Appendix C2. AF Form 3064 Progress Schedule (SOW Appendix).xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Modernize Electrical and HVAC Redundancy
Solicitation number
FA4855-20-R-0012
Issued by

About this file

This document contains a federal contract solicitation and supporting appendix. The solicitation calls for modernizing electrical and HVAC redundancy at an Air Force facility. Services required include establishing a redundant electrical power system, replacing two 200-ton primary water-cooled chillers with air-cooled chillers, and installing dedicated HVAC for ground control station bays. The electrical work includes upgrading power from a transformer and permitting independent operations on either side of the bays. The HVAC work includes creating a fully redundant system for the bays and replacing the primary chillers. The period of performance is 570 calendar days for a project valued between $5-10 million. This total small business set-aside is governed by FAR 19.502-2. The supporting appendix contains an Air Force form and instructions for contractors to submit progress schedules on fixed-price contracts.

View the file

Other files

File Type Posted
(Updated) Questions and Answers 24 August 2020.pdf PDF
Final Questions and Answers 18 August 2020.pdf PDF
Site Visit Photo 009.JPG JPG image
Site Visit Photo 007.JPG JPG image
Site Visit Photo 004.JPG JPG image
Site Visit Photo 002.JPG JPG image
List of Site Visit Attendees.pdf PDF
Site Visit Photo 0010.JPG JPG image
Site Visit Photo 001.JPG JPG image
Site Visit Photo 003.JPG JPG image
Site Visit Photo 008.JPG JPG image
Site Visit Photo 006.JPG JPG image
Site Visit Photo 0011.JPG JPG image
Site Visit Photo 005.JPG JPG image
Solicitation Amendment 0001 (FA4855-20-R-0012-0001).pdf PDF
Attachment 11- 100 percent Specifications 31 July 2020.pdf PDF
Summary of Changes Memorandum.pdf PDF
Attachment 12- 100 percent Drawings 31 July 2020.pdf PDF
Questions and Answers 7 August 2020.pdf PDF
Questions and Answers 4 August 2020.pdf PDF
Questions and Answers 30 July 2020.pdf PDF
Attachment 4-Wage Determination 24 January 2020.pdf PDF
Appendix D5. AEC CAD Standards (SOW Appendix).pdf PDF
Appendix C1. DD Form 1354 (SOW Appendix).pdf PDF
Appendix C3. AF Form 3065 Progress Reports (SOW Appendix).xlsx XLSX spreadsheet
Appendix D1. Contractor Base Briefing Pamphlet (SOW Appendix).pdf PDF
Attachment 3- 95 percent Drawings 17 June 2020.pdf PDF
Attachment 7- WBS 8 July 2020.xlsx XLSX spreadsheet
Attachment 1- Statement of Work 17 July 20.pdf PDF
Appendix D6. As-built Submittal Guidelines (SOW Appendix).pdf PDF
Solicitation FA4855-20-R-0012.pdf PDF
Attachment 2- 95 percent Specifications 17 June 2020.pdf PDF
Attachment 5 - Past Performance Information Sheet 17 July 2020.docx DOCX document
Attachment 9 - Past Performance Cover Letter 08 July 2020.pdf PDF
Attachment 10 - Consent Form 17 July 2020.pdf PDF
Appendix D3. Fire Protection Fire Prevention (SOW Appendix).pdf PDF
Appendix D2. Architectural Compatibility Guide (SOW Appendix).pdf PDF
Attachment 8- RESERVED 17 July 2020.pdf PDF
Attachment 6 - Past Performance Questionnaire 17 July 2020.docx DOCX document
Appendix D4. COMM Labeling Standards (SOW Appendix).pptx PPTX presentation
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3064 Front

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
DATE SIGNEDINSTALLATIONS ENGINEERS'S SIGNATURE
2. STARTING DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESSCONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.(Street, City, State, Zip Code)DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATE
7. ACTUAL COMPLETION DATE
LINE NO.WORK ELEMENTS%18-Nov-152-Dec-1516-Dec-1530-Dec-1513-Jan-1627-Jan-1610-Feb-1624-Feb-169-Mar-1623-Mar-166-Apr-1620-Apr-164-May-1618-May-161-Jun-1615-Jun-1629-Jun-1613-Jul-1627-Jul-16line %
ABCDEFGHIJKLMNOPQRSTUV
10.00%0.00%100
0.00%
20.00%0.00%
0.00%
30.00%0.00%90
0.00%
40.00%0.00%
0.00%
50.00%0.00%80
0.00%
60.00%0.00%
0.00%
70.00%0.00%70
0.00%
80.00%0.00%
0.00%
90.00%0.00%60
0.00%
100.00%0.00%
0.00%
110.00%0.00%50
0.00%
120.00%0.00%
0.00%
130.00%0.00%40
0.00%
140.00%0.00%
0.00%
150.00%0.00%30
0.00%
160.00%0.00%
0.00%
170.00%0.00%20
0.00%
180.00%0.00%
0.00%
190.00%0.00%10
0.00%
200.00%0.00%
0.00%
210.00%0.00%0
0.00%
220.00%0.00%
0.00%
230.00%0.00%
0.00%
Projected Total0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Actual Total0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Projected Cumulative0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Actual Cumulative0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 Back

INSTRUCTIONS TO CONTRACTORS
1. Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or as established
by the contracting officer.

2. Blocks 1,2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.

3. Block 8. Enter the title of the project as shown on the contract.

4. Block 9. Enter the name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized
representative of the firm.
5. Lines 1 through 15. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of
communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract
calls for more than 14 work elements, additional copies of the AF Form 3064 may be used as a continuation for the work elements.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown:
excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown
opposite each element. The total must equal 100%.
7. Columns D through P will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the
space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it
is planned to accomplish 10% of the excavation work the 1st week and 45% each week until excavation is complete, 10 would be shown in the upper half of Line 1
under Column D, 45 under Column E and 45 under Column F for a total of 100%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks
in equal amounts, 33,33, and 34 would be enteredd under columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 50 would
be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064 may be used as a continuation of performance record.
8. Total amount or work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of line 15.
Again, using the example cited above, the totals under Column D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a total of 100%. These totals will be
used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract
for performance time.
9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting
work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised
schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these
factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared.
The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title.
Time of submission of the revised schedule will be determined by the contracting officer.
10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065 "Contract Progress Report,"
indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the
contractor and th the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and maybe used in connection
with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If for
any reason it becomes known that any part of the progess under this contract will be delayed, this fact should be reported to the contracting officer immediately.

AF FORM 3064, JUN 90 (REVERSE)

Compatibility Report

Compatibility Report for 3064 (Under Construction).xls
Run on 7/23/2015 15:46

The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when opening this workbook in an earlier version of Excel or if you save this workbook in an earlier file format.

Minor loss of fidelity # of occurrences Version

Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 1 Excel 97-2003

File details come from the government source that posted it. Updated .