Appendix C3. AF Form 3065 Progress Reports (SOW Appendix).xlsx

Air Force Form XLSX spreadsheet 18 KB Posted

Attached to
Modernize Electrical and HVAC Redundancy
Solicitation number
FA4855-20-R-0012
Issued by

About this file

This document contains a federal contract solicitation and progress report template. The solicitation seeks firms to modernize electrical and HVAC redundancy at an Air Force facility. Firms are requested to establish a redundant electrical power system, replace two 200-ton chillers with air-cooled models, and install dedicated HVAC for ground control station bays. The period of performance is 570 calendar days with a project magnitude between $5 million to $10 million. The procurement utilizes lowest price technically acceptable procedures and has a total small business set-aside in accordance with FAR 19.502-2. The progress report template is an AF Form 3065 to track completion percentages for contract line items over multiple reporting periods by the contractor and contracting officer.

View the file

Other versions and copies of AF Form 3065

File Revision Posted Attached to
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
Attachment C - AF Form 3065.pdf Revision not stated Airfield Blast Shield
AF Form 3065.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment G - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 003 AF IMT 3065 Progress Report.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3065.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3065.xlsx Revision not stated Demo B6119
Attachment 5 - AF FORM 3065 Contract Progress Report.pdf Revision not stated Security System Upgrades
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf Revision not stated Nellis AFB Paving IDIQ
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
BLANK SAMPLE AF Form 3065.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]
Atch BLANK SAMPLE AF Form 3065.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Attachment 11 - AF Form 3065.pdf Revision not stated Construct/Repair LOX Canopies
Show all 20

Who attaches AF Form 3065

Other files

File Type Posted
(Updated) Questions and Answers 24 August 2020.pdf PDF
Final Questions and Answers 18 August 2020.pdf PDF
Site Visit Photo 004.JPG JPG image
Site Visit Photo 007.JPG JPG image
Site Visit Photo 0011.JPG JPG image
Site Visit Photo 001.JPG JPG image
Site Visit Photo 002.JPG JPG image
Site Visit Photo 003.JPG JPG image
Site Visit Photo 005.JPG JPG image
Site Visit Photo 0010.JPG JPG image
Site Visit Photo 008.JPG JPG image
List of Site Visit Attendees.pdf PDF
Site Visit Photo 006.JPG JPG image
Site Visit Photo 009.JPG JPG image
Attachment 11- 100 percent Specifications 31 July 2020.pdf PDF
Summary of Changes Memorandum.pdf PDF
Attachment 12- 100 percent Drawings 31 July 2020.pdf PDF
Solicitation Amendment 0001 (FA4855-20-R-0012-0001).pdf PDF
Questions and Answers 7 August 2020.pdf PDF
Questions and Answers 4 August 2020.pdf PDF
Questions and Answers 30 July 2020.pdf PDF
Attachment 3- 95 percent Drawings 17 June 2020.pdf PDF
Appendix C1. DD Form 1354 (SOW Appendix).pdf PDF
Attachment 5 - Past Performance Information Sheet 17 July 2020.docx DOCX document
Attachment 7- WBS 8 July 2020.xlsx XLSX spreadsheet
Attachment 6 - Past Performance Questionnaire 17 July 2020.docx DOCX document
Solicitation FA4855-20-R-0012.pdf PDF
Appendix D2. Architectural Compatibility Guide (SOW Appendix).pdf PDF
Appendix D1. Contractor Base Briefing Pamphlet (SOW Appendix).pdf PDF
Appendix D4. COMM Labeling Standards (SOW Appendix).pptx PPTX presentation
Attachment 10 - Consent Form 17 July 2020.pdf PDF
Appendix D3. Fire Protection Fire Prevention (SOW Appendix).pdf PDF
Attachment 1- Statement of Work 17 July 20.pdf PDF
Attachment 2- 95 percent Specifications 17 June 2020.pdf PDF
Attachment 8- RESERVED 17 July 2020.pdf PDF
Attachment 9 - Past Performance Cover Letter 08 July 2020.pdf PDF
Appendix D6. As-built Submittal Guidelines (SOW Appendix).pdf PDF
Attachment 4-Wage Determination 24 January 2020.pdf PDF
Appendix C2. AF Form 3064 Progress Schedule (SOW Appendix).xlsx XLSX spreadsheet
Appendix D5. AEC CAD Standards (SOW Appendix).pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACT PROGRESS REPORT
Public reporting burden for this collection of information is estimated to average per reseponse, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 9000-0062, Washington, DC, 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
1TO:
LINE NO.WORK ELEMENT% of TOTAL JOBPREVIOUS CUMULATIVE %% COMPLETED THIS PERIOD% COMPLETED CUMULATIVE
1Bond0000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
130000
140000
150000
160000
170000
180000
190000
200000
21000
22000
23000
Total0.00%0.00%0.00%0.00%
REMARKS
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
CONTRACTORBASE CIVIL ENGINEERING
TYPE OR PRINT NAME AND TITLESIGNATUREDATE
XXX, Construction ManagerDDMMYEAR
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

Sheet2

Sheet3