Attachment 7- WBS 8 July 2020.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Modernize Electrical and HVAC Redundancy
Solicitation number
FA4855-20-R-0012
Issued by

About this file

This solicitation calls for the establishment of a redundant electrical power system and HVAC systems at a Department of the Air Force facility. The scope of work includes replacing two 200-ton primary water-cooled chillers with air-cooled chillers, installing dedicated HVAC for ground control station bays, and establishing dual independent electrical systems to support servers and bays. Additional electrical work includes upgrading power via the transformer. The estimated period of performance is 570 calendar days for a project magnitude between $5 million to $10 million. This total small business set-aside opportunity utilizes lowest price technically acceptable procedures and has a response due date consistent with the attached solicitation and appendices.

View the file

Other files

File Type Posted
(Updated) Questions and Answers 24 August 2020.pdf PDF
Final Questions and Answers 18 August 2020.pdf PDF
Site Visit Photo 004.JPG JPG image
Site Visit Photo 002.JPG JPG image
List of Site Visit Attendees.pdf PDF
Site Visit Photo 0010.JPG JPG image
Site Visit Photo 001.JPG JPG image
Site Visit Photo 009.JPG JPG image
Site Visit Photo 007.JPG JPG image
Site Visit Photo 003.JPG JPG image
Site Visit Photo 008.JPG JPG image
Site Visit Photo 006.JPG JPG image
Site Visit Photo 0011.JPG JPG image
Site Visit Photo 005.JPG JPG image
Solicitation Amendment 0001 (FA4855-20-R-0012-0001).pdf PDF
Attachment 11- 100 percent Specifications 31 July 2020.pdf PDF
Summary of Changes Memorandum.pdf PDF
Attachment 12- 100 percent Drawings 31 July 2020.pdf PDF
Questions and Answers 7 August 2020.pdf PDF
Questions and Answers 4 August 2020.pdf PDF
Questions and Answers 30 July 2020.pdf PDF
Appendix C3. AF Form 3065 Progress Reports (SOW Appendix).xlsx XLSX spreadsheet
Appendix D1. Contractor Base Briefing Pamphlet (SOW Appendix).pdf PDF
Attachment 3- 95 percent Drawings 17 June 2020.pdf PDF
Appendix C2. AF Form 3064 Progress Schedule (SOW Appendix).xlsx XLSX spreadsheet
Attachment 4-Wage Determination 24 January 2020.pdf PDF
Appendix D5. AEC CAD Standards (SOW Appendix).pdf PDF
Appendix C1. DD Form 1354 (SOW Appendix).pdf PDF
Attachment 1- Statement of Work 17 July 20.pdf PDF
Appendix D6. As-built Submittal Guidelines (SOW Appendix).pdf PDF
Solicitation FA4855-20-R-0012.pdf PDF
Attachment 2- 95 percent Specifications 17 June 2020.pdf PDF
Attachment 5 - Past Performance Information Sheet 17 July 2020.docx DOCX document
Attachment 9 - Past Performance Cover Letter 08 July 2020.pdf PDF
Attachment 10 - Consent Form 17 July 2020.pdf PDF
Appendix D3. Fire Protection Fire Prevention (SOW Appendix).pdf PDF
Appendix D2. Architectural Compatibility Guide (SOW Appendix).pdf PDF
Attachment 8- RESERVED 17 July 2020.pdf PDF
Attachment 6 - Past Performance Questionnaire 17 July 2020.docx DOCX document
Appendix D4. COMM Labeling Standards (SOW Appendix).pptx PPTX presentation
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Activity Name
FireproofingInsulation and Instrumentation
Summary and Milestone ActivitiesActivities listed hereActivities listed here
Activities listed here
Joint SealingControls and Monitoring (EMCS)
Assemble Submittal DataActivities listed hereActivities listed here
Activities listed here
Division 08 - OpeningsNew Units Installation
Approvals of SubmittalsDoors, Frames and HardwareActivities listed here
Activities listed hereActivities listed here
Division 26 - Electrical
MobilizationDivision 09 - FinishesApparatus Inspection and Testing
Activities listed herePlaster and GypsumActivities listed here
Activities listed here
Testing and CommissioningTransformer Work
Activities listed hereCeilingsActivities listed here
Activities listed here
Administrative Close-Out ReqsNew Electrical Room (Bay 12 Conversion)
Activities listed hereFlooringActivities listed here
Activities listed here
Division 03 - ConcreteInterior Distribution and STS for Bays
Site & Civil Work/ImprovementsPainting and CoatingActivities listed here
Activities listed hereActivities listed here
Server Room Rewiring
Concrete WorkDivision 22 - PlumbingActivities listed here
Activities listed herePlumbing
Activities listed hereUPS, ATS Work and Establishing A&B Redundancy
Division 04 - MasonryActivities listed here
Courtyard & West-End Area WallDivision 23 - Heating, Ventilation, and Air-Conditioning
Activities listed hereAir Supply, Distribution, Ventilation and ExhaustGenerator Work
Activities listed hereActivities listed here
Division 06 - Wood, Plastics, Composites
Carpentry WorkPiping and Pumps for HVACInterior Lighting
Activities listed hereActivities listed hereActivities listed here
Division 07 - Thermal and Moisture ProtectionTesting, Adjusting and BalancingDivision 33 - Utilities
InsulationActivities listed hereUnderground Electrical Work
Activities listed hereActivities listed here