Albion Armory Specification 13 of 15.pdf

PDF 2 MB Posted

Attached to
511/21187. CAK; Albion Armory - Renovate Armory
Solicitation number
RFQ - 171 - 220000000461
Issued by
Calhoun County, Alden CDP, Michigan

About this file

This document is a specification related to renovating the Albion Armory as part of a state and local contract opportunity in Calhoun County, Michigan. The specification covers the HVAC power ventilators, diffusers, registers, and grilles, air-to-air energy recovery ventilators, packaged outdoor central-station air-handling units, and variable refrigerant flow HVAC systems required for the project. It provides detailed technical requirements for the equipment and systems, including performance, construction, controls, and installation. The project appears to be a renovation of the existing Albion Armory facility. No specific details are provided on response dates, award dates, contract term, or funding sources.

The specification does not include any pricing terms, set asides, incumbents, or other commercial details. It focuses entirely on the technical requirements and execution of the HVAC systems for the renovation project. The goal of the document is to establish the standards and specifications that the selected HVAC contractor must meet in order to complete the work on the Albion Armory renovation.

View the file

Other files

File Type Posted
Addendum 2 270500 DATA COMMUNICATION SYSTEM 220428.docx DOCX document
Addendum 5 21187.pdf PDF
MtgAttend1 - 21187.pdf PDF
Advertisement 21187.pdf PDF
Addendum No.2 08122022 - 21187.pdf PDF
21-046 Albion Armory - A0.0 - Cover Sheet.pdf PDF
21-046 Albion Armory Civil Drawings.pdf PDF
MtgAttend1 - 21187_REVISED.pdf PDF
Addendum 3 06 Wood Plastics and Composites 21187.pdf PDF
Addendum No.6 08222022 - 21187.pdf PDF
Addendum 1 - 21187.pdf PDF
Albion Armory MEP Set.pdf PDF
Albion Armory Specification 14 of 15.pdf PDF
Albion Armory Specification 12 of 15.pdf PDF
Addendum 3 07 Thermal and Moisture Protection 21187.pdf PDF
Albion Armory Specification 11 of 15.pdf PDF
Albion Armory Specification 3 of 15.pdf PDF
Addendum 2 M-303 - MECHANICAL CONTROLS DIAGRAMS.pdf PDF
Albion Armory Specification 1 of 15.pdf PDF
Albion Armory Specification 7 of 15.pdf PDF
Addendum 3 21187.pdf PDF
Addendum 3 05 Metals 21187.pdf PDF
Albion Armory Draft Logs 11-23-21.pdf PDF
Albion Armory Specification 8 of 15.pdf PDF
Addendum 2 M-301 - MECHANICAL SCHEDULES_ —
Albion Armory Specification 4 of 15.pdf PDF
Addendum 3 08 Openings 21187.pdf PDF
Albion Armory Specification 6 of 15.pdf PDF
Specifications 21187.pdf PDF
Addendum 4 21187.pdf PDF
21-046 Albion Armory Architectural A4-S1 Set.pdf PDF
Albion Armory Draft Map 11-23-21.pdf PDF
Albion Armory Specification 9 of 15.pdf PDF
Albion Armory Specification 15 of 15.pdf PDF
Albion Armory Specification 10 of 15.pdf PDF
Albion Armory Specification 2 of 15.pdf PDF
Albion Armory Specification 5 of 15.pdf PDF
21-046 Albion Armory Architectural A0-A3 Set.pdf PDF
Addendum 2 E-301 - ELECTRICAL DATA.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE ARMORY – ALBION ARMORY

HVAC POWER VENTILATORS 23 3423 - 1

SECTION 23 3423 - HVAC POWER VENTILATORS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Centrifugal roof ventilators.

1.3 PERFORMANCE REQUIREMENTS

A. Project Altitude: Base fan-performance ratings on sea level.

B. Operating Limits: Classify according to AMCA 99.

1.4 ACTION SUBMITTALS

A. Product Data: Include rated capacities, furnished specialties, and accessories for each type of product indicated and include the following:

1. Certified fan performance curves with system operating conditions indicated.

2. Certified fan sound-power ratings.

3. Motor ratings and electrical characteristics, plus motor and electrical accessories.

4. Material thickness and finishes, including color charts.

5. Dampers, including housings, linkages, and operators.

6. Roof curbs.

7. Fan speed controllers.

B. Operation and Maintenance Data: For power ventilators to include in emergency, operation, and maintenance manuals.

1.5 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. AMCA Compliance: Products shall comply with performance requirements and shall be licensed to use the AMCA-Certified Ratings Seal.

C. NEMA Compliance: Motors and electrical accessories shall comply with NEMA standards.

D. UL Standard: Power ventilators shall comply with UL 705.

HVAC POWER VENTILATORS 23 3423 - 2

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver fans as factory-assembled unit, to the extent allowable by shipping limitations, with protective crating and covering.

B. Disassemble and reassemble units, as required for moving to final location, according to manufacturer's written instructions.

C. Lift and support units with manufacturer's designated lifting or supporting points.

1.7 COORDINATION

A. Coordinate size and location of structural-steel support members.

B. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 03.

C. Coordinate installation of roof curbs, equipment supports, and roof penetrations. These items are specified in Division 07 Section "Roof Accessories."

1.8 EXTRA MATERIALS

A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Belts: One set for each belt-driven unit.

PART 2 - PRODUCTS

2.1 CENTRIFUGAL ROOF VENTILATORS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Acme Engineering & Mfg. Corp.

2. Greenheck.

3. Penn Ventilation.

4. Loren Cook Company

5. Others by voluntary alternate.

B. Description: Direct- or belt-driven centrifugal fans consisting of housing, wheel, fan shaft, bearings, motor and disconnect switch, drive assembly, curb base, and accessories.

C. Housing: Removable, spun-aluminum, dome top and outlet baffle, extruded-aluminum, rectangular top, or galvanized steel, mushroom-domed top; square, one-piece, aluminum base with venturi inlet cone.

D. Fan Wheels: Aluminum hub and wheel with backward-inclined blades.

E. Belt-Driven Drive Assembly: Resiliently mounted to housing, with the following features:

1. Fan Shaft: Turned, ground, and polished steel; keyed to wheel hub.

HVAC POWER VENTILATORS 23 3423 - 3

2. Shaft Bearings: Permanently lubricated, permanently sealed, self-aligning ball bearings.

3. Pulleys: Cast-iron, adjustable-pitch motor pulley.

4. Fan and motor isolated from exhaust airstream.

F. Accessories:

1. Bird Screens: Removable, 1/2-inch mesh, aluminum or brass wire.

2. Dampers: Counterbalanced, parallel-blade, backdraft dampers mounted in curb base;

factory set to close when fan stops.

G. Roof Curbs: Galvanized steel; mitered and welded corners; 1-1/2-inch-thick, rigid, fiberglass insulation adhered to inside walls; and 1-1/2-inch wood nailer. Size as required to suit roof opening and fan base.

1. Configuration: Self-flashing without a cant strip, with mounting flange or Built-in cant and mounting flange.

2. Overall Height: 14 inches.

3. Sound Curb: Curb with sound-absorbing insulation matrix.

4. Pitch Mounting: Manufacture curb for roof slope.

5. Metal Liner: Galvanized steel.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install power ventilators level and plumb.

B. Support units using Elastomeric mounts, restrained elastomeric mounts, spring isolators, and restrained spring isolators having a static deflection of 1 inch. Vibration- and seismic-control devices are specified in Division 23 Section "Vibration and Seismic Controls for HVAC Piping and Equipment."

1. Secure vibration and seismic controls to concrete bases using anchor bolts cast in concrete base.

C. Secure roof-mounting fans to roof curbs with cadmium-plated hardware. Refer to Division 07 Section "Roof Accessories" for installation of roof curbs.

D. Support suspended units from structure using threaded steel rods and elastomeric hangers, and spring hangers with vertical-limit stops having a static deflection of 1 inch. Vibration-control devices are specified in Division 23 Section "Vibration and Seismic Controls for HVAC Piping and Equipment."

E. Install units with clearances for service and maintenance.

F. Label units according to requirements specified in Division 23 Section "Identification for HVAC Piping and Equipment."

HVAC POWER VENTILATORS 23 3423 - 4

3.2 CONNECTIONS

A. Duct installation and connection requirements are specified in other Division 23 Sections.

Drawings indicate general arrangement of ducts and duct accessories. Make final duct connections with flexible connectors. Flexible connectors are specified in Division 23 Section "Air Duct Accessories."

B. Install ducts adjacent to power ventilators to allow service and maintenance.

C. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical Systems."

D. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."

3.3 FIELD QUALITY CONTROL

A. Perform the following field tests and inspections and prepare test reports:

1. Verify that shipping, blocking, and bracing are removed.

2. Verify that unit is secure on mountings and supporting devices and that connections to ducts and electrical components are complete. Verify that proper thermal-overload protection is installed in motors, starters, and disconnect switches.

3. Verify that cleaning and adjusting are complete.

4. Disconnect fan drive from motor, verify proper motor rotation direction, and verify fan wheel free rotation and smooth bearing operation. Reconnect fan drive system, align and adjust belts, and install belt guards.

5. Adjust belt tension.

6. Adjust damper linkages for proper damper operation.

7. Verify lubrication for bearings and other moving parts.

8. Verify that manual and automatic volume control and fire and smoke dampers in connected ductwork systems are in fully open position.

9. Disable automatic temperature-control operators, energize motor and adjust fan to indicated rpm, and measure and record motor voltage and amperage.

10. Shut unit down and reconnect automatic temperature-control operators.

11. Remove and replace malfunctioning units and retest as specified above.

B. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

3.4 ADJUSTING

A. Adjust damper linkages for proper damper operation.

B. Adjust belt tension.

C. Refer to Division 23 Section "Testing, Adjusting, and Balancing for HVAC" for testing, adjusting, and balancing procedures.

D. Replace fan and motor pulleys as required to achieve design airflow.

HVAC POWER VENTILATORS 23 3423 - 5

E. Lubricate bearings.

END OF SECTION 23 3423

DIFFUSERS, REGISTERS, AND GRILLES 23 3713 - 1

SECTION 23 3713 - DIFFUSERS, REGISTERS, AND GRILLES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Rectangular and square ceiling diffusers.

2. Perforated diffusers.

3. Louver face diffusers.

4. Fixed face registers and grilles.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated, include the following:

1. Data Sheet: Indicate materials of construction, finish, and mounting details; and performance data including throw and drop, static-pressure drop, and noise ratings.

2. Diffuser, Register, and Grille Schedule: Indicate drawing designation, room location, quantity, model number, size, and accessories furnished.

B. Source quality-control reports.

PART 2 - PRODUCTS

2.1 CEILING DIFFUSERS

A. All Diffusers and Grilles:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Nailor Industries Inc.

b. Price Industries.

c. Titus.

d. Others by voluntary alternate.

2. Devices shall be specifically designed for variable-air-volume flows.

3. Material: Steel or Aluminum per schedule on drawings.

4. Finish: Baked enamel, color selected by Architect.

5. Face Style: Per schedule on drawings.

6. Mounting: Per schedule on drawings.

7. Pattern: Fully adjustable.

DIFFUSERS, REGISTERS, AND GRILLES 23 3713 - 2

8. Accessories:

a. Plaster ring as required.

b. Wire guard as required.

c. Sectorizing baffles as required.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas where diffusers, registers, and grilles are to be installed for compliance with requirements for installation tolerances and other conditions affecting performance of equipment.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install diffusers, registers, and grilles level and plumb.

B. Ceiling-Mounted Outlets and Inlets: Drawings indicate general arrangement of ducts, fittings, and accessories. Air outlet and inlet locations have been indicated to achieve design requirements for air volume, noise criteria, airflow pattern, throw, and pressure drop. Make final locations where indicated, as much as practical. For units installed in lay-in ceiling panels, locate units in the center of panel. Where architectural features or other items conflict with installation, notify Architect for a determination of final location.

C. Install diffusers, registers, and grilles with airtight connections to ducts and to allow service and maintenance of dampers, air extractors, and fire dampers.

3.3 ADJUSTING

A. After installation, adjust diffusers, registers, and grilles to air patterns indicated, or as directed, before starting air balancing.

END OF SECTION 23 3713

SECTION 23 7200 - AIR-TO-AIR ENERGY RECOVERY VENTILATOR

PART 1 - GENERAL

1.1 SUMMARY

● This section includes Air-to-Air Energy Recovery Ventilators for rooftop installation.

● Within this document, these units may be referred to as Energy Recovery Ventilator (ERV) for brevity.

1.2 RELATED

Drawing and general provisions of the contract, including General Requirements Division 01, Division 23, Division 23 Specifications Sections, and common work requirements for HVAC apply to work specified in this section.

● Section 23 0900: Controls and Instrumentation

1.3 SUBMITTALS

● Product data: For each type or model of Energy Recovery Ventilator, include the following:

o Unit performance data for both Supply Air and Exhaust Air, with system operating conditions indicated.

o Enthalpy plate performance data for both summer and winter operation.

o Motor ratings and unit electrical characteristics.

o Dimensioned drawings for each type of installation, showing isometric and plan views, to include location of attached ductwork and service clearance requirements.

o Estimated gross weight of each installed unit.

o Filter types, quantities, and sizes o Installation, Operating and Maintenance manual (IOM) for each model.

● Shop Drawings: For air-to-air energy recovery ventilators, include plans, elevations, sections, details, and attachments to other work.

o Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

o Wiring Diagrams: For power, signal, and control wiring.

● Operation and maintenance data for air-to-air energy recovery ventilator

1.4 QUALITY ASSURANCE

● Source Limitations: Obtain Air-to-Air Energy Recovery Ventilator with all appurtenant components or accessories from a single manufacturer.

AIR-TO-AIR ENERGY RECOVERY VENTILATOR 23 7200 - 1

● For the actual fabrication, installation and testing of work under this section; use only thoroughly trained and experienced workers completely familiar with the items required and with the manufacturer's current recommended methods of installation.

● The ERV core shall be warranted to be free of manufacturing defects and to retain its functional characteristics, under circumstances of normal use, for a period of ten (10) years from the date of purchase.

The balance-of-unit shall be warranted to be free of manufacturing defects and to retain its functional characteristics, under circumstances of normal use, for a period of two (2) years from the date of installation.

● Manufacturer shall be able to provide evidence of independent testing of the core by Underwriters Laboratory (UL), verifying a maximum flame spread index (FSI) of 25 and a maximum smoke developed index (SDI) of 50 thereby meeting NFPA90A and NFPA 90B requirements for materials in a compartment handling air intended for circulation through a duct system. The method of test shall be UL Standard 723.

● Certifications:

o The energy recovery cores used in these products shall be third party Certified by AHRI under its Standard 1060 for Energy Recovery Ventilators. AHRI published certifications shall confirm manufacturer’s published performance for airflow, static pressure, temperature and total effectiveness, purge air (OACF) and exhaust air leakage (EATR).

Products that are not currently AHRI certified will not be accepted. OACF shall be no more than 1.02 and EATR shall be at 0% against balanced airflow.

o Entire unit shall be listed under UL 1812 Standard for Ducted Air to Air Heat Exchangers and comply with CSA Standard 22.2.

o Units intended for outdoor use shall be rain tested in accordance with UL 1812 Section 67.

● Every unit to be factory tested prior to shipping: Motor Dielectric Voltage-Withstand Bench Test, Unit Dielectric Voltage-Withstand Test, Continuity of Internal Control Circuits Test, Unit Amperage Test

1.5 COORDINATION

● Coordinate size and location of all building penetrations required for installation of each Energy Recovery Ventilator and associated electrical systems.

● Coordinate sequencing of construction for associated plumbing, HVAC, electrical supply.

● Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual equipment provided.

PART 2 – PRODUCTS

2.1 MANUFACTURERS

AIR-TO-AIR ENERGY RECOVERY VENTILATOR 23 7200 - 2

● Available Manufacturers: Subject to compliance with specifications contained within this document, manufacturers offering products that may be incorporated into the work include, but are not limited to:

o RenewAire

● Manufacturer should be in business for minimum 10 years manufacturing energy recovery ventilators.

2.2 MANUFACTURED UNITS

● Air-to-Air Energy Recovery Ventilators shall be fully assembled at the factory and consist of a fixed-plate cross-flow heat exchanger with no moving parts, an insulated double wall 20-gauge steel cabinet, outdoor air hood with bird screen, motorized outside air intake damper, filter assemblies for both intake and exhaust air, enthalpy core, supply air blower assembly, motorized return air damper, exhaust air hood, exhaust air blower assembly and electrical control box with all specified components and internal accessories factory installed and tested and prepared for single-point high voltage connection. Entire unit with the exception of field-installed components shall be assembled and test operated at the factory.

2.3 CABINET

● Materials: Formed double wall insulated metal cabinet, fabricated to permit access to internal components for maintenance.

● Outside casing: 20 gauge, galvanized (G90) steel meeting ASTM A653 for components that do not receive a painted finish.

● Access doors shall be hinged with airtight closed cell foam gaskets. Door pressure taps, with captive plugs, shall be provided for cross-core pressure measurement allowing for accurate airflow measurement.

● Unit shall have factory-installed duct flanges on all duct openings.

● Cabinet Insulation: Unit walls and doors shall be insulated with 1 inch, 4 pound density, foil/scrim faced, high density fiberglass board insulation, providing a cleanable surface and eliminating the possibility of exposing the fresh air to glass fibers, and with a minimum R-value of 4.3 (hr-ft2-°F/BTU).

● Enthalpy core: Energy recovery core shall be of the total enthalpy type, capable of transferring both sensible and latent energy between airstreams. Latent energy transfer shall be accomplished by direct water vapor transfer from one airstream to the other, without exposing transfer media in succeeding cycles directly to the exhaust air and then to the fresh air. No condensate drains shall be allowed. The energy recovery core shall be designed and constructed to permit cleaning and removal for servicing. The energy recovery core shall have a ten year warranty. Performance criteria are to be as specified in AHRI Standard 1060.

● Control center / connections: Energy Recovery Ventilator shall have an electrical control center where all high and low voltage connections are made. Control center shall be constructed to permit single-point high voltage power supply connections to the fused disconnect.

AIR-TO-AIR ENERGY RECOVERY VENTILATOR 23 7200 - 3

● Passive Frost Control: The ERV core shall perform without condensing or frosting under normal operating conditions (defined as outside temperatures above -10ºF and inside relative humidity below 40%). Occasional more extreme conditions shall not affect the usual function, performance or durability of the core. No condensate drains will be allowed.

● Motorized Isolation Damper(s): Return Air and Outside Air motorized dampers of an AMCA Class I low leakage type shall be factory installed.

2.4 BLOWER SECTION

● Blower section construction, Supply Air and Exhaust Air: Blower assemblies consist of a 208-230V 1 Phase 60 HZ, TEFC motor, and a belt driven forward-curved blower.

● Blower assemblies: Shall be statically and dynamically balanced and designed for continuous operation at maximum rated fan speed and horsepower.

2.5 MOTORS

● Blower motors shall be Premium Efficiency, EISA compliant for energy efficiency. The blower motors shall be totally enclosed (TEFC) and be shall be supplied with factory installed motor starters.

● Belt drive motors shall be provided with adjustable pulleys and motor mounts allowing for blower speed adjustment, proper motor shaft orientation and proper belt tensioning.

2.6 FILTER SECTION

● ERV shall have 2" thick MERV 13 disposable pleated filters located in the outdoor air and exhaust airstreams. All filters shall be accessible from the exterior of the unit.

PART 3 – EXECUTION

3.1 EXAMINATION

● Prior to start of installation, examine area and conditions to verify correct location for compliance with installation tolerances and other conditions affecting unit performance. See unit IOM.

● Examine roughing-in of plumbing, electrical and HVAC services to verify actual location and compliance with unit requirements. See unit IOM.

● Proceed with installation only after all unsatisfactory conditions have been corrected.

3.2 INSTALLATION

● Installation shall be accomplished in accordance with these written specifications, project drawings, manufacturer’s installation instructions as documented in manufacturer’s IOM, Best Practices and all applicable building codes.

AIR-TO-AIR ENERGY RECOVERY VENTILATOR 23 7200 - 4

● Install unit with clearances for service and maintenance.

3.3 CONNECTIONS

In all cases, industry Best Practices shall be incorporated. Connections are to be made subject to the installation requirements shown above.

● Duct installation and connection requirements are specified in Division 23 of this document.

● Electrical installation requirements are specified in Division 26 of this document.

3.4 FIELD QUALITY CONTROL

● Contractor to inspect field assembled components and equipment installation, to include electrical and piping connections. Report results to Architect/Engineer in writing. Inspection must include a complete startup checklist to include (as a minimum) the following:

Completed Start-Up Checklists as found in manufacturer’s IOM. Insert any other requirements here.

3.5 START-UP SERVICE

● Contractor to perform startup service. Clean entire unit, comb coil fins as necessary, and install clean filters. Measure and record electrical values for voltage and amperage. Refer to Division 23 “Testing, Adjusting and Balancing” and comply with provisions therein.

3.6 DEMONSTRATION AND TRAINING

● Contractor to train owner’s maintenance personnel to adjust, operate and maintain the entire Make-Up Air unit. Refer to Division 01 Section Closeout Procedures and Demonstration and Training.

END OF SECTION 23 7200

AIR-TO-AIR ENERGY RECOVERY VENTILATOR 23 7200 - 5

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 1

SECTION 23 7413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the following components and accessories:

1. Direct-expansion cooling.

2. Gas furnace.

3. Economizer outdoor- and return-air damper section.

4. Integral, space temperature controls.

5. Roof curbs.

1.3 DEFINITIONS

A. DDC: Direct-digital controls.

B. ECM: Electrically commutated motor.

C. Outdoor-Air Refrigerant Coil: Refrigerant coil in the outdoor-air stream to reject heat during cooling operations and to absorb heat during heating operations. "Outdoor air" is defined as the air outside the building or taken from outdoors and not previously circulated through the system.

D. Outdoor-Air Refrigerant-Coil Fan: The outdoor-air refrigerant-coil fan in RTUs. "Outdoor air" is defined as the air outside the building or taken from outdoors and not previously circulated through the system.

E. RTU: Rooftop unit. As used in this Section, this abbreviation means packaged, outdoor, central-station air-handling units. This abbreviation is used regardless of whether the unit is mounted on the roof or on a concrete base on ground.

F. Supply-Air Fan: The fan providing supply air to conditioned space. "Supply air" is defined as the air entering a space from air-conditioning, heating, or ventilating apparatus.

G. Supply-Air Refrigerant Coil: Refrigerant coil in the supply-air stream to absorb heat (provide cooling) during cooling operations and to reject heat (provide heating) during heating operations. "Supply air" is defined as the air entering a space from air-conditioning, heating, or ventilating apparatus.

H. VVT: Variable-air volume and temperature.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 2

1.4 ACTION SUBMITTALS

A. Product Data: Include manufacturer's technical data for each RTU, including rated capacities, dimensions, required clearances, characteristics, furnished specialties, and accessories.

1.5 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For RTUs to include in emergency, operation, and maintenance manuals.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Fan Belts: One set for each belt-driven fan.

2. Filters: Three sets of filters for each unit.

1.7 QUALITY ASSURANCE

A. ARI Compliance:

1. Comply with ARI 203/110 and ARI 303/110 for testing and rating energy efficiencies for RTUs.

2. Comply with ARI 270 for testing and rating sound performance for RTUs.

B. ASHRAE Compliance:

1. Comply with ASHRAE 15 for refrigeration system safety.

2. Comply with ASHRAE 33 for methods of testing cooling and heating coils.

3. Comply with applicable requirements in ASHRAE 62.1, Section 5 - "Systems and

Equipment" and Section 7 - "Construction and Startup."

C. ASHRAE/IESNA 90.1 Compliance: Applicable requirements in ASHRAE/IESNA 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."

D. NFPA Compliance: Comply with NFPA 90A and NFPA 90B.

E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

1.8 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to replace components of RTUs that fail in materials or workmanship within specified warranty period.

1. Warranty Period for Compressors: Manufacturer's standard, but not less than 5 years from date of Substantial Completion.

2. Warranty Period for Gas Furnace Heat Exchangers: Manufacturer's standard, but not less than 10 years from date of Substantial Completion.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 3

3. Warranty Period for Solid-State Ignition Modules: Manufacturer's standard, but not less than 3 years from date of Substantial Completion.

4. Warranty Period for Control Boards: Manufacturer's standard, but not less than 3 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. AAON, Inc.

2. Trane; American Standard Companies, Inc.

2.2 CASING

A. Exterior Casing Material: Galvanized steel with factory-painted finish, with pitched roof panels and knockouts with grommet seals for electrical and piping connections and lifting lugs.

1. Exterior Casing Thickness: 0.052 inch thick.

B. Casing Insulation and Adhesive: Comply with NFPA 90A or NFPA 90B.

1. Materials: ASTM C 1071, Type I.

2. Thickness: 1/2 inch.

3. Liner materials shall have air-stream surface coated with an erosion- and temperature-resistant coating or faced with a plain or coated fibrous mat or fabric.

4. Liner Adhesive: Comply with ASTM C 916, Type I.

C. Condensate Drain Pans: Formed sections of stainless-steel sheet, a minimum of 2 inches deep, and complying with ASHRAE 62.1.

1. Double-Wall Construction: Fill space between walls with foam insulation and seal moisture tight.

2. Drain Connections: Threaded nipple.

D. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in

ASHRAE 62.1.

2.3 FANS

A. Direct-Driven Supply-Air Fans: Double width, forward curved, centrifugal; with permanently lubricated, multispeed motor resiliently mounted in the fan inlet. Aluminum or painted-steel wheels, and galvanized- or painted-steel fan scrolls.

B. Belt-Driven Supply-Air Fans: Double width, forward curved, centrifugal; with permanently lubricated, single-speed motor installed on an adjustable fan base resiliently mounted in the casing. Aluminum or painted-steel wheels, and galvanized- or painted-steel fan scrolls.

C. Condenser-Coil Fan: Propeller, mounted on shaft of permanently lubricated motor.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 4

2.4 COILS

A. Supply-Air Refrigerant Coil:

1. Aluminum -plate fin and seamless copper tube in steel casing with equalizing-type vertical distributor.

2. Coil Split: Interlaced.

3. Baked phenolic coating.

4. Condensate Drain Pan: Stainless steel formed with pitch and drain connections complying with ASHRAE 62.1.

B. Outdoor-Air Refrigerant Coil:

1. Aluminum-plate fin and seamless copper tube in steel casing with equalizing-type vertical distributor.

2. Baked phenolic coating.

C. Hot-Gas Reheat Refrigerant Coil: (NOT USED)

1. Aluminum-plate fin and seamless copper tube in steel casing with equalizing-type vertical distributor.

2.5 REFRIGERANT CIRCUIT COMPONENTS

A. Number of Refrigerant Circuits: One for units 6-tons and smaller; Two for units 7.5-tons and Larger.

B. Compressor: Hermetic, scroll, mounted on vibration isolators; with internal overcurrent and high-temperature protection, internal pressure relief, and crankcase heater.

C. Refrigeration Specialties:

1. Refrigerant: R-410A.

2. Expansion valve with replaceable thermostatic element.

3. Refrigerant filter/dryer.

4. Manual-reset high-pressure safety switch.

5. Automatic-reset low-pressure safety switch.

6. Minimum off-time relay.

7. Automatic-reset compressor motor thermal overload.

8. Brass service valves installed in compressor suction and liquid lines.

9. Low-ambient kit high-pressure sensor.

2.6 AIR FILTRATION

A. Minimum arrestance according to ASHRAE 52.1, and a minimum efficiency reporting value (MERV) according to ASHRAE 52.2.

1. Glass Fiber: Minimum 80 percent arrestance, and MERV 5.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 5

B. Heating Coil

1. Access to heating coil shall be through hinged access door with lockable quarter turn handles.

2. Steam Distributing Heating Coil

a. Coil shall be hydrogen leak tested.

b. Tube-in-tube distributing coil shall be constructed of copper tubes with aluminum fins mechanically bonded to the tubes and aluminum end casings. Fin design shall be sine wave rippled.

c. Coil shall have single serpentine circuitry, 1 row and 12 fins per inch.

d. Coil shall have right hand external piping connections. Supply and return connec-tions shall be sweat connection. Coil connections shall be labeled, extend beyond the unit casing, and be factory sealed on both the interior and exterior of the unit casing to minimize air leakage.

e. Control valves shall be field supplied and field installed.

f. Coil shall be located in the preheat position upstream of the cooling coil.

2.7 DAMPERS

A. Outdoor- and Return-Air Mixing Dampers: Parallel- or opposed-blade galvanized-steel dampers mechanically fastened to cadmium plated for galvanized-steel operating rod in reinforced cabinet. Connect operating rods with common linkage and interconnect linkages so dampers operate simultaneously.

1. Damper Motor: Modulating with adjustable minimum position.

2. Relief-Air Damper: Gravity actuated or motorized, as required by

ASHRAE/IESNA 90.1, with bird screen and hood.

2.8 ELECTRICAL POWER CONNECTION

A. Provide for single connection of power to unit with unit-mounted disconnect switch accessible from outside unit and control-circuit transformer with built-in overcurrent protection.

2.9 CONTROLS

A. Control equipment and sequence of operation are specified in Section 23 0900 "Instrumentation and Control for HVAC."

B. Basic Unit Controls:

1. Control-voltage transformer.

2. Unit-Mounted Annunciator Panel for Each Unit:

a. Lights to indicate power on, cooling, heating, fan running, filter dirty, and unit alarm or failure.

b. DDC controller or programmable timer and interface with HVAC instrumentation and control system.

c. Digital display of outdoor-air temperature, supply-air temperature, return-air temperature, economizer damper position, indoor-air quality, and control parameters.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 6

C. DDC Controller:

1. Controller shall have volatile-memory backup.

2. Safety Control Operation:

a. Smoke Detectors: Stop fan and close outdoor-air damper if smoke is detected.

Provide additional contacts for alarm interface to fire alarm control panel.

b. Firestats: Stop fan and close outdoor-air damper if air greater than 130 deg F enters unit. Provide additional contacts for alarm interface to fire alarm control panel.

3. Scheduled Operation: Occupied and unoccupied periods on 365-day clock with a minimum of four programmable periods per day.

4. Unoccupied Period:

a. Heating Setback: 10 deg F

b. Cooling Setback: System off.

c. Override Operation: Two hours.

5. Supply Fan Operation:

a. Occupied Periods: Run fan continuously.

b. Unoccupied Periods: Cycle fan to maintain setback temperature.

6. Refrigerant Circuit Operation:

a. Occupied Periods: Cycle or stage compressors to match compressor output to cooling load to maintain discharge temperature. Cycle condenser fans to maintain maximum hot-gas pressure. Operate low-ambient control kit to maintain minimum hot-gas pressure.

b. Unoccupied Periods: Compressors off.

7. Steam Coil Operation:

a. Occupied Periods: Cycle control valve to maintain discharge temperature.

b. Unoccupied Periods: Cycle control valve to maintain setback temperature.

8. Economizer Outdoor-Air Damper Operation:

a. Occupied Periods: Open to 20 percent fixed minimum intake, and maximum 100 percent of the fan capacity to comply with ASHRAE Cycle II. Controller shall permit air-side economizer operation when outdoor air is less than 60 deg F. Use mixed-air temperature and select between outdoor-air and return-air enthalpy to adjust mixing dampers During economizer cycle operation, lock out cooling.

b. Unoccupied Periods: Close outdoor-air damper and open return-air damper.

9. Carbon Dioxide Sensor Operation:

a. Occupied Periods: Reset minimum outdoor-air ratio down to minimum 10 percent to maintain maximum 750-ppm concentration.

b. Unoccupied Periods: Close outdoor-air damper and open return-air damper.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 7

10. VVT Relays:

a. Provide heating- and cooling-mode changeover relays compatible with VVT terminal control system required in Section 23 0900 "Instrumentation and Control for HVAC."

D. Interface Requirements for HVAC Instrumentation and Control System:

1. Interface relay for scheduled operation.

2. Interface relay to provide indication of fault at the central workstation and diagnostic code storage.

3. Provide LonWorks compatible interface for central HVAC control workstation for the following:

a. Adjusting set points.

b. Monitoring supply fan start, stop, and operation.

c. Inquiring data to include outdoor-air damper position, supply- and room-air temperature.

d. Monitoring occupied and unoccupied operations.

2.10 ACCESSORIES

A. Duplex, 115-V, ground-fault-interrupter outlet with 15-A overcurrent protection. Include transformer if required. Outlet shall be energized even if the unit main disconnect is open.

B. Filter differential pressure switch with sensor tubing on either side of filter. Set for final filter pressure loss.

2.11 ROOF CURBS

A. Materials: Galvanized steel with corrosion-protection coating, watertight gaskets, and factory-installed wood nailer; complying with NRCA standards.

1. Application: Factory applied with adhesive and mechanical fasteners to the internal surface of curb.

a. Liner Adhesive: Comply with ASTM C 916, Type I.

b. Mechanical Fasteners: Galvanized steel, suitable for adhesive attachment, mechanical attachment, or welding attachment to duct without damaging liner when applied as recommended by manufacturer and without causing leakage in cabinet.

c. Liner materials applied in this location shall have air-stream surface coated with a temperature-resistant coating or faced with a plain or coated fibrous mat or fabric depending on service air velocity.

d. Liner Adhesive: Comply with ASTM C 916, Type I.

B. Curb Height: 14 inches.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 8

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of RTUs.

B. Examine roughing-in for RTUs to verify actual locations of piping and duct connections before equipment installation.

C. Examine roofs for suitable conditions where RTUs will be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Roof Curb: Install on roof structure or concrete base, level and secure, according to NRCA's "Low-Slope Membrane Roofing Construction Details Manual," Illustration "Raised Curb Detail for Rooftop Air Handling Units and Ducts."

Install RTUs on curbs and coordinate roof penetrations and flashing with roof construction specified in Section 07 7200 "Roof Accessories." Secure RTUs to upper curb rail, and secure curb base to roof framing or concrete base with anchor bolts.

3.3 CONNECTIONS

A. Install condensate drain, minimum connection size, with trap and indirect connection to nearest roof drain or area drain.

B. Install piping adjacent to RTUs to allow service and maintenance.

1. Gas Piping: Comply with applicable requirements in Section 23 1123 "Facility Natural- Gas Piping." Connect gas piping to burner, full size of gas train inlet, and connect with union and shutoff valve with sufficient clearance for burner removal and service.

C. Duct installation requirements are specified in other HVAC Sections. Drawings indicate the general arrangement of ducts. The following are specific connection requirements:

1. Install ducts to termination at top of roof curb.

2. Remove roof decking only as required for passage of ducts. Do not cut out decking under entire roof curb.

3. Connect supply ducts to RTUs with flexible duct connectors specified in Section 23 3300

"Air Duct Accessories."

4. Install return-air duct continuously through roof structure.

3.4 FIELD QUALITY CONTROL

A. Perform tests and inspections and prepare test reports.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 9

B. Tests and Inspections:

1. After installing RTUs and after electrical circuitry has been energized, test units for compliance with requirements.

2. Inspect for and remove shipping bolts, blocks, and tie-down straps.

3. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.

4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

C. Remove and replace malfunctioning units and retest as specified above.

3.5 STARTUP SERVICE

A. Complete installation and startup checks according to manufacturer's written instructions and do the following:

1. Inspect for visible damage to unit casing.

2. Inspect for visible damage to furnace combustion chamber.

3. Inspect for visible damage to compressor, coils, and fans.

4. Inspect internal insulation.

5. Verify that labels are clearly visible.

6. Verify that clearances have been provided for servicing.

7. Verify that controls are connected and operable.

8. Verify that filters are installed.

9. Clean condenser coil and inspect for construction debris.

10. Clean furnace flue and inspect for construction debris.

11. Connect and purge gas line.

12. Remove packing from vibration isolators.

13. Inspect operation of barometric relief dampers.

14. Verify lubrication on fan and motor bearings.

15. Inspect fan-wheel rotation for movement in correct direction without vibration and binding.

16. Adjust fan belts to proper alignment and tension.

17. Start unit according to manufacturer's written instructions.

a. Start refrigeration system.

b. Do not operate below recommended low-ambient temperature.

c. Complete startup sheets and attach copy with Contractor's startup report.

18. Inspect and record performance of interlocks and protective devices; verify sequences.

19. Operate unit for an initial period as recommended or required by manufacturer.

20. Perform the following operations for both minimum and maximum firing. Adjust burner for peak efficiency.

a. Measure gas pressure on manifold.

b. Inspect operation of power vents.

c. Measure combustion-air temperature at inlet to combustion chamber.

d. Measure flue-gas temperature at furnace discharge.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 10

e. Perform flue-gas analysis. Measure and record flue-gas carbon dioxide and oxygen concentration.

f. Measure supply-air temperature and volume when burner is at maximum firing rate and when burner is off. Calculate useful heat to supply air.

21. Calibrate thermostats.

22. Adjust and inspect high-temperature limits.

23. Inspect outdoor-air dampers for proper stroke and interlock with return-air dampers.

24. Start refrigeration system and measure and record the following when ambient is a minimum of 15 deg F above return-air temperature:

a. Coil leaving-air, dry- and wet-bulb temperatures.

b. Coil entering-air, dry- and wet-bulb temperatures.

c. Outdoor-air, dry-bulb temperature.

d. Outdoor-air-coil, discharge-air, dry-bulb temperature.

25. Inspect controls for correct sequencing of heating, mixing dampers, refrigeration, and normal and emergency shutdown.

26. Measure and record the following minimum and maximum airflows. Plot fan volumes on fan curve.

a. Supply-air volume.

b. Return-air volume.

c. Relief-air volume.

d. Outdoor-air intake volume.

27. Simulate maximum cooling demand and inspect the following:

a. Compressor refrigerant suction and hot-gas pressures.

b. Short circuiting of air through condenser coil or from condenser fans to outdoor-air intake.

28. Verify operation of remote panel including pilot-light operation and failure modes.

Inspect the following:

a. High-temperature limit on gas-fired heat exchanger.

b. Low-temperature safety operation.

c. Filter high-pressure differential alarm.

d. Economizer to minimum outdoor-air changeover.

e. Relief-air fan operation.

f. Smoke and firestat alarms.

29. After startup and performance testing and prior to Substantial Completion, replace existing filters with new filters.

3.6 CLEANING AND ADJUSTING

A. Occupancy Adjustments: When requested within 12 months of date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two visits to site during other-than-normal occupancy hours for this purpose.

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS 23 7413 - 11

B. After completing system installation and testing, adjusting, and balancing RTU and air-distribution systems, clean filter housings and install new filters.

3.7 DEMONSTRATION

A. Train the Owner's maintenance personnel to adjust, operate, and maintain RTUs. Refer to Section 01 7900 "Demonstration and Training."

END OF SECTION 23 7413

SECTION 23 8126 – VARIABLE REFRIGERANT FLOW HVAC SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes complete Variable Refrigerant Flow (VRF) HVAC system(s) including, but not limited to, delegated design and the following components to make a complete operating system(s) according to requirements indicated:

1. Outdoor, three-phase, air-source heat pump & heat recovery condensing units.

2. Indoor, three-phase, water-source heat pump & heat recovery condensing units.

3. Outdoor, single-phase, air-source heat pump & heat recovery condensing units.

4. Indoor, heat recovery boxes.

5. Indoor, ceiling concealed, high-static ducted fan coil units.

6. Complete VRF Control System.

7. VRF Refrigeration Piping Requirements.

8. VRF Manufacturer’s engineering and installation support qualifications.

9. VRF Installer Qualifications and Execution.

1.3 DEFINITIONS

A. Variable Refrigerant Flow (VRF) HVAC System: Variable capacity, direct expansion (DX) field-selectable heat pump or heat recovery engineered system within a single condensing unit cabinet. The outdoor unit consists of one or more frames connected through a common 2-pipe heat pump or 3-pipe heat recovery refrigerant piping network and control communication wiring. Each system consists of single or multiple inverter-driven compressor(s). Each system may be connected to multiple indoor units (ducted, non-ducted, or mixed combinations) through a common refrigerant piping network and integrated system controls and communication network. Each indoor unit may be controlled individually or as a group.

B. Heat Pump System Operation: VRF system only capable of operation in either heating or cooling mode across all zones served by a single VRF condensing unit. Heat pump VRF systems utilizing a two-pipe system design consist of one high pressure refrigerant vapor line one refrigerant liquid line connected to a single VRF condensing unit or multiple-manifolded VRF condensing units in a single system to associated system indoor fan coil units.

C. Heat Recovery System Operation: VRF system capable of operation with simultaneous heating and cooling between multiple zones served by a single VRF condensing unit. Heat recovery VRF systems utilizing a three-pipe system design consist of one high pressure refrigerant vapor line, one medium pressure refrigerant vapor line, and one refrigerant liquid line connected to a single VRF condensing unit or multiple-manifolded VRF condensing units in a single system to associated

VARIABLE REFRIGERANT FLOW HVAC SYSTEMS 23 8126 - 1

system Heat Recovery Boxes. One refrigerant liquid line and one refrigerant vapor line connect Heat Recovery Boxes to associated indoor fan coil units.

D. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50V, or for remote-control, signaling power-limited circuits.

E. Plenum: A space forming part of the air distribution system to which one or more air ducts are connected. An air duct passageway, other than a plenum, for transporting air to or from heating, ventilating, or air-conditioning equipment.

F. Controls:

1. BACnet MS/TP: BACnet communication utilizing Master slave/token passing.

2. BACnet IP: BACnet communication utilizing Internet Protocol.

3. API: Application Program Interface.

4. IoT: Internet of Things.

1.4 VRF CONTROLS SYSTEM ARCHITECTURE

A. All VRF Control Components provided and installed under this specification shall be a complete system from a single manufacturer (unless otherwise specified) and shall be designed for access on the client’s network.

B. The VRF Controls System shall include, but not be limited to:

1. Central Controller

2. Local Zone Controllers

3. Room Temperature Sensors (where applicable)

4. Dry Contact Kits (where applicable)

5. Specialty Application Controllers (where applicable)

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated:

1. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

2. Include construction details, material descriptions, dimensions or individual components and profiles, installation and service clearances, and finishes for indoor units, heat recovery boxes, and condensing units.

3. Include operating performance data at design conditions, and at extreme maximum and minimum outdoor ambient conditions.

4. Include total refrigerant required and a comprehensive breakdown of refrigerant required by each system installed.

5. Include refrigerant piping network diagrams indicating a comprehensive breakdown of VRF equipment model numbers, actual heating and cooling capacities at design outdoor ambient conditions, refrigerant pipe lengths, quantities and sizes between VRF condensing units, HR boxes, and indoor fan coil units. Refrigerant piping network diagrams shall include data

VARIABLE REFRIGERANT FLOW HVAC SYSTEMS 23 8126 - 2

indicating compliance with requirements indicated. Refrigerant piping network diagrams shall be generated by the manufacturer’s specific equipment selection software.

6. Include description of system controllers, dimensions, features, control interfaces and connections, power requirements and connections.

7. Include description of control software features.

B. Shop Drawings:

1. Include plans, elevations, sections, and mounting details.

2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Include diagrams and details of refrigerant piping, showing installation requirements for manufacturer-furnished divided flow fittings.

4. Include diagrams for power, signal, and control wiring.

C. Delegated-Design Submittals:

1. Include design calculations with corresponding diagram of refrigerant piping sizing for each system installed (Refer to section 1.4.A.5 for additional requirements).

2. Include design calculations indicating that refrigeration concentration limits (RCL) are within allowable limits of ASHRAE 15 and governing codes.

3. Include calculations showing that system travel distance for refrigerant piping and control wiring are within horizontal and vertical travel distances set by manufacturer.

1.6 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Plans, elevations, sections, and details, drawn to scale, on which the following items are shown and coordinated with each other, utilizing input from installers of the items involved:

1. Suspended ceiling components.

2. Structural floors, roofs and associated members to which equipment, piping, ductwork, cables, and conduit will be attached.

3. Size and location of initial access modules for acoustical tile.

4. Wall-mounted controllers located in finished space showing relationship to light switches, fire alarm devices, and all other installed devices.

5. Size and location of access doors and panels installed behind walls and inaccessible ceilings for products installed behind walls and requiring access.

6. Items penetrating finished ceiling including the following:

a. Luminaires.

b. Air outlets and inlets.

c. Speakers.

d. Sprinklers.

e. Service access panels.

VARIABLE REFRIGERANT FLOW HVAC SYSTEMS 23 8126 - 3

B. Qualification Data:

1. For Installer: Certificate from VRF HVAC system manufacturer certifying that Installer has successfully completed all perquisite training administered by manufacturer for proper installation of systems, including but not limited to, equipment, piping, controls, and accessories indicated…