
EL
S
IT
O
. A C
CE
SS
O A
LL
’A
R
EA
14125557
SEK
SCALE: 1 : 200A1
ELEC SITE, SITE PLAN. ACCESS TO PLOT
SITO ELET, PLANIMETRIA SITO. ACCESSO ALL’AREA
SHEET KEYNOTES / NOTE CHIAVE
1 EXISTING CIRCUIT FP-01/4 TO BE EXTENDED TO CONNECT NEW LUMINAIRE. / IL
CIRCUITO ESISTENTE FP-01/4 DEV'ESSERE PROLUNGATO PER COLLEGARE LA
NUOVA ILLUMINAZIONE.
2 1Ø50MM PVC RIGID CONDUIT. / CONDOTTA IN PVC RIGIDA 1Ø50MM.
3 EXISTING CIRCUIT DB-01/15L2 TO BE EXTENDED TO CONNECT NEW LUMINAIRES.
/ IL CIRCUITO ESISTENTE DB-01/15L2 DEV'ESSERE PROLUNGATO PER
COLLEGARE LA NUOVA ILLUMINAZIONE.
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEETS E-001 AND 3-002 FOR LEGEND, SYMBOLS AND ABBREVIATIONS. / VEDERE TAVOLE
E-001 E 3-002 PER LEGENDA, SIMBOLI E ABBREVIAZIONI.
2 SEE DRAWING EL601 FOR LIGHTING FIXTURE DETAILS. / VEDERE TAVILA EL601 PER
DETTAGLI DELL'APPARECCHIO DI ILLUMINAZIONE
3 THE NEW PARKING LIGHTS SHALL BE CONTROLLED BY THE EXISTING TIME SWITCHES IN THE
ELECTRICAL PANELS. / LE NUOVE LUCI DI PARCHEGGIO DEVONO ESSERE CONTROLLATE DAGLI
INTERRUTTORI ORARI ESISTENTI NELLA
QUADRI ELETTRICI.
G xL
D
C
F
H xK xJ xH
4 5 6
A
B
A1 A1
A1 A1
A1 A1
A1 A1
A1 A1
A1 A1
A3 A3
A3
A3
A3
A3
A3
A3 A3 A3 A3
A3
A2A2
A2
A1A1
A1A1
A1
A1
A1
A1
A1 A1
A3 A3
A3 A3
D1 D1 D1
C1 C1 C1 C1
C1 C1 C1 C1
C1 C1 C1 C1
C1 C1 C1 C1
F1F1F1
F1
F1F1
F1
E2
E2 E2 E2
E2
E1
E1
E1
E1
E1
E1
SPARES STORAGE
ROOM / LOCALE
STOCCAGGIO RICAMBI
MISSION PLANNING /
LIBRARY /
PIANIFICAZIONE
MISSIONE /
BIBLIOTECA
ELECTRICAL /
ELETTRICA
MECHANICAL /
MECCANICA
TELECOM / TELECOM?
MAINTENANCE OFFICE
/ UFFICIO
MANUTENZIONE
AVDTT / AVDTT
MULTI-PURPOSE
ROOM A / SALA
MULTIFUNZIONE A
MULTI-PURPOSE
ROOM B / SALA
MULTIFUNZIONE B
CORRIDOR /
CORRIDOIO
OFT SIMULATOR BAY /
BAIA SIMULATORE
OFT
SIMULATOR MX / TOOL
STORAGE / ICS
SUPPORT /
SIMULATORE MX /
MAGAZZINO
STRUMENTI /
SUPPORTO ICS
COMPUTER / IG /
COMPUTER /IG
D1D1D1
X1
X1 x5x4x3x2x1
G
I
F1
BOILER / CALDAIA
F1
F1
F1
F1
F1
JAN / SERVIZIO
UNISEX LATRINE /
SERVIZI IGIENICI
UNISEX
A1 A1 A1
A1A1A1
A1 A1 A1
A1A1A1
A2
A2
A2
A2
A2
A2
A2
A2 A2 A2
A2A2A2
B2
B1
GPP-01 CKT 24
GPP-01 CKT 19
GPP-01 CKT 25
GPP-01 CKT 22
GPP-01 CKT 20
GPP-01 CKT 23
GPP-01 CKT 24
X1 X1
X1
X1
WP
WP
WP
WP
GPP-01 CKT 20
GPP-01 CKT 24
WP
G1
1:100
0 1 32 4 5 10
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:5
IN
T
LI
G
H
TI
N G
, F
LO
O R
P
LA
N, G
R O
U
ND
F
LO
O R
RFAMJNHLL
EL101
IL
LU
M
IN
AZ
IO
N E
IN
T, P
LA
NI
M
ET
R
IA
, P
RI
M
O P
IA
N
O
14125558
SEK
SCALE: 1 : 100A1
INT LIGHTING, FLOOR PLAN, GROUND FLOOR
ILLUMINAZIONE INT, PLANIMETRIA, PIANO TERRA
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET E-001 AND E-002 FOR FOR LEGEND, SYMBOLS AND ABBREVIATIONS. / VEDERE IL
FOGLIO E-001 E-002 PER LA LEGENDA, I SIMBOLI E LE ABBREVIAZIONI.
2 SEE SHEET EL601 FOR LIGHTING SCHEDULE. / VEDERE IL FOGLIO EL601 PER LA SCHEDA
DELL'IMPIANTO DI ILLUMINAZIONE.
3 ALL LIGHTING WIRING CABLES TO BE NON PVC LOW SMOKE. / TUTTI I CAVI PER L'ILLUMINAZIONE
DEVONO ESSERE NON IN PVC A BASSA EMISSIONE DI FUMI.
4 MAIN HORIZONTAL POWER AND COMMUNICATIONS DISTRIBUTION THROUGHOUT THE BUILDING
SHALL BE ROUTED THROUGH CABLE TRAY SYSTEMS PER PLANS AND SECTIONS. VERTICAL
CONNECTIONS FROM SOURCES OR VERTICAL CONNECTIONS TO UTILIZATION DEVICES AND
FIXTURES SHALL BE ROUTED THROUGH CONDUIT SYSTEMS. ALL RACEWATY SYSTEMS SHALL
CONFORM TO UFGS SPECIFICATION SECTION 26 20 00.00 42. / LA DISTRIBUZIONE ORIZZONTALE PRINCIPALE DELL'ALIMENTAZIONE E DELLE COMUNICAZIONI IN TUTTO L'EDIFICIO DEVE ESSERE
ESEGUITA ATTRAVERSO SISTEMI DI PASSARELLE PORTACAVI SECONDO LE PLANIMETRIE E LE
SEZIONI. I COLLEGAMENTI VERTICALI DALLE SORGENTI O AI DISPOSITIVI DI UTILIZZO E AGLI APPARECCHI DEVONO ESSERE ESEGUITI ATTRAVERSO SISTEMI DI CANALINE. TUTTI I SISTEMI DI
CANALIZZAZIONE DEVONO ESSERE CONFORMI ALLA SPECIFICA UFGS 26 20 00.00 42.
5 AS CONDUIT SYSTEM, PVC AND GALVANISED STEEL WILL BE USED, WITH A MINIMUM DIAMETER OF 20mm. / PER IL SISTEMA DI CONDUZIONI SARANNO UTILIZZATI PVC E ACCIAIO GALVANIZZATO, CON UN DIAMETRO MINIMO DI 20 mm.
6 LIGHTING DISTRIBUTION IS COORDINATED WITH FALSE CEILING. REFER TO AR111 TO SEE
ARCHITECTURAL DISTRIBUTION OF TILES. / L' ILLUMINAZIONE È INTEGRATA AL CONTROSOFFITTO.
PER VEDERE LA DISTRIBUZIONE ARCHITETTONICA DEI PANNELLI, FARE RIFERIMENTO ALL'AR111.
K
GG
E
E
E
E
E
E
E
E
E
E
E E
E
1P 30
NF
1P 30
NF
3P 40
NF
3P 50
NF
1P 30
NF
3P 40
NF
3P 40
NF
E
E
SS
S
S
1P 40
NF
S
E
S
S
S
S
S F
E
E
E
E
E
E
E
E
E
C
E
E
E
EE
E
EE
E
E
E
G
E
E E E E
E
1P 30
NF 1P 30
NF
1P 30
NF
1P 30
NF
1P 30
NF
1P 30
NF
1P 30
NF
1P 30
NF
1P 30
NF
1P30
NF
1P30
NF
xL
D
C
F
H xK xJ xH
4 5 6
A
B
5 6
SPARES STORAGE
ROOM / LOCALE
STOCCAGGIO RICAMBI
MISSION PLANNING /
LIBRARY /
PIANIFICAZIONE
MISSIONE /
BIBLIOTECA
BOILER / CALDAIA
UNISEX LATRINE /
SERVIZI IGIENICI
UNISEX
ELECTRICAL /
ELETTRICA
MECHANICAL /
MECCANICA
TELECOM / TELECOM
VESTIBULE /
VESTIBOLO
MAINTENANCE OFFICE
/ UFFICIO
MANUTENZIONE
AVDTT / AVDTT
MULTI-PURPOSE
ROOM A / SALA
MULTIFUNZIONE A
MULTI-PURPOSE
ROOM B / SALA
MULTIFUNZIONE B
CORRIDOR /
CORRIDOIO
OFT SIMULATOR BAY /
BAIA SIMULATORE
OFT
SIMULATOR MX / TOOL
STORAGE / ICS
SUPPORT /
SIMULATORE MX /
MAGAZZINO
STRUMENTI /
SUPPORTO ICS
COMPUTER / IG /
COMPUTER /IG
CLM-PDU
GPP-02
ITP-01
EP401
A2 x5x4x3x2x1
G
I
TEL / DATA
EP402
A1
EP403
A1
GPP-02 CKT 11
MCP-01 CKT 45
ITP-01 CKT 4
MCP-01 CKT 2,4,6
MCP-01 CKT 1,3,5
GPP-01 CKT 9
GPP-01 CKT 11
GPP-01 CKT 23
ITP-01 CKT 4
GPP-02 CKT 2
GPP-01 CKT 12
GPP-02 CKT 6
MCP-01 CKT 24
GPP-01 CKT 14
GPP-01 CKT 17
GPP-01 CKT 8
ITP-01 CKT 4
MCP-01 CKT 24
GPP-01 CKT 18
MCP-01 CKT 40 ITP-01 CKT 1
ITP-01 CKT 3 ITP-01 CKT 5
ITP-01 CKT 2
MCP-01 CKT 21
MCP-01 CKT 23
CCP-01 CKT 2,4,6
CCP-01 CKT 1,3,5
GPP-02 CKT 9
ITP-01 CKT 4
GPP-01 CKT 13
GPP-01 CKT 10
GPP-01 CKT 27
18 18 18
181818
18 18 18
CSAC
GPP-01 CKT 23
GPP-02 CKT 1,3,5
MCP-01 CKT 19
GPP-01 CKT 15
MCP-01 CKT 47
MCP-01 CKT 49
MCP-01 CKT 49
RFMCP 20
21 21 21 21
MDB-01 CKT 25
GPP-01 CKT 16
MCP-01 CKT 27
MDB-01 CKT 14,16,18
MDB-01 208V CKT 2,4,6
MDB-01 CKT 8,10,12
MDB-01 480V CKT 2,4,6
23 23
1:100
0 1 32 4 5 10
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:0
IN
T
PO
W
ER
, F
LO
O
R P
LA
N, G R
O U
N D
FL
O
O R
RFAMJNHLL
EP101
PO
TE
N
ZA
IN
T, P
LA
N
IM
ET
R
IA
, P
RI
M
O P
IA
N
O
14125559
SEK
SCALE: 1 : 100A1
INT POWER, FLOOR PLAN, GROUND FLOOR
POTENZA INT, PLANIMETRIA, PIANO TERRA
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET E-001 AND E-002 FOR FOR LEGEND, SYMBOLS AND ABBREVIATIONS. / VEDERE IL
FOGLIO E-001 E-002 PER LA LEGENDA, I SIMBOLI E LE ABBREVIAZIONI.
2 MAIN HORIZONTAL POWER AND COMMUNICATIONS DISTRIBUTION THROUGHOUT THE BUILDING
SHALL BE ROUTED THROUGH CABLE TRAY SYSTEMS PER PLANS AND SECTIONS. VERTICAL
CONNECTIONS FROM SOURCES OR VERTICAL CONNECTIONS TO UTILIZATION DEVICES AND
FIXTURES SHALL BE ROUTED THROUGH CONDUIT SYSTEMS. ALL RACEWAY SYSTEMS SHALL
CONFORM TO YFGS SPECIFICATION SECTION 26 20 00.00 42. / LA DISTRIBUZIONE ORIZZONTALE PRINCIPALE DELL'ALIMENTAZIONE E DELLE COMUNICAZIONI IN TUTTO L'EDIFICIO DEVE ESSERE
ESEGUITA ATTRAVERSO SISTEMI DI PASSARELLE PORTACAVI SECONDO LE PLANIMETRIE E LE
SEZIONI. I COLLEGAMENTI VERTICALI DALLE SORGENTI O AI DISPOSITIVI DI UTILIZZO E AGLI APPARECCHI DEVONO ESSERE ESEGUITI ATTRAVERSO SISTEMI DI CANALINE. TUTTI I SISTEMI DI
CANALIZZAZIONE DEVONO ESSERE CONFORMI ALLA SPECIFICA YFGS 26 20 00.00 42.
3 AS CONDUIT SYSTEM, PVC AND GALVANISED STEEL WILL BE USED, WITH A MINIMUM DIAMETER OF 20mm. / PER IL SISTEMA DI CONDUZIONI SARANNO UTILIZZATI PVC E ACCIAIO GALVANIZZATO, CON UN DIAMETRO MINIMO DI 20 mm.
SHEET KEYNOTES / NOTE CHIAVE
1 230V 1P+N+G CONNECTION TO SPLIT UNIT FOR TELECOM ROOM. / 230V 1P+N+G
COLLEGAMENTO ALL'UNITÀ SPLIT PER LOCALE TELECOMUNICAZIONI.
2 400V 3P+N+G CONNECTION TO CHILLER UNIT. / 400V 3P+N+G COLLEGAMENTO AL
GRUPPO REFRIGERATORE.
3 230V 1P+N+G CONNECTION TO EXHAUST FAN. / 230V 1P+N+G COLLEGAMENTO
ALLA VENTOLA DI SCARICO.
4 230V 1P+N+G CONNECTION TO BOILER UNIT. / 230V 1P+N+G COLLEGAMENTO AL
GRUPPO CALDAIA.
5 400/230V PANELBOARD "IT PANEL". / QUADRO 400/230V "QUADRO IT".
6 30A RECEPTACLE FOR IT RACK. TO BE COORDINATED ACCORDING TO
TELECOMMUNICATIONS DISCIPLINE. / PRESA DA 30A PER RACK IT. DA
COORDINARE SECONDO LE DIRETTIVE NELL'AMBITO DELLE TELECOMUNICAZIONI.
7 SOCKETS FOR ELECTRICAL WATER COOLER. / PRESE PER IL REFRIGERATORE
D'ACQUA ELETTRICO.
8 230V 1P+N+G CONNECTION TO VAV DAMPER. / 230V 1P+N+G COLLEGAMENTO
ALLA SERRANDA VAV.
9 480/277V CLM PDU. / 480/277V CLM PDU.
10 208/120V PANELBOARD "GENERAL POWER PANEL". / QUADRO 208/120V "QUADRO
GENERALE DI POTENZA".
11 400V 3P+N+G CONNECTION TO OUTDOOR CRAC UNIT. / 400V 3P+N+G
COLLEGAMENTO ALL'UNITÀ CRAC ESTERNA.
12 400/230V PANELBOARD "MOTOR CONTROL PANEL -HOIST-". FINAL POSITION OF
PANELBOARD ACCORDING TO HOIST MANUFACTURER. / QUADRO 400/230V
"PANNELLO DI CONTROLLO DEL MOTORE -PARANCO-". POSIZIONE FINALE DEL
QUADRO SECONDO IL PRODUTTORE DEL PARANCO.
13 230V 1P+N+G CONNECTION TO ELECTRICAL HEATER. / 230V 1P+N+G
COLLEGAMENTO AL RISCALDATORE ELETTRICO.
14 TO BE INSTALLED ABOVE COUNTER TOP. / DA INSTALLARE SOPRA IL PIANO DI
LAVORO.
15 230V 1P+N+G CONNECTION TO OUTFRONT SIM BAY MOTORIZED DOOR. / 230V
1P+N+G COLLEGAMENTO ALLA PORTA MOTORIZZATA DELL'AREA SIM ANTERIORE.
16 CONNECTION TO SECURITY PANEL. / COLLEGAMENTO AL PANNELLO DI
SICUREZZA.
17 CONNECTION TO BLUE LIGHT SYSTEM. / COLLEGAMENTO AL SISTEMA LUCE BLU.
18 230V 1P+N+G CONNECTION TO MOTORIZED DIFFUSER. / COLLEGAMENTO 230V
1P+N+T AL DIFFUSORE MOTORIZZATO.
19 PROVIDE RECEPTACLE ABOVE CEILING FOR POWER SUPPLY TO A POTENTIAL
FUTURE RADON VENTILATION FAN. / FORNIRE UNA PRESA SOPRA IL SOFFITTO
PER L'ALIMENTAZIONE DI UNA POTENZIALE FUTURA VENTOLA DI VENTILAZIONE
DEL RADON.
20 230V PANELBOARD REMOTE FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
PROVIDED BY FIRE CONTRACTOR. / 230V PANNELLO DI CONTROLLO A DISTANZA
NOTIFICA DI MASSA/ALLARME ANTINCENDIO FORNITO DAL CONTRAENTE
ANTINCENDIO.
21 230V 1P+N+G CONNECTION TO MOTORIZED LOUVER VENT. / 230V 1P+N+G
COLLEGAMENTO ALLA PRESA D'ARIA MOTORIZZATA.
22 RECEPTACLE FOR HAND DRYER. / PRESA PER ASCIUGAMANI.
23 BRANCH CIRCUIT DISCONNECTOR SWITCH FOR LOW POWER APPLIANCES. /
SEZIONATORE DI CIRCUITO PER APPARECCHI A BASSA POTENZA.
D
C
F
H xK xJ xH
4 5 6
A
B x5x4x3x2x1
G
I
SPARES STORAGE
ROOM / LOCALE
STOCCAGGIO RICAMBI
MISSION PLANNING /
LIBRARY /
PIANIFICAZIONE
MISSIONE /
BIBLIOTECA
BOILER / CALDAIA
UNISEX LATRINE /
SERVIZI IGIENICI
UNISEX
ELECTRICAL /
ELETTRICA
MECHANICAL /
MECCANICA
TELECOM / TELECOM
MAINTENANCE OFFICE
/ UFFICIO
MANUTENZIONE
AVDTT / AVDTT
MULTI-PURPOSE
ROOM A / SALA
MULTIFUNZIONE A
MULTI-PURPOSE
ROOM B / SALA
MULTIFUNZIONE B
CORRIDOR /
CORRIDOIO
OFT SIMULATOR BAY /
BAIA SIMULATORE
OFT
SIMULATOR MX / TOOL
STORAGE / ICS
SUPPORT /
SIMULATORE MX /
MAGAZZINO
STRUMENTI /
SUPPORTO ICS
COMPUTER / IG /
COMPUTER /IG
CLM-PDU
GPP-02
UPSP-01
GPP-01
CCP-01
ITP-01
TEL / DATA
100 x 100mm 4450mm
400 x 100mm 4450mm
200 x 100mm -530mm
200 x 100mm -450mm
100 x 100mm 2750mm
400 x 100mm 2945mm
100 x 100mm 4450mm
400 x 100mm 2800mm
400 x 100mm 2786mm
200 x 100mm 2600mm
200 x 100mm 2600mm
400 x 100mm 2945mm
100 x 100mm 2945mm
100 x 100mm 2600mm
MCP-01
CSAC
200 x 100mm -450mm
200 x 100mm -450mm
200 x 100mm -450mm
200 x 100mm -450mm
200 x 100mm -450mm
200 x 100mm -450mm
100 x 100mm 2600mm
100 x 100mm 2600mm
100 x 100mm 2600mm
100 x 100mm 2600mm
100 x 100mm 2945mm
200 x 100mm 2600mm
200 x 100mm 4450mm
200 x 100mm 2365mm
200 x 100mm 2260mm
200 x 100mm 2365mm
100 x 100mm 2945mm
400 x 100mm 2610mm
400 x 100mm 2800mm
RFMCP
1:100
0 1 32 4 5 10
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:2
IN
T
PO
W
ER
, F
LO
O
R P
LA
N, F
IR
ST
F
LO
O
R . C
O
NT
AI
N
M
EN
T
RFAMJNHLL
EP102
PO
TE
N
ZA
IN
T, P
LA
N
IM
ET
R
IA
, P
RI
M
O P
IA
N
O . C
O
NT
EN
IM
EN
TO
14125560
SEK
SHEET KEYNOTES / NOTE CHIAVE
1 400/230V PANELBOARD "IT PANEL". / QUADRO 400/230V "QUADRO IT".
2 400/230V PANELBOARD "CHILLER CONTROL PANEL". / QUADRO 400/230V "QUADRO
DI CONTROLLO REFRIGERATORE".
3 480/277V CLM PDU. / 480/277V CLM PDU.
4 208/120V PANELBOARD "GENERAL POWER PANEL". / QUADRO 208/120V "QUADRO
GENERALE DI POTENZA".
5 MAIN DISTRIBUTION BOARD. / QUADRO DI DISTRIBUZIONE PRINCIPALE.
6 ELECTRICAL CABLING TRAY IN TRENCH FOR SIMULATOR. / PASSERELLA
PORTACAVI IN TRINCEA PER IL SIMULATORE.
7 400/230V PANELBOARD "GENERAL POWER PANEL". / QUADRO 400/230V "QUADRO
GENERALE DI POTENZA".
8 400/230V PANELBOARD "MOTOR CONTROL PANEL -HVAC-". / QUADRO 400/230V
"PANNELLO DI CONTROLLO DEL MOTORE -HVAC-".
9 480/277V PANELBOARD "UPS PANEL". / QUADRO 480/277V "QUADRO UPS".
10 2NO. 100MM DIAMETER CONDUIT FOR ELECTRICAL SUPPLY OF CHILLER AND SPLIT
UNITS BURIED AT LEAST 650MM UNDER FLOOR LEVEL. / 2NO. TUBO DIAMETRO
100MM PER ALIMENTAZIONE ELETTRICA DEL REFRIGERATORE E UNITÀ SPLIT
INTERRATO AD ALMENO 650MM AL DI SOTTO DEL LIVELLO DEL PAVIMENTO.
11 600X600 MM HANDHOLE. / PORTELLO 600X600MM.
12 64MM DIAMETER CONDUIT FOR ELECTRICAL SUPPLY OF CHILLER AND SPLIT
UNITS BURIED AT LEAST 650MM UNDER FLOOR LEVEL. / TUBO DIAMETRO 64MM
PER ALIMENTAZIONE ELETTRICA DEL REFRIGERATORE E UNITÀ SPLIT INTERRATO
AD ALMENO 650MM AL DI SOTTO DEL LIVELLO DEL PAVIMENTO.
13 TRANSITION FROM ABOVE GROUND TRAY TO BELOW RAISED FLOOR. / PASSAGGIO
PASSAGGIO DEL SUPPORTO DA SOPRA IL PIANO TERRA A SOTTO IL PIANO
SOPRAELEVATO
SCALE: 1 : 100A1
INT POWER, FLOOR PLAN, GROUND FLOOR
POTENZA INT, PLANIMETRIA, PIANO TERRA
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET E-001 AND E-002 FOR FOR LEGEND, SYMBOLS AND ABBREVIATIONS. / VEDERE IL
FOGLIO E-001 E-002 PER LA LEGENDA, I SIMBOLI E LE ABBREVIAZIONI.
2 MAIN HORIZONTAL POWER AND COMMUNICATIONS DISTRIBUTION THROUGHOUT THE BUILDING
SHALL BE ROUTED THROUGH CABLE TRAY SYSTEMS PER PLANS AND SECTIONS. VERTICAL
CONNECTIONS FROM SOURCES OR VERTICAL CONNECTIONS TO UTILIZATION DEVICES AND
FIXTURES SHALL BE ROUTED THROUGH CONDUIT SYSTEMS. ALL RACEWATY SYSTEMS SHALL
CONFORM TO YFGS SPECIFICATUON SECTUIN 26 20 00.00 42. / LA DISTRIBUZIONE ORIZZONTALE PRINCIPALE DELL'ALIMENTAZIONE E DELLE COMUNICAZIONI IN TUTTO L'EDIFICIO DEVE ESSERE
ESEGUITA ATTRAVERSO SISTEMI DI PASSARELLE PORTACAVI SECONDO LE PLANIMETRIE E LE
SEZIONI. I COLLEGAMENTI VERTICALI DALLE SORGENTI O AI DISPOSITIVI DI UTILIZZO E AGLI APPARECCHI DEVONO ESSERE ESEGUITI ATTRAVERSO SISTEMI DI CANALINE. TUTTI I SISTEMI DI
CANALIZZAZIONE DEVONO ESSERE CONFORMI ALLA SPECIFICA YFGS 26 20 00.00 42.
3 AS CONDUIT SYSTEM, PVC AND GALVANISED STEEL WILL BE USED, WITH A MINIMUM DIAMETER OF 20mm. / PER IL SISTEMA DI CONDUZIONI SARANNO UTILIZZATI PVC E ACCIAIO GALVANIZZATO, CON UN DIAMETRO MINIMO DI 20 mm.
4 CABLING FROM CABLE TRAY TO EQUIPMENT THROUGH CEILING OR EMBEDDED IN WALLS SHALL BE INSTALLED THROUGH RIGID PVC CONDUIT OR EMT, AS PER UFC REQUIREMENT. / CABLAGGIO DAL CANALE PORTACAVI ALL'ATTREZZATURA ATTRAVERSO IL SOFFITTO O INCASSATO NELLE PARETI
DEVE ESSERE INSTALLATO ATTRAVERSO UN CONDOTTO RIGIDO IN PVC O EMT, COME DA
REQUISITI UFC.
GI
GI
GI
GL GLGL
GL
GL
GL
GL
GL GLGL
GL
GL
GL
GL
GL
GL
GL
GL
GL
GL GLGL GL GLGL GL GLGL
GL
GL
GL GLGL GL GL
GL
GL
GL
GL
GL
GL GL
GI GIGI GI
GI
GI
GI GIGI GI GI GI
GI
GI
GI
GI
GI
GI
GI GIGI GI GI GI GI GI
GI
GI
GI
GI
GL GLGL GLGL GL
GI GIGI
GI
GI
GI
GI
GI
GI
GI GIGI
GI
GI
GIGI
GI
GI
GI
GI GIGI
GI
GI
GI GI
GI
GI
GI
GI GIGI
GI
GI
GI GIGI
GI
GI
GI
GI GI
GI
GI
GI
GI
GL GLGL GL GL
GI
GI
GI
GI
GI
GI
GIGI GIGIGI
GI GIGI GI GI
GI
GI
GI GIGI GI GI GI
GI
GI
GL GL
GL
GL
xL
D
C
F
H xK xH
4 5 6
A
B
EBB-TELECOM
EBB-MECH
EBB-IGR
EBB-SB
1 1 1
1 1
3 3
SPARES STORAGE
ROOM / LOCALE
STOCCAGGIO RICAMBI
MISSION PLANNING /
LIBRARY /
PIANIFICAZIONE
MISSIONE /
BIBLIOTECA
UNISEX LATRINE /
SERVIZI IGIENICI
UNISEX
ELECTRICAL /
ELETTRICA
MECHANICAL /
MECCANICA
TELECOM / TELECOM
VESTIBULE /
VESTIBOLO070
MAINTENANCE OFFICE
/ UFFICIO
MANUTENZIONE
AVDTT / AVDTT
MULTI-PURPOSE
ROOM A / SALA
MULTIFUNZIONE A
JAN / SERVIZIO
MULTI-PURPOSE
ROOM B / SALA
MULTIFUNZIONE B
VESTIBULE /
VESTIBOLO
CORRIDOR
CORRIDOR /
CORRIDOIO
OFT SIMULATOR BAY /
BAIA SIMULATORE
OFT
SIMULATOR MX / TOOL
STORAGE / ICS
SUPPORT /
SIMULATORE MX /
MAGAZZINO
STRUMENTI /
SUPPORTO ICS
COMPUTER / IG /
COMPUTER /IG
BOILER / CALDAIA
EBB-CHILLER
x5x4x3x2x1
G
I
MEBB-ELEC
1 1
3 3
1:100
0 1 32 4 5 10
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
E.
rv t
/0 3/
3:
:3
G R
O U
ND
IN
G , G
R O
U
ND
IN
G
F
LO
O R
PL
AN
, G R
O U
ND
F
LO
O
R
RFAMJNHLL
EG101
M
ES
SA
A
T
ER
RA
, P
LA
N
IM
ET
R
IA
M
ES
SA
A
T
ER
R A, P
RI
M O
P
IA
N O
14125561
SEK
SCALE: 1 : 100A1
GROUNDING, GROUNDING FLOOR PLAN, GROUND FLOOR
MESSA A TERRA, PLANIMETRIA MESSA A TERRA, PIANO TERRA
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET E-001 AND E-002 FOR FOR LEGEND, SYMBOLS AND ABBREVIATIONS. / VEDERE IL
FOGLIO E-001 E-002 PER LA LEGENDA, I SIMBOLI E LE ABBREVIAZIONI.
2 THE NUMBER OF GROUND RODS AND CONDUCTORS ARE SHOWN AS A REFERENCE ONLY OF THE
MINIMUM REQUIREMENTS. IF NEEDED, THE CONTRACTOR SHALL PROVIDE ADDITIONAL RODS,
WIRING, WELDING, ETC… TO ACHIVE THE SPECIFIC MAXIMUM GROUNDING RESISTANCE AT NO
ADDITIONAL COST TO THE GOVERMENT. / IL NUMERO DI ASTE DI TERRA E DI CONDUTTORI È
INDICATO SOLO COME RIFERIMENTO DEI REQUISITI MINIMI. SE NECESSARIO, L'APPALTATORE
DOVRÀ FORNIRE ASTE, CABLAGGI, SALDATURE, ECC. SUPPLEMENTARI PER RAGGIUNGERE LA
RESISTENZA DI MESSA A TERRA MASSIMA SPECIFICA SENZA COSTI AGGIUNTIVI PER
L'AMMINISTRAZIONE.
3 PROVIDE EXOTHERMIC WELDING FOR ALL GROUNDING RODS AND GROUND CABLE CONNECTIONS
BELOW GRADE. / PREVEDERE UNA SALDATURA ESOTERMICA PER TUTTE LE ASTE DI TERRA E I
COLLEGAMENTI DEI CAVI DI TERRA SOTTO IL LIVELLO DEL SUOLO.
4 GENERAL CONTRACTOR SHALL DEMOLISH PART OF THE EXISTING EARTHING MESH ACCORDING
TO THE NEW ARCHITECTURAL DISTRIBUTION / L'APPALTATORE GENERALE DEMOLIRÀ PARTE
DELLA RETE DI MESSA A TERRA ESISTENTE IN BASE ALLA NUOVA DISTRIBUZIONE
ARCHITETTONICA.
5 GENERAL CONTRACTOR SHALL ADAPT EXISTING LIGHTNING PROTECTION INSTALLATION
ACCORDING TO THE NEW ARCHITECTURAL DISTRIBUTION / L'APPALTATORE GENERALE DOVRÀ
ADATTARE L'IMPIANTO DI PROTEZIONE CONTRO I FULMINI ESISTENTE IN BASE ALLA NUOVA
DISTRIBUZIONE ARCHITETTONICA.
SHEET KEYNOTES / NOTE CHIAVE
1 GROUNDING PIT 600MM X 600MM WITH CAST IRON COVER. INCLUDES A Ø19MM
L=3M COPPER CLAD STEEL GROUND ROD CONNECTED TO FOUNDATION BEAMS
REINFORCEMENT, TO GROUNDING LOOP AND TO LIGHTNING VERTICAL COPPER
CONDUCTOR. / POZZETTO DI TERRA 600 MM X 600 MM CON CHIUSINO IN GHISA.
COMPRENDE UN'ASTA DI TERRA IN ACCIAIO RAMATO Ø19MM L=3M COLLEGATA
ALL'ARMATURA DELLE TRAVI DI FONDAZIONE, ALL’ANELLO DI MESSA A TERRA E
AL CONDUTTORE VERTICALE DI RAME PER FULMINI.
2 95MM2 BARE COPPER WIRE BURIED AT 1200MM MIN. / FILO DI RAME NUDO DA 95
MM2 INTERRATO A 1200 MM MIN.
3 VERTICAL CONNECTION WITH 95MM2 BARE COPPER WIRE. / COLLEGAMENTO
VERTICALE CON FILO DI RAME NUDO DA 95 MM2.
4 DEDICATED EARTHING ROD CONNETED THROUGH 2-INCH BRAIDED GROUND
STRAP ACCORDING TO SIMULATOR SUPPLIER. WHERE CROSSING WITH BUILDING
GROUNDING SYSTEM, GROUNDING CONDUCTOR SHALL BE WIRED THROUGH
NON-METALLIC CONDUIT FOR 2M FROM THE CROSSING POINT. / ASTA DI TERRA
COLLEGATA ATTRAVERSO UNA CINGHIA DI TERRA INTRECCIATA DA 2 POLLICI
SECONDO IL FORNITORE DEL SIMULATORE. IN CASO DI INCROCIO CON
L'IMPIANTO DI MESSA A TERRA DELL'EDIFICIO, IL CONDUTTORE DI TERRA DEVE
ESSERE CABLATO ATTRAVERSO UNA GUAINA NON METALLICA PER 2 M DAL
PUNTO DI INCROCIO.
5 DEDICATED EARTHING ROD. CONNECTED TO ISOLATION TRANSFORMER 400/480
VAC. WHERE CROSSING WITH BUILDING GROUNDING SYSTEM, GROUNDING
CONDUCTOR SHALL BE WIRED THROUGH NON-METALLIC CONDUIT FOR 2M FROM
THE CROSSING POINT. / ASTA DI TERRA. COLLEGATA AL TRASFORMATORE DI
ISOLAMENTO 400/480 VAC. IN CASO DI INCROCIO CON L'IMPIANTO DI MESSA A
TERRA DELL'EDIFICIO, IL CONDUTTORE DI TERRA DEVE ESSERE CABLATO
ATTRAVERSO UNA GUAINA NON METALLICA PER 2 M DAL PUNTO DI INCROCIO.
6 DEDICATED EARTHING ROD FOR SIMULATOR PDU (D < 7.6M). WHERE CROSSING
WITH BUILDING GROUNDING SYSTEM, GROUNDING CONDUCTOR SHALL BE
WIRED THROUGH NON-METALLIC CONDUIT FOR 2M FROM THE CROSSING POINT.
/ ASTA DI TERRA PER SIMULATORE PDU (D < 7,6 M). IN CASO DI INCROCIO CON
L'IMPIANTO DI MESSA A TERRA DELL'EDIFICIO, IL CONDUTTORE DI TERRA DEVE
ESSERE CABLATO ATTRAVERSO UNA GUAINA NON METALLICA PER 2 M DAL
PUNTO DI INCROCIO.
7 CONNECTION TO EXISTING MEBB IN EXISTING SWITCHBOARDS ROOM. /
COLLEGAMENTO AL MEBB ESISTENTE NEL LOCALE DEI QUADRI DI CONTROLLO
ESISTENTI.
8 CONNECTION TO EXISTING EARTHING MESH. / COLLEGAMENTO ALLA RETE DI
MESSA A TERRA ESISTENTE.
9 TO BE INSTALLED IN CABLING TRAY. / DA INSTALLARE NELLA PASSERELLA
PORTACAVI.
10 DEDICATED GROUNDING SYSTEM. / IMPIANTO DI MESSA A TERRA.
11 CLM PDU LOCATION TO BE DEFINED BY SIMULATOR PROVIDER. / POSIZIONE DEL
CLM PDU DA DEFINIRE DA PARTE DEL FORNITORE DEL SIMULATORE.
12 DEDICATED EARTHING ROD. CONNECTED TO SECONDARY SIDE OF
TRANSFORMER 480/208 VAC. WHERE CROSSING WITH BUILDING GROUNDING
SYSTEM, GROUNDING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .