RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf
PDF 797 KB Posted
- Attached to
- USAID/South Sudan Juba Compound Electrical Upgrade Federal contract opportunity
- Solicitation number
- 72066821R00014
About this file
This is a request for proposals for electrical upgrade services at the USAID compound in Juba, South Sudan. The solicitation seeks design-build phase one proposals for upgrading generators, electrical distribution systems, fuel storage and monitoring systems at the Office and Residential Compounds. Offerors must be registered under NAICS code 236220 and proposals are due by May 13, 2021. The acquisition will follow a two-phase design-build selection process. The contract type will be firm-fixed-price and the order of magnitude is between $20-35 million, to be completed within 500 days of notice to proceed. Mason & Hanger is precluded from competing due to organizational conflict of interest.
View the file
Other files for this federal contract opportunity
Show all 50
USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Issuing Date: April 20, 2021 Phase One Proposal Submission Due Date: May 13, 2021 at 1500 Juba time
Subject: Request for Proposals No. 72066821R00014 for USAID/South Sudan Juba Compound Electrical Upgrade
Dear Prospective Offerors:
The United States Government, represented by the U.S. Agency for International Development Mission in South Sudan (USAID/South Sudan), is seeking Phase One proposals from qualified organizations interested in providing the services as described in this solicitation. This acquisition for construction is being procured in accordance with Federal Acquisition Regulation Subpart 36.3 -- Two-Phase Design- Build Selection Procedures.
• Phase One will be evaluated in accordance with FAR 36.303-1 -- Phase One.
• Phase Two will be evaluated in accordance with FAR 36.303-2 -- Phase Two.
USAID/South Sudan anticipates awarding one firm-fixed-price contract. For Phase Two, the U.S.
Government may award this contract without discussions.
The order of magnitude of the resultant contract is between $20-35 million. All work must be finished no later than 500 days after Notice to Proceed (NTP)
Prime Offerors under this RFP must be registered under the North American Industry Classification System (NAICS) code 236220 – Commercial and Institutional Building Construction. Due to an organizational conflict of interest, Mason & Hanger, a Day & Zimmerman Company, and any parents, subsidiaries, or affiliates are precluded from competing for this contract at the prime or any subcontract level.
Questions regarding this request must be submitted via e-mail to the points of contact identified in Section L no later than the date and time for questions stated above. Unless otherwise notified by an amendment to this RFP, USAID will not answer questions after the deadline or by phone. Offerors must not submit questions to any other USAID staff. All questions submitted and answers to all questions will be provided in writing through an amendment to the RFP which will be publicly posted on beta.SAM.gov.
Issuance of this solicitation in no way obligates USAID to award a contract, nor does it commit USAID to pay any cost incurred in the preparation and submission of a proposal. USAID reserves the right to reject any and all offers received. Award of a contract under this RFP is subject to availability of funds and other internal USAID approvals. Final award of any resultant contract cannot be made until funds have been fully appropriated, allocated, and committed through USAID’s internal procedures. USAID bears no responsibility for data errors resulting from transmission or conversion processes.
Sincerely, /s/
Michael Capobianco Contracting Officer USAID/South Sudan
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PURPOSE
The purpose of this contract is to provide design-build services as described in detail in Section C, Statement of Work.
B.2 TYPE OF CONTRACT
This is a firm fixed price contract with two contract line item numbers (CLINs) and payable entirely in U.S.
dollars. The Government will not adjust the contract price due to fluctuations in currency exchange rates.
B.3 CONTRACT PRICE
The contractor must complete all work (including furnishing all labor, material, equipment, management, and services) required under this contract for the following firm fixed price:
Item No Description Unit Amount
CLIN 001 Completion of Design
1 Lot Firm Fixed Price $TBD
CLIN 002 Construction 1 Lot Firm Fixed Price $TBD
Total Contract Price
$TBD
B.4 SCHEDULE OF VALUES
To be inserted at time of contract award for progress payments.
[END OF SECTION B]
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GENERAL
C.1.1 Project Title
C.1.1.1 Juba Compound Electrical Upgrade
C.1.2 Project Description
C.1.2.1 Contractor must provide complete design and construction services and contract coordination and supervision, including but not limited to the management, professional design services, and construction necessary to meet the requirements of this contract within the established schedules.
C.1.2.2 Contractor must design and construct this project in accordance with the technical requirements identified and referenced herein.
C.1.2.3 Site Description
C.1.2.3.1 The U.S. Embassy in Juba is composed of two major site areas; the Office Compound (OC) and the Residential Compound (RC). The Compound Electrical Upgrade project involves electrical work at both embassy sites. The OC is located approximately .365 km west of RC. There are other ancillary areas such as the RC Annex, located across the street from the RC. All areas are located within the city limits of Juba.
C.1.2.3.2 The OC is a rectangular shaped site of approximately 1 hectare (2 acres). It is located on Kololo Road, north of the European Union Embassy. The main vehicle and pedestrian access to the OC are through a Compound Access Control (CAC) facility from a paved frontage road on the east, known as the “East CAC.” A separate vehicle service CAC connects to a dirt road to the west, known as “West CAC.” The OC has a number of mixed uses, including a USAID program office, Embassy functions and consular services. A number of support buildings occupy the OC, including an on-site cafeteria, vehicle maintenance shop, motor pool displace office, workshops and storage.
C.1.2.3.3 The RC is a polygonal shaped site of approximately 2.8 hectares (7 acres). Adjacent, and east of the RC, is the former Regional African Issue (RAI) compound, which abuts the RC east perimeter wall. Both the RC and RAI compounds are enclosed with opaque walls. The RAI compound topography is low-lying and prone to flooding being within a storm-water collection area. Access to the RC is provided via two CAC facilities, each on the west frontage road, one being close to the center of the west perimeter wall known as the “North CAC”, and the second being close to the southwest corner of the compound and known as the “South CAC”. A network of circulation roads within the RC provides access to mission housing. The RC contains housing structures provided in various forms including five ‘single family’ villas, and 28 efficiency residences. An on-site cafeteria provides catering for mission staff and a recreation building and swimming pool is centrally located on the compound.
C.1.2.4 Major Project Elements included in this contract.
a. OC and RC Generator Connectivity:
a. Contractor must remove existing Automatic Transfer Switch (ATS) units, ECMP 3.1 controllers, generator output breakers, and network control cables in conduits between onboard controllers.
b. The Contractor must design and install a new paralleling system utilizing a Cat EMCP 4.4 based, on-board decentralized paralleling solution. Provide controls and electrically operated breakers complete with spare stock, programming, configuration, documentation, and demonstration and training.
b. OC and RC Electrical Distribution Topology:
a. Contractor must design / replace the existing compound electrical radial distribution system with a loop feed strategy system replace the existing Main Distribution Panels (MDPs) and associated infrastructure wiring. The new design strategy should account for future compound growth of at least 30%.
c. OC and RC Generator Selection and sizing:
a. OC - The OC has four (4) existing generators: two (2) 400kW/500kVA, two (2) 328kW/410kVA providing power to the compound.
i. Contractor must design and replace all existing generators with new prime rated 400kW/500kVA generators for the OC in N+2 configuration to satisfy the OC loads. Initial recommended sizing criteria is based on a 10% expected seasonal variation of loads captured while on site plus a 30% site load growth factor over the anticipated 10 year planning horizon. Contractor must phase the generator replacement to reduce compound power disruption and maintain current Embassy operations at all times.
b. RC – The RC has four (4) existing generators: one (1) 640kW/800kVA and three (3) 400kW/500kVA providing power to the compound.
i. Contractor must replace all existing generators with new prime rated 650kW/800kVA generators for the RC in N+2 configuration to satisfy the RC loads. Initial recommended sizing criteria is based on a 10% expected seasonal variation of loads captured while on site plus a 20% site load growth factor over the anticipated 10 year planning horizon. Contractor must phase the generator replacement to reduce compound power disruption.
ii. Contractor must validate generator size based on the properties that will be connected to the RC compound electrical distribution system. (South African Embassy, Hotel property, another property, and future MSGQ expansion project.
c. Contractor must assure generators satisfy real, apparent, and power factor limitations of the site, noting how closely these sites’ real and apparent power are (due to a high power factor), primary limiting equipment to its kW rating. As well, selected capacities must fall within PRP limitations for 70% load factors, whether single unit or parallel operation. Initial review of load profiles do not currently illustrate variance in loads to suggest smaller paralleled generators on off-peak hours.
d. Evaluate equipment load classifications (emergency and legally required stand-by) and segregate facility loads with separate, additional stand-by power sources that comply with applicable building codes and the 2020 OBO Design Standards.
d. OC and RC Underground Electrical Distribution System Infrastructure:
a. Contractor to develop and install a site masterplan scheme for underground or aboveground raceway and cabling routing composed of multiple paths with spare conduits to satisfy future distribution growth, density needs, and provisions for the phased replacement of failed cable. Conduits must have adequate manholes/hand holes/pull boxes as well as access points for spare ducts for future extension.
b. Contractor must implement prior to or concurrently with C.1.2.4.c, Electrical Distribution Topology.
e. OC and RC Fuel Storage and Distribution System:
a. The OC fuel oil storage and distribution system consists of two (2) 20,000 liter diesel underground storage tanks and one (1) 34,000 liter above grade diesel storage tank and manually operated to fill the existing generators.
b. The RC fuel oil storage and distribution system consists of three (3) 25,400 liter diesel underground storage tanks, and five (5) above grade diesel storage tanks. Two (2) 27,000 liter, two (2) 1,000 liter, and one (1) 18,000 liter and manually operated to provide fuel to the existing generators.
c. The contractor must perform the following:
i. Survey the existing OC and RC fuel oil systems.
ii. Survey the existing conditions of the above grade fuel oil tanks and underground fuel oil tank and piping.
iii. Confirm the OC and RC above grade Fuel oil storage tanks comply with 12-
FAH – 5.
iv. Automate and upgrade the existing OC and RC fuel oil system to which will include:
1. Provide individual lockable grade mounted fill ports outside the OC and RC compound walls and individual fill piping to each underground fuel oil storage tank.
2. Provide automated fuel pump system from each fuel oil storage tank to each generator day/belly tank
3. Provide tank(s) level alarm system that automates the pumping system as well as annunciates the levels to OC Post 1 and RC Post 3 (TOC) as well as personnel filling the underground fuel oil storage tanks.
f. OC and RC Remote Monitoring and Alarming:
a. Contractor must design and install a metering and alarm network system for the OC and RC to gather data for trending and immediate alarming to posted locations to include but not limited to:
i. Generators:
1. OC and RC total power consumption.
2. Run status.
3. Engine monitoring.
4. Enclosure temperature monitoring
5. Engine coolant and oil temperature alarm.
6. Battery and charging system monitoring alarm
7. Main breaker status monitoring.
ii. Fuel System:
1. Fuel tanks high-level alarm.
2. Fuel tanks low level alarm.
3. Fuel pump failure.
b. Contractor to implement concurrently with C.1.2.4.a
g. OC and RC Load Banks:
a. Contractor must install and connect one (1) stationary resistive load bank, rated for
100% of one (1) generator, for the compound generator banks on the RC and OC compounds.
b. Contractor must provide the RC with one (1) portable resistive load bank to test the Safe Haven, CMR, and the TOC stand-by generators. The resistive load bank is to be sized for the largest stand-by generator.
c. Connection to the electrical distribution system will vary from the addition of permanent output generator breakers to allow for connection of a load bank to a centralized load bank connection separate from the power distribution system.
h. RC Safe Haven Manual Transfer Scheme
a. Contractor to replace the manual transfer switches (MTS) with automatic transfer switches (ATS) to reduce the reliance on operator’s initiations. This shall be accomplished by placing a single ATS at the line side of the safe haven main panel board or providing (2) ATSs at the same location of the MTS. If (2) ATSs are used at the MTS locations, contractor shall relocate the EAP equipment and communications equipment circuits from the main panel board to Panel ‘A’ or ‘B’ so that the equipment has generator backup power
i. RC TOC Generator and UPS:
a. Contractor must design and install a new stand-by generator and UPS, sized based on
TOC electrical loads. Include 20% spare capacity.
b. Contractor must provide a double conversion UPS with a one (1) hour minimum battery back-up to provide power during unforeseen post power outage or open transition generator transfer.
j. New Electrical Feeders to the OC and RC Annex Sites.
a. The OC and RC Annex sites are outside the existing OC and RC compounds. The existing power feeds are routed below public roads; therefore, coordination with local municipality is required to perform this work. The contractor must provide new power feed from the new power distribution systems on the OC and RC to each Annex site.
Work to be included:
i. Survey and examine existing routing from the OC and RC to the Annexes.
ii. Determine if power feed is direct buried or in a duct bank.
iii. Provide most efficient means to install new power feed without disturbing the existing perimeter walls of the compounds.
iv. Contractor to determine the correct feeder size extension from the OC and RC loop feed switchboard at 415Y/230V/50hz/3 phase/ 4 wire. Minimum size shall be based on maximum metered load of the OC and RC annex plus 25% spare.
C.1.3 Project Security
C.1.3.1 Contractor must comply with the Division 01 Specifications, and additional security requirements in Section H.
C.1.3.2 Limit of Construction
C.1.3.2.1 The Contract includes:
C.1.3.2.1.2 All work within the U.S. Government (USG) property line.
C. 1.3.2.1.3 Any work the Contractor has to perform outside the OC or RC is to be coordinated with the COR and RSO prior proceeding. This includes work outside the property line including driveway connections, grading, drainage, temporary construction access, erosion control during construction and final stabilization. Repair of all disturbed areas outside the USG property line shall meet or exceed the pre-contract condition.
C. 1.4 Permits and Licenses
C.1.4.1 It is anticipated that permits or licenses may be required for this project. In the event a permit or license is required the Contractor is responsible for obtaining all other permits (such as utility, construction, occupancy) and licenses required to execute the work.
C.1.4.2 Contractor must provide all drawings and other design documents needed to obtain those permits and licenses for which they are responsible, as well as official translations as required to execute those permit actions.
C.1.4.3 Contractor must submit all drawings to the COR for approval prior to releasing drawings to local permitting and/or licensing agencies for any permits.
C.1.4.4 Permit drawings must be labeled by generic terminology (e.g. office, restroom, mechanical space).
C.1.4.5 Permit documents, drawings, specifications and calculations shall be sealed and signed by the architect and engineers of record.
C.1.5 Work by Other Contractors
C.1.5.1 Work By “The Government and Separate Contractors”.
C.1.5.2 Contractors must afford other entities reasonable opportunity for:
C.1.5.2.1 Access to the site.
C.1.5.2.2 Introduction and storage of the materials and equipment.
C.1.5.2.3 Performance of their activities.
C.1.5.3 Separate Contractor working for the Government will be conducting the following:
C.1.5.3.1Compound Security Upgrade project C.1.5.3.2Marine Security Guard Residence Upgrade and Expansion C.1.5.3.3 Additional electrical work may have been undertaken in order to mitigate unsafe conditions. The contractor must assess the work and provide a written assessment to the Contracting Officer advising: 1) the work has been installed in such a manner that it would meet the terms and conditions of this contract and may remain;
of 2) the work does not meet the terms and conditions of this contract and should be replaced. The Contracting Officer will make the decision to leave the work or replace it upon review of the contractor’s assessment.
C.1.6 Construction Phasing
C.1.6.1 This project requires phasing of all construction work identified in C.1.2.4 Major Project Elements, while maintaining the continued full operation of the existing Embassy operations. The contractor must submit their own construction phasing plans detailing their phasing and site utilization plans. The contractor’s phasing plan(s) will be reviewed and approved by the COR prior to the Contracting Officer issuing a Full Notice to Proceed
(NTP).
C.1.6.1.1 Execute a Phased Construction Plans, achieving the milestones identified below in order of priority:
C.1.6.1.2 Upon Substantial Completion (Government Acceptance of each project element or completion of all project elements) for each phase (Phase Completion), the Government shall take possession of that completed phase, with the exception of designated areas of the site identified as construction zones or facilities the contractor uses during the subsequent phase.
C.1.6.1.3 Contractor shall coordinate scope of work requirements for each phase prior to phase completion with all applicable Division 01 Specifications.
C.1.6.14 Unless authorized in writing by the Contracting Officer, the warranty period does not begin until the phase has been completely accepted by the Government.
C.1.7 Phasing of Operations and Maintenance and Warranty
C.1.7.1 Contractor must provide Operations and Maintenance (O&M) task services in accordance with Division 01, Section. 017705 and 017825; inclusive of qualified\manufacturer certified labor, tools, equipment, and spares; for the improvements and permanent facilities installed by the Contractor during phases of work to include, but not limited to, the following:
1.1. Site work, perimeter lighting, fences and walls, and associated security features
1.2. Site utilities and related infrastructure
1.3. Example: (structures granted substantial completion by the Government, as partial, before the contract’s (Final) substantial completion date has been issued.)
C.1.7.2 The Contractor’s O&M tasks must commence from the Government’s declaration of substantial completion of the each phase’s improvements and permanent facilities identified as construction zones or facilities the Contractor uses during the subsequent phase and continue for the period of time that coincides with the overall contract’s (Final) substantial completion date or until the Government takes full possession. The Contractor must document in writing, sketches, and photographs for the coordination of O&M issues including emergency repairs, warranty items and design deficiencies with the Project Director/COR.
C.1.7.3 Scheduling and execution of preventative maintenance (PM) tasks must be coordinated through the Department of State’s designated Computerized Maintenance Management System (CMMS), which is Global Maintenance Management System (GMMS). Completed tasks must be validated through the COR’s. GMMS maintains information about work orders (scheduled and unscheduled); detailed information on equipment (manufacturer’s data, model number, size/capacity, warranty data, parts and etc.); total cost of maintaining properties, equipment and facility systems; backlog reports; and reports of work accomplished Facility Maintenance personnel and service contractors. Based on the
Contractor’s provided data through the submission of the CMMS Template (Attachment 1), GMMS must generate scheduled work orders each day for Weekly, Monthly, Quarterly, Semi-Annual, and Annual PM Tasks on equipment and building systems that are balanced throughout a year as detailed in the Preventive Maintenance Checklist in GMMS. The scheduled PM events on equipment and systems must be based on manufacturer instructions and industry standards aimed at the prevention of premature equipment breakdowns and failures. The Contractor must provide a Government-accepted CMMS Template for each phase prior to issuance of substantial completion of that phase (Phase Completion).
C.2 TECHNICAL REQUIREMENTS FOR FACILITY
C.2.1 Design Source Requirements
C.2.1.1 Building Code. Design and construction of this project is governed by:
C.2.1.1.1 2020 OBO Building Code: Refer to the adoption of the (International Building Code (IBC) as amended by the OBO Codes Supplement (OBO-ICS). This is described in OBO-ICS IBC Chapter 1 (including the listing of adopted versions of codes). The OBO- ICS is found in the OBO Design Standards (A0301) (Attachment 2).
C.2.1.1.2 Accessibility Guidelines for Buildings and Facilities, Architectural Barrier Act (ABA) 2006 must be applicable for all areas of design that are to be fully accessible for visitors and staff as identified in the OBO-ICS IBC Chapter 11.
C.2.1.2 Bridging Documents
C.2.1.2.1 The Bridging Documents describe the design intent as well as provide project-specific definition of required performance of the site and building systems.
C.2.1.2.2 These documents are not fully developed and do not describe the entire scope of work required for the full performance and completion of the project.
C.2.1.2.3 Bridging documents provide the base for development of the final design reflected in construction drawings and specifications.
C.2.1.2.4 See Attachments 1-5 for bridging documents.
C.2.1.3 2020 OBO Design Standards (Attachment 2)
C.2.1.3.1 2020 OBO Design Standards: In addition to utilizing the OBO Building Code and OBO Standard Specification sections, which are incorporated into the OBO Design Standards, other portions of the OBO Design Standards must be utilized in the design process (i.e., other content including base “webpage” text, Planning Modules for Spaces, and References).
C.2.2 General Design Attributes
C.2.2.1 There are no Security Waivers and Exceptions for this project.
C.2.3 Order of Precedence
C.2.3.1 Order of precedence must be used to address conflicts in contract requirements.
The Contracting Officer is the only individual authorized to resolve conflicts and disputes arising from the contract requirements.
1. Section C Scope of Work
2. Other Sections of the contract
3. Attachment 1: Division 01 Specifications
4. Attachments 4-7: Project Specific Requirements Documents
5. Attachment 2: OBO Design Standards
6. Other Section J Attachments
C.3 DESIGN PROCESS
C.3.1 Design Expertise
C.3.1.1. Provide the following licensed professionals in accordance with the OBO Building Code, Chapter 1 (Attachment 2):
C.3.1.1 Registered Architects (registered in the U.S.)
C.3.1.2 Professional Engineers (PE) (registered in the U.S.)
1. PE with Civil specialty
2. PE with Structural specialty
3. PE with Mechanical / Plumbing specialty
4. PE with Electrical specialty
C.3.2 Design Submittals
C.3.2.1 General
1. Refer to Attachment 2, OBO Design Standards for documentation format requirements
2. Refer to Section C and Attachments for submittal content requirements for drawings, reports, calculations, and other submittal requirements. The Contractor must prepare and submit for COR approval all required construction design drawings and specifications documents for each of the Electrical Upgrade project elements necessary to convey clear design intent and constructability for each discipline, to include;
civil/site/landscape, structural, electrical, TSS, security, etc.
3. Refer to Section F for submittal quantity requirements.
4. Incorporate all IDR comments
5. Submittals will be back-checked by USAID for incorporation of previous USAID review comments at each design phase.
C.3.2.2 Construction Document Submittal CD-1.
Provide construction drawings, specifications, reports, calculations, and other submittal requirements as specified in Section C and Attachment 5.
C.3.2.3 Construction Document Submittal CD-2
Provide final construction document drawings, specifications, reports and calculations as specified in Section C and Attachment 5.
C.3.2.4 CD Back-check Submittal
Provide corrected CD-2 submittal as specified in Section F.
C.3.2.5 Final Design Documents/Design Issued for Construction (IFC) Submittal
Provide stamped/sealed and signed Design Issued for Construction documents. The submittal shall consist if updated final construction documents based on review comments provided by OBO in the CD Back-check Submittal as specified in Section F. The IFC documents shall contain drawings, specifications, and calculations required to construct the project in conformance with contract requirements.
C.3.3 SCHEDULE OF DESIGN DELIVERABLES
Complete and deliver all design work within time specified below.
Design Deliverables
Req’d Deliverable Item Hard Copy
Electroni c Copy
Due Date (calendar days)
Notes
Contractor to submit CD-1, 60% level of completion Design Submission.
See Notes See
Notes
NTP + (45)
days
Hard Copies - (3), half –size drawings & (3) hard copies of specifications submitted to USAID, Juba, South Sudan Electronic Copy – submitted to the COR and CO.
60% , CD-1 USAID/OBO
review meeting/comments provided
N/A N/A
NTP + (65)
days Location TBD
Contractor to submit CD-2, 90% level of completion, design submission
N/ASee Notes
See NotesN/A
NTP + (110)
days
Hard Copies – (3), half-size drawings & (3) hard copies of specifications submitted to USAID, Juba, South Sudan Electronic copy submitted to the COR and CO.
90% Review USAID/OBO review meeting/comments provided
N/A N/A
NTP + (130)
days Location TBD
Contractor to submit CD-2, Back-check incorporating all USAID/OBO Comments
See Notes See
Notes
NTP + (150)
days
Hard Copies - (3), half –size drawings & (3) hard copies of specifications submitted to USAID, Juba, South Sudan
CD-2 Back-check Review USAID/OBO review meeting/comments provided
N/A N/A
NTP + (170)
days Location TBD
Contractor submits complete
IFC.
See Notes See
Notes
NTP + (185)
days
Hard Copies – (3) half-size drawings & (3) copies of specifications submitted to USAID, Juba, South Sudan Electronic copy submitted to the COR and CO.
C.4 CONSTRUCTION PROCESS
C.4.1 Materials Shipping Address
C.4.1.1 Materials delivered to the site shall be marked as follows:
U.S. EMBASSY JUBA, SOUTH SUDAN
C\O: USAID or Employee’s Name, e.g. State ICASS Mgt Section, Purchase Order # Attn: EXO/GSO Shipping Unit Office Phone: +1 202 216-6279 Ext: 273/197 (US number) Cellphone +211 912 117 887/+211 912 117 847 (South Sudan number)
JUBA, SOUTH SUDAN (DIPLOMATIC CARGO)
C.4.2 Specification Division 01
C.4.2.1 Contractor shall execute the construction, commissioning, and closeout of the project in accordance with the requirements of the contract, including the procedures identified in the Division 01.
C.4.2.2 Contractor’s Temporary Facility shall be off the U.S. Embassy Compound and designated in the Site Utilization Plan and in compliance with Div. 1, Section 015005, Temporary Facilities and Control.
C.4.3 Security During Construction
C.4.3.1 Per Division 01, Contractor will be required to limit access to the construction site through a security screening facility known as an Access Control Facility (ACF).
C.4.3.2 If one of the permanent CACS is used during construction as an SSA and/or ACF, these facilities shall be designated on the Site Utilization Plan submitted in accordance with Attachment 1 (Division 01).
C.4.4 Geotechnical Engineering
C.4.4.1 Contractor shall provide the services of a geotechnical consultant during construction of foundations, ground modifications, retaining systems, etc., to confirm that recommendations provided during the design stage have been implemented in the field.
C.4.4.2 Contractor shall provide a report, signed and sealed by the geotechnical consultant, outlining the systems installed and the tests performed, within 20 days after completion of work. A draft summary of findings must be provided to the COR and CO within 48 hours after completion of work.
C.4.4.3 Refer to Attachment 7 for a previous geotechnical report.
C.4.5 Diplomatic Security (DS) Security Compliance Review
C.4.5.1 As a quality assurance measure, the Bureau of Diplomatic Security will perform Inspections of the security features of the project. The DS compliance teams document these inspections, address physical and technical security deficiencies or discrepancies relating to the project and provide corrective recommendations.
C.4.5.2 The purpose of interim evaluations is to ensure construction meets the security requirements specified in the construction drawings and project specifications manuals. The goals of the interim Security Compliance Reviews (SCRs) are to view the security posture of a project, identify potential problem areas and take corrective action earlier in the construction cycle of the project.
C.4.5.3 A final security compliance review, and subsequent report will be accomplished at project completion.
C.4.6 As-Built Construction Documents
C.4.6.1 As-built drawings, models, and documentation shall be delivered to the USG as part of the permanent project record. USG shall be the exclusive owner of this documentation. Refer to the 2020 OBO Design Standards Section A05 Design Submittal Format Standards (Attachment 2).
C.4.6.2 Contractor shall provide O&M manuals related to project installed equipment. This shall include warranty documentation, warranty registration and information and/or documentation required for the USG to exercise such warranty rights. The following contract specifications shall be referenced (see Attachment 1):
1. Section 017705 Closeout Procedures
2. Section 017825 Systems Manual and O&M Data
C.5 GENERAL
The following describes the specifications, reports, calculations, presentation materials, and other required submittals for the contract.
1. Pages of the report(s) must be identified by the project name, number, and date
2. Each set of calculations must have a table of contents. Sections and sequential page numbers must identify calculation pages.
3. Calculations must be initialed by designer and signed and sealed by checking engineer. Final calculations must be sealed by the engineer of record.
4. Applicable product cut-sheets and design charts must be included in reports.
C.5.1 REPORTS, CALCULATIONS AND OTHER SUBMITTAL REQUIREMENTS
C.5.1.1 Design Execution Pan: In coordination with the schedule requirements in Division 01 (Attachment
1) and not less than one week following the award of contract, the Contractor must prepare and submit to the COR for review and approval, a plan for development of the project design and construction documents. The Contractor’s plan must indicate the number, type, content, and organization of each package and indicate how the various packages interrelate to form a complete project set of design and construction documents. The plan must include design and construction document submittals required at each stage of development and must include a milestone schedule indicating the planned submission schedule. Changes may be made to the project Design Execution Plan by written request addressed to the COR and CO.
C.5.1.2 Permit Report: The Contractor must verify permits required for the project and the documentation that must be submitted with each permit. Highlight variances with information provided (for verification) in the contract and propose required action.
C.5.1.3 Geotechnical Investigation Report
C.5.1.3.1 The Contractor must review available geotechnical information for the project to determine if additional investigation is necessary. If additional investigation is required, the contractor must submit its exploration and testing program to the COR for review including information for the designated, qualified site representative. The designated, qualified site representative must be on-site during field investigations in accordance with IBC 1803.4. The geotechnical consultant must develop the geotechnical investigation report so that the subsurface information needed for the design of the project is obtained for incorporation into the first design submittal.
C.5.1.3.2 Environmental Remediation: Where identified in Section C the Contractor must provide proposed solutions and a remediation plan related to existing soils and site conditions. If there are no proposed solutions, and the Environmental Assessment Report indicates some type of contamination at the site, the Contractor must develop and submit a plan indicating the measures required to be taken to remediate the site. In such a case, EPA or local standards, whichever are the most stringent, must be followed.
C.5.1.3.3 Evaluation of Conditions and Conformance of Design: The Contractor must evaluate soil conditions for stability and for short term and long term effects on foundation elements and structures.
C.5.1.3.4 The Contractor must consider potential settlements and soil-bearing capacity requirements under static and dynamic loading conditions including earthquake, groundwater fluctuation effects, seepage, and other significant site and project conditions. The Contractor must describe conformance of geotechnical design with evaluation of recommendations, as well as with practices and standards recognized by industry and professional organizations.
C.5.1.3.5 The Contractor must analyze and consider in the final design recommendations the seasonal highest water table or other ground water conditions that may affect the building foundations or cause water infiltration. The Contractor must include recommendations for remedial measures, including but not limited to waterproofing, foundation drains, under slab drainage, and sump pumps.
C.5.1.3.6 The Contractor must include calculations associated with soils condition evaluation and geotechnical design at the end of this section. At a minimum the Contractor must discuss the following elements, as appropriate:
1. Underground Storage Tank Systems
2. Pavement-driveway designs (primary and secondary), and parking lots include calculations for the CBR values considered for each layer including subgrades for the traffic loads utilized for the project
3. Earthwork and compaction requirements
4. Suitable soils for structural fill
5. Dewatering and shoring
6. Ground modifications
7. Global and local slope stability analysis under static as well as under dynamic loads for projects in Seismic Design Categories C, D, E, and F
8. Reinforced earth retaining system
9. Liquefaction elevation and recommendation for the foundation system proposed
10. Aggresivity of soils and groundwater against concrete and steel
11. Natural hazards issues
12. Other systems as necessary
C.5.1.3.7 Certification of Report and Documents: The geotechnical engineer of record must stamp and sign the final geotechnical report and appropriate drawings and specifications to confirm that the construction documents are in compliance with the geotechnical report.
C.5.1.4 Site Layout and Sitework Report/Calculations
C.5.1.4.1 For each civil engineering design section, the Contractor must provide a narrative that describes the overall design philosophy and highlights special design considerations. The narrative must include data sources, design criteria and requirements, assumptions, and design methods or procedures used. All infrastructures must be designed for the ultimate master-planned facilities.
Applicable product cut-sheets and design charts must be included in the report. All pages in the report must be identified by the project name, number, and date.
Calculations must be initialed by the designer and checking engineer. Final calculations must be signed and sealed by the engineer of record. Include report tabs to identify each section and subsection of the report.
C.5.1.4.2 Calculations must be organized and annotated to clearly convey the engineering process in a logical step by step manner.
C.5.1.4.3 Structural calculations must be included in each of the structural submittals associated with each phase of the project for structural components and must contain an increasing level of detail as the project progresses. Structural calculations must include, but are not limited to, the following subjects: reinforcing steel source evaluation, durability analysis, gravity design, lateral design, computer modeling, and blast design.
C.5.1.4.4 Reinforcing Steel Source Evaluation
1. At the CD-1 submission and thereafter, updated as appropriate, the Contractor must submit documentation of the reinforcing steel source(s) and an evaluation of the reinforcing steel by the Structural Engineer of Record.
2. The documentation must identify the proposed producing mill(s). Indicate in which of the following categories the reinforcing steel mill belongs, and provide documentation required for that category.
3. Pre-Qualified Reinforcing Steel Mills: Provide a copy of the mill specific bar identification marks.
Provide a sample copy of the mill’s tag utilized to properly separate and identify the manufacturer’s heat or test identification number during shipping submission and final submission stages.
C.5.1.5 Security Compliance Report: The Contractor must provide a completed Security Compliance
Report to indicate the security elements included in the Construction Documents. Provide drawing numbers into reference column; apply check marks to information boxes accordingly.
Mechanical and Plumbing Report
C.5.1.6 Mechanical and Plumbing Report: The Contractor must include the following data and calculations used for analysis and design.
1. Calculations for fuel oil storage and transfer system, including sizing of underground tanks, day tanks, and pumps.
C.5.1.7 Electrical Report
C.5.1.7.1 All Buildings (Additional Requirements)
1. Power Quality Study: The Contractor must monitor the utility electrical feeder to collect one week’s worth of power quality data using an energy monitoring device equivalent to a Power Sight PS3000 energy monitor. Obtain the energy-monitoring device for use in the study. If the utility feeder is not available, monitor the utility service at the existing embassy. If this is not practical, monitor a representative commercial building in the area of the site. Recorded data must include a continuous record of voltage magnitude on phases to neutral to determine extent of steady state variation of voltage magnitude and frequency and to create a record of outages during this period. A second similar energy-monitoring device must be used during this period to record the magnitude and duration of transient voltage spikes on one phase continuously. Record the worst spike observed by the energy monitoring device on a daily basis. Based on data gathered, provide a recommendation as to power quality mitigation measures to be employed for the facilities (e.g., voltage regulators, transient voltage surge suppressors).
2. Power Quality/Generators: The Contractor must provide a life cycle cost justification for equipment selection.
3. Design Calculations: The Contractor must perform a complete fault analysis to determine the fault level at transformers, feeder breakers and panelboards. This must be the basis for equipment selection and coordination of the tripping circuits of the protective devices.
Include motor contribution where appropriate. Since the USG has little control of the local utility system with regard to future expansion, the calculation must be based on an "infinite" source at the point of connection. If the initial calculation produces awkwardly high fault levels anywhere in the system that leads to expensive equipment, they must be reduced (in the following order) by using an actual source fault level at the utility connection rather than assuming an infinite source. This value must be obtained from the utility during the pre-design survey; Specifying higher-than-standard transformer impedances to reduce the fault current levels; using current-limiting fuses; or rearranging the distribution system to make use of smaller transformers and to increase system impedance (reduce available fault currents).
4. The Contractor must perform other studies/calculations that are required to insure satisfactory design including 1) voltage drop calculations on the longest and the smallest sized feeders that would provide for the largest potential voltage drop in the system; 2) load calculations that confirm the adequacy of the feeders and circuits and confirm the proper sizes of the switchboards, panels, and protective devices; 3) power factor studies to increase system capacity and provide for economic operation of the electrical system; 4) voltage transient studies to verify the proper operation of the electrical system; and a 5) short circuit and coordination study.
5. Engine Generator Sets: The Contractor must submit generator sizing calculations.
Submit a list of loads that must be connected to the generator and generator sizing calculations including compliance with the more stringent of OBO or local noise and air pollution standards.
6. Equipment Sizing: The Contractor must submit calculations to justify sizing of major equipment such as switchgear, main circuit breakers, and power factor correction equipment. Calculate loads individually for sizing transformers, voltage regulators, power factor correction equipment, UPS: The Contractor must calculate loads to support sizing the UPS
C.5.1.8 Quality Assurance Report
C.5.1.8.1 See Division 1 for requirements.
C.5.1.9 Food Service Equipment Parts and Service: The Contractor must provide a narrative that describes the food service facility including unique requirements of the facility, sources for replacement parts and qualified service technicians for proposed commercial and residential kitchen equipment, incorporation of local religious and cultural provisions, customer service process (e.g.. how a customer proceeds through the facility) and food prep process (from delivery of the food to trash removal from the building.)
C.5.1.10 Specifications: The Contractor must provide complete specifications to construct the project in conformance with contract requirements using, without change, Division 01 Specifications and Division 02-48 Sections edited for the project as part of the Bridging Documents.
C.5.1.11 Basis of Design (BOD) for Commissioning Report
C.5.1.11.1 Beginning with the CD-1 Submittal, the Contractor must provide short narratives describing the System concepts.
C.5.1.11.2 The CD-1 BOD must establish the organizational outline for developing the CD-2 BOD through IFC-BOD (used during construction) and Final-BOD (used by the Construction Contractor for the Systems Manual). The BOD must include systems to be Commissioned and the Building Envelope.
C.5.1.11.3 The BOD for Commissioning must identify the following material the A/E of Record must fully develop Performance Criteria:
1. Specific codes, standards, and guidelines considered during design
2. Usage assumptions
1. Operations and maintenance assumptions
2. Design and operations narratives
3. Equipment make and model used as basis of drawings and specifications
4. Revision History: A summary of changes made throughout the project phases
5. Issues Log: record design review comments about the BOD
C.5.1.11.4 Compliance with the Plain Writing Act of 2010: The BOD for Commissioning must clearly state the BOD’s developed by the A/E of Record is written per the guidance of Federal Plain Language Guidelines, March 2011, Rev. 1; which implements the Plain Writing Act of 2010.
(http://www.plainlanguage.gov/howto/guidelines/FederalPLGuidelines/ FederalPLGuidelines.pdf).
C.5.1.12 Operations & Maintenance (O&M) Strategy
C.5.1.12.1 The Design/Build Contractor must perform maintainability reviews of the CD-1, CD- 2, and Issued for Construction (IFC) documents from an operational Facility Management perspective to develop a finalized submission of an O&M Strategy Report. The Design/Build contractor must advise, assist, and make recommendations to OBO with respect to durability, operational cost effectiveness, flexibility, accessibility, risk, and ease of performing routine predictive operations and maintenance and for projected replacement.
C.5.1.12.2 The O&M Strategy Report must include the following:
1. The Contractor must develop and submit a project specific Maintainability Checklist which provides a systemic review and analysis for technical and operational factors for equipment, system and assemblies including serviceability risks. The checklist must address the Mission Critical Systems and Equipment List (below) and must incorporate the Construction Industry Institute Implementation Resource 142-2, Tool No. 14B and Tool No.
15 as an appropriate cross referenced standard.
C.5.1.12.3 Major Building Systems and Equipment which includes both Mission Critical and
Non-Critical contingent upon the type and location of the project:
1. Compound generator(s)
2. Generator switchgear
3. Fuel management system for generators
4. Compound automatic transfer switches
5. Compound electrical transformer
6. Automatic voltage regulator
C.5.2 DELIVERABLES
C.5.2.1 The below table indicates which reports, calculations and other submittals are to be included in construction document submissions CD-1, CD-2, and IFC. These documents to be included for issue in Construction Document Submissions CD-1, CD-2, and IFC. Documents issued at the CD-1 submission only must be re-issued, if altered, at subsequent submissions.
CD-1 CD-2 IFC Report/Calculation
Design Execution Plan
• Permit Report
• • Geotechnical Investigation Report
• • Mechanical and Plumbing Report
• • Electrical Report
• • • Quality Assurance Report
• • • Specifications
• • • Basis of Design (BOD) for Commissioning Report
• • • Operations & Maintenance (O&M) Strategy Reports
• • • Drawing Submittal Requirements
C.5.3 DRAWING SUBMITTAL REQUIREMENTS
C.5.3.1 General
1. Refer to Attachment 5 for submission requirements.
2. General notes, legend of abbreviations, line types, and symbol, and typical details and schedules, must be provided in the GEN series sheets and included in the first volume of drawings. Unique, building-specific sheets for this information are prohibited. Building-specific information must be indicated in the GEN series sheets. The full set of GEN series sheets, or the applicable subset, may be copied and attached to each bound volume of drawings.
C.6 COMPLETION
Substantial Completion
"Substantial Completion" means the stage in the progress of the work as determined and certified by the CO in writing to the Contractor, on which the work (or a portion designated by USAID) is sufficiently complete and satisfactory. The activities that are required to be complete to achieve Substantial Completion are provided below:
● Completion of the elements of work as defined in the final design.
● Completion of all Division 01 requirements, including commissioning.
● Submission of final certified site surveys; test pit data and other field investigation data undertaken during the performance of the work.
● Submission of owner’s O&M manuals and warranties for gate motors
● Submission of as-built drawings for all construction.
Substantial completion means that the work is essentially complete and may be used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which do not interfere with the intended utilization of the work and can be completed or corrected within the time period required for final acceptance.
The "date of substantial completion" means the date determined by the CO as of which substantial completion of the work has been achieved.
The Government shall have the right to take possession of and use the work upon substantial completion. Upon notice by the Contractor that the work is substantially complete (a Request for Substantial Completion) and an inspection by the Contracting Officer or an authorized Government representative (including any required tests), the Contracting Officer shall furnish the Contractor a Certificate of Substantial Completion, accompanied by the Schedule of Defects listing items of work remaining to be performed, completed or corrected before final completion and acceptance. Failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government's possession or use upon substantial completion shall not be deemed an acceptance of any work under the contract.
Demobilization
At the direction of the CO, after substantial completion inspection the Contractor may be authorized to demobilize all equipment, personnel, materials and temporary facilities from the site according to the approved demobilization plan if there are no significant issues identified during the inspection. If the Contractor is not authorized to demobilize after the substantial completion inspection, the Contractor must not demobilize until after final acceptance.
Final Completion and Acceptance
Definitions
(a) "Final completion and acceptance" means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, on which all work required under the contract has been completed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .