Attachment K - 1684614dwg12of16.pdf
PDF 3 MB Posted
- Attached to
- P242 Combat Rescue Helicopter Simulator Facility Federal contract opportunity
- Solicitation number
- N6247023R0003
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIPING SYMBOLS /
LEGENDA TUBAZIONI
S
GATE VALVE /
VALVOLA A SARACINESCA
GLOBE VALVE /
VALVOLA A GLOBO
BUTTERFLY VALVE /
VALVOLA A FARFALLA
CHECK VALVE /
VALVOLA DI CONTROLLO
BALL VALVE /
VALVOLA A SFERA
SOLENOID VALVE /
VALVOLA A SOLENOIDE
WYE /
Y
CAP /
TAPPO
ELBOW, 90° /
CURVA 90°
ELBOW, 90° TURNED UP /
CURVA 90° VERSO L'ALTO
ELBOW 90°, TURNED DOWN /
CURVA 90° VERSO IL BASSO
ELBOW, 45° /
CURVA 45°
TEE /
DERIVAZIONE T
TEE, OUTLET TURNED UP /
DERIVAZIONE T, PRESA VERSO L'ALTO
TEE, OUTLET TURNED DOWN /
DERIVAZIONE T, PRESA VERSO IL BASSO
UNION /
UNIONE
NATURAL GAS (NG) /
GAS NATURALE (NG)
DOMESTIC COLD WATER (CW) /
ACQUA FREDDA USO DOMESTICO (CW)
DOMESTIC HOT WATER (HW) /
ACQUA CALDA USO DOMESTICO (HW)
FLOOR DRAIN (FD) W/TRAP /
SCARICO A PAVIMENTO (FD) CON TRAPPOLA GAS
WATER METER /
CONTATORE ACQUA
TRENCH DRAIN /
CADITOIA PER DRENAGGIO LINEARETD
STORM DRAIN (SDR) /
SCARICO DELLE ACQUE PLUVIALI (SDR)
PIPE FITTING SYMBOLS /
SIMBOLI ACCESORI TUBAZIONI
M
REDUCED PRESSURE ZONE BACKFLOW PREVENTER /
DISCONNETTORE IDRAULICO AZONA DI PRESSIONE
RIDOTTA
Y-TYPE STRAINER /
FILTRO A Y
PUMP /
POMPA
AREA DRAIN /
DRENAGGIO PER AREA
AD
S
PLUMBING FIXTURE MARK (SEE PLUMBING SCHEDULES) /
MARCATURA DEGLI IMPIANTI IDRAULICI (VEDI TABELLA IDRAULICHE)LV-1
PLUMBING EQUIPMENT MARK (SEE PLUMBING SCHEDULES) /
MARCATURA DEGLI IMPIANTI IDRAULICI (VEDI TABELLA IDRAULICHE)
WS-1
PRESSURE REDUCING VALVE /
VALVOLA RIDUTTRICE DI PRESSIONE
CONDENSATE DRAIN (CD) /
SCARICO CONDENSA (CD)
DOMESTIC HOT WATER RETURN (HWR) /
RITORNO ACQUA CALDA USI DOMESTICI (HWR)
SOLAR HOT WATER SUPPLY (SWS) /
MANDATA ACQUA CALDA PANNELLO SOLARE (SWS)
SOLAR HOT WATER RETURN (SWR) /
RITORNO ACQUA CALDA PANNELLO SOLARE (SWR)
FLOW DIRECTION /
DIREZIONE DI FLUSSO
SANITARY VENT (V) /
VENTILAZIONE SCARICO (V)
ABBREVATIONS /
ABBREVIAZIONI
ABOVE FINISHED FLOOR /
AL DI SOPRA DEL PIANO FINITO
AFF
BOILER /
CALDAIA
B1
CLEAN OUT /
ISPEZIONE
CO
DOMESTIC COLD WATER /
ACQUA FREDDA USO DOMESTICO
CW
DOMESTIC WATER TANK /
SERBATOIO DELL'ACQUA USO
DOMESTICO
DWT
EXPANSION TANK /
VASO ESPANSIONE
ET
FLOOR CLEAN OUT /
ISPEZIONE A PAVIMENTO
FCO
FLOOR DRAIN /
GRIGLIA A PAVIMENTO
FD
GAS METER /
CONTATORE DEL GAS
GM
HOSE BIB /
RUBINETTO PORTAGOMMA
HB
DOMESTIC HOT WATER /
ACQUA CALDA USI DOMESTICI
HW
DOMESTIC HOT WATER RETURN /
RITORNO ACQUA CALDA USI
DOMESTICI
HWR
DOMESTIC HOT WATER SUPPLY /
MANDATA ACQUA CALDA USI
DOMESTICI
HWS
INVERTER ELEVATION /
QUOTA INVERSA
IE
MECHANICAL /
MECCANICO
MECH
MECHANICAL, ELECTRICAL,
PLUMBING /
MECCANICI, ELETRICCI, IMPIANTO
IDRICO
MEP
MILLIMITERS /
MILLIMETRI
MM
NORMALLY CLOSED /
NORMALMENTE CHIUS
N.C.
NOT TO SCALE /
NO SCALA
NTS
PUMP /
POMPA
P
PLUMBING /
IMPIANTE IDRAULICI
PL
RECIRCULATION PUMP /
POMPA DI RICIRCOLO
RP
RADON /
RADON
RDN
SINK /
LAVANDINO
S
SANITARY /
SANITARIO
SAN
SOLAR COLLECTOR /
COLLETTORE SOLARE
SC
SUMP PUMP /
POMPA A IMMERSIONE
SP
SOLAR WATER RETURN /
RITORNO ACQUA PANNELLO
SOLARE
SWR
SOLAR WATER SUPPLY /
MANDATA ACQUA PANNELLO
SOLARE
SWS
SOLAR WATER STORAGE TANK /
SERBATOIO DI ACCUMULO ACQUA
PANNELLO SOLARE
ST
TOP OF WALL /
FILO SUPERIORE DEL MURO
TOW
WATER CLOSET /
RUBINETTO DI INTERCETTAZIONE
ACQUA
WC
WALL CLEAN OUT /
ISPEZIONE A MURO
WCO
WATER SOFTNER /
ADDOLCITORE
WS
DIAMETER /
DIAMETRO
Ø
THERMOSTATIC WATER MIXING VALVE /
VALVOLA MISCELATRICE TERMOSTATICA PER ACQUA
AUTOMATIC CONTROL VALVE, 3 WAY /
VALVOLA DI CONTROLLO AUTOMATICO, TRE VIE
EMERGENCY SHUT-OFF VALVE /
VALVOLA DI ARRESTO DI EMERGENZA
GAS DETECTION PANEL /
PANNELLO DI RILEVAMENTO GAS
STORM DRAIN / SCARICO ACQUE
PLUVIALI
SDR
NORMALLY OPEN /
NORMALMENTE APERTO
N.O.
SANITARY DRAIN (SAN) /
SFOGO SANITARIO (SAN)
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:0
PL
UM
, G
EN
ER
AL
, L
EG
EN
D
S, G
EN
ER
AL
N
O
TE
S
A
BB
R
EV
IA
TI
O N
S
RFAJFMJCB
P-001
IS
/S
C, G
EN
ER
AL
E, L
EG
EN
D
E, N
O
TE
G
EN
ER
AL
I & A
BB
R
EV
IA
ZI
O
N I
14125502
SCE
GENERAL SHEET NOTES / NOTE GENERALI
17 IF A CONFLICT EXISTS WITHIN THE DRAWINGS AND SPECIFICATIONS, THE REQUIEREMENTS
IN THE SPECIFICATIONS SHALL APPLY. ITEMS SHOWN ON THE DRAWINGS, BUT NOT
SPECIFIED, MUST BE FURNISHED &INSTALLED BY THE CONTRACTOR. IF AN ITEM IS SHOWN
ON THE DRAWINGS, BUT IS NOT INCLUDED IN THE SPECIFICATIONS, PROVIDE ITEM OF A
QUALITY LEVEL CONSISTENT WITH THE GENERAL QUALITY LEVEL OF THE CONTACTOR
REQUIEREMENTS. BRING CONFLICTS BETWEEN DRAWINGS & SPECIFICATIONS TO THE
ATTENTION OFTHE GOVERNMENT CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION. / IN CASO DI DISCREPANZA TRA I DISEGNI E LE SPECIFICHE, SI
APPLICHERANNO I REQUISITI DELLE SPECIFICHE. GLI ELEMENTI INDICATI NEI DISEGNI, MA
NON SPECIFICATI, DEVONO ESSERE FORNITI E INSTALLATI DALL'APPALTATORE. SE UN
ELEMENTO È INDICATO NEI DISEGNI, MA NON È INCLUSO NELLE SPECIFICHE, FORNIRE UN
ELEMENTO QUALITATIVAMENTE COERENTE CON IL LIVELLO DI QUALITÀ GENERALE DEI
REQUISITI DELL'APPALTATORE. LE DISCREPANZE TRA I DISEGNI E LE SPECIFICHE DEVONO
ESSERE RIFERITI IMMEDIATAMENTE AL RESPONSABILE DELL'ENTE APPALTANTE.
18 TYPICAL DETAILS THROUGHOUT THE DRAWING SET SHALL APPLY FOR ALL APPLICABLE
CONDITIONS, EVEN IF NOT SPECIFICALLY SHOWN OR REFERENCED. / I DETTAGLI STANDARD
PRESENTI ALL’ INTERNO DEL SET DI DISEGNI SI INTENDONO VALIDI PER TUTTE LE CONDIZIONI
APPLICABILI, ANCHE SE NON SPECIFICAMENTE MOSTRATI O INDICATI.
19 ENTEND PLUMBING VENTS WITHIN A 3 M RADIUS OF ANY VENTILATION UNIT TO A HEIGHT OF
1 M ABOVE THE VENTILATION INTAKE / INSERIRE LE BOCCHETTE IDRAULICHE ENTRO UN
RAGGIO DI 3 M DA QUALSIASI APPARECCHIO DI VENTILAZIONE A UN'ALTEZZA DI 1 M SOPRA
LA PRESA DI VENTILAZIONE
20 ESTABLISH SLOPES AND INVERT ELEVATIONS OF INTERIOR PIPING BEFORE PIPING IS
INSTALLED, SO THAT SLOPES WILL BE MAINTAINED. INSTALL PIPING TO AVOID CONFLICTS
WITH OTHER TRADES. / STABILIRE LE PENDENZE E LA QUOTA DI POSA DELLE TUBAZIONI
INTERNE PRIMA DELL'INSTALLAZIONE, IN MODO DA MANTENERE LE PENDENZE. INSTALLARE
LE TUBAZIONI IN MODO DA EVITARE INTERFERENZE CON ALTRE OPERAZIONI.
21 PROVIDE DEEP SEAL TRAPS FOR ALL FLOOR DRAINS. / PREVEDERE SIFONI A IMMERSIONE
PER TUTTI GLI SCARICHI A TERRA.
22 INSULATION REQUIREMENTS FOR PIPING ARE INCLUDED IN SECTION 3.2.2.1 WITHIN
SPECIFICATION 23 07 00. THE MOST STRINGENT REQUIREMENTS SHALL BE CONSIDERED
BETWEEN ASHRAE 90.1 AND HN DPR 412/93. / I REQUISITI DI ISOLAMENTO PER LE TUBAZIONI
SONO COMPRESI NELLA SEZIONE 3.2.2.1 ALLA VOCE DEL CAPITOLATO 23 07 00. I
CONSIDERARE I REQUISITI PIU' STRINGENTI TRA ASHRAE 90.1 E HN DPR
412/93.
GENERAL SHEET NOTES / NOTE GENERALI
1 THESE GENERAL PLUMBING NOTES APPLY TO PLUMBING DRAWINGS IN THIS SET. SHEET
SPECIFIC NOTES ARE INDICATED ON EACH SHEET UNDER GENERAL SHEET NOTES. / LE
PRESENTI NOTE GENERALI SI APPLICANO AI DISEGNI DELL'IMPIANTO IDRAULICO DEL
PRESENTE FASCICOLO. LE NOTE SPECIFICHE DELLA SCHEDA SONO INDICATE IN CIASCUN
FOGLIO SOTTO LE NOTE GENERALI.
2 SEE GENERAL SHEETS FOR ADDITIONAL ABBREVIATIONS AND GENERAL SYMBOLS.
CHARACTER IDENTIFIERS MAY ALSO BE USED FOR PIPING DESCRIPTIONS. / VEDERE I FOGLI
GENERALI PER ULTERIORI ABBREVIAZIONI E SIMBOLI GENERALI. GLI IDENTIFICATORI
POSSONO ESSERE UTILIZZATI ANCHE PER LE DESCRIZIONI DELLE TUBAZIONI.
3 PLUMBING LAYOUTS ARE SCHEMATIC ONLY. CONTRACTOR TO PROVIDE ANY ADDITIONAL
DROPS, RISES, OR OFFSETS REQUIRED FOR A COMPLETE INSTALLATION. COORDINATE
EXACT ROUTING OF WORK WITH ALL OTHER TRADES AND OBSTRUCTIONS. / I LAYOUT
DELL'IMPIANTO IDRAULICO SONO SOLO SCHEMATICI. L'APPALTATORE È TENUTO A FORNIRE
LE DIRAMAZIONI IN SALITA E IN DISCESA, O GLI OFFSET AGGIUNTIVI NECESSARI PER
UN'INSTALLAZIONE COMPLETA. COORDINARE L'ESATTA DISPOSIZIONE CON TUTTI GLI ALTRI
LAVORI E OPERAZIONI.
4 UNLESS OTHERWISE INDICATED, ROUTE ALL PIPING ABOVE CEILING. ROUTE ALL PIPING AS
HIGH AS POSSIBLE IN AREAS WITHOUT CEILINGS. / SE NON DIVERSAMENTE INDICATO,
POSARE TUTTE LE TUBAZIONI AL DI SOPRA DEL SOFFITTO. NELLE AREE PRIVE DI SOFFITTO, FAR PASSARE TUTTE LE TUBAZIONI IL PIÙ IN ALTO POSSIBILE.
5 LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING/CONTROL DEVICES IN
ACCESSIBLE LOCATIONS WITH A STRAIGHT SECTION OF PIPE UPSTREAM AND DOWNSTREAM,
AS RECOMMENDED BY THE DEVICE MANUFACTURER FOR ACCURACY. INSTALL
THERMOMETER IN A VERTICAL AND TILTED POSITION TO ALLOW READING BY OBSERVER
STANDING ON FLOOR. / COLLOCARE TUTTI I DISPOSITIVI DI MISURAZIONE/CONTROLLO DI
TEMPERATURA, PRESSIONE E PORTATA IN POSIZIONI ACCESSIBILI, CON UN TRATTO DI TUBO
DIRITTO A MONTE E A VALLE, COME RACCOMANDATO DAL FABBRICANTE DEL DISPOSITIVO.
COLLOCARE IL TERMOMETRO IN POSIZIONE VERTICALE E INCLINATA PER CONSENTIRE LA
LETTURA DA PARTE DI UN OBSERVER IN PIEDI SUL PAVIMENTO.
6 SOME SYMBOLS INDICATED ON THIS LEGEND SHEET MAY NOT APPEAR ON THE DRAWINGS. /
ALCUNI SIMBOLI INDICATI SU QUESTO FOGLIO DI LEGENDE POTREBBERO NON ESSERE
PRESENTI NEI DISEGNI.
7 DO NOT LOCATE PLUMBING WORK IN ELEVATOR, ELECTRICAL, OR COMMUNICATION ROOMS,
EXCEPT FOR RUNOUTS SPECIFICALLY SERVING THE RESPECTIVE ROOM. / NON POSIZIONARE
I RACCORDI IDRAULICI IN ASCENSORI, LOCALI ELETTRICI O DI COMUNICAZIONE, ECCETTO
CHE PER LE USCITE DEL RISPETTIVO LOCALE.
8 SEISMIC BRACING FOR PIPING WILL BE PROVIDED BASED ON THE SEISMIC DESIGN
CATEGORY. / IL RINFORZO SISMICO PER LE TUBAZIONI SARÀ FORNITO IN BASE ALLA
CATEGORIA DI PROGETTAZIONE SISMICA.
9 DRAIN POINTS FOR EMPTYING THE SYSTEMS OF DOMESTIC COLD WATER, DOMESTIC HOT
WATER AND DOMESTIC HOT WATER RETURN SHALL BE PROVIDED IN THE LOWER POINT OF
EACH MECHANICAL SHAFTS. / I PUNTI DI SCARICO PER LO SVUOTAMENTO DEGLI IMPIANTI DI
ACQUA FREDDA SANITARIA, ACQUA CALDA SANITARIA E RITORNO DELL'ACQUA CALDA
SANITARIA DEVONO ESSERE PREVISTI NEL PUNTO PIÙ BASSO DI CIASCUN ALBERO
MECCANICO.
10 CONTRACTOR TO COORDINATE AND PROVIDE ACCESS PANELS FOR ALL COMPONENTS
INSTALLED IN INACCESSIBLE AREAS THAT MAY REQUIRE MAINTENANCE. / L'APPALTATORE
DEVE COORDINARE E PREVEDERE PANNELLI DI ACCESSO PER TUTTI I COMPONENTI
INSTALLATI IN ZONE INACCESSIBILI E CHE POTREBBERO RICHIEDERE MANUTENZIONE.
11 PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
A COMPLETE AND OPERABLE PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS
SPECIFIED, AND AS REQUIRED BY CODE. ALL MATERIALS SHALL BE NEW AND OF GOOD
QUALITY. ALL WORK SHALL BE INSTALLED IN A NEAT AND ORDERLY MANNER. / FORNIRE
TUTTI I MATERIALI, LE ATTREZZATURE ED ESEGUIRE TUTTE LE OPERAZIONI DI LAVORO
NECESSARIE PER INSTALLARE UN IMPIANTO IDRAULICO COMPLETO E FUNZIONANTE COME
INDICATO NEI DISEGNI E COME SPECIFICATO E RICHIESTO DAL CODICE. TUTTI I MATERIALI
DEVONO ESSERE NUOVI E DI BUONA QUALITÀ. IL LAVORO DOVRÀ ESSERE ESEGUITO IN
MODO ORDINATO E PULITO.
12 INSTALL ALL PLUMBING EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, MAINTENANCE REQUIREMENTS, CONTRACT
DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS. / INSTALLARE TUTTE LE
APPARECCHIATURE IDRAULICHE E QUELLE ACCESSORIE IN CONFORMITÀ DELLE
RACCOMANDAZIONI DEL PRODUTTORE, DEI REQUISITI DI MANUTENZIONE, DELLA
DOCUMENTAZIONE CONTRATTUALE E DEI CODICI E REGOLAMENTI APPLICABILI.
13 UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT AND IN
BYPASSES TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS. / I RACCORDI E/O LE
FLANGE DEVONO ESSERE INSTALLATI SU OGNI APPARECCHIATURA E NEI BYPASS PER
CONSENTIRE LO SMONTAGGIO PER MODIFICHE E RIPARAZIONI.
14 PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR MATERIALS. / PREVEDERE
COLLEGAMENTI DIELETTRICI TRA MATERIALI DIFFORMI.
15 CONTRACTOR TO ROUTE ALL CONDENSATE PIPING TO NEAREST FLOOR DRAIN. /
L'APPALTATORE DEVE INSTRADARE TUTTE LE TUBAZIONI DELLA CONDENSA VERSO LO
SCARICO A TERRA PIÙ VICINO.
16 CONTRACTOR TO COORDINATE WITH OTHER DISCIPLINES. PROVIDE OFFSETS IN PIPING
AROUND OBSTRUCTION AT NO ADDITIONAL COST TO THE GOVERMENT. / L'APPALTATORE
DEVE COORDINARSI CON LE ALTRE AREE. PREVEDERE DEI COMPENSATORI NELLE
TUBAZIONI INTORNO ALLE OSTRUZIONI SENZA COSTI AGGIUNTIVI PER L'AMMINISTRAZIONE.
Approved by CDR Jonathan Horner, ROICC, via SAT-TO form
USE THE CURRENT (LATEST EDITION) CODES, STANDARDS, AND GUIDELINES LISTED BELOW.
WHERE COMPLIANCE WITH TWO OR MORE CODE/STANDARDS/GUIDELINES IS SPECIFIED, AND
THE CODES/STANDARDS/GUIDELINES ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS
FOR MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST STRINGENT
REQUIREMENTS. / UTILIZZARE I CODICI, LE NORME E LE LINEE GUIDA ATTUALI (ULTIMA
EDIZIONE) ELENCATI DI SEGUITO. IN CASO DI CONFORMITÀ CON DUE O PIÙ
CODICI/NORME/LINEE GUIDA CHE PREVEDONO REQUISITI DIVERSI O CONTRASTANTI PER LE
QUANTITÀ MINIME O I LIVELLI DI QUALITÀ, RISPETTARE I REQUISITI PIÙ SEVERI.
WHERE APPLICABLE, PROVIDE MATERIALS AND EQUIPMENT WITH STAMPS OR SEALS OF ARI,
ASME, UL OR ASTM. PERFORM TESTS IN THE PRESENCE OF THE GOVERMENT UNLESS
OTHERWISE WAIVED IN WRITING. / FORNIRE, OVE APPLICABILE, MATERIALI E ATTREZZATURE
CON TIMBRI O SIGILLI ARI, ASME, UL O ASTM. ESEGUIRE LE PROVE IN PRESENZA
DELL'AMMINISTRAZIONE, SALVO DIVERSA DEROGA SCRITTA.
STANDARDS AND GUIDELINES:
• AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONING ENGINEERS
(ASHRAE)
• STANDARDS SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION
(SMACNA) HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE.
• AMERICAN SOCIETY OF PLUMBLING ENGINEERS (ASPE) PLUMBING ENGINEERING DESIGN
HANDBOOK
CODES:
• INTERNATIONAL BUILDING CODE (IBC) (2018 EDITION)
• INTERNATIONAL PLUMBING CODE (IPC) (2018 EDITION)
• INTERNATIONAL MECHANICAL CODE (IMC) (2018 EDITION)
• NATIONAL ELECTRIC CODE (NEC)
• UNIFIED FACILITIES CRITERIA (UFC) MECHANICAL ENGINEERING (UFC 3-401-01)
• UNIFIED FACILITIES CRITERIA (UFC) HVAC SYSTEMS (UFC 3-410-01)
• UNIFIED FACILITIES CRITERIA (UFC) PLUMBING SYSTEMS (UFC 3-420-01)
• UNIFIED FACILITIES CRITERIA (UFC) FIRE PROTECTION AND LIFE SAFETY (UFC 3-600-01)
/ CODICI:
• CODICE EDILIZIO INTERNAZIONALE (IBC) (EDIZIONE 2018)
• CODICE IDRAULICO INTERNAZIONALE (IPC) (EDIZIONE 2018)
• CODICE MECCANICO INTERNAZIONALE (IMC) (EDIZIONE 2018)
• CODICE ELETTRICO NAZIONALE (NEC)
• CRITERI EDILIZI UNIFICATI (UFC) PROGETTAZIONE MECCANICA (UFC 3-401-01)
• CRITERI EDILIZI UNIFICATI (UFC) IMPIANTI HVAC (UFC 3-410-01)
• CRITERI EDILIZI UNIFICATI (UFC) IMPIANTI IDRAULICI (UFC 3-420-01)
• CRITERI EDILIZI UNIFICATI (UFC) PROTEZIONE ANTINCENDIO E SICUREZZA (UFC 3-600-01)
ITALIAN REFERENCES
ITALIAN LAWS AND DECREES (D.M.)
• D.P.R. No. 120/2017
• D.L. No. 152/2006
• D.M. No. 37/2008
• D.M. 17/03/2003
• D.M. 26-6-2009
• D.M. 22/11/2012
• D.L. No. 81/2008
• D.P.R. No. 74/2013
• D.P.R. No. 59/2009
• D.L. No. 192/2005
• D.L. No. 311/2006
• D.L. No. 31/2001
• D.L. No. 93/2000
• D.L. No. 56/2010
• D.L. No. 115/2008
• DM 174/04
• DM 10/02/14
• D.P.R. No. 1288/1967
• D.M. 26-6-2015
EUROPEAN COMMUNITY QUALITY MARKS (CE)
ITALIAN INSTITUTES AND COMMITTEES
CTI - COMITATO TERMOTECNICO ITALIANO
INAIL - ISTITTUTO SUPERIORE NAZIONALE PER L'ASSICURAZIONE CONTRO GLI INFORTUNI SUL
LAVORO
ITALIAN NATIONAL ASSOCIATION FOR UNIFICATION OF STANDARDS (UNI)
• UNI 1248
• UNI 4179
• UNI 8349
NORMATIVE ITALIANE DI RIFERIMENTO
LEGGI E DECRETI ITALIANI (D.M.)
• D.P.R. No. 120/2017
• D.L. No. 152/2006
• D.M. No. 37/2008
• D.M. 17/03/2003
• D.M. 26-6-2009
• D.M. 22/11/2012
• D.L. No. 81/2008
• D.P.R. No. 74/2013
• D.P.R. No. 59/2009
• D.L. No. 192/2005
• D.L. No. 311/2006
• D.L. No. 31/2001
• D.L. No. 93/2000
• D.L. No. 56/2010
• D.L. No. 115/2008
• DM 174/04
• DM 10/02/14
• D.P.R. No. 1288/1967
• D.M. 26-6-2015
MARCHI DI QUALITÀ DELLA COMUNITÀ EUROPEA (CE)
ISTITUTI E COMITATI ITALIANI
CTI - COMITATO TERMOTECNICO ITALIANO
INAIL - ISTITTUTO SUPERIORE NAZIONALE PER L'ASSICURAZIONE CONTRO GLI INFORTUNI
SUL LAVORO
ENTE NAZIONALE ITALIANO DI UNIFICAZIONE (UNI)
• UNI 1248
• UNI 4179
• UNI 8349
APPLICABLE CODES / CODICI DA APPLICARE APPLICABLE CODES / CODICI DA APPLICARE
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:0
PL
UM
, G
EN
ER
AL
, L
EG
EN
D
S, G
EN
ER
AL
N
O
TE
S
A
BB
R
EV
IA
TI
O N
S
RFAJFMJCB
P-002
IS
/S
C, G
EN
ER
AL
E, L
EG
EN
D
E, N
O
TE
G
EN
ER
AL
I & A
BB
R
EV
IA
ZI
O
N I
14125503
SCE
DN
xL
2 3
H
E x6 x7 x8 x9 x10 x11 x12 x13x2 xK xJ xH xG xF
4 5 6 xM
A
PL401
A1
PL401
C1
PL401
C3
40 CW
BFP-1
xE xD xC x5x4x3x1
B
G
I
F
D
C
26 SWS 26 SWR 40 CW
15 CW
3EWC-1
20 CW
CI-02 CI-01
20 CW20 CW
20 CW
40 128 16
1:200
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:3
PL
UM
, F
LO
O R
P
LA
N , P
LU
M
BI
N
G , G
R O
UN
D
F
LO
O R
RFAJFMJCB
PL101
IS
/S
C, P
IA
N
TA
D
EL
P
AV
IM
EN
TO
, I D
R
IC
O -S
AN
IT
AR
IO
, P
IA
NO
T
ER
RA
14125504
SCE
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET P-001 FOR PLUMBING GENERAL NOTES, ABBREVIATIONS AND SYMBOLS. / VEDERE
FOGLIO P-001 PER LE NOTE GENERALI, LE ABBREVIAZIONI E I SIMBOLI IDRAULICI.
2 SEE SHEETS P-601 AND P-602 FOR EQUIPMENT SCHEDULES. / VEDERE I FOGLI P-601 E P-602 PER
LE SCHEDE DELLE ATTREZZATURE.
3 REFER TO CIVIL DRAWING CU101 FOR EXACT LOCATIONS OF WATER SUPPLY, WASTE WATER AND NATURAL GAS CONNECTION CONNECTIONS. / FARE RIFERIMENTO AL DISEGNO CIVILE CU101 PER LA POSIZIONE ESATTA DEGLI ALLACCIAMENTI PER L'APPROVVIGIONAMENTO IDRICO, LE ACQUE
REFLUE E IL GAS NATURALE.
4 SOLAR PANELS PRIMARY CIRCUIT PIPING TO BE CONNECTED TO EXISTING FLAT SOLAR PANELS ON THE ROOF OF BUILDING 7300. / LE TUBAZIONI DEL CIRCUITO PRIMARIO DEI PANNELLI SOLARI
DEVONO ESSERE COLLEGATE AI PANNELLI SOLARI PIANI SUL TETTO DELL'EDIFICIO 7300.
SCALE: 1 : 200A1
PLUMBING, FLOOR PLAN, GROUND FLOOR
IMPIANTO IDRAULICO, PLANIMETRIA, PIANO TERRA
SHEET KEYNOTES / NOTE CHIAVE
1 DOMESTIC WATER SUPPLY. CONNECTION TO EXISTING COLD WATER MAIN IN
MECHANICAL ROOM AT BUILDING 7300, UPSTREAM EXISTING WATER METER. /
APPROVVIGIONAMENTO IDRICO DOMESTICO. COLLEGAMENTO ALLA
CONDUTTURA DELL'ACQUA FREDDA ESISTENTE NEL LOCALE TECNICO
DELL'EDIFICIO 7300, A MONTE DEL CONTATORE DELL'ACQUA ESISTENTE.
2 PROVIDE WATER METER AND REDUCED PRESSURE BACKFLOW PREVENTER. /
PREVEDERE CONTATORE ACQUA E DISPOSITIVO ANTIRIFLUSSO A PRESSIONE
RIDOTTA.
3 UP TO ROOF LEVEL FOR CONNECTION TO EXISTING SOLAR WATER PANELS.
PENETRATION POINT ON THE ROOF TO BE COORDINATED TO MATCH WITH
CURRENT SOLAR PRIMARY CIRCUIT PIPES. / FINO AL LIVELLO DEL TETTO PER IL
COLLEGAMENTO AI PANNELLI SOLARI PER L'ACQUA CALDA ESISTENTI. IL PUNTO
DI PENETRAZIONE SUL TETTO DEVE ESSERE COORDINATO IN MODO DA
CORRISPONDERE ALLE ATTUALI TUBAZIONI DEL CIRCUITO PRIMARIO SOLARE.
DN
xL
2 3
H
E x2 xK xJ xH
4 5 6
A
50 CD
160SAN
50 CD
50 CD
50 CD
SPARES STORAGE
ROOM / LOCALE
STOCCAGGIO RICAMBI
MISSION PLANNING /
LIBRARY /
PIANIFICAZIONE
MISSIONE /
BIBLIOTECA
MECHANICAL /
MECCANICA
TELECOM / TELECOM
VESTIBULE /
VESTIBOLO
MAINTENANCE OFFICE
/ UFFICIO
MANUTENZIONE
AVDTT / AVDTT
MULTI-PURPOSE
ROOM B / SALA
MULTIFUNZIONE B
OFT SIMULATOR BAY /
BAIA SIMULATORE
OFT
50 CD
PW401
A1
PW401
C1
PW401
C3 x4x3x1
B
G
I
F
D
C 080
JAN / SERVIZIO
ELECTRICAL /
ELETTRICA
BOILER / CALDAIA
UNISEX LATRINE /
SERVIZI IGIENICI
UNISEX
MULTI-PURPOSE
ROOM A / SALA
MULTIFUNZIONE A
COMPUTER / IG /
COMPUTER /IG
CORRIDOR /
CORRIDOIO
160 SAN
100 SAN
100SAN
40 CD
25 CD 40 CD
25 CD
15 CD
160 SAN
SIMULATOR MX / TOOL
STORAGE / ICS
SUPPORT /
SIMULATORE MX /
MAGAZZINO
STRUMENTI /
SUPPORTO ICS
50 CD
EWC-1
IU-02 IU-01
CI-02
CI-01
100SAN
150SDR 150SDR 150SDR 200SDR
25 CD
150SDR 150SDR 150SDR 150SDR
200SDR
100SDR 125SDR 150SDR3
3 3
75 RDN
75 RDN
100RDN
100RDN
100RDN 11
1:100
0 1 32 4 5 10
SCALE:SCALE:
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:4
PL
UM
, F
LO
O R
P
LA
N , S
AN
IT
AR
Y, G R
O
UN
D F
LO
O
R
RFAJFMJCB
PW101
IS
/S
C, P
IA
N
TA
D
EL
P
AV
IM
EN
TO
, S C
AR
IC
H I, PI
AN
O T
ER
RA
14125505
SCE
SCALE: 1 : 100A1
SANITARY, FLOOR PLAN, GROUND FLOOR
IMPIANTO SANITARIO, PLANIMETRIA, PIANO TERRA
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET P-001 FOR PLUMBING GENERAL NOTES, ABBREVIATIONS AND SYMBOLS. / VEDERE
FOGLIO P-001 PER LE NOTE GENERALI, LE ABBREVIAZIONI E I SIMBOLI IDRAULICI.
2 SEE SHEETS P-601 AND P-602 FOR EQUIPMENT SCHEDULES. / VEDERE I FOGLI P-601 E P-602 PER
LE SCHEDE DELLE ATTREZZATURE.
3 REFER TO CIVIL DRAWING CU101 FOR EXACT LOCATIONS OF WATER SUPPLY, WASTE WATER AND NATURAL GAS CONNECTION CONNECTIONS. / FARE RIFERIMENTO AL DISEGNO CIVILE CU101 PER LA POSIZIONE ESATTA DEGLI ALLACCIAMENTI PER L'APPROVVIGIONAMENTO IDRICO, LE ACQUE
REFLUE E IL GAS NATURALE.
4 STORM DRAIN HORIZONTAL PIPES (PRIMARY AND SECUNDARY) FOR NEW FLAT ROOF WILL BE
ROUTED BELOW THE ROOF AND ABOVE THE CEILING WITH A MINIMUM 1% SLOPE. / I TUBI
ORIZZONTALI DI SCARICO DELLE ACQUE PLUVIALI (PRIMARI E SECONDARI) PER IL NUOVO TETTO IN PIANO SARANNO INSTRADATI SOTTO IL TETTO E SOPRA IL SOFFITTO CON UNA PENDENZA MINIMA
DELL'1%.
5 STORM DRAIN HORIZONTAL PIPES FOR EXISTING ROOF CONNECTING TO THE EXISTING
DOWNSPOUTS, WILL BE ROUTED BELOW THE ROOF AND ABOVE THE CEILING WITH A MINIMUM 1% SLOPE. / I TUBI DI SCARICO ORIZZONTALI DELLE ACQUE PLUVIALI PER IL TETTO ESISTENTE COLLEGATI AI PLUVIALI ESISTENTI, SARANNO INSTRADATI SOTTO IL TETTO E SOPRA IL SOFFITTO
CON UNA PENDENZA MINIMA DELL'1%.
SHEET KEYNOTES / NOTE CHIAVE
1 PROVIDE UNDERGROUND SANITARY PIPING. SEE CIVIL DRAWINGS FOR
CONTINUATION. / PREVEDERE UNA TUBAZIONE SANITARIA INTERRATA. VEDERE I
DISEGNI CIVILI PER IL PROSIEGUO.
2 CONDENSATE DRAIN CONNECTION TO CRAC UNIT. PROVIDE AN OVERFLOW
SHUTOFF SWITCH ON THE CONDENSATE DRAIN PAN. / COLLEGAMENTO DELLO
SCARICO DELLA CONDENSA ALL'IMPIANTO CRAC. PREVEDERE UN
INTERRUTTORE DI SICUREZZA DEL TROPPOPIENO SULLA VASCHETTA DI
RACCOLTA DELLA CONDENSA.
3 EXISTING DOWNSPOUT TO BE DEMOLISHED. EXISTING GUTTER OUTLET TO BE
CONNECTED TO A HORIZONTAL STORM DRAINAGE PIPE BELOW THE ROOF AND
ABOVE THE CEILING. / PLUVIALE ESISTENTE DA DEMOLIRE. SCARICO DI GRONDA
ESISTENTE DA COLLEGARE AD UN TUBO DI SCARICO ORIZZONTALE DELLE
ACQUE PLUVIALI SOTTO IL TETTO E SOPRA IL SOFFITTO.
4 PROVIDE CONNECTION TO ROOF DRAIN (PRIMARY DRAIN). / FORNIRE
COLLEGAMENTO ALLO SCARICO DEL TETTO (SCARICO PRIMARIO).
5 PROVIDE CONNECTION TO ROOF DRAIN (SECONDARY/EMERGENCY DRAIN). /
FORNIRE COLLEGAMENTO ALLO SCARICO DEL TETTO (SCARICO DI
EMERGENZA/SECONDARIO).
6 NEW DOWNSPOUT 200 MM FROM CEILING TO UNDERGROUND NETWORK. /
NUOVO PLUVIALE DA 200 MM DA SOFFITTO A RETE INTERRATA.
7 EXISTING DOWNSPOUT TO BE CONNECTED TO NEW STORM DRAINAGE
MANHOLE. / PLUVIALE ESISTENTE DA COLLEGARE A NUOVO POZZETTO DI
SCARICO ACQUE PLUVIALI.
8 NEW SCUPPER AT FAÇADE FOR SECONDARY (EMERGENCY) STORM DRAINAGE
SYSTEM AND NEW DOWNSPOUT 200 MM WITH FREE DISCHARGE TO THE
GROUND. / NUOVO OMBRINALE IN FACCIATA PER SISTEMA DI DRENAGGIO
SECONDARIO (EMERGENZA) DELLE ACQUE PLUVIALI E NUOVO PLUVIALE DA 200
MM CON SCARICO LIBERO A TERRA.
9 REFER CIVIL DRAWING CU101 FOR CONTINUATION. INVERT LEVEL AT 1.5 M
FROM THE FAÇADE: -800 MM FROM MECHANICAL ROOM FFL. / FARE
RIFERIMENTO AI DISEGNI CIVILI CU101 PER IL PROSIEGUO. LIVELLO INVERTITO A
1,5 M DALLA FACCIATA: -800 MM DA AMBIENTE MECCANICO FFL .
10 PROVIDE FLOOR CLEANOUT. REFER TO DETAIL B1/CU502 FOR FURTHER
INFORMATION. / PROVVEDERE ALLA PULIZIA DEL PAVIMENTO. PER ULTERIORI
INFORMAZIONI FARE RIFERIMENTO AL DETTAGLIO B1/CU502.
11 PROVIDE RADON VENT PIPE FROM CRAWL SPACE TO ROOF. SEE DETAIL C3/P-502
FOR TYPICAL VENT THROUGH ROOF (TYP). THE CRAWL SPACE MUST BE
CONNECTED TO THE EXTERIOR BY ROUND GRILLES AT THE FACADE. SEE SHEET
A-211 AND A-212 WITHIN ARCHITECTURAL PACKAGE FOR GRILLES LOCATIONS
AND SHEET A-514 FOR SECTION DETAIL. / FORNIRE UN TUBO DI SFIATO DEL
RADON DALL'INTERCAPEDINE AL TETTO. VEDERE IL DETTAGLIO C3/P-502 PER
VENTILAZIONE TIPICA ATTRAVERSO IL TETTO (TIPO). L'INTERCAPEDINE DEVE
ESSERE COLLEGATA ALL'ESTERNO DA GRIGLIE ROTONDE IN FACCIATA. VEDERE
SCHEDA A-211 AND A-212 ALL'INTERNO DEL PACCHETTO ARCHITETTURALE PER
LE UBICAZIONI DELLE GRIGLIE E LA SCHEDA A-514 PER I DETTAGLI DELLA
SEZIONE.
12 PROVIDE CONDENSING WATER CONNECTION TO THE WASTE WATER NETWORK
THROUGH AN AIR GAP AND AN AIR TRAP BEFORE THE CONNECTION TO THE
CONDENSATE DRAIN PAN OF CSAC UNIT. / FORNIRE IL COLLEGAMENTO
DELL'ACQUA DI CONDENSAZIONE ALLA RETE DELLE ACQUE REFLUE
ATTRAVERSO UN'INTERCAPEDINE D'ARIA E UN SIFONE PRIMA DEL
COLLEGAMENTO ALLA BACINELLA DI RACCOLTA DELLA CONDENSA DELL'UNITÀ
CSAC.
13 INVERT LEVEL -520 FROM FINISH FLOOR LEVEL OF THE SIMULATOR BAY /
LIVELLO DI INVERSIONE -520 DAL LIVELLO DEL PAVIMENTO FINALE DELL'AREA DI
SIMULAZIONE
14 INVERT LEVEL -1.450 FROM FINISH FLOOR LEVEL OF THE MECHANICAL ROOM /
LIVELLO DI INVERSIONE -1,450 DAL LIVELLO DEL PAVIMENTO FINALE DEL LOCALE
MECCANICO
15 DRAINAGE CONNECTION TO BUFFER VESSELS. / COLLEGAMENTO DI
DRENAGGIO A SERBATOI TAMPONE.
ROOF FLOOR - DOWN
B3 P-301
B3 P-301
B-01
WS-01
40 HW
40 HW
20 NG
20 HW
40 CW
20 CW
50 CW
EV-01
DWT-02
MECHANICAL /
MECCANICA
-150
TOP OF ROOF SLAB
CC
ROOF FLOOR - DOWN
C
B1 P-301
B1 P-301
WS-01EV-01
EV-02
DWT-01DWT-02
20 NG
20 HW40 CW
20 HWR
20 HW
25 SWS
26 SWR
MECHANICAL /
MECCANICA
-150
TOP OF ROOF SLAB
0 421 3 5
SCALE: 1:50SCALE:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:1
PL
UM
, S
EC
TI
O
N , M
EC
H
AN
IC
AL
R
O O
M A
N D
B O
IL
ER
R O
O M
RFAJFMJCB
P-301
IS
/S
C, S
EZ
IO
N E, C
EN
TR
AL
E
TE
R M
IC
A
E
LO
C
AL
E C
AL
DA
IA
14125506
SCE
SCALE: 1 : 50B1
PLUM, SECTION, MECHANICAL ROOM AND BOILER ROOM 1
IMPIANTO IDRAULICO, SEZIONE, LOCALE TECNICO E LOCALE CALDAIA 1
SCALE: 1 : 50B3
PLUM, SECTION, MECHANICAL ROOM AND BOILER ROOM 2
IMPIANTO IDRAULICO, SEZIONE, LOCALE TECNICO E LOCALE CALDAIA 1
SHEET KEYNOTES / NOTE CHIAVE
1 REFER TO DRAWING P-602 SCHEMATIC FOR ADDITIONAL INFORMATION. / PER
ULTERIORI INFORMAZIONI CONSULTARE IL DISEGNO P-602.
2 SOLAR HEATING SYSTEM. COLD WATER FEED. / IMPIANTO SOLARE TERMICO.
IMMISSIONE ACQUA FREDDA.
3 DOMESTIC HOT WATER SYSTEM. COLD WATER FEED. / IMPIANTO DI ACQUA CALDA
SANITARIA. IMMISSIONE ACQUA FREDDA.
4 STAINLESS STEEL ACCESS COVER. / COPERCHIO DI ACCESSO IN ACCIAIO INOX.
5 COLD WATER SUPPLY TO NEW BUILDING. FOR CONTINUATION SEE DWG No PL101.
/ ALIMENTAZIONE DELL'ACQUA FREDDA AL NUOVO EDIFICIO. PER IL PROSIEGUO
VEDERE DIS N. PL101.
B-01
B
C
25 CW
20 NG
20 HW
40 HW
40 HW
EV-01
DWT-01
WS-01
DWT-02
40 HW
20 HW
26 SWS
26 SWR
20 CW
32 CW
32 CW
EV-02
WC-01
D
C
20 CW
15 HW
15 CW
15 HW
15 CW
LV-01
20 CW
WC-1
D
C
20 CW
40 CW
26 SWR
26 SWS
15 HW
15 HW
LV-01
15 CW
SCALE:SCALE:
0.40 1.20.8 1.6
1:20
20.2
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:3
PL
UM
, F
LO
O R
P
LA
N, P
LU
M
B
IN
G , E
N
LA
R G
ED
P
LA
N
RFAJFMJCB
PL401
IS
/S
C, ID
R
IC
O -S
AN
IT
AR
IO
, P
IA
NT
A
D I D
ET
TA
G
LI
O
14125507
SCE
SCALE: 1 : 20A1
PLUMBING, FLOOR PLAN, GROUND FLOOR - BOILER ROOM
IMPIANTO IDRAULICO, PLANIMETRIA, PIANO TERRA - LOCALE CALDAIA
SCALE: 1 : 20C1
PLUMBING, FLOOR PLAN, GROUND FLOOR - MALE & FEMALE LATRINE
IMPIANTO IDRAULICO, PLANIMETRIA, PIANO TERRA - BAGNI UOMINI E DONNE
SCALE: 1 : 20C3
PLUMBING, FLOOR PLAN, GROUND FLOOR - JANITOR / IMPIANTO IDRAULICO,
PLANIMETRIA, PIANO TERRA - PERSONALE ADDETTO ALLA SORVEGLIANZA
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET P-001 FOR PLUMBING GENERAL NOTES, ABBREVIATIONS AND SYMBOLS / VEDERE
FOGLIO P-001 PER LE NOTE GENERALI, LE ABBREVIAZIONI E I SIMBOLI IDRAULICI
2 SEE SHEETS P-601 AND P-602 FOR EQUIPMENT SCHEDULES / VEDERE I FOGLI P-601 E P-602 PER LE
SCHEDE DELLE ATTREZZATURE.
3 REFER TO CIVIL DRAWING CU101 FOR EXACT LOCATIONS OF WATER SUPPLY, WASTE WATER AND
NATURAL GAS CONNECTION CONNECTIONS / FARE RIFERIMENTO AL DISEGNO CIVILE CU101 PER LA POSIZIONE ESATTA DEGLI ALLACCIAMENTI PER L'APPROVVIGIONAMENTO IDRICO, LE ACQUE
REFLUE E IL GAS NATURALE.
4 SOLAR PANELS PRIMARY CIRCUIT PIPING TO BE CONNECTED TO EXISTING FLAT SOLAR PANELS ON THE ROOF OF BUILDING 7300 / LE TUBAZIONI DEL CIRCUITO PRIMARIO DEI PANNELLI SOLARI
DEVONO ESSERE COLLEGATE AI PANNELLI SOLARI PIANI SUL TETTO DELL'EDIFICIO 7300.
5 SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION ABOUT MECHANICAL EQUIPMENT
LAYOUT / VEDERE I DISEGNI MECCANICI PER ULTERIORI INFORMAZIONI SULLA DISPOSIZIONE
DELLE APPARECCHIATURE MECCANICHE.
SHEET KEYNOTES / NOTE CHIAVE
1 REFER TO DRAWING P-602 SCHEMATIC FOR ADDITIONAL INFORMATION. / PER
ULTERIORI INFORMAZIONI CONSULTARE IL DISEGNO P-602.
2 COLD WATER SUPPLY TO NEW BUILDING. FOR CONTINUATION SEE DWG No PL101.
/ ALIMENTAZIONE DELL'ACQUA FREDDA AL NUOVO EDIFICIO. PER IL PROSIEGUO
VEDERE DIS N. PL101.
3 PROVIDE NATURAL GAS METER AND PRESSURE REGULATOR WITH SOLENOID
SHUT-OFF VALVE CONNECTED TO A GAS SENSOR WITHIN THE BOILER ROOM. /
PREVEDERE IL CONTATORE DI GAS NATURALE E REGOLATORE DI PRESSIONE
CON ELETTROVALVOLA DI INTERCETTAZIONE COLLEGATO A UN SENSORE DI GAS
ALL'INTERNO DEL LOCALE CALDAIA.
4 SOLAR HEATING SYSTEM. COLD WATER FEED. / IMPIANTO SOLARE TERMICO.
IMMISSIONE ACQUA FREDDA.
5 DOMESTIC HOT WATER SYSTEM. COLD WATER FEED. / IMPIANTO DI ACQUA CALDA
SANITARIA. IMMISSIONE ACQUA FREDDA.
6 UNDERGROUND NATURAL GAS PIPING. SEE CIVIL DRAWING CU101 FOR
CONTINUATION. / TUBAZIONI SOTTERRANEE DEL GAS NATURALE. VEDERE
DISEGNO CIVILE CU101 PER IL PROSIEGUO.
D
C
100SAN
50 SAN
LV-01
WCO-1
FD-1
50 V
50 V
50 SAN
100 SAN
100 SAN
50 SAN
100 SAN
D
C
100 SAN 100 SAN
80 SAN
65 SAN
LV-01 2
WCO-1
WC-1
LV-01
B
C
25 CD
25 CD
DWT-01
WS-01
EV-02
FD-1
B-01
EV-01
DWT-02
100 SAN
SCALE:SCALE:
0.40 1.20.8 1.6
1:20
20.2
PLAN
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
GRAPHIC SCALE
SCALA GRAFICA
NORTH
NORD AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:4
PL
UM
, F
LO
O R
P
LA
N, S
AN
IT
AR
Y, E N
LA
R
G
ED
P
LA
N
RFAJFMJCB
PW401
IS
/S
C, P
IA
N
TA
D
EL
P
AV
IM
EN
TO
, S C
AR
IC
HI
, P
IA
NT
A D
I D
ET
TA
G
LI
O
14125508
SCE
GENERAL SHEET NOTES / NOTE GENERALI
1 SEE SHEET P-001 FOR PLUMBING GENERAL NOTES, ABBREVIATIONS AND SYMBOLS / VEDERE
FOGLIO P-001 PER LE NOTE GENERALI, LE ABBREVIAZIONI E I SIMBOLI IDRAULICI.
2 SEE SHEETS P-601 AND P-602 FOR EQUIPMENT SCHEDULES / VEDERE I FOGLI P-601 E P-602 PER LE
SCHEDE DELLE ATTREZZATURE.
3 REFER TO CIVIL DRAWING CU101 FOR EXACT LOCATIONS OF WATER SUPPLY, WASTE WATER AND
NATURAL GAS CONNECTION CONNECTIONS / FARE RIFERIMENTO AL DISEGNO CIVILE CU101 PER LA POSIZIONE ESATTA DEGLI ALLACCIAMENTI PER L'APPROVVIGIONAMENTO IDRICO, LE ACQUE
REFLUE E IL GAS NATURALE.
SCALE: 1 : 20C3
SANITARY, FLOOR PLAN, GROUND FLOOR - JANITOR / IMPIANTO SANITARIO,
PLANIMETRIA, PIANO TERRA - PERSONALE ADDETTO ALLA SORVEGLIANZA
SCALE: 1 : 20C1
SANITARY, FLOOR PLAN, GROUND FLOOR - MALE & FEMALE LATRINE
IMPIANTO SANITARIO, PLANIMETRIA, PIANO TERRA - BAGNI UOMINI E DONNE
SCALE: 1 : 20A1
SANITARY, FLOOR PLAN, GROUND FLOOR - BOILER ROOM
IMPIANTO SANITARIO, PLANIMETRIA, PIANO TERRA - LOCALE CALDAIA
SHEET KEYNOTES / NOTE CHIAVE
1 STAINLESS STEEL ACCESS COVER. / COPERCHIO DI ACCESSO IN ACCIAIO INOX.
2 PROVIDE VENTILATION TROUGH ROOF. / PREVEDERE VENTILAZIONE DELLA RETE
DI SCARICO IN COPERTURA.
VARIES / VARIE
7M
M
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:1
PL
UM
, P
LU
M
BI
N G
A N
D W
AS
TE
W
AT
ER
D
ET
AI
LS
I
RFAJFMJCB
P-501
IS
/S
C, D
ET
TA
G
LI
ID
R
IC
O
-S
AN
IT
AR
IO
E
S C
AR
IC
H I I
14125509
SCE
SCALE: NTS
WALL CLEANOUT DETAIL
DETTAGLIO SPURGO A PARETEC1 SCALE: NTS
FLOOR SLAB PIPE PENETRATION DETAIL
DETTAGLIO PENETRAZIONE TUBO NELLA LASTRA DEL PAVIMENTOC3
SCALE: NTS
BACKFLOW PREVENTER & FLOW METER
DISPOSITIVO ANTIREFLUSSO E CONTATORE FLUSSOA2
SHEET KEYNOTES / NOTE CHIAVE
1 STAINLESS STEEL ACCESS COVER. / COPERCHIO DI ACCESSO IN ACCIAIO
INOX.
2 SANITARY PIPE. / TUBO SANITARIO.
3 FINISHED FLOOR. / PAVIMENTO FINITO.
4 WATERPROOF SLEEVE. / MANICOTTO IMPERMEABILE.
5 CLEANOUT FITTING. / RACCORDO DI SPURGO.
6 PVC PIPING. / TUBATURA IN PVC.
7 BALL VALVE (TYP). / VALVOLA A SFERA (TIP.).
8 REDUCED PRESSURE BACKFLOW PREVENTER (RPBP). / DISPOSITIVO
ANTIRIFLUSSO A PRESSIONE RIDOTTA (RPBP).
9 WATER METER. / CONTATORE ACQUA.
10 PRESSURE REDUCING VALVE. / VALVOLA DI RIDUZIONE DELLA PRESSIONE.
11 FILTER TYPE "Y". / FILTRO TIPO “Y”.
12 STEEL PIPE. / TUBO D'ACCIAIO.
13 PIPE CLAMP. / FASCETTA FISSAGGIO DEL TUBO.
14 PIPE. / TUBO.
15 CAULK WATER TIGHT. / STUCCO A TENUTA.
16 SCH 40 STEEL SLEEVE CAST IN FLOOR. / MANICOTTO IN ACCIAIO INOX
ANNEGATO NEL PAVIMENTO SCH 40.
17 SEALANT. / SIGILLANTE.
18 TOP OF CONCRETE FLOOR. / PARTE SUPERIORE DEL PAVIMENTO IN
CALCESTRUZZO.
19 BACK FILL MATERIAL. / MATERIALE DI RIEMPIMENTO.
CL
CL1 2 3
0m m
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:2
PL
UM
, P
LU
M
BI
N G
A N
D W
AS
TE
W
AT
ER
D
ET
AI
LS
II
RFAJFMJCB
P-502
IS
/S
C, D
ET
TA
G
LI
ID
R
IC
O
-S
AN
IT
AR
IO
E
S C
AR
IC
H I I
I
14125510
SCE
SCALE: NTS
FLOOR DRAIN DETAIL
DETTAGLIO SCARICO A PAVIMENTOC1 SCALE: NTS
SANITARY VENT THROUGH ROOF DETAIL
DETTAGLIO VENTILAZIONE SCARICO IN COPERTURAC3
SCALE: NTS
GAS METER_REGULATOR WITH PLUSE INITIATOR DETAIL
CONTATORE GAS_DETTAGLIO REGOLATORE CON GENERATORE DI IMPULSIA1
SHEET KEYNOTES / NOTE CHIAVE
1 FINISHED FLOOR. / PAVIMENTO FINITO.
2 ADJUSTABLE HOUSING. / ALLOGGIAMENTO REGOLABILE.
3 REMOVABLE STRAINER. / FILTRO REMOVIBILE.
4 INSTALL TRAP SEAL FLOOR DRAIN. / INSTALLARE SCARICO A PAVIMENTO
CON SIFONE.
5 CONCRETE FLOOR SLAB. / LASTRA DEL PAVIMENTO IN CALCESTRUZZO.
6 COLLAR. / FASCETTA.
7 VENT STACK. / TERMINALE DI SFIATO.
8 ROOF MEMBRANE. / MEMBRANA PER TETTO.
9 FIRESTOP OPENING BETWEEN PIPE SLEEVE WITH FIRE RATED
SEALANT. / APERTURA TAGLIAFUOCO TRA MANICOTTI DEI TUBI CON
SIGILLANTE RESISTENTE AL FUOCO.
10 PRE-MOLDED BOOT FLASHING WITH STAINLESS STEEL CLAMP
COMPATIBLE WITH SINGLE PLY ROOFING SYSTEM. / GUARNIZIONE PER TUBO
PREFORMATA CON FASCETTA IN ACCIAIO INOX
COMPATIBILE CON TETTO A MEMBRANA SINGOLA.
11 PIPE SLEEVE BY ROOFING CONTRACTOR. / MANICOTTO FORNITO
DALL'APPALTATORE INCARICATO DEL TETTO.
12 ROOF DECK. / TETTO.
13 POLYETHYLENE GAS PIPING. / TUBATURA GAS IN POLIETILENE.
14 POLYETHYLENE TO STEEL ANODE LESS TRANSITION RISER. / COLONNA DI
TRANSIZIONE SENZA ANODO DA POLIETILENE AD ACCIAIO.
15 INSULATING SLEEVE. / MANICOTTO ISOLANTE.
16 LINE SHIELD ADAPTER COUPLING. / RACCORDO ADATTATORE
SCHERMATURA.
17 GAS PLUG VALVE. / VALVOLA CHIUSURA DEL GAS.
18 GAS VENT. / SFIATO GAS.
19 PRESSURE REGULATOR 0.4BAR INLET PRESSURE 0.04 BAR OUTLET
PRESSURE. / REGOLATORE DI PRESSIONE 0,4BAR PRESSIONE IN INGRESSO
0,04BAR PRESSIONE IN USCITA.
20 BLACK STEEL GAS PIPING (PAINT ALL EXPOSED PIPING). / TUBATURA GAS IN
ACCIAIO NERO (VERNICIARE TUTTE LE TUBATURE ESPOSTE).
21 GAS METER MUST BE INSTALLED IN A LOCKED STAINLESS STEEL
CABINET. / IL CONTATORE DEL GAS DEV'ESSERE INSTALLATO IN UN
ARMADIETTO CHIUSO IN ACCIAIO INOX.
22 METER INDICATING ASSEMBLY WITH INTEGRAL TRANSMITTER TO.
PROVIDE A PULSED OUTPUT OF THE METER READINGS COMPATIBLE
WITH LOCAL GAS AUTHORITY STANDARDS. / UNITÀ CONTATORE CON
TRASMETTITORE INTEGRALE.
FORNIRE UN SEGNALE IN USCITA A IMPULSI PER LE LETTURE DEL
CONTATORE COMPATIBILE CON LE INDICAZIONI DELL’AUTORITÀ LOCALE DEL
GAS.
23 PLUG VALVE (TYP). / VALVOLA DI CHIUSURA (TIP.).
24 DIELECTRIC UNION (TYP). / UNIONE DIELETTRICA (TIP.).
25 GAS METER LOCATED OUTSIDE OF BUILDING. / CONTATORE DEL GAS
POSIZIONATO FUORI DALL'EDIFICIO.
26 FINISHED GRADE. / LIVELLO FINITO.
27 610 X 610 X 50MM THICK CONCRETE PAD. / BASE IN CALCESTRUZZO DA 610
X 610 X 50mm DI SPESSORE.
28 TAPE TRACER WIRE TO CONDUIT AT GROUND LEVEL. / NASTRO
TRACCIANTE A CONDOTTA A LIVELLO DEL TERRENO.
29 GALVANIZED CONDUIT CASING. / INVOLUCRO CONDOTTA ZINCATO.
30 #12 GAGE TRACER WIRE. / FILO TRACCIANTE N.12.
PRIMARY CIRCUIT INLET /
INGRESSO CIRCUITO
PRIMARIO
PRIMARY CIRCUIT
OUTLET / USCITA
CIRCUITO PRIMARIO
COLD WATER INLET /
INGRESSO ACQUA
FREDDA
HOT WATER OUTLET /
USCITA ACQUA CALDA
HOT WATER RETURN /
RITORNO ACQUA CALDA
DWT-2
DOMESTIC HOT WATER
(BOILER) / ACQUA
CALDA SANITARIA
(CALDAIA)
BOILER ROOM /
LOCALE CALDAIA 300 650 x 1499 11 60 1" 1" 1 1/4" 1 1/4" 1 1/4" C 1,2
DWT-1
DOMESTIC HOT WATER
(SOLAR) / ACQUA
CALDA SANITARIA
(SOLARE)
BOILER ROOM /
LOCALE CALDAIA 800 900 x 2135 11 60 2" 2" 1 1/4" 1 1/2" 1 1/4" B 1,2
2. INSTALL IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS / INSTALLARE SECONDO I REQUISITI DEL PRODUTTORE
DOMESTIC HOT WATER TANKS SCHEDULE / SCHEDA SERBATOI ACQUA CALDA DOMESTICA
NOTES / NOTE:
1. FLOOR MOUNTED UNIT / APPARECCHIO A TERRA
MARK / NOME SERVICE /
MANUTENZIONE
LOCATION / POSIZIONE STORAGE CAPACITY / CAPACITÀ DI
ACCUMULO (I)
TANK SIZE Ø x HEIGHT / DIMENSIONI DEL SERBATOIO Ø x
ALTEZZA (mm)
DCW INLET TEMP / TEMP. DI
INGRESSO DCW (ºC)
STORAGE TEMP / TEMP. DI
ACCUMULO (ºC)
CONNECTIONS / ATTACCHI
ENERGY EFFICIENCY, DHW /
EFFICIENZA ENERGETICA, DHW REMARKS /
OSSERVAZIONI
FD-1
FLOOR DRAIN 125 MM ROUND BRONCE TOP, CAST IRON BODY, 100 MM DRAIN CONNECTION,
INTEGRAL TRAP GUARD DEVICE / COPERCHIO IN BRONZO ROTONDO 125 MM DELLO
SCARICO A TERRA, CORPO IN GHISA, ATTACCO DELLO SCARICO 100 MM, DISPOSITIVO DI
PROTEZIONE DEL SIFONE INTEGRATO
- - 100 40
WCO-1 WALL CLEAN OUT, CAST IRON BODY, STAINLESS STEEL COVER / SCARICO A PARETE,
CORPO IN GHISA, COPERCHIO IN ACCIAIO INOX - - - -
EWC-1 FULL STAINTLESS STEEL WATER COOLER / REFRIGERATORE D'ACQUA IN ACCIAIO
INOSSIDABILE 15 - 40 32 -
S-1
STAINLESS STEEL FLOOR MOUNTED MOP SINK WITH STAINLESS STEEL GRATE IN JANITOR'S
ROOM / LAVATOIO A TERRA IN ACCIAIO INOX CON STRIZZATOIO IN ACCIAIO INOX NELLA
STANZA DEGLI ADDETTI ALLE PULIZIE 600mmx600mm 15 15 40 32 3,4
WC-1
WATER CLOSET FLOOR MOUNTED, FLOOR DISCHARGE, VITREOUS CHINA, DUAL FLUSH
MANUAL FLUSHOMETER / WC A TERRA, SCARICO A TERRA, VITREOUS CHINA,
FLUSSOMETRO MANUALE A DOPPIO SCARICO 655mmx355mm
25 - 100 50 5 1,3,4
LV-1 LAVATORY COUNTERTOP / RIPIANO BAGNO 500mmx800mm 15 15 40 32 2.25 1,2,3,4
PLUMBING FIXTURE SCHEDULE / SCHEDA DEGLI APPARECCHI PER L'IMPIANTO IDRAULICO
MARK / NOME FIXTURE DESCRIPTION / DESCRIZIONE APPARECCHIO
COLD WATER / ACQUA
FREDDA (mm)
HOT WATER / ACQUA CALDA
(mm) WASTE / SCARICO (mm) VENT / SFIATO (mm) FLOW RATE / PORTATA (F.U.)
REMARKS / OSSERVAZIONI
3. FIXTURE MUST HAVE AN EUROPEAN WATER LABEL WITH A WATER EFFICIENCY RATING OR PERFORMANCE EQUAL OR BETTER THAN THE MINIMUM REQUIREMENTS OF A SAME TYPE OF FIXTURE WITH A WATERSENSE LABEL / GLI APPARECCHI DEVONO AVERE L'ETICHETTA EUROPEA WATER LABEL CON IL RELATIVO GRADO DI EFFICIENZA IDRICA O PRESTAZIONI PARI O SUPERIORI AI REQUISITI MINIMI DELLO STESSO TIPO DI APPARECCHIO CON ETICHETTA WATERSENSE
4. SIZES SHOWN ABOVE ARE FOR ONE FIXTURE ONLY. ANY EXCEPTIONS ARE SHOWN ON DRAWINGS./ LE MISURE SOPRA INDICATE SI RIFERISCONO A UN SOLO APPARECCHIO. EVENTUALI ECCEZIONI SONO INDICATE SUI DISEGNI
NOTES / NOTE:
1. REFER TO ARCHITECTURAL PLANS FOR ELEVATIONS / FARE RIFERIMENTO AI PIANI ARCHITETTONICI PER I PROSPETTI
2. PROVIDE ADJUSTIBLE BRACKETS AND ACCESORIES FOR WALL MOUNT INSTALLATION./ PREVEDERE STAFFE REGOLABILI E ACCESSORI PER L'INSTALLAZIONE A PARETE
0.25
INLET / INGRESSO OUTLET / USCITA
TMV-1 MECHANICAL ROOM / LOCALE
TECNICO 8 112 11 60 45 0.5 3/4" 3/4"
TEMPERATURE MIXING VALVE SCHEDULE / SCHEDA DELLE VALVOLE MISCELATRICI
NOTES / NOTE
MARK / NOME LOCATION / POSIZIONE MIN. FLOW RATE / PORTATA MIN. (LPM) MAX. FLOW RATE / PORTATA MAX. (LPM) COLD WATER TEMPERATURE / TEMPERATURA
ACQUA FREDDA (ºC) HOT WATER TEMPERATURE / TEMPERATURA ACQUA
CALDA (ºC)
CIRCULATION WATER TEMPERATURE / TEMPERATURA
ACQUA DI RICIRCOLO (ºC) PRESSURE DROP / PERDITA DI CARICO (Bar)
CONNECTIONS / ATTACCHI
REMARKS /
OSSERVAZIONI
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:2
PL
UM
, D
IA
G R
AM
, S
CH
ED
U
LE
S
RFAJFMJCB
P-601
IS
/S
C, D
IA
G
R
AM
M I, AB
AC
HI
14125511
SCE
MARK / NOME LOCATION / POSIZIONE SYSTEM / SISTEMA TYPE / TIPO SIZE / DIMENSIONI MAXIMUM ALLOWABLE PRESSURE DROP / PERDITA DI CARICO MASSIMA CONSENTITA (kPA)
BFP-1
MECHANICAL ROOM EXISTING
BUILDING / LOCALE TECNICO EDIFICIO
ESISTENTE
POTABLE WATER / ACQUA POTABILE REDUCED PRESSURE ZONE / ZONA A
PRESSIONE RIDOTTA
- 100
3. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND REQUIREMENTS AT A MINIMUM OF 900 MM ABOVE FINISHED GROUND LEVEL / INSTALLARE SECONDO LE ISTRUZIONI E I REQUISITI DEL PRODUTTORE A
UN'ALTEZZA MINIMA DI 900 MM DA TERRA.
2. INSTALLED BACKFLOW PREVENTER TO BE TESTED AND CERTIFIED AT THE COMPLETION OF THE PROJECT / LA VALVOLA ANTIRIFLUSSO INSTALLATA DEVE ESSERE TESTATA E CERTIFICATA AL TERMINE DEL PROGETTO.
BACKFLOW PREVENTER SCHEDULE / SCHEDA DELLA VALVOLA ANTIRIFLUSSO
NOTES / NOTE:
1. PROVIDE FIXED AIR GAP DISCHARGE TO THE GROUND / PREVEDERE UN'INTERCAPEDINE D'ARIA FISSA DELLO SCARICO A TERRA.
MARK / NOME SERVICE / MANUTENZIONE LOCATION / POSIZIONE FLOW RATE / PORTATA (l/min) PRESSURE / PRESSIONE (kPa)
POWER CONSUMPTION / CONSUMO
ENERGETICO
(kW) VOLT(V)/PHASE/FRECUENCY(Hz) /
VOLT(V)/FASE/FREQUENZA(Hz) REMARKS / OSSERVAZIONI
P-04 SOLAR PRIMARY CIRCUIT PUMP / POMPA DEL CIRCUITO
PRIMARIO SOLARE BOILER ROOM / LOCALE CALDAIA 10.8 19.65 0.05 230 / 1 / 50 1
PUMP SCHEDULE / SCHEDA POMPE
NOTES / NOTE: 1. RECIRCULATING PUMPS WILL BE CONTROLLED VIA AN AQUASTAT AND A BUILDING OFF-HOURS TIMER. PUMPS WILL BE DEENERGIZED DURING NON-PEAK HOURS / LE POMPE DI RICIRCOLO SARANNO CONTROLLATE DA UN AQUASTAT E DA UN TIMER. LE POMPE SARANNO DISALIMENTATE DURANTE LE ORE NON DI PUNTA.
EV-01 MECHANICAL ROOM / LOCALE
TECNICO
DOMESTIC HOT WATER / ACQUA CALDA
SANITARIA
14.13 50
MARK / NOME LOCATION / POSIZIONE SYSTEM / IMPIANTO ACCEPTANCE VOLUME / VOLUME AMMESSO (L)
TOTAL VOLUME / VOLUME TOTALE
(L) REMARKS /
OSSERVAZIONI
EV-02 MECHANICAL ROOM / LOCALE
TECNICO
SOLAR WATER PRIMARY CIRCUIT /
CIRCUITO PRIMARIO DELL'ACQUA
RISCALDATA DAL SOLE
1.46 5
EXPANSION VESSEL SCHEDULE / SCHEDA VASO DI ESPANSIONE
NOTES / NOTE:
WC-01 BOILER ROOM / LOCALE CALDAIA COLD WATER SYSTEM / IMPIANTO
ACQUA FREDDA
230 / 1 / 50
MARK / NOME LOCATION / POSIZIONE DESCRIPTION /
DESCRIZIONE
INLET PIPE SIZE / DIMENSIONI DEL TUBO DI
INGRESSO (mm)
FLOW RATE / PORTATA
(L/h) PRESSURE DROP / PERDITA DI CARICO (kPA)
DIMENSIONS / DIMENSIONI
(mm)
VOLTS(V)/PH/FRECUENCY(Hz) / VOLT(V)/FASE/FREQUENZA(Hz)
NOTES /
NOTE
WATER CONDITIONING SCHEDULE / SCHEDA CONDIZIONAMENTO DELL'ACQUA
NOTES / NOTE:
54 1.7 287x287x258
1. PROVIDE WALL MOUNTED EQUIPMENT. / PREVEDERE APPARECCHIATURE MONTATE A PARETE.
- 1
WS-01 BOILER ROOM / LOCALE
CALDAIA
COMPACT AUTOMATIC
WATER SOFTENER /
ADDOLCITORE
AUTOMATICO COMPATTO
230 / 1 / 50 1
MARK / NOME LOCATION / POSIZIONE DESCRIPTION /
DESCRIZIONE
INLET PIPE SIZE / DIMENSIONI DEL TUBO
DI INGRESSO (mm)
MAX FLOW RATE / PORTATA
MASSIMA
(L/h)
PRESSURE RANGE / GAMMA DI
PRESSIONE (bar)
RESINS VOLUME / VOLUME
DELLE RESINE
(L)
CYCLIC CAPACITY /
CAPACITA' CICLICA
(m3/ºF) DIMENSIONS / DIMENSIONI (mm) VOLTS(V)/PH/FRECUENCY(Hz) /
VOLT(V)/FASE/FREQUENZA(Hz)
NOTES /
NOTE
WATER SOFTENER SYSTEM SCHEDULE / SCHEDA DEL SISTEMA DI ADDOLCIMENTO DELL'ACQUA
NOTES / NOTE: 1. FLOOR MOUNTED UNIT. / APPARECCHIO A TERRA.
1730 x 310 x 18808871131.7-8.3720040
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:2
PL
UM
, D
IA
G R
AM
, S
CH
ED
U
LE
S
RFAJFMJCB
P-602
IS
/S
C, D
IA
G
R
AM
M I, AB
AC
HI
14125512
SCE
26 SWS
26 SWR
EXPANSION
VESSEL
EV-02 /
VASO DI
ESPANSIONE
EV-02
EXPANSION
VESSEL /
VASO DI
ESPANSIONE DOMESTIC
WATER
TANK
800L
(SOLAR) /
SERBATOIO ACQUA
DOMESTICA 800L
(SOLARE)
DOMESTIC
WATER
TANK
300L
(BOILER) /
SERBATOIO ACQUA
DOMESTICA 300L
(CALDAIA)
NC 20 HW
NC
WATER
SOFTENING
SYSTEM /
ADDOLCITORE
DELL'ACQUA
32 DHW
WATER
CONDITIONER /
CONDIZIONATORE
DELL’ACQUA
WC-01
50 CW MANIFOLD /
COLLETTORE 50 CW
MANIFOLD /
COLLETTORE
M M
CW
EXTERNAL
MECHANICAL
WALL IN
EXISTING
BUILDING /
PARETE MECCANICA
ESTERNA IN EDIFICIO
ESISTENTE
40 CW
26 SWS
WS-01
DWT-01 DWT-02
EV-01
TMV-1
P-04
20 HW 32 HW
20 CW
25 CW
40 CW
20 CW
32 CW
25 CW
AV
TP
TP
CV
HEAD
SET / TESTE
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
1684614
11/07/22
Richard Tyler, PE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
100 AIRSIDE DRIVE
MOON TOWNSHIP, PA 15108
AV
IA
N O
A
IR
B
AS
E
AV
IA
N
O , I
TA
LY
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FI
LE
N
AM
E:
PL
OT
TE
D:
LMM / BTN
FIRE PROTECTION DPS
F2
AD
AL
C O
M B A
T R
ES
C
U E
H
EL
IC
O
PT
ER
SI
M
U
LA
T O R
F
AC
IL
IT
Y (P
2)
N A
VA
L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
YS
TE
M S
C O
M M
A N
D
N O
R
FO
LK
, V
A A
TL
AN
TI
C
D E
SI
G
N A
N D
C O
N S
TR
U
C
TI
O N
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
AT
LA
NT
IC
DRAWFORM REVISION: 12 APRIL 2018
ISSUED FOR CONSTRUCTION – 10 MAR 2023
AS NOTED
BI
M
P
Si m ul at or
/B
LD
G P
2-
4-
P.
rv t
/0 3/
2:
:2
PL
UM
, D
IA
G
RA
M , S
CH
EM
AT
IC
S
RFAJFMJCB
P-603
IS
/S
C, D
IA
G
R
AM
M I, ID
RI
CO
-S
AN
IT
AR
IO
S C
H
EM
AT
IC
I
14125513
SCE
SCALE: NTS
PLUMBING SYSTEM - SCHEMATIC
IMPIANTO IDRAULICO - SCHEMIA1
SHEET KEYNOTES / NOTE CHIAVE
1 DOMESTIC WATER SUPPLY. CONNECTION TO EXISTING COLD WATER MAIN IN
MECHANICAL ROOM AT BUILDING 7300, UPSTREAM EXISTING WATER METER. /
APPROVVIGIONAMENTO IDRICO DOMESTICO. COLLEGAMENTO ALLA
CONDUTTURA DELL'ACQUA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .