- 511/21187. CAK; Albion Armory - Renovate Armory
- Solicitation number
- RFQ - 171 - 220000000461
- Issued by
- Calhoun County, Alden CDP, Michigan
About this file
This document appears to be a specification related to a state and local contract opportunity for the renovation of the Albion Armory in Calhoun County, Michigan. The specification outlines the selective demolition work required, including removing structural framing members, disposing of demolished items, and maintaining site access and temporary controls. It also details the requirements for concrete forming and accessories, concrete reinforcing, and cast-in-place concrete. The work is part of a larger project to renovate the Albion Armory facility.
The contract opportunity is being issued by the state of Michigan and the local jurisdiction of Calhoun County, including the Alden CDP area. The specification does not provide details on the response dates, due dates, site visits, bidder's meetings, award dates, or contract term. However, it does outline the specific requirements for the concrete and masonry work that is part of the overall armory renovation project.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATE ARMORY - ALBION ARMORY
space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 2 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly. Comply with requirements in
Section 017419 "Construction Waste Management and Disposal."
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch (19 mm) at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
SELECTIVE DEMOLITION 024119 - 6
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
E. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."
F. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight. See Section <Insert Section number and title> for new roofing requirements.
1. Remove existing roof membrane, flashings, copings, and roof accessories.
2. Remove existing roofing system down to substrate.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
SELECTIVE DEMOLITION 024119 - 7
SECTION 031000 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1.Form-facing material for cast-in-place concrete.
2.Shoring, bracing, and anchoring.
1.2 DEFINITIONS
A. Form-Facing Material: Temporary structure or mold for the support of concrete while the concrete is setting and gaining sufficient strength to be self-supporting.
B. Formwork: The total system of support of freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as supporting members, hardware, and necessary bracing.
1.3 ACTION SUBMITTALS
A. Product Data: For each of the following:
1.Exposed surface form-facing material.
2.Form ties.
3.Form-release agent.
1.4 QUALITY ASSURANCE
A. Testing and Inspection Agency Qualifications: An independent agency, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
1.Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."
2.Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.
a. For architectural concrete specified in Section 033300 "Architectural Concrete," limit deflection of form-facing material, studs, and walers to 0.0025 times their respective clear spans (L/400).
2.2 RELATED MATERIALS
A. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch thick, with bent tab anchors.
CONCRETE FORMING AND ACCESSORIES 031000 - 1
Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.
B. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1.Formulate form-release agent with rust inhibitor for steel form-facing materials.
2.Form release agent for form liners shall be acceptable to form liner manufacturer.
C. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1.Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.
PART 3 - EXECUTION
3.1 INSTALLATION OF FORMWORK
A. Comply with ACI 301.
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finishes.
C. Limit concrete surface irregularities as follows:
1.Surface Finish-3.0: ACI 117 Class A, 1/8 inch.
D. Construct forms tight enough to prevent loss of concrete mortar.
1.Minimize joints.
2.Exposed Concrete: Symmetrically align joints in forms.
E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.
1.Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.
2.Provide top forms for inclined surfaces steeper than
1.5 horizontal to 1 vertical.
3.Install keyways, reglets, recesses, and other accessories, for easy removal.
F. Do not use rust-stained, steel, form-facing material.
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.
1.Provide and secure units to support screed strips
CONCRETE FORMING AND ACCESSORIES 031000 - 2
2.Use strike-off templates or compacting-type screeds.
H. Chamfer exterior corners and edges of permanently exposed concrete.
I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.
1.Determine sizes and locations from trades providing such items.
2.Obtain written approval of Architect prior to forming openings not indicated on Drawings.
J. Clean forms and adjacent surfaces to receive concrete.
Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.
1.Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2.Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
3.Install dovetail anchor slots in concrete structures, as indicated on Drawings.
4.Clean embedded items immediately prior to concrete placement.
3.3 REMOVING AND REUSING FORMS
A. Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 72 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.
1.Leave formwork for beam soffits, joists, slabs, and other structural elements that support weight of concrete in place until concrete has achieved its 28-day design compressive strength.
CONCRETE FORMING AND ACCESSORIES 031000 - 3
2.Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.
3.4 SHORING AND RESHORING INSTALLATION
A. Comply with ACI 318 and ACI 301 for design, installation, and removal of shoring and reshoring.
1.Do not remove shoring or reshoring until measurement of slab tolerances is complete.
B. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
B. Inspections:
1.Inspect formwork for shape, location, and dimensions of the concrete member being formed.
END OF SECTION 031000
CONCRETE FORMING AND ACCESSORIES 031000 - 4
SECTION 032000 - CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1.Steel reinforcement bars.
2.Welded-wire reinforcement.
B. Related Requirements:
1.Section 321313 "Concrete Paving" for reinforcing related to concrete pavement and walks.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1.Each type of steel reinforcement.
2.Bar supports.
B. Shop Drawings: Comply with ACI SP-066:
1.Include placing drawings that detail fabrication, bending, and placement.
2.Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.
C. Construction Joint Layout: Indicate proposed construction joints required to build the structure.
1.Location of construction joints is subject to approval of Architect.
1.3 INFORMATIONAL SUBMITTALS
A. Qualification Statements: For testing and inspection agency.
B. Welding certificates.
1.Reinforcement To Be Welded: Welding procedure specification in accordance with AWS D1.4/D1.4M.
1.4 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.
B. Welding Qualifications: Qualify procedures and personnel in accordance with AWS D1.4/D 1.4M.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
1.Store reinforcement to avoid contact with earth.
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
CONCRETE REINFORCING 032000 - 1
A. Reinforcing Bars: ASTM A615/A615M, Grade 60, deformed.
B. Low-Alloy Steel Reinforcing Bars: ASTM A706/A706M, deformed.
C. Plain-Steel Welded-Wire Reinforcement:
ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.
D. Deformed-Steel Welded-Wire Reinforcement:
ASTM A1064/A1064M, flat sheet.
2.2 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
PART 3 - EXECUTION
3.1 PREPARATION
A. Protection of In-Place Conditions:
1.Do not cut or puncture vapor retarder.
2.Repair damage and reseal vapor retarder before placing concrete.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
1.Locate and support reinforcement with bar supports to maintain minimum concrete cover.
2.Do not tack weld crossing reinforcing bars.
C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.
D. Provide concrete coverage in accordance with ACI 318.
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Splices: Lap splices as indicated on Drawings.
1.Bars indicated to be continuous, and all vertical bars to be lapped not less than 36 bar diameters at splices, or 24 inches, whichever is greater.
2.Stagger splices in accordance with ACI 318.
3.Weld reinforcing bars in accordance with
AWS D1.4/D 1.4M, where indicated on Drawings.
G. Install welded-wire reinforcement in longest practicable lengths.
1.Support welded-wire reinforcement in accordance with CRSI "Manual of Standard Practice."
CONCRETE REINFORCING 032000 - 2
a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches.
2.Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.
3.Offset laps of adjoining sheet widths to prevent continuous laps in either direction.
4.Lace overlaps with wire.
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
1.Place joints perpendicular to main reinforcement.
2.Continue reinforcement across construction joints unless otherwise indicated.
3.Do not continue reinforcement through sides of strip placements of floors and slabs.
B. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or asphalt coat one-half of dowel length, to prevent concrete bonding to one side of joint.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
B. Inspections:
1.Steel-reinforcement placement.
2.Steel-reinforcement welding.
END OF SECTION 032000
CONCRETE REINFORCING 032000 - 3
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1.Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1.Section 031000 "Concrete Forming and
Accessories" for form-facing materials, form liners, insulating concrete forms, and waterstops.
2.Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.
3.Section 321313 "Concrete Paving" for concrete pavement and walks.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.
B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.
1.3 ACTION SUBMITTALS
A. Product Data: For each of the following.
1.Portland cement.
2.Fly ash.
3.Slag cement.
4.Aggregates.
5.Admixtures:
a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.
6.Fiber reinforcement.
7.Vapor retarders.
8.Floor and slab treatments.
9.Curing materials.
10. Joint fillers.
11. Repair materials.
CAST-IN-PLACE CONCRETE 033000 - 1
B. Design Mixtures: For each concrete mixture, include the following:
1.Mixture identification.
2.Minimum 28-day compressive strength.
3.Durability exposure class.
4.Maximum w/cm.
5.Calculated equilibrium unit weight, for lightweight concrete.
6.Slump limit.
7.Air content.
8.Nominal maximum aggregate size.
9.Steel-fiber reinforcement content.
10. Synthetic micro-fiber content.
11. Indicate amounts of mixing water to be withheld for later addition at Project site if permitted.
12. Intended placement method.
13. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments..
C. Concrete Schedule: For each location of each Class of concrete indicated in "Concrete Mixtures" Article, including the following:
1.Concrete Class designation.
2.Location within Project.
3.Exposure Class designation.
4.Formed Surface Finish designation and final finish.
5.Final finish for floors.
6.Curing process.
7.Floor treatment if any.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs
Project personnel qualified as an ACI-certified Flatwork Technician and Finisher and a supervisor who is a certified ACI Flatwork Concrete Finisher/Technician or an ACI Concrete Flatwork Technician .
1.Post-Installed Concrete Anchors Installers:
ACI-certified Adhesive Anchor Installer.
B. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.
C. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with ASTM C1077 and
CAST-IN-PLACE CONCRETE 033000 - 2
ASTM E329 for testing indicated and employing an ACI-certified Concrete Quality Control Technical Manager.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301.
1.6 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 and
ACI 306.1 and as follows.
1.Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
2.When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
3.Do not use frozen materials or materials containing ice or snow.
4.Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.
5.Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:
1.Maintain concrete temperature at time of discharge to not exceed 95 deg F.
2.Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.
2.2 CONCRETE MATERIALS:
A. Regional Materials: Concrete shall be manufactured within
500 miles of Project site from aggregates that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles of Project site. If materials are transported by rail or water, the distance transported by rail or water shall be multiplied by 0.25 to determine the distance to Project site.
B. Source Limitations:
CAST-IN-PLACE CONCRETE 033000 - 3
1.Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.
2.Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant.
3.Obtain aggregate from single source.
4.Obtain each type of admixture from single source from single manufacturer.
C. Cementitious Materials:
1.Portland Cement: ASTM C150/C150M, Type II gray.
2.Fly Ash: ASTM C618, Class C or F.
3.Slag Cement: ASTM C989/C989M, Grade 100 or
120.
D. Normal-Weight Aggregates: ASTM C33/C33M, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source.
1.Maximum Coarse-Aggregate Size: 1-1/2 inches Footings 3/4 inch slabs nominal..
2.Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
E. Water and Water Used to Make Ice: ASTM C94/C94M, potable
2.3 REPAIR MATERIALS
A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.
1.Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.
2.Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.
3.Aggregate: Well-graded, washed gravel, 1/8 to 1/4 incLimits of silica fume alone or in combination with other cementitious materials below are based on ACI 301 (ACI 301M) and ACI 318 (ACI 318M).
4.Silica Fume: 10 percent by mass.h or coarse sand, as recommended by underlayment manufacturer.
5.Compressive Strength: Not less than [3000 psi at 28 days when tested in accordance with
ASTM C109/C109M.
2.4 CONCRETE MIXTURES, GENERAL
CAST-IN-PLACE CONCRETE 033000 - 4
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with
ACI 301.
1.Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1.Fly Ash or Other Pozzolans: 25 percent by mass.
2.Slag Cement: 50 percent by mass.
C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.
1.Use water-reducing or plasticizing admixture in concrete, as required, for placement and workability.
2.Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
3.Use water-reducing admixture in pumped concrete.
2.5 CONCRETE MIXTURES
A. Class A: Normal-weight concrete used for footings, grade beams, and tie beams.
1.Exposure Class: ACI 318 F2 S2 W1 C1.
2.Minimum Compressive Strength: As indicated at 28 days.
3.Maximum w/cm: 0.45..
4.Slump Limit: 4 inches, plus or minus 1 inch 5.Air Content:
a. Exposure Classes F2 and F3: 5.5 percent, plus or minus 1.5 percent at point of delivery for concrete containing 1-1/2-inch nominal maximum aggregate size.
6.Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.
B. Class B: Normal-weight concrete used for interior slabs-on-ground.
1.Exposure Class: ACI 318 F0 S1 W0 C1.
2.Minimum Compressive Strength: 3500 psi at 28 days.
3.Maximum w/cm: 0.45.
4.Minimum Cementitious Materials Content: 540 lb/cu. yd..
CAST-IN-PLACE CONCRETE 033000 - 5
5.Slump Limit: 4 inches, plus or minus 1 inch.
6.Air Content:
a. Do not use an air-entraining admixture or allow total air content to exceed 3 percent for concrete used in trowel-finished floors.
7.Limit water-soluble, chloride-ion content in hardened concrete to 1.00 percent by weight of cement.
C. Class C: Normal-weight concrete used for interior suspended slabs.
1.Exposure Class: ACI 318 F0 S2 W0 C1.
2.Minimum Compressive Strength: 4500 psi at 28 days.
3.Maximum w/cm: 0.45.
4.Minimum Cementitious Materials Content:540 lb/cu. yd.
5.Slump Limit: 8 inches, plus or minus 1 inch for concrete with verified slump of 3 inches, plus or minus 1 inch, before adding high-range water-reducing admixture or plasticizing admixture at Project site.
6.Slump Flow Limit: 22 inches, plus or minus 1.5 inches .
7.Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement
D. Class D: Normal-weight concrete used for building walls.
1.Exposure Class: ACI 318 F0 S1 W0 C1.
2.Minimum Compressive Strength: 4500 psi at 28 days.
3.Maximum w/cm: 0.45.
4.Slump Limit: 8 inches, plus or minus 1 inch for concrete with verified slump of 3 inches, plus or minus 1 inch, before adding high-range water-reducing admixture or plasticizing admixture at Project site.
5.Slump Flow Limit: 22 inches, plus or minus 1.5 inches.
6.Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.
2.6 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M, and furnish batch ticket information.
CAST-IN-PLACE CONCRETE 033000 - 6
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete in accordance with ASTM C94/C94M. Mix concrete materials in appropriate drum-type batch machine mixer.
1.For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than five minutes after ingredients are in mixer, before any part of batch is released.
2.For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu.
yd..
3.Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions:
1.Before placing concrete, verify that installation of concrete forms, accessories, and reinforcement, and embedded items is complete and that required inspections have been performed.
2.Do not proceed until unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:
1.Daily access to the Work.
2.Incidental labor and facilities necessary to facilitate tests and inspections.
3.Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.
4.Security and protection for test samples and for testing and inspection equipment at Project site.
3.3 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.
1.Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
CAST-IN-PLACE CONCRETE 033000 - 7
2.Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of ANSI/AISC 303.
3.4 INSTALLATION OF VAPOR RETARDER
A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder in accordance with ASTM E1643 and manufacturer's written instructions.
1.Install vapor retarder with longest dimension parallel with direction of concrete pour.
2.Face laps away from exposed direction of concrete pour.
3.Lap vapor retarder over footings and grade beams not less than 6 inches, sealing vapor retarder to concrete.
4.Lap joints 6 inches and seal with manufacturer's recommended tape.
5.Terminate vapor retarder at the top of floor slabs, grade beams, and pile caps, sealing entire perimeter to floor slabs, grade beams, foundation walls, or pile caps.
6.Seal penetrations in accordance with vapor retarder manufacturer's instructions.
7.Protect vapor retarder during placement of reinforcement and concrete.
a. Repair damaged areas by patching with vapor retarder material, overlapping damages area by 6 inches on all sides, and sealing to vapor retarder.
3.5 JOINTS
A. Construct joints true to line, with faces perpendicular to surface plane of concrete.
B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.
1.Install so strength and appearance of concrete are not impaired, at locations indicated on Drawings or as approved by Architect.
2.Place joints perpendicular to main reinforcement.
a. Continue reinforcement across construction joints unless otherwise indicated.
b. Do not continue reinforcement through sides of strip placements of floors and slabs.
3.Locate joints for beams, slabs, joists, and girders at third points of spans. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.
CAST-IN-PLACE CONCRETE 033000 - 8
4.Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.
C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated.
Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows:
1.Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of control joints after applying surface finishes.
Eliminate groover tool marks on concrete surfaces.
2.Sawed Joints: Form control joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random cracks.
D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.
1.Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated on Drawings.
2.Terminate full-width joint-filler strips not less than 1/2 inch or more than 1 inch below finished concrete surface, where joint sealants, specified in Section 079200 "Joint Sealants," are indicated.
3.Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.
E. Doweled Joints:
1.Install dowel bars and support assemblies at joints where indicated on Drawings.
3.6 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.
1.Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.
CAST-IN-PLACE CONCRETE 033000 - 9
2.Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.
B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.
C. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Architect , but not to exceed the amount indicated on the concrete delivery ticket.
1.Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
D. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301, but not to exceed the amount indicated on the concrete delivery ticket.
E. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.
1.If a section cannot be placed continuously, provide construction joints as indicated.
2.Deposit concrete to avoid segregation.
3.Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.
4.Consolidate placed concrete with mechanical vibrating equipment in accordance with ACI 301.
a. Do not use vibrators to transport concrete inside forms.
b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.
c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.
d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
F. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.
1.Do not place concrete floors and slabs in a checkerboard sequence.
CAST-IN-PLACE CONCRETE 033000 - 10
2.Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.
3.Maintain reinforcement in position on chairs during concrete placement.
4.Screed slab surfaces with a straightedge and strike off to correct elevations.
5.Level concrete, cut high areas, and fill low areas.
6.Slope surfaces uniformly to drains where required.
7.Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.
8.Do not further disturb slab surfaces before starting finishing operations.
3.7 FINISHING FORMED SURFACES
Retain types of formed finishes required in this article. Coordinate finishes retained with Drawing Room Finish Schedule, or indicate location of each finish on Drawings.
A. As-Cast Surface Finishes:.
1.ACI 301 Surface Finish SF-2.0: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams.
a. Patch voids larger than 3/4 inch wide or 1/2 inch deep.
b. Remove projections larger than 1/4 inch.
c. Patch tie holes.
d. Surface Tolerance: ACI 117 Class B.
e. Locations: Apply to concrete surfaces exposed to public view.
B. Rubbed Finish: Apply the following to as cast surface finishes where indicated on Drawings:
1.Smooth-Rubbed Finish:
a. Perform no later than one day after form removal.
b. Moisten concrete surfaces and rub with carborundum brick or another abrasive until producing a uniform color and texture.
c. If sufficient cement paste cannot be drawn from the concrete by the rubbing process, use a grout made from the same cementitious materials used in the in-place concrete.
CAST-IN-PLACE CONCRETE 033000 - 11
d. Maintain required patterns or variances as shown on Drawings or to match field sample panels.
C. Related Unformed Surfaces:
1.At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a color and texture matching adjacent formed surfaces.
2.Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.8 FINISHING FLOORS AND SLABS
A. Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Trowel Finish:
1.After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel.
2.Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance.
3.Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.
4.Do not add water to concrete surface.
5.Do not apply hard-troweled finish to concrete, which has a total air content greater than 3 percent.
6.Apply a trowel finish to surfaces exposed to view or to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage membrane, paint, or another thin-film-finish coating system.
7.Finish surfaces to the following tolerances, in accordance with ASTM E1155, for a randomly trafficked floor surface:
a. Slabs on Ground:
1) Finish and measure surface so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.- long straightedge resting on two high spots and placed anywhere on the surface does not exceed 1/8 inch and also no more than 1/16 inch in2 feet.
CAST-IN-PLACE CONCRETE 033000 - 12
b. Suspended Slabs:
1) Finish and measure surface so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.- long straightedge resting on two high spots and placed anywhere on the surface does not exceed 1/4 inch.
2) C. Trowel and Fine-Broom Finish: Apply a first trowel finish to surfaces indicated on Drawings. While concrete is still plastic, slightly scarify surface with a fine broom perpendicular to main traffic route.
1.Coordinate required final finish with Architect before application.
2.Comply with flatness and levelness tolerances for trowel-finished floor surfaces.
D. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and locations indicated on Drawings.
1.Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route.
2.Coordinate required final finish with Architect before application.
3.9 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS
A. Filling In:
1.Fill in holes and openings left in concrete structures after Work of other trades is in place unless otherwise indicated.
2.Mix, place, and cure concrete, as specified, to blend with in-place construction.
3.Provide other miscellaneous concrete filling indicated or required to complete the Work.
B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.
C. Equipment Bases and Foundations:
1.Coordinate sizes and locations of concrete bases with actual equipment provided.
2.Construct concrete bases 4 inches high unless otherwise indicated on Drawings, and extend base not less than 6 inches in each direction beyond the maximum dimensions of supported equipment
CAST-IN-PLACE CONCRETE 033000 - 13
unless otherwise indicated on Drawings, or unless required for seismic anchor support.
3.Minimum Compressive Strength: 3000 psi at 28 days.
4.Prior to pouring concrete, place and secure anchorage devices.
a. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
b. Cast anchor-bolt insert into bases.
c. Install anchor bolts to elevations required for proper attachment to supported equipment.
3.10 CONCRETE CURING
A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
1.Comply with ACI 301 and ACI 306.1 for cold weather protection during curing.
2.Comply with ACI 301 and ACI 305.1 for hot-weather protection during curing.
3.Maintain moisture loss no more than 0.2 lb/sq. ft. x h before and during finishing operations.
B. Curing Formed Surfaces: Comply with ACI 308.1 as follows:
1.Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces.
2.Cure concrete containing color pigments in accordance with color pigment manufacturer's instructions.
3.If forms remain during curing period, moist cure after loosening forms.
4.If removing forms before end of curing period, continue curing for remainder of curing period, as follows:
a. Continuous Fogging: Maintain standing water on concrete surface until final setting of concrete.
b. Continuous Sprinkling: Maintain concrete surface continuously wet.
c. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.
CAST-IN-PLACE CONCRETE 033000 - 14
d. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.
e. Membrane-Forming Curing Compound:
Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.
1) Recoat areas subject to heavy rainfall within three hours after initial application.
2) Maintain continuity of coating and repair damage during curing period.
C. Curing Unformed Surfaces: Comply with ACI 308.1 as follows:
1.Begin curing immediately after finishing concrete.
2.Interior Concrete Floors:
a. Floors to Receive Floor Coverings Specified in Other Sections: Contractor has option of the following:
1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
a) Lap edges and ends of absorptive cover not less than 12 inches.
b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.
2) Moisture-Retaining-Cover Curing:
Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.
a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
CAST-IN-PLACE CONCRETE 033000 - 15
b) Cure for not less than seven days.
3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:
a) Water.
b) Continuous water-fog spray.
b. Floors to Receive Urethane Flooring:
1) As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
2) Rewet absorptive cover, and cover immediately with polyethylene moisture-retaining cover with edges lapped 6 inches and sealed in place.
3) Secure polyethylene moisture-retaining cover in place to prohibit air from circulating under polyethylene moisture-retaining cover.
4) Leave absorptive cover and polyethylene moisture-retaining cover in place for duration of curing period, but not less than 28 days.
3.11 TOLERANCES
A. Conform to ACI 117.
3.12 JOINT FILLING
A. Prepare, clean, and install joint filler in accordance with manufacturer's written instructions.
1.Defer joint filling until concrete has aged at least one month(s).
2.Do not fill joints until construction traffic has permanently ceased.
B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joints clean and dry.
C. Install semirigid joint filler full depth in saw-cut joints and at least 2 inches deep in formed joints.
D. Overfill joint, and trim joint filler flush with top of joint after hardening.
CAST-IN-PLACE CONCRETE 033000 - 16
3.13 CONCRETE SURFACE REPAIRS
A. Defective Concrete:
1.Repair and patch defective areas when approved by Architect.
2.Remove and replace concrete that cannot be repaired and patched to Architect's approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-1/2 parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.
1.Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension to solid concrete.
a. Limit cut depth to 3/4 inch.
b. Make edges of cuts perpendicular to concrete surface.
c. Clean, dampen with water, and brush-coat holes and voids with bonding agent.
d. Fill and compact with patching mortar before bonding agent has dried.
e. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.
2.Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement, so that, when dry, patching mortar matches surrounding color.
a. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching.
b. Compact mortar in place and strike off slightly higher than surrounding surface.
3.Repair defects on concealed formed surfaces that will affect concrete's durability and structural performance as determined by Architect.
D. Repairing Unformed Surfaces:
1.Test unformed surfaces, such as floors and slabs, for finish, and verify surface tolerances specified for each surface.
a. Correct low and high areas.
CAST-IN-PLACE CONCRETE 033000 - 17
b. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.
2.Repair finished surfaces containing surface defects, including spalls, popouts, honeycombs, rock pockets, crazing, and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.
3.After concrete has cured at least 14 days, correct high areas by grinding.
4.Correct localized low areas during, or immediately after, completing surface-finishing operations by cutting out low areas and replacing with patching mortar.
a. Finish repaired areas to blend into adjacent concrete.
5.Correct other low areas scheduled to receive floor coverings with a repair underlayment.
a. Prepare, mix, and apply repair underlayment and primer in accordance with manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
b. Feather edges to match adjacent floor elevations.
6.Correct other low areas scheduled to remain exposed with repair topping.
a. Cut out low areas to ensure a minimum repair topping depth of 1/4 inch to match adjacent floor elevations.
b. Prepare, mix, and apply repair topping and primer in accordance with manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
7.Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete.
a. Remove defective areas with clean, square cuts, and expose steel reinforcement with at least a 3/4-inch clearance all around.
b. Dampen concrete surfaces in contact with patching concrete and apply bonding agent.
CAST-IN-PLACE CONCRETE 033000 - 18
c. Mix patching concrete of same materials and mixture as original concrete, except without coarse aggregate.
d. Place, compact, and finish to blend with adjacent finished concrete.
e. Cure in same manner as adjacent concrete.
8.Repair random cracks and single holes 1 inch or less in diameter with patching mortar.
a. Groove top of cracks and cut out holes to sound concrete, and clean off dust, dirt, and loose particles.
b. Dampen cleaned concrete surfaces and apply bonding agent.
c. Place patching mortar before bonding agent has dried.
d. Compact patching mortar and finish to match adjacent concrete.
e. Keep patched area continuously moist for at least 72 hours.
E. Perform structural repairs of concrete, subject to Architect's approval, using epoxy adhesive and patching mortar.
F. Repair materials and installation not specified above may be used, subject to Architect's approval.
3.14 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
1.Testing agency to be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with ASTM C31/C31M.
2.Testing agency to immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.
3.Testing agency to report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests.
a. Test reports to include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection:
1) Project name.
2) Name of testing agency.
CAST-IN-PLACE CONCRETE 033000 - 19
3) Names and certification numbers of field and laboratory technicians performing inspections and testing.
4) Name of concrete manufacturer.
5) Date and time of inspection, sampling, and field testing.
6) Date and time of concrete placement.
7) Location in Work of concrete represented by samples.
8) Date and time sample was obtained.
9) Truck and batch ticket numbers.
10) Design compressive strength at 28 days.
11) Concrete mixture designation, proportions, and materials.
12) Field test results.
13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.
14) Type of fracture and compressive break strengths at seven days and 28 days.
B. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at Project site.
C. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M to be performed in accordance with the following requirements:
1.Testing Frequency: Obtain one composite sample…