Attachment 07 AF Form 3000.pdf

PDF 2 MB Posted

Attached to
Construct Park and Ride Area Federal contract opportunity
Solicitation number
FA481921R0016
Issued by
Department of the Air Force Air Combat Command

About this file

This document is an AF Form 3000 Material Approval Submittal form used by contractors to submit shop drawings, equipment data, manufacturer's literature, certificates, and material samples to the government for approval in accordance with contract provisions. The form requires submission of item descriptions, specifications, drawings, and other attachments for government review and approval or disapproval. It outlines procedures for contractors to clearly identify and tab required submittal items. The form also provides instructions for contractors to consecutively number submittals by contract, submit signed copies to the contracting officer for required approval under contract terms, and resubmit disapproved items within a specified timeframe.

The related federal contract opportunity is a solicitation to design and construct parking lots at Tyndall Air Force Base to support construction vehicle parking and displaced employee parking during base rebuild efforts after damage from a hurricane. The design-build project will be performed by a construction team and Designer of Record in accordance with the statement of work. The solicitation was issued by the Department of the Air Force Air Combat Command.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Park and Ride Area, newest first.
File Type Posted
Solicitation Amendment FA481921R00160004 SF 30.pdf PDF
Solicitation Amendment - FA481921R00160004.pdf PDF
Attachment 02 Appendix A - Revised 09Aug2021.pdf PDF
Attachment 03 Appendix B Drawings V2 - Revised 09Aug2021.pdf PDF
Attachment 08 AF 3064_fillable.xlsx XLSX spreadsheet
Solicitation Amendment FA481921R00160003 SF 30.pdf PDF
Post Amendment 2 Questions.docx DOCX document
Solicitation Amendment - FA481921R00160003.pdf PDF
Attachment 14 Division Cost Estimate Worksheet.xls XLS spreadsheet
Attachment 03 Appendix B Drawings V2.pdf PDF
Park_Ride_RFI - Answers 12July21.xlsx XLSX spreadsheet
Section L and M - Park and Ride.docx DOCX document
Solicitation Amendment - FA481921R00160002.pdf PDF
Attachment 15 Completed AF form 813 Construct Park and Ride.pdf PDF
Site Visit Sign-In.pdf PDF
Solicitation Amendment FA481921R00160001 SF 30.pdf PDF
Attachment 03 Appendix B Drawings.pdf PDF
RFP APPENDIX - B Construct Park and Ride Area_XLWU 21-4009_20Jan21v3.pdf PDF
Solicitation FA481921R0016.pdf PDF
Attachment 13 EAL.xlsx XLSX spreadsheet
Attachment 08 AF 3064.pdf PDF
Attachment 02 Appendix A.pdf PDF
Attachment 12 Wage Determination FL20210005.pdf PDF
Attachment 01 Statement of Work.pdf PDF
Attachment 10 Required Insurance_FY21.pdf PDF
Attachment 09 AF3065.pdf PDF
Attachment 04 Appendix C.xlsx XLSX spreadsheet
Attachment 11 General Financial Information.pdf PDF
Attachment 06 AF 66.pdf PDF
Attachment 05 Discovery trifold July2020.pdf PDF
Attachment 03 Appendix B Drawings.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse) Form Approved OMB No 9000-062 Expires May 31, 2005 Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

SUBMITTAL

TO BE COMPLETED BY CONTRACTOR

FOR GOVERNMENT USE ONLY

ITEM NO.

SPECIFICATION SECTION/PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-PROVED

DISAP- PROVED

SEE REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

FOR GOVERNMENT USE ONLY

RECOMMEND

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

INSTRUCTIONS TO CONTRACTORS

AF IMT 3000, 20030901, V1 (REVERSE)

11.0.1.20130826.2.901444.899636

To:
From:
Date_1:
Contract_Number:
New:
Resubmittal:
Previous_Contract_Number:
Cell1:
Cell2:
Cell3:
ApprovedCheckBox: 0
DispprovedCheckBox: 0
SeeReverseCheckBox: 0
Initials:
Cell4: 0
Cell4: 0
Cell4: 0
Cell4: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
:
CheckBox1: 0
Cntractr_Date:
Contractor_Name:
Contractor:
Civil_Engineer:
To_Eval:
Contract_Officer:
To_Cntrt_Office:
Base:
Base_Civil:
APPROVED_CHECK: 0
DISAPPROVED_CHECK: 0
TextField1:
SignatureField1:
For_Eval_Action:
TextField2:

File details come from the government source that posted it. Updated .