Attachment 7- WBS 8 July 2020.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Modernize Electrical and HVAC Redundancy
- Solicitation number
- FA4855-20-R-0012
About this file
This solicitation calls for the establishment of a redundant electrical power system and HVAC systems at a Department of the Air Force facility. The scope of work includes replacing two 200-ton primary water-cooled chillers with air-cooled chillers, installing dedicated HVAC for ground control station bays, and establishing dual independent electrical systems to support servers and bays. Additional electrical work includes upgrading power via the transformer. The estimated period of performance is 570 calendar days for a project magnitude between $5 million to $10 million. This total small business set-aside opportunity utilizes lowest price technically acceptable procedures and has a response due date consistent with the attached solicitation and appendices.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Activity Name | ||
| Fireproofing | Insulation and Instrumentation | |
| Summary and Milestone Activities | Activities listed here | Activities listed here |
| Activities listed here | ||
| Joint Sealing | Controls and Monitoring (EMCS) | |
| Assemble Submittal Data | Activities listed here | Activities listed here |
| Activities listed here | ||
| Division 08 - Openings | New Units Installation | |
| Approvals of Submittals | Doors, Frames and Hardware | Activities listed here |
| Activities listed here | Activities listed here | |
| Division 26 - Electrical | ||
| Mobilization | Division 09 - Finishes | Apparatus Inspection and Testing |
| Activities listed here | Plaster and Gypsum | Activities listed here |
| Activities listed here | ||
| Testing and Commissioning | Transformer Work | |
| Activities listed here | Ceilings | Activities listed here |
| Activities listed here | ||
| Administrative Close-Out Reqs | New Electrical Room (Bay 12 Conversion) | |
| Activities listed here | Flooring | Activities listed here |
| Activities listed here | ||
| Division 03 - Concrete | Interior Distribution and STS for Bays | |
| Site & Civil Work/Improvements | Painting and Coating | Activities listed here |
| Activities listed here | Activities listed here | |
| Server Room Rewiring | ||
| Concrete Work | Division 22 - Plumbing | Activities listed here |
| Activities listed here | Plumbing | |
| Activities listed here | UPS, ATS Work and Establishing A&B Redundancy | |
| Division 04 - Masonry | Activities listed here | |
| Courtyard & West-End Area Wall | Division 23 - Heating, Ventilation, and Air-Conditioning | |
| Activities listed here | Air Supply, Distribution, Ventilation and Exhaust | Generator Work |
| Activities listed here | Activities listed here | |
| Division 06 - Wood, Plastics, Composites | ||
| Carpentry Work | Piping and Pumps for HVAC | Interior Lighting |
| Activities listed here | Activities listed here | Activities listed here |
| Division 07 - Thermal and Moisture Protection | Testing, Adjusting and Balancing | Division 33 - Utilities |
| Insulation | Activities listed here | Underground Electrical Work |
| Activities listed here | Activities listed here |
File details come from the government source that posted it. Updated .