Attachment 0012 Prohibited Materials Waiver.pdf
PDF 162 KB Posted
- Solicitation number
- W56HZV-19-R-0118
About this file
This document is a request for use of prohibited materials under an Army contract for Type I Family of All Terrain Cranes. The contractor must complete sections providing details of the prohibited materials, associated health hazards, analysis of alternative materials, technical justification for use, program risks if denied, and a get well plan to integrate alternatives. The Army will evaluate the request and provide a recommendation on approval to the Product Director. If approved, the prohibited materials can be used in identified parts for the contract.
The related federal contract opportunity is a solicitation for 265 Type I Family of All Terrain Cranes, three first article test units, ancillary services and logistics data under a six-year firm-fixed-price requirements contract with the Army. Offers are due by March 17, 2021 for the competitive solicitation with full and open competition. The NAICS code is 333120 and FOB Destination applies.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 0012
Request for Use of Prohibited Materials
04 November 2014
Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)
1. General Information Requesting Company Date of Request Point of Contact
Prohibited material for which waiver is requested
2. Explanation of Use Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts that will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives Instructions: Identify all alternatives that were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.
5. Technical Justification
Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated.
6. Program Risk Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan Instructions: Identify which parts where an alternative may be integrated at a later date.
Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.
The following Sections will be filled in by the Government
8. Environmental Safety and Occupational Health Working Group (ESOH WG) Evaluation/ Recommendation
Instructions: Government ESOH WG will to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.
{Name1} {Date1} XXXX, ESOH WG Date
9. Concurrence I concur that use of {prohibited material} as described above under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:
{Name2} {Date2} System Engineer, XXXX Date
{Name3} {Date3} Lead Engineer, XXXX Date
{Name4} {Date4} Product Director, XXXX Date
10. Approval Upon the basis of the findings above, I hereby determine that use of {prohibited material} in the parts identified in Section 1 for {Contractor Name} Contract {Contract Number}is acceptable and justified.
{Name5} {Date5}
Project Manager, XXXX Date