Attachment 08 AF 3064_fillable.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Construct Park and Ride Area Federal contract opportunity
Solicitation number
FA481921R0016
Issued by
Department of the Air Force Air Combat Command

About this file

This solicitation is for a design-build project to construct parking lots at Tyndall Air Force Base to support reconstruction efforts following damage from Hurricane Michael. The Air Force seeks a construction and design team to build parking areas outlined in an attached drawing to provide parking for construction vehicles working on rebuilding at the base as well as displaced employees. The selected offeror will perform the services described in the statement of work including serving as the designer of record. The soliciting agency is the Department of the Air Force Air Combat Command. The solicitation number is FA481921R0016 and responses are due by the date specified on the Federal Business Opportunities website.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Park and Ride Area, newest first.
File Type Posted
Solicitation Amendment FA481921R00160004 SF 30.pdf PDF
Solicitation Amendment - FA481921R00160004.pdf PDF
Attachment 02 Appendix A - Revised 09Aug2021.pdf PDF
Attachment 03 Appendix B Drawings V2 - Revised 09Aug2021.pdf PDF
Solicitation Amendment FA481921R00160003 SF 30.pdf PDF
Post Amendment 2 Questions.docx DOCX document
Solicitation Amendment - FA481921R00160003.pdf PDF
Attachment 14 Division Cost Estimate Worksheet.xls XLS spreadsheet
Attachment 03 Appendix B Drawings V2.pdf PDF
Park_Ride_RFI - Answers 12July21.xlsx XLSX spreadsheet
Section L and M - Park and Ride.docx DOCX document
Solicitation Amendment - FA481921R00160002.pdf PDF
Attachment 15 Completed AF form 813 Construct Park and Ride.pdf PDF
Site Visit Sign-In.pdf PDF
Solicitation Amendment FA481921R00160001 SF 30.pdf PDF
Attachment 03 Appendix B Drawings.pdf PDF
RFP APPENDIX - B Construct Park and Ride Area_XLWU 21-4009_20Jan21v3.pdf PDF
Solicitation FA481921R0016.pdf PDF
Attachment 13 EAL.xlsx XLSX spreadsheet
Attachment 08 AF 3064.pdf PDF
Attachment 07 AF Form 3000.pdf PDF
Attachment 02 Appendix A.pdf PDF
Attachment 12 Wage Determination FL20210005.pdf PDF
Attachment 01 Statement of Work.pdf PDF
Attachment 10 Required Insurance_FY21.pdf PDF
Attachment 09 AF3065.pdf PDF
Attachment 04 Appendix C.xlsx XLSX spreadsheet
Attachment 11 General Financial Information.pdf PDF
Attachment 06 AF 66.pdf PDF
Attachment 05 Discovery trifold July2020.pdf PDF
Attachment 03 Appendix B Drawings.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 66

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NO.
XLWU 20-0000PROJECT TITLE, TYNDALL AFB, FLFA4819-19-C-A0000
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATEOF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'SRECOMMENDATIONSMANUFACTURER'SWARRANTYCATALOG DATAOPERATINGINSTRUCTIONSAS-BUILT DRAWINGS& DISKDOCUMENTATION ASREQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1Kick-Off Meeting1Award + 7 Days
2Meeting Minutes (All Meetings)1Meeting + 2 Days
3Contractor Badging Applications1Award + 14 Days
4Project Schedule - AF Form 30641At Kick-Off Meeting
5Work Clearance Request / Digging Permit - AF Form 103110 Days Prior to Commencing Work
6HAZMAT Inventory Form 81 & 82114 Days Prior to Commencing Work
7Progress Report - AF Form 30651Weekly
8Material Approval - AF Form 30001111115 Days Prior to Order
9Permits Regulatory Documentation114 Days Prior to Commencing Work
10Construction Materials Testing Reports1Upon Receipt
11Welding/Burn Permit - As Required1Prior to Commencing Work
12Draft DD 1354 - Transfer & Acceptance of Military Real Property1NTP +30 Days
13Pre-Final Inspection Report1Pre-Final + 3 Days
14Contractor Environmental Reporting Entry - TAFB Form 831Prior to Final Inspection
15Equipment Manuals and Parts Lists1Prior to Final Inspection
16Final DD 1354 - Transfer & Acceptance of Military Real Property1At Final Inspection
17Final Inspection Report1Final Inspection + 5 Days
18As-Built Drawings1Final Inspection + 7 Days
19Project Close Out Documents111111Final Inspection + 7 Days

&"Arial,Bold"&12AF Form 66

AF 3064

PRINTING TIPS:Print to Settings -Select Landscape Orientation; Paper Size Tabloid 11x17; Fit All Rows on One Page.OTHER TIPS:Spread sheet is locked. If edits are required, you can unprotect sheet in the Review tab above (leave password blank).
If above does not print properly, try adjusting using a custom scale between 55% and 65%
CONTRACT PROGRESS SCHEDULEForm Approved
OMB NO. 0704-0188 ALT
Public reporting burden for this collection of information is estimated to average 15 minutes per response. Including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. AWARD DATE :6-Oct-209. PROJECT TITLE:PROJECT TITLE, TYNDALL AFB, FL15. APPROVAL RECOMMENDED BY:17. CONTRACT MODIFICATION:$0.000
2. AWARD AMOUNT :$350,000.0010. CONTRACT NO :FA4819-19-C-A000011. PROJECT NO :XLWU 20-0000DATE SIGNEDINSTALLATIONS ENGINEERS' SIGNATURE17a. MODIFICATION NO. :DATE :
3. NTP POP START DATE :12. SUBMITTED BY :John DoeGOV ONLYGOV ONLYCOST :DAYS :
4. PERIOD OF PERFORMANCE :13. CONTRACTOR NAME :John Doe Construction, Inc.17b. MODIFICATION NO. :DATE :
5. SCHEDULED STARTING DATE :ERRORADDRESS :1111 US-9816. APPROVED BY:COST :DAYS :
6. ACTUAL STARTING DATE :CITY, STATE, ZIP :Panama CityFlorida32405DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE17c. MODIFICATION NO. :DATE :
7. SCHEDULED COMPLETION DATE :14. CONTRACTOR'S(SIGNATURE)(DATE)GOV ONLYGOV ONLYCOST :DAYS :
8. ACTUAL COMPLETION DATE :Fill When CompleteSIGNATUREMODIFIED CONTRACT VALUES:$350,000.00COMPLETION DATE :ERROR:#VALUE!
-5.0ERROR:#NUM!FebMarAprMayJunJulAug
LINE NO.WORK ELEMENTSLINE ITEM COST%-5.02-Jan9-Jan16-Jan23-Jan30-Jan6-Feb13-Feb20-Feb27-Feb5-Mar12-Mar19-Mar26-Mar2-Apr9-Apr16-Apr23-Apr30-Apr7-May14-May21-May28-May4-Jun11-Jun18-Jun25-Jun2-Jul9-Jul16-Jul23-Jul30-Jul6-Aug13-Aug20-Aug
ABCD1-Jan8-Jan15-Jan22-Jan29-Jan5-Feb12-Feb19-Feb26-Feb4-Mar11-Mar18-Mar25-Mar1-Apr8-Apr15-Apr22-Apr29-Apr6-May13-May20-May27-May3-Jun10-Jun17-Jun24-Jun1-Jul8-Jul15-Jul22-Jul29-Jul5-Aug12-Aug19-Aug26-Aug
0.00%1Bonds
SHARKEY, KEVIN M GS-12 USAF ACC 325 CES/CENMP: Line items should be selected that are simple and verifyable. This is not a project take off line item listScheduled
0.00%Actual
0.00%2Survey & GeotechScheduled
0.00%Actual
0.00%3(Task 1) DesignScheduled
0.00%Actual
0.00%4(Task 2) DemolitionScheduled
0.00%Actual
0.00%5(Task 2) Site PreperationScheduled
0.00%Actual
0.00%6(Task 2) Utility Service InstallationScheduled
0.00%Actual
0.00%7(Task 2) Install FoundationScheduled
0.00%Actual
0.00%8(Task 2) Install Vertical StructureScheduled
0.00%Actual
0.00%9(Task 3) Install Parking Lot Base MaterialScheduled
0.00%Actual
0.00%10(Task 3) Install Parking Lot Asphalt PavementScheduled
0.00%Actual
0.00%11(Task 3) Install Parking Lot Pavement MarkingsScheduled
0.00%Actual
0.00%12DemobilizationScheduled
0.00%Actual
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.00%$ - 0
0.00%
0.000.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Scheduled0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
PROJECT PERCENTAGE TOTAL (SUMS TO 100%)0.0%

SHARKEY, KEVIN M GS-12 USAF ACC 325 CES/CENMP: Values in this column should sum to 100.000% otherwise, an error will flag

SHARKEY, KEVIN M GS-12 USAF ACC 325 CES/CENMP: Input percentage values that result in actual line item costs0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Actual0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETEPROGRESS CHART

23 30 37 44 51 58 65 72 79 86 93 100 107 114 121 128 135 142 149 156 163 170 177 184 191 198 205 212 219 226 233 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 30 37 44 51 58 65 72 79 86 93 100 107 114 121 128 135 142 149 156 163 170 177 184 191 198 205 212 219 226 233 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AF 3065 (1)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
1From:-5.0To:1-Jan-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(2)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
2From:2-Jan-00To:8-Jan-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(3)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
3From:9-Jan-00To:15-Jan-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(4)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
4From:16-Jan-00To:22-Jan-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(5)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
5From:23-Jan-00To:29-Jan-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(6)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
6From:30-Jan-00To:5-Feb-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(7)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
7From:6-Feb-00To:12-Feb-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(8)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
8From:13-Feb-00To:19-Feb-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(9)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
9From:20-Feb-00To:26-Feb-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(10)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
10From:27-Feb-00To:4-Mar-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(11)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
11From:5-Mar-00To:11-Mar-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(12)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
12From:12-Mar-00To:18-Mar-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(13)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
13From:19-Mar-00To:25-Mar-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(14)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98
Panama CityFlorida32405
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.SCHEDULED COMPLETION DATE
14From:26-Mar-00To:1-Apr-00XLWU 20-0000FA4819-19-C-A000031-Dec-99
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds

2 Survey & Geotech

3 (Task 1) Design

4 (Task 2) Demolition

5 (Task 2) Site Preperation

6 (Task 2) Utility Service Installation

7 (Task 2) Install Foundation

8 (Task 2) Install Vertical Structure

9 (Task 3) Install Parking Lot Base Material

10 (Task 3) Install Parking Lot Asphalt Pavement

11 (Task 3) Install Parking Lot Pavement Markings

12 Demobilization

TOTAL0.00%0.00%0.00%
REMARKSSCHEDULED:0.00%
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
TYPE OR PRINT NAME AND TITLECONTRACTOR SIGNATUREDATE
Lemuel Campbell, Project Manager
Contractor:John Doe Construction, Inc.
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLECES SIGNATUREDATERecommend ApprovalYes / No
Inspector / COR:325 Civil Engineer Squadron, TAFB
TYPE OR PRINT NAME AND TITLECO SIGNATUREDATE

Contracting Officer / Administrator: 325 Contracting Squadron, TAFB

(15)

DOCUMENT TRACKING - Do Not Print
DateRemarks
Submitted:
CE Review:
CONS Review:
Return to KTR:
CONTRACT PROGRESS REPORTForm Approved
OMB NO. 9000-0058
Expires March 31, 1993
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering
and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden to the Department of Defense, Washing Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
Davis Highway, Suite 1204, Arlington, VA 2202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
John Doe Construction, Inc.1111 US-98

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .