Attachment 4 - M1-706 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf

PDF 1 MB Posted

Attached to
USAID/South Sudan Juba Compound Electrical Upgrade Federal contract opportunity
Solicitation number
72066821R00014
Issued by
US Agency for International Development South Sudan

About this file

This document provides details on a federal solicitation from the US Agency for International Development South Sudan for electrical upgrade services at the USAID/South Sudan Juba Compound. The solicitation seeks Phase One proposals to provide services for the USAID/South Sudan Juba Compound Electrical Upgrade project, including generator diesel fuel system piping schematic services as an attachment. Interested organizations are invited to respond with initial proposals by the solicitation response date of 72066821R00014 to be considered for the award and provision of electrical upgrade services at the USAID compound in Juba, South Sudan.

View the file

Other files for this federal contract opportunity

Other files attached to USAID/South Sudan Juba Compound Electrical Upgrade, newest first.
File Type Posted
RFP No. 72066821R00014_Amendment No. 4_28 October, 2021.pdf PDF
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf PDF
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf PDF
J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf PDF
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf PDF
J.3.8_E1-702_Existing Residential Compound Singe Line Diagram_AMD003.pdf PDF
J.3.7_E1-104_Residential Compound Site Plan_AMD003.pdf PDF
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf PDF
Q and A 72066821R00014 for USAID South Sudan Juba Compound Electrical Upgrade.pdf PDF
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf PDF
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf PDF
Attachment 3 - 260508 COMMON WORK ELEC-COMM.pdf PDF
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf PDF
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
Attachment 3 - 262725 WIRING DEVICES JAN19.pdf PDF
Attachment 3 - 262417 PANELBOARDS JAN19.pdf PDF
Attachment 3 - 262913 ENCLOSED CONTROLLERS JAN12.pdf PDF
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 6 - Design Intent Report.pdf PDF
Attachment 8-Past Performance Information Sheet.xlsx XLSX spreadsheet
SF1442-14b Juba Compound Electrical Upgrade.pdf PDF
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf PDF
Attachment 1 -017825 O and M Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 260573 OVERCURRENT PROTECTIVE DEVICE STUDY JAN17R.pdf PDF
Attachment 3 - 260915 ELECTRICAL POWER MONITOR JAN20.pdf PDF
Attachment 3 - 260815 FIELD TESTING-INSPECTION ELECTRICAL.pdf PDF
Attachment 3 - 262300 LOW-VOLTAGE SWITCHGEAR JAN17RR.pdf PDF
Attachment 3 - 263354 JUCR UPS JAN19.pdf PDF
Attachment 3 - 335617 UNDERGROUND FUEL STORAGE TANKS AND DISTRIBUTION OBO.pdf PDF
Attachment 3 - 337105 UNDERGROUND DUCTS AND RACEWAYS JAN19.pdf PDF
Attachment 3 - 263600 TRANSFER SWITCHES FL.pdf PDF
Attachment 4 - E1-103 OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-104 RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - M1-701 EXISTING GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-501 SCHEDULE AND DETAILS.pdf PDF
Attachment 4 - M1-101 EXISTING OFFICE COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 5-Design Submittal Requirements.xlsx XLSX spreadsheet
Attachment 7 - Juba Electrical Distribution Study - Final (For Information Only).pdf PDF
Attachment 1 -017825A CMMS Template v2-00-02.xlsx XLSX spreadsheet
Attachment 1 -017705 Closeout Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -015005 TempFa Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -013525 Safety Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -013205 Scheduling Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 000000 TABLE OF CONTENTS.pdf PDF
Show all 50

USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .