Attachment 0015 - Level of Repair Analysis (LORA).pdf

PDF 156 KB Posted

Attached to
Type I Family of All Terrain Crane Solicitation Amendment 0009
Solicitation number
W56HZV-19-R-0118
Issued by

About this file

This document contains an attachment providing guidance for completing a Level of Repair Analysis (LORA) as well as details of a solicitation for Type I Family of All-Terrain Cranes. The attachment outlines the LORA candidate list development process and specifies data elements required for input into the COMPASS model. It defines levels of maintenance and provides directions for determining repair times, failure rates, and incorporating special tools and support equipment evaluations. A non-economic evaluation, economic evaluation, and sensitivity and trend analyses adjusting MTBF, operating hours, and MTTR values plus maintenance policies are to be completed.

The solicitation seeks proposals for 265 Type I Family of All-Terrain Cranes, three first article test units, ancillary services, and logistics data development. The requirement is for commercial items with minor military modifications. The contract type will be firm-fixed-price for a six-year period including three base and three option years. Proposals are due by March 17, 2021 for this competitive solicitation issued by the Department of the Army Materiel Command TACOM Life Cycle Management Command.

View the file

Other files

File Type Posted
W56HZV-19-R-0118 Conformed Copy Thru AMD 0009.pdf PDF
Solic Amend W56HZV-19-R-0118 0009.pdf PDF
Attachment 0041_ Pricing Attachment.xlsx XLSX spreadsheet
FOATC T1 Industry Q and_A on RFP 25May2021.pdf PDF
FOATC T1 Industry Q and_A on RFP 11MAY2021.pdf PDF
Attachment 0004 Operator and Maintainer Technical Supplementation Requirements.pdf PDF
Attachment 0041 - Pricing Attachment .xlsx XLSX spreadsheet
ATTACH 0047 TABLE A-II TM Req Matrix10.pdf PDF
Solic Amend W56HZV-19-R-0118 0008.pdf PDF
ATTACH 0018 TABLE A-IV TM Req Matrix23.pdf PDF
Solic Amend W56HZV-19-R-0118 0007.pdf PDF
Solic Amend W56HZV-19-R-0118 0006.pdf PDF
Attachment 0041 Pricing Attachment.xlsx XLSX spreadsheet
Solic Amend W56HZV-19-R-0118 0005.pdf PDF
FOATC T1 Industry Q and A on RFP 24 March 2021.pdf PDF
Solic Amend W56HZV-19-R-0118 0004.pdf PDF
Attachment 0042 Small Business Participation Factor Workbook 03Mar2021.xlsx XLSX spreadsheet
Attachment 0001 AT-PRF-0001 Type I FOATC PD v1.5.pdf PDF
Solic Amend W56HZV-19-R-0118 0003.pdf PDF
FOATC T1 Industry Q and A on Draft RFP Updated 12 Mar 2021.pdf PDF
FOATC T1 Industry Q and A on RFP 12 March 2021.pdf PDF
Solic Amend W56HZV-19-R-0118 0002.pdf PDF
W56HZV-19-R-0118 Signed.pdf PDF
Solic Amend W56HZV-19-R-0118 0001.pdf PDF
Attachment 0028 - GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0044 Certification Form.pdf PDF
Attachment 0041 - Pricing Attachment.xlsx XLSX spreadsheet
Attachment 0006 Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0007 Type I FOATC Point of Contact (POC) List.pdf PDF
Attachment 0010 Type I FOATC Program Risk Management Plan (RMP).PDF PDF
Attachment 0026 LMI Summary Worksheet NMWR Data.pdf PDF
Attachment 0043 Small Business Participation Factor Workbook Instructions.pdf PDF
Attachment 0033 Incoming Format Transaction.pdf PDF
Solicitation W56HZV-19-R-0118.pdf PDF
Attachment 0003 DA Form 2028 Recommended Changes to Publications and Blank Forms.pdf PDF
Attachment 0013 Hazardous Materials Management Report HMMR.XLSX XLSX spreadsheet
Attachment 0025 NMWR Special Instructions.pdf PDF
Attachment 0012 Prohibited Materials Waiver.pdf PDF
Attachment 0004 COTS Publications Requirements.pdf PDF
Attachment 0030 Critical Stockage List.pdf PDF
Attachment 0029 LMI Data Products Worksheet.pdf PDF
Attachment 0040 Transportability for Better Deployability SDDC TEA Pamphlet 70-1.pdf PDF
Attachment 0009 LMI Summary Worksheet Maintenance Analysis.pdf PDF
Attachment 0008 Provisioning Requirements Statement.pdf PDF
Attachment 0031 Sample of DLA Approved EDFP Drawings.pdf PDF
Attachment 0014 - Treatment And Finish Requirements.pdf PDF
Attachment 0017 - General Publications Requirements for Page-Based TMs.pdf PDF
Attachment 0045 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Attachment 0002 DD Form 1692.pdf PDF
FOATC T1 Industry QAs 16 Feb 2021.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 0015

LEVEL OF REPAIR ANALYSIS (LORA)

1. COMPASS. COMPASS is the Army approved system-level LORA model. This program is available to all U.S. Government offices and their contractors working under a current contract. The Contractor may obtain the COMPASS software at: https://www.logsa.army.mil/#/lec/compass

Software training on is available to the contractor. The Contractor may schedule training by contacting:

The Technical Support Branch: usarmy.redstone.LDAC.mbx.tsb-smartdesk@mail.mil

Data elements for the input spreadsheet shall be completed as indicated below.

Field Definition Status Applied To

Item Item type to be created in COMPASS database (must be LRU, NLRU, SRU, or NSRU)

Required All

Nomenclature Item nomenclature, required if name preference is set to "Nomenclature" in input database

Required All

FGC Item FGC, required if name preference is set to FGC" in input database " Required All

Part Number Item Part Number, required if name preference is set to Part Number" in input database "

Required All

NIIN Item NIIN, required if name preference is set to NIIN" in input database "

Required if available All

CAGE CAGE code Required All

SMR Source, Maintenance, and Recoverability code Optional All

Unit Price Item unit price Required All False Removal Rate Item false removal rate Required All

Washout Rate Item washout rate Required All Unit Weight Item packaged shipping weight Required All

Avg Price of Parts Average price of piece (repair) parts for an item Required All

MTTR Item Mean Time To Repair; part of item repair alternative Required All

Diagnostic Time Item Diagnostic Time; part of item repair alternative Required All

TPS Dev Cost Test Program Set (TPS) Development Cost; part of item repair alternative Required All

TPS Main Cost TPS Maintenance Cost; part of item repair alternative Required All

Pages of Doc Number of pages of technical documentation for an item; part of item repair alternative

Required All

LRU Association Name of LRU which the SRU/NSRU is associated Required SRU/NSRU

MTBF Mean Time Between Failure for item Required NLRU/SRU/NSRU

2. Additional information for completing the LORA effort.

ATTACHMENT 0015

LEVEL OF REPAIR ANALYSIS (LORA)

a. The first step in the process is to develop a LORA candidate list; initial candidate list shall include all repairable items/components. A copy of this list shall be provided to the government.

b. The initial candidate list shall include all repairable items/components. If the repairable items/components are determined not to be viable LORA candidates when analyzed, these items/components shall be annotated as not applicable (N/A).

c. Levels of Maintenance – For the purpose of this effort the following levels shall be used: Field

Maintenance (DS), Sustainment Maintenance (DEPOT and Contractor).

d. Remove/Replace and Repair Time - The current commercial repair/replace times shall be used. If times are not available, times shall be estimated using MIL-HDBK-470A.

e. Failure Rates – The current commercial failure rates shall be used for the initial/baseline results.

The failure rates shall be increased as stated elsewhere in this attachment.

f. Unknown DATA - Elements that do not have current or known data shall use historical data for that item/component or a like item/component; data shall be either commercial or military.

g. Special Tools – All individual Special Tools needed for repair tasks shall be added under Support Equipment. Support Equipment shall be incorporated in each evaluation.

h. All data shall be entered in COMPASS and be as complete as possible, this is to ensure that the evaluations are as accurate as possible.

3. Evaluations to be completed for this effort

a. Non-Economic Evaluation

b. Economic Evaluation

c. Sensitivity and Trend Analysis – The Parameters that are to be adjusted for these analyses are:

Mean Time Between Failure (MTBF) - shall be +/- 30 percent

Operating Hours – Shall be +/- 50 percent

Mean Time To Repair (MTTR) – shall be +/- 30 percent

For all Evaluations listed above the contractor shall provide a Front End Analysis (FEA) and Maintenance Policy for each evaluation completed.