This single line diagram depicts the existing electrical infrastructure for an office compound in Juba, South Sudan. It shows two 400kW diesel generators with associated automatic transfer switches, main panelboards, and distribution to various buildings within the compound including the generator building, support building, chancery, pump house, cafeterias, motor pool, and central air conditioning units. The related federal contract opportunity is a solicitation from the US Agency for International Development seeking phase one proposals to upgrade the electrical system. Proposals are due from qualified organizations to disconnect and remove existing equipment and feeders from the generators to the main panelboards and loads, and to install new infrastructure to support the continued operations of the USAID mission in South Sudan.
View the file
Other files for this federal contract opportunity
Show all 50
USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERATOR YARD
G1
400kW/500kVA PRIME-
RATED, 1500RPM,
400Y/230V, 50 Hz
GENERATOR
P/BD 'GP1'
800A
800A
328kW/410kVA PRIME-
RATED, 1500RPM,
415Y/240V, 50 Hz
GENERATOR
800A
G2
ATS-1 - 800A ,
415V, 4P, 50Hz
P/BD 'MDP1'
800A
600A
G4
400kW/500kVA PRIME-
RATED, 1500RPM,
400Y/230V, 50 Hz
GENERATOR
P/BD 'GP2'
800A
800A
328kW/410kVA PRIME-
RATED, 1500RPM,
415Y/240V, 50 Hz
GENERATOR
800A
G3
ATS-2 - 800A,
415V, 4P, 50Hz
P/BD 'MDP2'
600A
200A
GENERATOR ELECTRICAL BUILDING
50A150A200A125A125A125A200A250A200A500A
200A 800A
SPARESPARE
200A 800A
SPARESPARE
K K
K
K K K K800AK
SPARE
P/
BD
'O
AU
M
(A N
N
EX
M P
(T
AP
B O
X)
SU
PP
O R
T
BU
IL
D
IN
G
C H
AN
C
ER
Y
(T
AP
B O
X)
P/
BD
'P H
1' (P
U M
P H
O U
SE
P/
BD
'K P1
(C
AF
ET
ER
IA
P/
BD
'K P2
(C
AF
ET
ER
IA
P/
BD
'A
BU
LU
TI
O N
(M
O
TO
R
PO
O L)
P/
BD
'G 3'
(E
AS
T C
AC
G
EN
. B
LD
G
PA
N
EL
BO
AR
D
P/
BD
'W C
U
(W
ES
T
C
AC
1 DISCONNECT AND REMOVE EQUIPMENT AND EXISTING FEEDER SEGMENTS FROM GENERATORS
THROUGH MPD1, MDP1A, MDP2, MDP2A AS WELL AS THOSE BETWEEN MDP1, MDP1A, MDP2, MDP2A AND
THEIR LOADS
PLAN REFERENCE NOTES
E1-701
0.039:1
PDM
WFS
049901E1-701.DWG
EXISTING OFFICE COMPOUND
SINGLE LINE DIAGRAM
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 98 10
I
J
K
L
M
N
O
P
1 2 3 4 5 6 7 98 10
11 12 13 14 15 16 17 18
A
B
C
D
E
F
G
H
11 12 13 14 15 16 17
I
J
K
L
M
N
O
P
UNCLASSIFIED
UNCLASSIFIED
As Indicated
WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of USAID.
CADD Plot Scale
Drawing Scale
USAID/PE/PBD
OBO Project Number
CADD File Name
USAID/PE/PM
Drawing Title
Release For Construction:
Drawn By
Checked By
Project Number
Classification
Date NumberSheet
0499.01
JULY 13, 2020
COMPOUND ELECTRICAL
UPGRADE
Juba, South Sudan
Revision Schedule
Rev Number Description Date
UNCLASSIFIED
ISSUE FOR BID
BRIDGING DOCUMENTS
Bridging
ISSUE FOR BID100% 100% BACK-CK
1 ADDENDUM 1 09/27/2021
EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM
SCALE: NONE
E1-701
AutoCAD SHX Text
File details come from the government source that posted it. Updated .