J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf

PDF 381 KB Posted

Attached to
USAID/South Sudan Juba Compound Electrical Upgrade
Solicitation number
72066821R00014
Issued by

About this file

This site plan drawing and related federal contract opportunity solicitation provide details for the USAID/South Sudan Juba Compound Electrical Upgrade project. The site plan drawing depicts the existing layout of buildings and infrastructure at the USAID compound in Juba, South Sudan and notes required upgrades to the electrical system, including replacing distribution panelboards and splice boxes, relocating equipment, and removing unused wiring. The solicitation seeks proposals to provide Phase One services for the electrical upgrade project, with the US Agency for International Development South Sudan as the contracting agency. Proposals are due on an unspecified date for upgrading the electrical infrastructure and systems at the USAID compound in Juba to address issues shown on the site plan drawing and improve reliability and safety.

View the file

Other files

File Type Posted
RFP No. 72066821R00014_Amendment No. 4_28 October, 2021.pdf PDF
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf PDF
J.3.8_E1-702_Existing Residential Compound Singe Line Diagram_AMD003.pdf PDF
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf PDF
J.3.7_E1-104_Residential Compound Site Plan_AMD003.pdf PDF
J.3.3.2_Design Intent Report_AMD003.pdf PDF
J.3.7_E1-001_General Notes, Legend and Abbreviations_AMD003.pdf PDF
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf PDF
J.3.7_E1-103_Office Compound Site Plan_AMD003.pdf PDF
J.3.3.2_Design Intent Report Cover_AMD003.pdf PDF
J.3.8_E1-703_Office Compound Single Line Diagram_AMD003.pdf PDF
J.3.7_G001_Compound Electrical Upgrade_Cover Page_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Compound Single Line Diagram_AMD003.pdf PDF
Q and A 72066821R00014 for USAID South Sudan Juba Compound Electrical Upgrade.pdf PDF
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf PDF
72066821R00014 Amendment 01 - Electrical Retrofit.pdf PDF
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf PDF
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf PDF
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf PDF
Attachment 1 -013525 Safety Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -019115 Commissioning Juba Electrical Upgrades Final.pdf PDF
Attachment 4 - E1-104 RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
Attachment 1 -017905 DemonstrationTraining Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -017825 O and M Juba Electrical Upgrades Final.pdf PDF
Attachment 4 - E1-103 OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 5-Design Submittal Requirements.xlsx XLSX spreadsheet
Attachment 3 - 262300 LOW-VOLTAGE SWITCHGEAR JAN17RR.pdf PDF
Attachment 1 -ToC SM DB wo CW Juba Electrical Upgrades Final.pdf PDF
Attachment 4 - M1-706 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-704 RESIDENTIAL COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 4 - M1-101 EXISTING OFFICE COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf PDF
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 335617 UNDERGROUND FUEL STORAGE TANKS AND DISTRIBUTION OBO.pdf PDF
Attachment 3 - 260915 ELECTRICAL POWER MONITOR JAN20.pdf PDF
Attachment 3 - 260525 GROUNDING-BONDING-ELEC-SYSTEMS JAN19.pdf PDF
Attachment 7 - Juba USAID Geotechnical Report dated Feb 2008.pdf PDF
Attachment 4 - E1-001 GENERAL NOTES LEGEND AND ABBREVIATIONS.pdf PDF
Attachment 1 -ds1663.PDF PDF
Attachment 3 - 262413 SWITCHBOARDS FL.pdf PDF
Attachment 3 - 262923 VARIABLE-FREQUENCY MOTOR CONTROLLERS FL.pdf PDF
Attachment 3 - 62816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS FL.pdf PDF
Attachment 1 -014010 Quality Juba Electrical Upgrades Final.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHU11

SHU12SHG

E

KP2

CAFETERIA

KP1

CAFETERIA

OAUM

(ANNEX)

ABOLUTION

(MOTORPOOL)

OFE

OFFICE

PH1 (PUMP HOUSE)

MDP1 MDP2

SPLICE

BOX - ML

MEN'S LOCKER

RM

G3 (EAST CAC)

WEP12

CHANCERY (TAP BOX)

EAST CAC

TYP

GEN BLDG

PANELBOARD

CR1

CR2ML

MP-1

MP-2

OAU11

OAU12

MP (TAP BOX)

CAC (TAP

BOX)

WWTP

CONTAINER

SUPPORT

BLDG

ANNEX BUILDING

CHANCERY BUILDING

CAFETERIAMOTOR POOL

ABLUTION

WWTP

PARKING

BANK

CONTAINER

CON.

ROOMCON.

ROOM

BREAK

ROOM

BUILDINGFUEL

STATION

FUEL

TANK CONT.

GENERATOR

PADS

GEN.

BLDG.

IT

ROOM

PUMP

HOUSE

STORAGE

TANKS

HESCO BARRIER

EU COMPOUND

H

ES

C O

B

AR

R

IE

R

WPS

ROOM

STOR

IRAM

OFFICE

MP-2

MP-1

MAIL

SORTSHRED

WCU11

(WEST CAC)

WEST CAC

6 6 6 6

PLAN REFRENCE NOTES:

DISCONNECT AND REMOVE EQUIPMENT AND EXISTING FEEDER SEGMENTS FROM

GENERATORS THROUGH MPD1, MDP1A, MDP2, MDP2A AS WELL AS THOSE BETWEEN

MDP1, MDP1A, MDP2, MDP2A AND THEIR LOADS.

DISCONNECT, REMOVE, AND RELOCATE PANELBOARD. EXTEND FEEDER WIRING AND

CONDUIT AS REQUIRED. REFER TO DWG. E1-103 FOR NEW LOCATION.

UNUSED BRANCH CIRCUIT WIRING ARE HANGING OUT OF PANEL. REMOVE UNUSED

BRANCH CIRCUITS.

REMOVE EXISTING TAP BOX AND REPLACE WITH A NEW DISTRIBUTION PANELBOARD.

ALL TAPPED FEEDERS CONNECTED TO PANELS DOWNSTREAM SHALL BE PROVIDED

WITH OVERCURRENT PROTECTION DEVICE.

REMOVE EXISTING SPLICE BOX AND REPLACE WITH A NEW NEMA 3R SPLICE BOX.

DISCONNECT AND REPLACE EXISTING PANELBOARD AND CIRCUIT BREAKERS WITH

NEW PANELBOARD. MATCH EXISTING EQUIPMENT AND PROVIDE NEMA 3R ENCLOSURE

IF MOUNTED ON THE EXTERIOR. REFER TO DWG. E1-103 FOR NEW LOCATION.

DISCONNECT, REMOVE, AND RELOCATE PANELBOARD. REFER TO DWG. E1-103 FOR

NEW LOCATION.

E1-101

0.039:1

PDM

WFS

049901E1-101.DWG

EXISTING OFFICE COMPOUND SITE

PLAN

A

B

C

1 2 3

D

E

F

G

H

4 5 6 7 98 10

I

J

K

L

M

N

O

P

1 2 3 4 5 6 7 98 10

11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

H

11 12 13 14 15 16 17

I

J

K

L

M

N

O

P

0 16M4M 8M

1:200

UNCLASSIFIED

UNCLASSIFIED

As Indicated

WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of USAID.

CADD Plot Scale

Drawing Scale

USAID/PE/PBD

OBO Project Number

CADD File Name

USAID/PE/PM

Drawing Title

Release For Construction:

Drawn By

Checked By

Project Number

Classification

Date NumberSheet

0499.01

JULY 13, 2020

COMPOUND ELECTRICAL

UPGRADE

Juba, South Sudan

Revision Schedule

Rev Number Description Date

UNCLASSIFIED

ISSUE FOR BID

BRIDGING DOCUMENTS

N

N

Bridging

ISSUE FOR BID100% 100% BACK-CK

1 ADDENDUM 1 09/27/2021

EXISTING OFFICE COMPOUND SITE PLAN

SCALE: 1:200

E1-101

AutoCAD SHX Text AeccDbCogoPoint (AeccLand50)

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

File details come from the government source that posted it. Updated .