Attachment 1 -ToC SM DB wo CW Juba Electrical Upgrades Final.pdf

PDF 93 KB Posted

Attached to
USAID/South Sudan Juba Compound Electrical Upgrade
Solicitation number
72066821R00014
Issued by

About this file

This table of contents outlines the general requirements and specifications for electrical upgrades to facilities in the Juba compound in South Sudan. Key sections include construction execution and coordination, project scheduling, construction submittals, construction safety and occupational health, construction security, contractor quality control, temporary facilities and controls, closeout procedures, operation and maintenance data, computerized maintenance management systems, demonstration and training, and commissioning.

The related federal contract opportunity is a solicitation from USAID/South Sudan seeking phase one proposals from qualified organizations to provide services for electrical upgrades to the Juba compound. The work includes upgrades to wiring, panels, generators and associated infrastructure. Proposals are due by the specified date, and the contract is intended to be awarded by a specified future date. The selected contractor will be expected to adhere to all requirements for safety, security, and coordination outlined in the table of contents while executing the upgrades to facilities operated by USAID in South Sudan.

View the file

Other files

File Type Posted
RFP No. 72066821R00014_Amendment No. 4_28 October, 2021.pdf PDF
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf PDF
J.3.8_E1-702_Existing Residential Compound Singe Line Diagram_AMD003.pdf PDF
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf PDF
J.3.7_E1-104_Residential Compound Site Plan_AMD003.pdf PDF
J.3.3.2_Design Intent Report_AMD003.pdf PDF
J.3.7_E1-001_General Notes, Legend and Abbreviations_AMD003.pdf PDF
J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf PDF
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf PDF
J.3.7_E1-103_Office Compound Site Plan_AMD003.pdf PDF
J.3.3.2_Design Intent Report Cover_AMD003.pdf PDF
J.3.8_E1-703_Office Compound Single Line Diagram_AMD003.pdf PDF
J.3.7_G001_Compound Electrical Upgrade_Cover Page_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Compound Single Line Diagram_AMD003.pdf PDF
Q and A 72066821R00014 for USAID South Sudan Juba Compound Electrical Upgrade.pdf PDF
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf PDF
72066821R00014 Amendment 01 - Electrical Retrofit.pdf PDF
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf PDF
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf PDF
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf PDF
Attachment 1 -013525 Safety Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -019115 Commissioning Juba Electrical Upgrades Final.pdf PDF
Attachment 4 - E1-104 RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
Attachment 1 -017905 DemonstrationTraining Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -017825 O and M Juba Electrical Upgrades Final.pdf PDF
Attachment 4 - E1-103 OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 5-Design Submittal Requirements.xlsx XLSX spreadsheet
Attachment 3 - 262300 LOW-VOLTAGE SWITCHGEAR JAN17RR.pdf PDF
Attachment 4 - M1-706 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-704 RESIDENTIAL COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 4 - M1-101 EXISTING OFFICE COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf PDF
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 335617 UNDERGROUND FUEL STORAGE TANKS AND DISTRIBUTION OBO.pdf PDF
Attachment 3 - 260915 ELECTRICAL POWER MONITOR JAN20.pdf PDF
Attachment 3 - 260525 GROUNDING-BONDING-ELEC-SYSTEMS JAN19.pdf PDF
Attachment 7 - Juba USAID Geotechnical Report dated Feb 2008.pdf PDF
Attachment 4 - E1-001 GENERAL NOTES LEGEND AND ABBREVIATIONS.pdf PDF
Attachment 1 -ds1663.PDF PDF
Attachment 3 - 262413 SWITCHBOARDS FL.pdf PDF
Attachment 3 - 262923 VARIABLE-FREQUENCY MOTOR CONTROLLERS FL.pdf PDF
Attachment 3 - 62816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS FL.pdf PDF
Attachment 1 -014010 Quality Juba Electrical Upgrades Final.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUBA COMPOUND ELECTRICAL UPGRADES JUBA, SOUTH SUDAN

TABLE OF CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS

011005

CONSTRUCTION EXECUTION AND COORDINATION

013205

PROJECT SCHEDULING

013305 CONSTRUCTION SUBMITTALS

013525 CONSTRUCTION SAFETY AND OCCUPATIONAL HEALTH

013550

CONSTRUCTION SECURITY

014010 CONTRACTOR’S QUALITY CONTROL

015005 TEMPORARY FACILITIES AND CONTROLS

017705 CLOSEOUT PROCEDURES

017825

017825A

OPERATION AND MAINTENANCE DATA

COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS)

017905

019115

DEMONSTRATION AND TRAINING

COMMISSIONING

PROJECT SCHEDULING
CONSTRUCTION SAFETY AND OCCUPATIONAL HEALTH
CONSTRUCTION SECURITY
CONTRACTOR’S QUALITY CONTROL
TEMPORARY FACILITIES AND CONTROLS
CLOSEOUT PROCEDURES

File details come from the government source that posted it. Updated .