Attachment F - SB Participation Commitment Document.pdf

PDF 335 KB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This is a Small Business Participation Commitment Document (SBPCD) for federal contract N40085-26-R-0001, a Design-Bid-Build contract for USCG Offshore Patrol Cutters (OPC) Homeport Pier at Naval Station Newport, Newport, Rhode Island. The document is a template that must be completed by all offerors—both large and small businesses—to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. This is the only form evaluated to determine an offeror's small business participation commitment; information provided in alternative formats will not be evaluated. The document requires offerors to identify their prime contractor size based on the applicable NAICS Code and, if classified as a small business, to check all applicable socioeconomic categories including HUBZone Small Business, Woman-Owned Small Business (WOSB), Economically Disadvantaged Woman-Owned Small Business (EDWOSB), Small Disadvantaged Business (SDB), Veteran-Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business (SDVOSB).

The SBPCD requires offerors to provide a subcontracting breakdown showing total contract value and total value of work to be self-performed, then document small business participation by dollar value and percentage of total contract value. The minimum total small business subcontracting requirement for this contract is 20%, and if this threshold is not met, a detailed explanation is required. Offerors must identify small business subcontractors with firm written commitments—including written teaming agreements, joint venture agreements, mentor-protégé agreements, or signed letters of commitment—in a designated table specifying company name, small business category, products/services, and nature of commitment. If no subcontractors are identified, offerors must provide detailed explanations for why subcontractors are not identified with firm commitments and how the firm will achieve the proposed small business participation. Large businesses not intending to subcontract must explain why subcontracting would not result in efficient contract performance; small businesses intending 100% self-performance are exempted from this requirement.

View the file

Other files

File Type Posted
Amendment 0009 USCG OPC.pdf PDF
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Attachment P - Spc 100 Final Specs Appendix F - Soil GW Sed Sampling Reports.pdf PDF
Attachment R - 26 08 00 - Electrical Shore Ties CSTO (Rev B) - Section 2.4.6 Testing.pdf PDF
JA ML-26-41 USCG Comm Shore Tie Receptacle - Redacted.pdf PDF
JA ML-26-42 USCG Line Insulation Monitor - Redacted.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Attachment J Site Visit Meeting Location.pdf PDF
Specifications USCG OPC Newport.pdf PDF
1826479dwg02of05_STRUC1.pdf PDF
1826479dwg03of05_STRUC2.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

N40085-26-R-0001

ATTACHMENT F

SMALL BUSINESS PARTICIPATION COMMITMENT

DOCUMENT (SBPCD)

OFFEROR’S NAME

ADDRESS

N40085-26-R-0001 Design-Bid-Build, USCG Offshore Patrol Cutters (OPC)

Homeport Pier, Naval Station Newport, Newport RI

Date Prepared

1. Instructions. The SBPCD includes the minimum level of commitment to subcontract with the SBs identified herein. This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. This is the only form that will be evaluated to determine the offeror’s small business participation commitment. Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to this form will not be evaluated. Round dollars to nearest whole dollar and percentages to the nearest tenth of a percent.

2. Offeror Information. Prime contractor size based on the NAICS Code identified in the solicitation (check one):

☐ Large Business (LB) ☐ Small Business (SB)

For offerors that identify as a SB, check all applicable socioeconomic categories that apply or check “None” if the offeror does not qualify under any of the socioeconomic categories:

☐ Historically Underutilized Business Zone Small Business (HUBZone SB) ☐ Woman-Owned Small Business (WOSB) ☐ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ☐ Small Disadvantaged Business (SDB) ☐ Veteran-Owned Small Business (VOSB) ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB) ☐ None

3. Subcontracting Breakdown.

a. Total contract value (TCV)(including options) $

b. Total value of the work to be self-performed by the prime offeror $

4. Small Business Participation.

a.

Small Business Participation (Including Small Business prime offeror’s participation)

Business Category Dollar Value % of TCV

Total Small Business (SB) (including all SB socio-economic categories and work self-performed as a SB) The minimum total small business subcontracting requirement for this contract is 20%. If this minimum small business participation requirement is not met, a detailed explanation is required below.

Small Disadvantaged Business (SDB) $ %

Woman-Owned Small Business (WOSB) $ %

Historically Underutilized Business Zone Small Business (HUBZone) $ %

Veteran-Owned Small Business (VOSB) $ %

Service-Disabled Veteran-Owned Small Business (SDVOSB) $ %

If the offeror has not proposed a minimum of 20% for small business participation, provide a detailed explanation:

b. To the greatest extent possible, the table below should identify SBs where firm commitments are in place, to support the minimum small business participation requirement identified in paragraph 4.a (above). Only add subcontractors with firm commitments to the table below, do NOT add subcontractor without firm commitments established. A SB commitment is a written agreement between a prime and small business to work together on this contract. This commitment in writing is considered the nature of commitment, which can include written teaming agreement, joint venture agreement, mentor-protégé agreement, written/signed letter of commitment from the small business, etc. This table can be expanded as needed.

Company Name Small Business Category(ies)*

Products/Services, including type & variety of work

Nature of Commitment

*SB, WOSB, EDWOSB, SDB, HUBZone SB, VOSB, SDVOSB

5. Explanation/Rationale. If no subcontractors are identified in paragraph 4.b. above, provide detailed explanation for why subcontractors are not identified with firm commitments AND how your firm will be able to achieve the proposed small business participation.

6. If the offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance. SBs intending to 100% self-perform are not required to provide an explanation.

File details come from the government source that posted it. Updated .