About this file
Written by GovTribe AI
· Dec 28, 2023
This attachment provides a single line diagram for a residential compound electrical upgrade. The related federal contract opportunity is a solicitation from the US Agency for International Development Mission in South Sudan seeking Phase One proposals to upgrade the electrical system at USAID's Juba compound in South Sudan. Qualified organizations are invited to submit proposals to provide services including assessing the existing electrical infrastructure, developing design plans and specifications, obtaining necessary permits and approvals, and performing the upgrade work. The period of performance is anticipated to be approximately 12 months with an expected award date in late 2021. Proposals are due by the specified date in August 2021 as detailed in solicitation number 72066821R00014.
Other files for this federal contract opportunity
Other files attached to USAID/South Sudan Juba Compound Electrical Upgrade, newest first.
File
Type
Posted
RFP No. 72066821R00014_Amendment No. 4_28 October, 2021.pdf
PDF
Oct 29, 2021
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf
PDF
Oct 8, 2021
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf
PDF
Oct 8, 2021
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf
PDF
Oct 8, 2021
J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf
PDF
Oct 8, 2021
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf
PDF
Oct 8, 2021
J.3.8_E1-702_Existing Residential Compound Singe Line Diagram_AMD003.pdf
PDF
Oct 8, 2021
J.3.7_E1-104_Residential Compound Site Plan_AMD003.pdf
PDF
Oct 8, 2021
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf
PDF
Apr 21, 2021
Q and A 72066821R00014 for USAID South Sudan Juba Compound Electrical Upgrade.pdf
PDF
Apr 21, 2021
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf
PDF
Mar 24, 2021
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf
PDF
Mar 24, 2021
Attachment 3 - 260508 COMMON WORK ELEC-COMM.pdf
PDF
Mar 24, 2021
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf
PDF
Mar 24, 2021
Attachment 3 - 262725 WIRING DEVICES JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 262417 PANELBOARDS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 262913 ENCLOSED CONTROLLERS JAN12.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf
PDF
Mar 24, 2021
Attachment 6 - Design Intent Report.pdf
PDF
Mar 24, 2021
Attachment 8-Past Performance Information Sheet.xlsx
XLSX spreadsheet
Mar 24, 2021
SF1442-14b Juba Compound Electrical Upgrade.pdf
PDF
Mar 24, 2021
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf
PDF
Mar 24, 2021
Attachment 1 -017825 O and M Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 3 - 260573 OVERCURRENT PROTECTIVE DEVICE STUDY JAN17R.pdf
PDF
Mar 24, 2021
Attachment 3 - 260915 ELECTRICAL POWER MONITOR JAN20.pdf
PDF
Mar 24, 2021
Attachment 3 - 260815 FIELD TESTING-INSPECTION ELECTRICAL.pdf
PDF
Mar 24, 2021
Attachment 3 - 262300 LOW-VOLTAGE SWITCHGEAR JAN17RR.pdf
PDF
Mar 24, 2021
Attachment 3 - 263354 JUCR UPS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 335617 UNDERGROUND FUEL STORAGE TANKS AND DISTRIBUTION OBO.pdf
PDF
Mar 24, 2021
Attachment 3 - 337105 UNDERGROUND DUCTS AND RACEWAYS JAN19.pdf
PDF
Mar 24, 2021
Attachment 3 - 263600 TRANSFER SWITCHES FL.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-103 OFFICE COMPOUND SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - E1-104 RESIDENTIAL COMPOUND SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-701 EXISTING GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-501 SCHEDULE AND DETAILS.pdf
PDF
Mar 24, 2021
Attachment 4 - M1-101 EXISTING OFFICE COMPOUND ENLARGED SITE PLAN.pdf
PDF
Mar 24, 2021
Attachment 5-Design Submittal Requirements.xlsx
XLSX spreadsheet
Mar 24, 2021
Attachment 7 - Juba Electrical Distribution Study - Final (For Information Only).pdf
PDF
Mar 24, 2021
Attachment 1 -017825A CMMS Template v2-00-02.xlsx
XLSX spreadsheet
Mar 24, 2021
Attachment 1 -017705 Closeout Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 1 -015005 TempFa Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 1 -013525 Safety Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 1 -013205 Scheduling Juba Electrical Upgrades Final.pdf
PDF
Mar 24, 2021
Attachment 3 - 000000 TABLE OF CONTENTS.pdf
PDF
Mar 24, 2021
Show all 50
USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Mar 24, 2021 .