About this file
Written by GovTribe AI
· Dec 28, 2023
This document is an attachment to a federal solicitation for electrical upgrade services at a USAID residential compound in South Sudan. The solicitation was issued by USAID/South Sudan seeking Phase One proposals from qualified organizations to provide electrical upgrade services at the Juba compound, as described in the solicitation. Proposals are due by the specified date to upgrade the electrical system and infrastructure at the residential compound to address safety and capacity issues. Organizations must have experience performing electrical work for USAID or other government agencies on overseas compounds. The selected contractor will be responsible for upgrading the electrical distribution system, installing backup generators, and replacing outdated electrical components to modernize and improve the reliability of power at the compound.
Other files for this federal contract opportunity
Other files attached to USAID/South Sudan Juba Compound Electrical Upgrade, newest first.
File
Type
Posted
J.3.7_E1-103_Office Compound Site Plan_AMD003.pdf
PDF
Oct 8, 2021
J.3.7_E1-001_General Notes, Legend and Abbreviations_AMD003.pdf
PDF
Oct 8, 2021
J.3.3.2_Design Intent Report_AMD003.pdf
PDF
Oct 8, 2021
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf
PDF
Oct 8, 2021
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf
PDF
Oct 8, 2021
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf
PDF
Oct 8, 2021
J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf
PDF
Oct 8, 2021
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf
PDF
Oct 8, 2021
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf
PDF
Apr 21, 2021
72066821R00014 Amendment 01 - Electrical Retrofit.pdf
PDF
Mar 30, 2021
Attachment 1 -ToC SM DB wo CW Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 1 -014010 Quality Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 1 -ds1663.PDF
PDF
Mar 24, 2021
Attachment 3 - 62816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS FL.pdf
PDF
Mar 24, 2021
Attachment 3 - 260525 GROUNDING-BONDING-ELEC-SYSTEMS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 262214 LOW-VOLTAGE TRANSFORMERS.pdf
PDF
Mar 24, 2021
Attachment 3 - 262413 SWITCHBOARDS FL.pdf
PDF
Mar 24, 2021
Attachment 3 - 262923 VARIABLE-FREQUENCY MOTOR CONTROLLERS FL.pdf
PDF
Mar 24, 2021
Attachment 3 - 263535 POWER-FACTOR CORRECTION JAN18.pdf
PDF
Mar 24, 2021
Attachment 3 - 263214 ENGINE GENERATORS JAN18R FOR JUBA.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-001 GENERAL NOTES LEGEND AND ABBREVIATIONS.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-706 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-703 EXISTING GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-102 EXISTING RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-704 RESIDENTIAL COMPOUND SINGLE LINE DIAGRAM.pdf
PDF
Mar 24, 2021
Attachment 7 - Juba USAID Geotechnical Report dated Feb 2008.pdf
PDF
Mar 24, 2021
RFP 72066821R00014 Juba Compound Electrical Upgrade Final.pdf
PDF
Mar 24, 2021
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf
PDF
Mar 24, 2021
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf
PDF
Mar 24, 2021
Attachment 3 - 260508 COMMON WORK ELEC-COMM.pdf
PDF
Mar 24, 2021
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf
PDF
Mar 24, 2021
Attachment 3 - 262725 WIRING DEVICES JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 262417 PANELBOARDS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 262913 ENCLOSED CONTROLLERS JAN12.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf
PDF
Mar 24, 2021
Attachment 6 - Design Intent Report.pdf
PDF
Mar 24, 2021
Attachment 8-Past Performance Information Sheet.xlsx
XLSX spreadsheet
Mar 24, 2021
SF1442-14b Juba Compound Electrical Upgrade.pdf
PDF
Mar 24, 2021
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf
PDF
Mar 24, 2021
Attachment 1 -017825 O and M Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 3 - 260573 OVERCURRENT PROTECTIVE DEVICE STUDY JAN17R.pdf
PDF
Mar 24, 2021
Attachment 3 - 260915 ELECTRICAL POWER MONITOR JAN20.pdf
PDF
Mar 24, 2021
Attachment 3 - 260815 FIELD TESTING-INSPECTION ELECTRICAL.pdf
PDF
Mar 24, 2021
Attachment 3 - 262300 LOW-VOLTAGE SWITCHGEAR JAN17RR.pdf
PDF
Mar 24, 2021
Show all 50
USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Mar 24, 2021 .