Attachment 03 Appendix B Drawings V2 - Revised 09Aug2021.pdf
PDF 6 MB Posted
- Attached to
- Construct Park and Ride Area Federal contract opportunity
- Solicitation number
- FA481921R0016
About this file
This document includes an appendix and related federal contract opportunity. The appendix contains drawings outlining the areas of construction for two parking lots to be built in support of rebuilding efforts at Tyndall Air Force Base by the Program Management Office and Civil Engineer Squadron. The contract opportunity is a solicitation to provide design-build services for the parking lots near Building 2580. The selected contractor will design and construct the parking areas to support construction vehicles and displaced base employees, as delineated in the appendix drawings. The Department of the Air Force Air Combat Command is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4819-21-R-0016
Appendix - B
09 Dec 2020
APPENDIX – B
MAPS, DRAWINGS, AND OTHER
PROJECT SPECIFICS
For
REQUEST FOR PROPOSAL
Construct Park and Ride Area
TYNDALL AFB FLORIDA
Project Number: XLWU 21-4009
PMO Support Parking Lot
CES Support Parking Lot
Park & Ride Locations pointLayer Override 1 Building Label
Building Airfield Label Road Label
Airfield Surface Road
January 20, 2021 0 420 840210 ft
0 125 25062.5 m
1:4,514
PMO Support Parking Lot
Storm Water Pond
PMO Support Parking Lot
November 30, 2020 polygonLayer
Override 1
Override 2
Building Label
Building
Road Label
0 210
0 62.5
1:4,514 420 840 ft
125 250 m
Construction Limits
334.129 ft
726.83 ft
CES Support Parking Lot polylineLayer Override 1 polygonLayer Override 1 Override 2
Building Label Building Airfield Label
Road Label Road
January 20, 2021 0 210 420105 ft
0 60 12030 m
1:2,257
C onstruction Lim its
Park & Ride Lot with Utility Overlay
October 28, 2020
Cultural Resource Potential Area
Historic Building Area
Transformer
Overhead Primary
Proposed/Temporary
Under Repair/Construction
In Service
Overhead Secondary
Proposed/Temporary
Under Repair/Construction
In Service
0 210
0 62.5
1:4,514 420 840 ft
125 250 m
325th CES
FOR OFFICIAL USE ONL
1 In. = 215 Ft.
Legend
Electrical Electrical Underground Primary
Gas Gas Distribution
Water Distribution Main
Fire Protection
Existing Utilities Electrical Overhead Primary
Electrical Underground Primary
Gas Distribution
Gas Service
Sewer Main
Sewer Service sLinePressurizedMain_L
Stormwater dLineGravity_L dOpenDrainage_L
Water Main
Water Service
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Elevation Contours
Index Contour Elevation Contour
June 30, 2021 0 210 420105 ft
0 60 12030 m
1:2,257
File details come from the government source that posted it. Updated .