Attachment 14 Division Cost Estimate Worksheet.xls

XLS spreadsheet 829 KB Posted

Attached to
Construct Park and Ride Area Federal contract opportunity
Solicitation number
FA481921R0016
Issued by
Department of the Air Force Air Combat Command

About this file

This is a solicitation for a design-build project to construct parking areas at Tyndall Air Force Base in Florida. The Department of the Air Force Air Combat Command is seeking proposals to build parking lots near Building 2580 to support reconstruction efforts by the PMO and CES following damage from Hurricane Michael. The selected offeror will serve as the Designer of Record and perform design and construction services. Appendix B outlines the areas for construction, which include parking for construction vehicles and displaced base employees.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Park and Ride Area, newest first.
File Type Posted
Attachment 03 Appendix B Drawings V2 - Revised 09Aug2021.pdf PDF
Solicitation Amendment FA481921R00160004 SF 30.pdf PDF
Solicitation Amendment - FA481921R00160004.pdf PDF
Attachment 02 Appendix A - Revised 09Aug2021.pdf PDF
Attachment 08 AF 3064_fillable.xlsx XLSX spreadsheet
Solicitation Amendment FA481921R00160003 SF 30.pdf PDF
Post Amendment 2 Questions.docx DOCX document
Solicitation Amendment - FA481921R00160003.pdf PDF
Park_Ride_RFI - Answers 12July21.xlsx XLSX spreadsheet
Section L and M - Park and Ride.docx DOCX document
Solicitation Amendment - FA481921R00160002.pdf PDF
Attachment 03 Appendix B Drawings V2.pdf PDF
Attachment 15 Completed AF form 813 Construct Park and Ride.pdf PDF
Site Visit Sign-In.pdf PDF
Solicitation Amendment FA481921R00160001 SF 30.pdf PDF
Attachment 03 Appendix B Drawings.pdf PDF
RFP APPENDIX - B Construct Park and Ride Area_XLWU 21-4009_20Jan21v3.pdf PDF
Attachment 12 Wage Determination FL20210005.pdf PDF
Attachment 01 Statement of Work.pdf PDF
Solicitation FA481921R0016.pdf PDF
Attachment 13 EAL.xlsx XLSX spreadsheet
Attachment 08 AF 3064.pdf PDF
Attachment 07 AF Form 3000.pdf PDF
Attachment 02 Appendix A.pdf PDF
Attachment 10 Required Insurance_FY21.pdf PDF
Attachment 09 AF3065.pdf PDF
Attachment 04 Appendix C.xlsx XLSX spreadsheet
Attachment 11 General Financial Information.pdf PDF
Attachment 06 AF 66.pdf PDF
Attachment 05 Discovery trifold July2020.pdf PDF
Attachment 03 Appendix B Drawings.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs.

Summary

CONSTRUCTION COST ESTIMATEDate:
21-Jul-21
COMPANY
Fill Here
PROJECT
Tyndall AFB Park and Ride
LOCATIONPROJECT NO.
Tyndall AFB, FLORIDA
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTS0.0%- 0
DIVISION 02EXISTING CONDITIONS0.0%- 0
DIVISION 03CONCRETE WORK0.0%- 0FILL IN AS REQUIRED (this will link to the entire document)
DIVISION 04MASONRY0.0%- 0
DIVISION 05METALS0.0%- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITES0.0%- 0GC Overhead0.00%
DIVISION 07THERMAL AND MOISTURE PROTECTION0.0%- 0GC Protit0.00%
DIVISION 08OPENINGS0.0%- 0Sub Overhead0.00%
DIVISION 09FINISHES0.0%- 0Sub Profit0.00%
DIVISION 10SPECIALTIES0.0%- 0Sales Tax0.00%
DIVISION 11EQUIPMENT0.0%- 0Risk/Bonding0.00%
DIVISION 12FURNISHINGS0.0%- 0
DIVISION 13SPECIAL CONSTRUCTION0.0%- 0This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENT0.0%- 0
DIVISION 15RESERVED0.0%- 0
DIVISION 16RESERVED0.0%- 0
DIVISION 20RESERVED0.0%- 0
DIVISION 21FIRE SUPRESSION0.0%- 0
DIVISION 22PLUMBING0.0%- 0
DIVISION 23HEATING, VENTILATING AND A/C0.0%- 0
DIVISION 24RESERVED0.0%- 0
DIVISION 25INTEGRATED AUTOMATION0.0%- 0
DIVISION 26ELECTRICAL0.0%- 0
DIVISION 27COMMUNICATIONS0.0%- 0
DIVISION 28ELECTRONIC SAFETY AND SECURITY0.0%- 0
DIVISION 29RESERVED0.0%- 0
DIVISION 30RESERVED0.0%- 0
DIVISION 31EARTHWORK0.0%- 0
DIVISION 32EXTERIOR IMPROVEMENTS0.0%- 0
DIVISION 33UTILITIES0.0%- 0
DIVISION 34TRANSPORTATION0.0%- 0
DIVISION 35WATERWAYS AND MARINE CONSTRUCTION0.0%- 0
DIVISION 36RESERVED0.0%- 0
DIVISION 37RESERVED0.0%- 0
DIVISION 38RESERVED0.0%- 0
DIVISION 39RESERVED0.0%- 0
DIVISION 40PROCESS INTEGRATION0.0%- 0
DIVISION 41MATERIAL PROCESING AND HANDLING EQUIPMENT0.0%- 0
DIVISION 42PROCESS HEATING, COOLING AND DRYING EQUIPMENT0.0%- 0
DIVISION 43PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT0.0%- 0
DIVISION 44POLLUTION CONTROL EQUIPMENT0.0%- 0
DIVISION 45INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT0.0%- 0
DIVISION 46RESERVED0.0%- 0
DIVISION 47RESERVED0.0%- 0
DIVISION 48ELECTRICAL POWER GENERATION0.0%- 0
DIVISION 49RESERVED0.0%- 0
HARD COST TOTAL0%- 0
GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%- 0
SUBTOTAL- 0
GENERAL CONTRACTOR'S PROFIT(Fill in%)0%- 0
SUBTOTAL- 0
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0%- 0
CONTRACT TOTAL$ - 0

&R&"Arial"&8&B SHEET &P OF &N davisjam:

Percentages listed are place fillers. Please complete as required

Div1

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div2

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div3

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div4

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div5

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div6

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div7

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div8

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div9

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div10

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div11

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div12

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div13

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div14

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div15

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div16

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div20

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div21

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div22

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div23

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div24

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div25

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div26

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div27

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div28

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div29

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div30

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div31

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div32

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div33

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div34

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div35

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div36

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div37

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div38

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div39

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div40

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS INTEGRATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div41

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MATERIAL PROCESING AND HANDLING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div42

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS HEATING, COOLING AND DRYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div43

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div44

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
POLLUTION CONTROL EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div45

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div46

CONSTRUCTION COST ESTIMATEDATE
21-Jul-21
PROJECTBASIS FOR ESTIMATE
Tyndall AFB Park and RideCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Tyndall AFB, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here- 0
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL