Albion Armory MEP Set.pdf

PDF 5 MB Posted

Attached to
511/21187. CAK; Albion Armory - Renovate Armory
Solicitation number
RFQ - 171 - 220000000461
Issued by
Calhoun County, Alden CDP, Michigan

About this file

This document contains the plans and specifications for the Albion Armory Renovation project in Albion, Michigan. The project is being administered by the Department of Military and Veterans Affairs for the State of Michigan. The key details include:

The project involves mechanical, plumbing, and electrical demolition and renovation work at the Albion Armory facility. The scope includes removal and replacement of HVAC equipment, ductwork, piping, fixtures, and related systems. The project will be bid and awarded through a competitive process, with a bid due date and construction period specified. A pre-bid conference and site visit are required for all bidders. The successful contractor will be responsible for all work as detailed in the plans and specifications, which include specific quantities, models, and technical requirements.

The contract pricing terms, funding sources, and set-asides are not explicitly detailed in the document provided. However, this is a State of Michigan facility, so state procurement rules and requirements would apply. The current incumbent contractor is not identified.

View the file

Other files

File Type Posted
Addendum 2 270500 DATA COMMUNICATION SYSTEM 220428.docx DOCX document
Addendum 5 21187.pdf PDF
MtgAttend1 - 21187.pdf PDF
Advertisement 21187.pdf PDF
Addendum No.2 08122022 - 21187.pdf PDF
21-046 Albion Armory - A0.0 - Cover Sheet.pdf PDF
21-046 Albion Armory Civil Drawings.pdf PDF
MtgAttend1 - 21187_REVISED.pdf PDF
Addendum 3 06 Wood Plastics and Composites 21187.pdf PDF
Addendum No.6 08222022 - 21187.pdf PDF
Addendum 1 - 21187.pdf PDF
Albion Armory Specification 14 of 15.pdf PDF
Albion Armory Specification 12 of 15.pdf PDF
Addendum 3 07 Thermal and Moisture Protection 21187.pdf PDF
Albion Armory Specification 11 of 15.pdf PDF
Albion Armory Specification 3 of 15.pdf PDF
Addendum 2 M-303 - MECHANICAL CONTROLS DIAGRAMS.pdf PDF
Albion Armory Specification 1 of 15.pdf PDF
Albion Armory Specification 7 of 15.pdf PDF
Addendum 3 21187.pdf PDF
Addendum 3 05 Metals 21187.pdf PDF
Albion Armory Draft Logs 11-23-21.pdf PDF
Albion Armory Specification 8 of 15.pdf PDF
Addendum 2 M-301 - MECHANICAL SCHEDULES_ —
Albion Armory Specification 4 of 15.pdf PDF
Addendum 3 08 Openings 21187.pdf PDF
Albion Armory Specification 6 of 15.pdf PDF
Specifications 21187.pdf PDF
Addendum 4 21187.pdf PDF
21-046 Albion Armory Architectural A4-S1 Set.pdf PDF
Albion Armory Draft Map 11-23-21.pdf PDF
Albion Armory Specification 13 of 15.pdf PDF
Albion Armory Specification 9 of 15.pdf PDF
Albion Armory Specification 15 of 15.pdf PDF
Albion Armory Specification 10 of 15.pdf PDF
Albion Armory Specification 2 of 15.pdf PDF
Albion Armory Specification 5 of 15.pdf PDF
21-046 Albion Armory Architectural A0-A3 Set.pdf PDF
Addendum 2 E-301 - ELECTRICAL DATA.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 105 7 8

A

B

C

D

E

F

H

J

G

1 3 4 6 7A 9 11 12 13 14

Y.C.O.

Y.C.O.

Y.C.O.

FD

FD

FD FD

FD

FD

S S

ST

S S

S S

S

S

ST ST

S

S S

GWGW

GW

GW

ST

ST

S S

S

S

S

S

GW

GW

GW

GW

FD

FD FD

TDC

TDC

TDCTDCTDCTDC

TDC

TDC

FD

STST

ST

ST

ST

STST

ST

ST

ST

ST

STSTSTST

ST

S

ST

SS

V

V

V

V

4"

4" 4"

ST

ST

6" 6"

6" 8" 8" 8" 8" 8" 8"

ST

4"

4"

4"

S

S

4" 4"

4"

4"

4"

TDC

GARAGE

SUMP/SAND

TRAP.

FD

3" CON. FROM

ABOVE. 2"W UP TO

EX'G. LAV.

4"SAN

DOWN.

4"

4"

CO

CO

CO

4"W UP TO

EX'G. WC.

3"W UP TO

EX'G. FD.

3" CON. FROM

ABOVE.

3"W UP TO

EX'G. UR.

3" CON.

FROM

ABOVE.

4"

4"SAN

DOWN.

4" 4"

4"W UP TO

EX'G. WC'S.

3"W UP TO

EX'G. FD.

4"W UP TO

EX'G. WC.

3" ST. FROM

ABOVE.

4" 4"

3"

3" CON. DOWN.

4" 4"

3" CON. FROM

ABOVE TO

REMAIN.

4" 4" 5" 5" 5" 5" 5"

5"

5"

3"W UP TO.

3" CON. FROM

ABOVE.

4"W UP TO

EX'G. WC.

3"W UP TO

EX'G. FD.

4"W UP TO

EX'G. SS.

4" 4" 4"

4"4"

4" 4"

4" 6"

6" 6"

4" 4" 4"

5" 5"

3" CON. FROM

ABOVE.

3"W UP TO

EX'G. FD.

4" 4"

4"SAN

DOWN.

6"

6 6

EX'G. LAV.

(TYP. 3)

EX'G. WC.

(TYP 4)

4EX'G. UR.

(TYP 4)

EXISTING

GREASE

TRAP

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION. THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD THEY BE CONSIDERED AS THE ONLY

UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE EXACT ROUTING AND

ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. ALL OF THE PLUMBING WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE DRAWINGS. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY FOR REMOVAL OR RELOCATION BY THE

OWNER OR HIS/HER REPRESENTATIVE, SHALL BE PART OF THIS CONTRACT.

7. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO MATCH CEILING.

8. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR TO INSTALLATION.

(TYPICAL FOR ALL UTILITIES)

9. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES AT ALL PLUMBING

FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE AGAINST WATER HAMMER. (SEE

SPECIFICATIONS SECTION 15410) PROVIDE HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES (EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL BE RESPONSIBLE

FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

10. IN GENERAL ALL PLUMBING FIXTURES AND TRIMS AND EQUIPMENT REQUIRING PLUMBING CONNECTIONS AS FURNISHED BY THE OWNER SHALL BE RECEIVED AND UNCRATED BY THE GENERAL CONTRACTOR. G.C.

SHALL VERIFY THAT ALL EQUIPMENT IS INCLUDED PER THE OWNERS EQUIPMENT LIST AND THAT THERE ARE NO DAMAGED COMPONENTS. AT THIS POINT G.C. SHALL TURN THE PLUMBING FIXTURES OR EQUIPMENT OVER TO THE PLUMBING CONTRACTOR FOR INSTALLATION. P.C. SHALL VERIFY ALL ROUGH-IN

REQUIREMENTS.

11. PROVIDE ACCESS PANELS IN ALL LOCATIONS WHERE PLUMBING VALVES ARE LOCATED WITHIN HARD

CEILING AND/OR WALLS.

PLUMBING DEMO GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

REMOVE EXISTING SANITARY, STORM AND/OR VENT PIPING SHOWN HATCHED.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE AT CEILING.

REMOVE EXISTING HW AND/OR CW SHOWN HATCHED. CAP ANY OPEN ENDED PIPE.

REMOVE AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING F.C.O.AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING FLOOR DRAIN.

REMOVE AND PROPERLY DISPOSE OF EXISTING DOMESTIC HOT WATER HEATER, STORAGE TANK

EXPANSION TANK, AND PUMPS.

EXISTING PLUMBING FIXTURE TO REMAIN.

CUT AND CAP DOMESTIC CW AND/OR HW AT WALL AND/OR FLOOR AND ABANDON WITHIN WALL.

MAINTAIN 1/2" CW UP TO ELECTRIC WATER COOLER.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE BELOW FLOOR.

REMOVE EXISTING VENT FROM LEVEL 1 DOWN TO BELOW GRADE, EXISTING VENT UP TO REMAIN.

ABANDON EXISTING SAN. BELOW FLOOR. CAP OR SEAL ENDS OF PIPE.

VERIFY LOCATION OF EXISTING HAND SINK WITHIN AREA. VERIFY EXISTING HAND SINK HAS ASSE 1070.

REMOVE SECTION OF PIPE FOR NEW CONNECTION.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

PD

SCALE:

Plumbing Basement Level Sanitary and Storm Demolition

1/8"=1'-0"

B

C

D

E

F

H

J

G

1 3 4 6 7A 9 11 12 13 14

EX'G. 3" CON.

Y.C.O.

Y.C.O.

Y.C.O.

FD

FD

FD

FD

FD

EX'G. 3" CON.

EX'G. 3" ST.

EX'G. 3"

VENT UP.

EX'G. LAV.

EX'G. UR.

EX'G. WC.

EX'G. LAV'S.

EX'G. WC'S.

EX'G. 2"

VENT UP.

EX'G. 4"

VENT UP.

EX'G. 3" CON.

3" ST. UP &

DN.

EX'G. 4"

VENT UP.

EX'G. EWC.

EXISTING

GREASE

TRAP

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

EX WC

8 EX LAV14

EX WC8

EX LAV

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION. THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD THEY BE CONSIDERED AS THE ONLY

UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE EXACT ROUTING AND

ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. ALL OF THE PLUMBING WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE DRAWINGS. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY FOR REMOVAL OR RELOCATION BY THE

OWNER OR HIS/HER REPRESENTATIVE, SHALL BE PART OF THIS CONTRACT.

7. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO MATCH CEILING.

8. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR TO INSTALLATION.

(TYPICAL FOR ALL UTILITIES)

9. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES AT ALL PLUMBING

FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE AGAINST WATER HAMMER. (SEE

SPECIFICATIONS SECTION 15410) PROVIDE HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES (EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL BE RESPONSIBLE

FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

10. IN GENERAL ALL PLUMBING FIXTURES AND TRIMS AND EQUIPMENT REQUIRING PLUMBING CONNECTIONS AS FURNISHED BY THE OWNER SHALL BE RECEIVED AND UNCRATED BY THE GENERAL CONTRACTOR. G.C.

SHALL VERIFY THAT ALL EQUIPMENT IS INCLUDED PER THE OWNERS EQUIPMENT LIST AND THAT THERE ARE NO DAMAGED COMPONENTS. AT THIS POINT G.C. SHALL TURN THE PLUMBING FIXTURES OR EQUIPMENT OVER TO THE PLUMBING CONTRACTOR FOR INSTALLATION. P.C. SHALL VERIFY ALL ROUGH-IN

REQUIREMENTS.

11. PROVIDE ACCESS PANELS IN ALL LOCATIONS WHERE PLUMBING VALVES ARE LOCATED WITHIN HARD

CEILING AND/OR WALLS.

PLUMBING DEMO GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

REMOVE EXISTING SANITARY, STORM AND/OR VENT PIPING SHOWN HATCHED.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE AT CEILING.

REMOVE EXISTING HW AND/OR CW SHOWN HATCHED. CAP ANY OPEN ENDED PIPE.

REMOVE AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING F.C.O.AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING FLOOR DRAIN.

REMOVE AND PROPERLY DISPOSE OF EXISTING DOMESTIC HOT WATER HEATER, STORAGE TANK

EXPANSION TANK, AND PUMPS.

EXISTING PLUMBING FIXTURE TO REMAIN.

CUT AND CAP DOMESTIC CW AND/OR HW AT WALL AND/OR FLOOR AND ABANDON WITHIN WALL.

MAINTAIN 1/2" CW UP TO ELECTRIC WATER COOLER.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE BELOW FLOOR.

REMOVE EXISTING VENT FROM LEVEL 1 DOWN TO BELOW GRADE, EXISTING VENT UP TO REMAIN.

ABANDON EXISTING SAN. BELOW FLOOR. CAP OR SEAL ENDS OF PIPE.

VERIFY LOCATION OF EXISTING HAND SINK WITHIN AREA. VERIFY EXISTING HAND SINK HAS ASSE 1070.

REMOVE SECTION OF PIPE FOR NEW CONNECTION.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

PD

SCALE:

Plumbing Main Level Sanitary and Storm

B

C

D

E

F

H

J

G

1 3 4 6 7A 9 11 12 13 14

2" 1"

1"

2 1/2" 2"

1"

2"

2" CW UP.

3/4"

3/4"H&CW UP.

2"

1"CW & 3/4"HW DN.

TO 3 LAV'S.

2 1/2" 2" 1"1 1

/4"

2"

EXISTING BOILER

EXISTING WATER

HEATER AND

STORAGE TANK 1/2"H&CW UP

TO SHOWER.

1/2"H&CW UP

TO LAV.

3/4"CW UP TO UR.

3/4"CW UP TO WC.

2 1 /2"

3/4"CW UP TO HB.

EX'G. UR.

(TYP 4) 4

EX'G. WC.

(TYP. 4) 4

EX'G. LAV.

(TYP. 4)

EX'G. SH.

(TYP. 6)

EXISTING 1-1/4"

MAKE UP WATER

TO EXISTING

STEAM BOILER

EXISTING

CONDENSATE

RECEIVER

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

2"

EXISTING WATER

COND. UNIT TO

REMAIN.

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION. THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD THEY BE CONSIDERED AS THE ONLY

UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE EXACT ROUTING AND

ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. ALL OF THE PLUMBING WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE DRAWINGS. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY FOR REMOVAL OR RELOCATION BY THE

OWNER OR HIS/HER REPRESENTATIVE, SHALL BE PART OF THIS CONTRACT.

7. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO MATCH CEILING.

8. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR TO INSTALLATION.

(TYPICAL FOR ALL UTILITIES)

9. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES AT ALL PLUMBING

FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE AGAINST WATER HAMMER. (SEE

SPECIFICATIONS SECTION 15410) PROVIDE HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES (EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL BE RESPONSIBLE

FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

10. IN GENERAL ALL PLUMBING FIXTURES AND TRIMS AND EQUIPMENT REQUIRING PLUMBING CONNECTIONS AS FURNISHED BY THE OWNER SHALL BE RECEIVED AND UNCRATED BY THE GENERAL CONTRACTOR. G.C.

SHALL VERIFY THAT ALL EQUIPMENT IS INCLUDED PER THE OWNERS EQUIPMENT LIST AND THAT THERE ARE NO DAMAGED COMPONENTS. AT THIS POINT G.C. SHALL TURN THE PLUMBING FIXTURES OR EQUIPMENT OVER TO THE PLUMBING CONTRACTOR FOR INSTALLATION. P.C. SHALL VERIFY ALL ROUGH-IN

REQUIREMENTS.

11. PROVIDE ACCESS PANELS IN ALL LOCATIONS WHERE PLUMBING VALVES ARE LOCATED WITHIN HARD

CEILING AND/OR WALLS.

PLUMBING DEMO GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

REMOVE EXISTING SANITARY, STORM AND/OR VENT PIPING SHOWN HATCHED.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE AT CEILING.

REMOVE EXISTING HW AND/OR CW SHOWN HATCHED. CAP ANY OPEN ENDED PIPE.

REMOVE AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING F.C.O.AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING FLOOR DRAIN.

REMOVE AND PROPERLY DISPOSE OF EXISTING DOMESTIC HOT WATER HEATER, STORAGE TANK

EXPANSION TANK, AND PUMPS.

EXISTING PLUMBING FIXTURE TO REMAIN.

CUT AND CAP DOMESTIC CW AND/OR HW AT WALL AND/OR FLOOR AND ABANDON WITHIN WALL.

MAINTAIN 1/2" CW UP TO ELECTRIC WATER COOLER.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE BELOW FLOOR.

REMOVE EXISTING VENT FROM LEVEL 1 DOWN TO BELOW GRADE, EXISTING VENT UP TO REMAIN.

ABANDON EXISTING SAN. BELOW FLOOR. CAP OR SEAL ENDS OF PIPE.

VERIFY LOCATION OF EXISTING HAND SINK WITHIN AREA. VERIFY EXISTING HAND SINK HAS ASSE 1070.

REMOVE SECTION OF PIPE FOR NEW CONNECTION.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

PD

SCALE:

Plumbing Basement Level Domestic Water

B

C

D

E

F

H

J

G

1 3 4 6 7A 9 11 12 13 14

EX'G. LAV.

EX'G. UR.

EX'G. WC.

EX'G. WC'S.

EX'G. LAV'S.4 EX'G. SH.

EX'G. EWC.

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

8 EX WC

8 EX LAV14

EX WC8

EX LAV

EX'G. SC.

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION. THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD THEY BE CONSIDERED AS THE ONLY

UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE EXACT ROUTING AND

ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. ALL OF THE PLUMBING WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE DRAWINGS. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY FOR REMOVAL OR RELOCATION BY THE

OWNER OR HIS/HER REPRESENTATIVE, SHALL BE PART OF THIS CONTRACT.

7. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO MATCH CEILING.

8. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR TO INSTALLATION.

(TYPICAL FOR ALL UTILITIES)

9. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES AT ALL PLUMBING

FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE AGAINST WATER HAMMER. (SEE

SPECIFICATIONS SECTION 15410) PROVIDE HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES (EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL BE RESPONSIBLE

FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

10. IN GENERAL ALL PLUMBING FIXTURES AND TRIMS AND EQUIPMENT REQUIRING PLUMBING CONNECTIONS AS FURNISHED BY THE OWNER SHALL BE RECEIVED AND UNCRATED BY THE GENERAL CONTRACTOR. G.C.

SHALL VERIFY THAT ALL EQUIPMENT IS INCLUDED PER THE OWNERS EQUIPMENT LIST AND THAT THERE ARE NO DAMAGED COMPONENTS. AT THIS POINT G.C. SHALL TURN THE PLUMBING FIXTURES OR EQUIPMENT OVER TO THE PLUMBING CONTRACTOR FOR INSTALLATION. P.C. SHALL VERIFY ALL ROUGH-IN

REQUIREMENTS.

11. PROVIDE ACCESS PANELS IN ALL LOCATIONS WHERE PLUMBING VALVES ARE LOCATED WITHIN HARD

CEILING AND/OR WALLS.

PLUMBING DEMO GENERAL NOTES

PLUMBING DEMOLITION KEY NOTES

REMOVE EXISTING SANITARY, STORM AND/OR VENT PIPING SHOWN HATCHED.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE AT CEILING.

REMOVE EXISTING HW AND/OR CW SHOWN HATCHED. CAP ANY OPEN ENDED PIPE.

REMOVE AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING F.C.O.AND PROPERLY DISPOSE OF EXISTING PLUMBING FIXTURE.

REMOVE EXISTING FLOOR DRAIN.

REMOVE AND PROPERLY DISPOSE OF EXISTING DOMESTIC HOT WATER HEATER, STORAGE TANK

EXPANSION TANK, AND PUMPS.

EXISTING PLUMBING FIXTURE TO REMAIN.

CUT AND CAP DOMESTIC CW AND/OR HW AT WALL AND/OR FLOOR AND ABANDON WITHIN WALL.

MAINTAIN 1/2" CW UP TO ELECTRIC WATER COOLER.

REMOVE EXISTING SANITARY PIPING TO THIS POINT. CAP REMAINING PIPE BELOW FLOOR.

REMOVE EXISTING VENT FROM LEVEL 1 DOWN TO BELOW GRADE, EXISTING VENT UP TO REMAIN.

ABANDON EXISTING SAN. BELOW FLOOR. CAP OR SEAL ENDS OF PIPE.

VERIFY LOCATION OF EXISTING HAND SINK WITHIN AREA. VERIFY EXISTING HAND SINK HAS ASSE 1070.

REMOVE SECTION OF PIPE FOR NEW CONNECTION.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

PD

SCALE:

Plumbing Main Level Domestic Water

105 7

AA

BB

CC

DD

EE

FF

HH

JJ

GG

1 7A

11 13 14

KK

2.8 3.9 6.2 6.9 7.9

Y.C.O.

Y.C.O.

Y.C.O.

FD

FD

S S

ST

S S

S S S

ST ST

S S

GWGW

S

GW

ST

ST

S

S

S

S

GW

GW

GW

GW

FD

FD FD

TDC

TDC

TDCTDCTDCTDC

TDC

TDC

FD

STST

ST

ST

ST

STST

ST

ST

ST

ST

STSTSTST

ST

S

SS

4"

4" 4"

ST

S

6" 6"

6" 8" 8" 8" 8" 8" 8"

ST

4"

4"

4"

S

S

4" 4"

4"

4"

4"

TDC

GARAGE

SUMP/SAND

TRAP.

FD

3" CON. FROM

ABOVE.

4"SAN

DOWN.

4"

CO

CO

3" CON. FROM

ABOVE.

3" CON.

FROM

ABOVE.

4"

4"

4"W UP TO

EX'G. WC.

EX 3" ST

FROM ABOVE.

6" 6"

6"

3" CON. FROM

ABOVE.

4" 4" 5" 5" 5" 5" 5"

5"

5"

3"W UP TO.

3" CON. FROM

ABOVE.

4"W UP TO

EX'G. WC.

3"W UP TO

EX'G. FD.

4"W UP TO

EX'G. SS.

4" 4" 4"

4"4"

4" 4"

4" 6"

6" 6"

4" 4" 4"

5" 5"

3" CON. FROM

ABOVE.

3"W UP TO

EX'G. FD.

4" 4"

4"SAN

DOWN.

6"

4" UP TO

F.C.O.

4" UP TO WC-2

4" UP TO WC-1

4" UP TO WC-1

3" UP TO FD-1

2" UP TO UR-1

& 2" V

4" UP TO WC-1

4" UP TO WC-1

3" UP TO FD-1

2" UP TO SH-1

2" UP TO SH-1

3" UP TO FD-1

2" UP TO SH-1

2" UP TO SH-1

2" UP TO SH-1

4" UP TO

W.C.O.

2" UP TO

EWC-1, 2" V

2" UP TO SH-1

3" V UP

3" UP TO FD-1

2" UP TO SH-1

2" UP TO SH-1 3" UP TO FD-1

3" V UP3" V UP

2" V UP

4" UP TO

WC-2

3" V UP

3"

4"

4"

4"

4"

3"

3" UP TO FD-1 3" UP TO

MSB-1

2" V UP

3"

4"

4"

4"

4" DN TO

EXISTING

UNDERGROUND

SANITARY

4"

S S

S

S

S S

S S

2" UP TO (2)

LAV'S, 2" V

4" UP TO

E.W.C EX.4"

S

3" FD-1

W/ TS-1.

2" UP TO LAV-2

4" UP TO

F.C.O.

2" UP TO SK-1 &

2" V.

C.O.

SLOPE 1/4" / FT.

1-1/4" CON UP

CON

CO

N

4" F.C.O.

6" ST DOWN BELOW GROUND

PROVIDE CLEAN OUT 1' AFF.

6"

6"

ST

ST

6" ST UP

4"

4"

EXISTING

GREASE

TRAP

4" UP TO F.C.O.

3" UP TO W.C.O.

3" UP TO W.C.O.

2" V UP

2" UP TO UR-1

& 2" V

IE=99'-0"

4" UP TO

W.C.O.

IE=99'-0"

IE=97'-10"

2" UP TO (2)

LAV'S, 2" V

2" UP TO (2)

LAV'S, 2" V

4" UP TO

F.C.O.

EX 3" V UP

S

EX 3" ST

FROM ABOVE.

BOILER

ROOM

STAIR #1

PASSAGE

STAIR #2

ENTRY

CORRIDOR

STORAGE

PHYSICAL

TRAINING

COMM

PLATOON

SGT

ADJUST FIRE

SIM

LEARNING

OFFICE SUP

NBC

PLATOON 1

022A

PLATOON 2

022B

PLATOON 3

022C

MVSB

TOILET

MAINTENANCE

SHOP

OFFICE

PASSAGE

INTERIOR

DOCK

VAULT

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

EXTENT OF

FLOOR CUTTING

ST

3" UP TO

F.C.O.

4"

4" 3"

1-1/4"

PLUMBING KEY NOTES

PROVIDE WATER HAMMER ARRESTOR. QUANTITY AND LOCATION IS APPROXIMATE.

PLUMBING CONTRACTOR TO REFER TO DETAIL 3/P202, SPECIFICATIONS, AND

PDI-WH-201 FOR EXACT QUANTITIES AND LOCATIONS.

PROVIDE DEDICATED 1/2" HOT AND COLD WATER RUN-OUT TO EACH INDIVIDUAL

SHOWER VALVE. PROVIDE INDIVIDUAL 1/2" BALL SHUT-OFF ISOLATION VALVE FOR

HOT WATER AND COLD WATER RUN-OUT TO EACH SHOWER VALVE. PROVIDE

RUN-OUT PIPING FROM INDIVIDUAL SHUT-OFF VALVE TO SHOWER VALVE IN PEX-A

PIPE. PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO INDIVIDUAL

ISOLATION VALVES. INTENT IS TO ALLOW MEANS FOR ISOLATION AND REMOVAL OF

SHOWER VALVE THRU WALL WITHOUT TAKING DOWN ENTIRE SHOWER AREA AND

WITHOUT CUTTING OPEN DRYWALL CEILING. PLUMBING CONTRACTOR TO

COORDINATE EXACT SIZE AND LOCATION OF ACCESS PANELS WITH ARCHITECTURAL

DOCUMENTATION AND GENERAL CONTRACTOR.

PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO ISOLATION VALVES

AND BALANCING VALVE.

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION.

THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD

THEY BE CONSIDERED AS THE ONLY UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE

EXACT ROUTING AND ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO

MATCH CEILING.

7. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR

TO INSTALLATION. (TYPICAL FOR ALL UTILITIES)

8. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES

AT ALL PLUMBING FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE

AGAINST WATER HAMMER. (SEE SPECIFICATIONS SECTION 15410) PROVIDE

HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES

(EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL

BE RESPONSIBLE FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

9. NEW ROOF DESIGNED WITHOUT PARAPET, EMERGENCY ROOF DRAINAGE DESIGNED

TO RUN OFF SIDE OF ROOF. REFER TO ARCHITECTURAL DOCUMENTATION FOR

ADDITIONAL INFORMATION.

10. P.C. SHALL VERIFY EXISTENCE OF AN ASSE 1070 MIXING VALVE. PROVIDE BID TO ADD

AN ASSE 1070 MIXING VALVE, REPAIR OF INSULATION, IF FIXTURE IS BARRIER FREE.

PLUMBING GENERAL NOTES

2" OR 3" VENT FROM BELOW, SIZES NOTED ON PLAN.

2" SANITARY DOWN.

2" SANITARY DOWN, 2" VENT UP.

OFFSET 1-1/2" SAN. IN WALL TO ADJACENT 3" SAN DOWN. 2" V UP.8

ABANDON PIPING WITHIN WALL.

CAP OPEN ENDED PIPES.

1/4" VINYL DISCHARGE TUBE.

1-1/4" CONDENSATE TO DRAIN AT FLOOR DRAIN WITH AIR GAP. PROVIDE FUNNEL FOR

FLOOR DRAIN.

SEAL PIPE PENETRATION THOUGH EXISTING FOUNDATION WALL.

CAP OPEN ENDED PIPES WITHIN WALL.

REPAIR REMOVED SECTION OF EXISTING UNDERGROUND PIPING.

COORDINATE NEW PLUMBING SANITARY/STORM PIPE WITH EXISTING MECHANICAL

SYSTEMS WITHIN EXISTING CORRIDOR.

P.C. SHALL VERIFY EXISTANCE OF AN ASSE 1070 MIXING VALVE. PROVIDE UNIT PRICE

IN BID TO ADD AN ASSE 1070 MIXING VALVE. REPAIR AND INSULATION IF FIXTURE IS

BARRIER FREE.

BALL VALVE.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

P-1

SCALE:

Plumbing Basement Level Sanitary and Storm Revised

B

C

D

E

F

H

J

G

1 3 4 6 7A 9 11 12 13 14

DN

EX'G. 4"

VENT UP.

3" ST. UP &

DN.

(6) SH-1,

2" TRAPPED

WASTE, EA.

SH-1,

2" TRAPPED

WASTE, EA.

(2) SH-1,

2" TRAPPED

WASTE, EA.

(3) SH-1,

2" TRAPPED

WASTE, EA.

3" FD-1

W/ TS-1.

3" FD-1

W/ TS-1.

3" FD-1

W/ TS-1.

3" FD-1

W/ TS-1.

3" FD-1

W/ TS-1.

EWC-1,

1-1/2" W.

(4) LAV-1,

1-1/4" WASTE.

(4) LAV-1,

1-1/4" WASTE.(2) UR-1

4" VTR

73"

73"

7 3"

4" UP TO

F.C.O.

73"

4" F.C.O.

LAV-2,

1-1/4" W., 2" SAN DN

2" V UP

3" UP TO

F.C.O.

V V

V

V

V

EX'G. 3" CON.

EX'G. 3"

VENT UP.

4" F.C.O.

2"

3"

3"

3"7 7

SK-1,

1-1/4" W.

2" V

WC-2,

4"W

(2) WC-1,

4" W

WC-2,

4"W

(3) WC-1,

4" W

MSB-1,

3" W.

FC-120

FC-119

FC-122

FC-121

C.O.

C.O.

SLOPE 1/4" / FT.

CON

EX'G. 4"

VENT UP.

EX'G. 3" ST.

1-1/2"

1-1/2" CON DN

4" RD-1

4" RD-1

C.O.

ST

6"

6"

4" 4"

6" ST DN

4" F.C.O.

2" SAN. DOWN,

2"V. UP

2" SAN. DOWN,

2"V. UP

3" FD-1

W/ TS-1.

2" SAN. DOWN,

2"V. UP

2" V UP

3" FROM BELOW TO

W.C.O., 2" V UP

EX'G. EWC.

2" SAN DN

& 2" V UP

4"

3"

3"

4" UP TO

F.C.O.

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

READINESS

TRAINING

ADMIN

MAIL

LACTATION

ROOM

JANITOR

ADMIN

121SGT

C.O.

NEW IT

NEW BLDG

MAINT

STAIR #1

LOBBY

FAMILY

CLASS

RM. #26

CLASS

RM. #27

CLASS

RM. #28

AUDIO/VID

STORAGE

DAY

ROOM#32

CORRIDOR

STAIR #2

TABLE AND

CHAIR

DRILL

HALL #18

KITCHEN

UNISEX

106DRY

STOR.105

OFFICE

SERVING

LINE

JAN.

SCULLERY

RECRUITING

VESTIBULE

MEN

SHOWER

WOMEN

SHOWER

WOMEN

LATRINE

MEN

LATRINE

BREAK

ROOM

OPEN

OFFICE

AREA

3", F.C.O.

NOTE: NEW ROOF DESIGNED

WITHOUT PARAPET, EMERGENCY

ROOF DRAINAGE DESIGNED TO RUN

OFF SIDE OF ROOF. REFER TO

ARCHITECTURAL DOCUMENTATION

FOR ADDITIONAL INFORMATION.

V

V

V

2"ST

ST

2"

2"

PLUMBING KEY NOTES

PROVIDE WATER HAMMER ARRESTOR. QUANTITY AND LOCATION IS APPROXIMATE.

PLUMBING CONTRACTOR TO REFER TO DETAIL 3/P202, SPECIFICATIONS, AND

PDI-WH-201 FOR EXACT QUANTITIES AND LOCATIONS.

PROVIDE DEDICATED 1/2" HOT AND COLD WATER RUN-OUT TO EACH INDIVIDUAL

SHOWER VALVE. PROVIDE INDIVIDUAL 1/2" BALL SHUT-OFF ISOLATION VALVE FOR

HOT WATER AND COLD WATER RUN-OUT TO EACH SHOWER VALVE. PROVIDE

RUN-OUT PIPING FROM INDIVIDUAL SHUT-OFF VALVE TO SHOWER VALVE IN PEX-A

PIPE. PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO INDIVIDUAL

ISOLATION VALVES. INTENT IS TO ALLOW MEANS FOR ISOLATION AND REMOVAL OF

SHOWER VALVE THRU WALL WITHOUT TAKING DOWN ENTIRE SHOWER AREA AND

WITHOUT CUTTING OPEN DRYWALL CEILING. PLUMBING CONTRACTOR TO

COORDINATE EXACT SIZE AND LOCATION OF ACCESS PANELS WITH ARCHITECTURAL

DOCUMENTATION AND GENERAL CONTRACTOR.

PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO ISOLATION VALVES

AND BALANCING VALVE.

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION.

THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD

THEY BE CONSIDERED AS THE ONLY UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE

EXACT ROUTING AND ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO

MATCH CEILING.

7. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR

TO INSTALLATION. (TYPICAL FOR ALL UTILITIES)

8. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES

AT ALL PLUMBING FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE

AGAINST WATER HAMMER. (SEE SPECIFICATIONS SECTION 15410) PROVIDE

HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES

(EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL

BE RESPONSIBLE FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

9. NEW ROOF DESIGNED WITHOUT PARAPET, EMERGENCY ROOF DRAINAGE DESIGNED

TO RUN OFF SIDE OF ROOF. REFER TO ARCHITECTURAL DOCUMENTATION FOR

ADDITIONAL INFORMATION.

10. P.C. SHALL VERIFY EXISTENCE OF AN ASSE 1070 MIXING VALVE. PROVIDE BID TO ADD

AN ASSE 1070 MIXING VALVE, REPAIR OF INSULATION, IF FIXTURE IS BARRIER FREE.

PLUMBING GENERAL NOTES

2" OR 3" VENT FROM BELOW, SIZES NOTED ON PLAN.

2" SANITARY DOWN.

2" SANITARY DOWN, 2" VENT UP.

OFFSET 1-1/2" SAN. IN WALL TO ADJACENT 3" SAN DOWN. 2" V UP.8

ABANDON PIPING WITHIN WALL.

CAP OPEN ENDED PIPES.

1/4" VINYL DISCHARGE TUBE.

1-1/4" CONDENSATE TO DRAIN AT FLOOR DRAIN WITH AIR GAP. PROVIDE FUNNEL FOR

FLOOR DRAIN.

SEAL PIPE PENETRATION THOUGH EXISTING FOUNDATION WALL.

CAP OPEN ENDED PIPES WITHIN WALL.

REPAIR REMOVED SECTION OF EXISTING UNDERGROUND PIPING.

COORDINATE NEW PLUMBING SANITARY/STORM PIPE WITH EXISTING MECHANICAL

SYSTEMS WITHIN EXISTING CORRIDOR.

P.C. SHALL VERIFY EXISTANCE OF AN ASSE 1070 MIXING VALVE. PROVIDE UNIT PRICE

IN BID TO ADD AN ASSE 1070 MIXING VALVE. REPAIR AND INSULATION IF FIXTURE IS

BARRIER FREE.

BALL VALVE.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

P-1

SCALE:

Plumbing Main Level Sanitary and Storm

105 7

AA

BB

CC

DD

EE

FF

HH

JJ

GG

1 7A

11 13 14

KK

2.8 3.9 6.2 6.9 7.9

2"

ABANDON PIPE

AT LEVEL 1

FLOOR

3/4"CW UP TO HB.

2 1/2" 2" 1"

2 1/2" 2" 1"

10 10

2 1/2" 2" 1"

2 1/2" 2" 1"

1 1 /4"

EXISTING BOILER

2 1 /2"

ET-1

2" CW UP

TO LEVEL 1

1-1/2" HW UP

TO LEVEL 1

1/2" HWR UP

TO LEVEL 1

EXISTING 1-1/4"

MAKE UP WATER

TO EXISTING

STEAM BOILER

EXISTING

CONDENSATE

RECEIVER

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

BOILER

ROOM

STAIR #1

PASSAGE

STAIR #2

ENTRY

CORRIDOR

STORAGE

PHYSICAL

TRAINING

COMM

005 PLATOON

SGT

ADJUST FIRE

SIM

LEARNING

OFFICE SUP

NBC

PLATOON 1

022A

PLATOON 2

022B

PLATOON 3

022C

MVSB

TOILET

MAINTENANCE

SHOP

OFFICE

PASSAGE

INTERIOR

DOCK

VAULT

P.C. TO INSTALL

NEW BALANCING

VALVE, BALANCE

TO 1.0 GPM.

P.C. TO INSTALL

NEW BALANCING

VALVE, BALANCE

TO 1.0 GPM.

EXISTING WATER

COND. UNIT TO

REMAIN.

WATER HEATERS, WH-1 & WH-2

SEE SPEC'S AND DETAIL 3/P301

2"

RCP-3

1/2"

PLUMBING KEY NOTES

PROVIDE WATER HAMMER ARRESTOR. QUANTITY AND LOCATION IS APPROXIMATE.

PLUMBING CONTRACTOR TO REFER TO DETAIL 3/P202, SPECIFICATIONS, AND

PDI-WH-201 FOR EXACT QUANTITIES AND LOCATIONS.

PROVIDE DEDICATED 1/2" HOT AND COLD WATER RUN-OUT TO EACH INDIVIDUAL

SHOWER VALVE. PROVIDE INDIVIDUAL 1/2" BALL SHUT-OFF ISOLATION VALVE FOR

HOT WATER AND COLD WATER RUN-OUT TO EACH SHOWER VALVE. PROVIDE

RUN-OUT PIPING FROM INDIVIDUAL SHUT-OFF VALVE TO SHOWER VALVE IN PEX-A

PIPE. PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO INDIVIDUAL

ISOLATION VALVES. INTENT IS TO ALLOW MEANS FOR ISOLATION AND REMOVAL OF

SHOWER VALVE THRU WALL WITHOUT TAKING DOWN ENTIRE SHOWER AREA AND

WITHOUT CUTTING OPEN DRYWALL CEILING. PLUMBING CONTRACTOR TO

COORDINATE EXACT SIZE AND LOCATION OF ACCESS PANELS WITH ARCHITECTURAL

DOCUMENTATION AND GENERAL CONTRACTOR.

PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO ISOLATION VALVES

AND BALANCING VALVE.

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION.

THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD

THEY BE CONSIDERED AS THE ONLY UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE

EXACT ROUTING AND ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO

MATCH CEILING.

7. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR

TO INSTALLATION. (TYPICAL FOR ALL UTILITIES)

8. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES

AT ALL PLUMBING FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE

AGAINST WATER HAMMER. (SEE SPECIFICATIONS SECTION 15410) PROVIDE

HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES

(EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL

BE RESPONSIBLE FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

9. NEW ROOF DESIGNED WITHOUT PARAPET, EMERGENCY ROOF DRAINAGE DESIGNED

TO RUN OFF SIDE OF ROOF. REFER TO ARCHITECTURAL DOCUMENTATION FOR

ADDITIONAL INFORMATION.

10. P.C. SHALL VERIFY EXISTENCE OF AN ASSE 1070 MIXING VALVE. PROVIDE BID TO ADD

AN ASSE 1070 MIXING VALVE, REPAIR OF INSULATION, IF FIXTURE IS BARRIER FREE.

PLUMBING GENERAL NOTES

2" OR 3" VENT FROM BELOW, SIZES NOTED ON PLAN.

2" SANITARY DOWN.

2" SANITARY DOWN, 2" VENT UP.

OFFSET 1-1/2" SAN. IN WALL TO ADJACENT 3" SAN DOWN. 2" V UP.8

ABANDON PIPING WITHIN WALL.

CAP OPEN ENDED PIPES.

1/4" VINYL DISCHARGE TUBE.

1-1/4" CONDENSATE TO DRAIN AT FLOOR DRAIN WITH AIR GAP. PROVIDE FUNNEL FOR

FLOOR DRAIN.

SEAL PIPE PENETRATION THOUGH EXISTING FOUNDATION WALL.

CAP OPEN ENDED PIPES WITHIN WALL.

REPAIR REMOVED SECTION OF EXISTING UNDERGROUND PIPING.

COORDINATE NEW PLUMBING SANITARY/STORM PIPE WITH EXISTING MECHANICAL

SYSTEMS WITHIN EXISTING CORRIDOR.

P.C. SHALL VERIFY EXISTANCE OF AN ASSE 1070 MIXING VALVE. PROVIDE UNIT PRICE

IN BID TO ADD AN ASSE 1070 MIXING VALVE. REPAIR AND INSULATION IF FIXTURE IS

BARRIER FREE.

BALL VALVE.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

P-2

SCALE:

Plumbing Basement Level Domestic Water

B

C

D

E

F

H

J

G

1 3 4 6 7A 9 11 12 13 14

DN

FD

FD

EX'G. 3" ST.

(6) SH-1

1/2"H&CW

SH-1

1/2"H&CW

(2) SH-1

1/2"H&CW

(3) SH-1

1/2"H&CW

WC-2, 1"CW

(4) LAV-1,

1/2" HW&CW EA.

EWC-1,

1/2" CW.

(4) LAV-1,

1/2" HW&CW EA.

(2) UR-1, 3/4"CW, SEE

ARCH'L. FOR MTG. HTS.

LAV-2,

1/2" H&CW.

MSB-1,

1/2" H&CW.

3/4"

2" 1-1/2"

1-1/4"

1/2" 1/2"

1/2"

3/4"

1-1/2"

(3) WC-1,

1"CW EA.

3/4"

3/4"

WC-2,

1"CW

(2) WC-1,

1"CW EA.

2" CW DN TO

BASEMENT

1-1/2" HW DN TO

BASEMENT

1/2" HWR DN TO

BASEMENT

2" 1-1/2" 1/2"

HWR

HW

CW

HWCWCW HW

HW

CW

1"

1"

1-1/4"

1/2"

HW

CW

SK-1,

1/2" H&CW.

2"3/4"

EX'G. EWC.

3/4"

NO WORK REQUIRED IN THIS AREA

UNLESS OTHERWISE NOTED

READINESS

TRAINING

ADMIN

MAIL

LACTATION

ROOM

JANITOR

ADMIN

SGT

C.O.

NEW

IT 134

NEW BLDG

MAINT

STAIR #1

LOBBY

FAMILY

CLASS

RM. #26

CLASS

RM. #27

CLASS

RM. #28

AUDIO/VID

STORAGE

DAY

ROOM#32

132CORRIDOR

STAIR #2

TABLE AND

CHAIR

DRILL

HALL #18

KITCHEN

UNISEX

DRY STOR.

OFFICE

SERVING

LINE

JAN.

SCULLERY

RECRUITING

VESTIBULE

MEN

SHOWER

WOMEN

SHOWER

WOMEN

LATRINE

MEN

LATRINE

143 BREAK

ROOM

OPEN

OFFICE

AREA

EX WC

EX LAV

EX WC

EX LAV

P.C. TO INSTALL

NEW BALANCING

VALVE, BALANCE

TO 1.0 GPM.

18(TYP.)

18 (TYP.)

3/4" HW & CW

DN IN WALL

3/4" HW & CW

DN IN WALL

1-1/2"

PLUMBING KEY NOTES

PROVIDE WATER HAMMER ARRESTOR. QUANTITY AND LOCATION IS APPROXIMATE.

PLUMBING CONTRACTOR TO REFER TO DETAIL 3/P202, SPECIFICATIONS, AND

PDI-WH-201 FOR EXACT QUANTITIES AND LOCATIONS.

PROVIDE DEDICATED 1/2" HOT AND COLD WATER RUN-OUT TO EACH INDIVIDUAL

SHOWER VALVE. PROVIDE INDIVIDUAL 1/2" BALL SHUT-OFF ISOLATION VALVE FOR

HOT WATER AND COLD WATER RUN-OUT TO EACH SHOWER VALVE. PROVIDE

RUN-OUT PIPING FROM INDIVIDUAL SHUT-OFF VALVE TO SHOWER VALVE IN PEX-A

PIPE. PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO INDIVIDUAL

ISOLATION VALVES. INTENT IS TO ALLOW MEANS FOR ISOLATION AND REMOVAL OF

SHOWER VALVE THRU WALL WITHOUT TAKING DOWN ENTIRE SHOWER AREA AND

WITHOUT CUTTING OPEN DRYWALL CEILING. PLUMBING CONTRACTOR TO

COORDINATE EXACT SIZE AND LOCATION OF ACCESS PANELS WITH ARCHITECTURAL

DOCUMENTATION AND GENERAL CONTRACTOR.

PROVIDE CEILING ACCESS PANEL AS REQUIRED FOR ACCESS TO ISOLATION VALVES

AND BALANCING VALVE.

1. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE INFORMATION.

THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT LOCATIONS NOR SHOULD

THEY BE CONSIDERED AS THE ONLY UTILITIES IN THE AREA.

2. CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.

3. SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

4. KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

5. INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE

EXACT ROUTING AND ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

6. RUN ALL SANITARY SEWER VENTS IN WALLS TO AS HIGH AS POSSIBLE. PAINT TO

MATCH CEILING.

7. PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR PRIOR

TO INSTALLATION. (TYPICAL FOR ALL UTILITIES)

8. AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY LINES

AT ALL PLUMBING FIXTURES AND AT THE TOP OF EACH WATER RISER TO ENSURE

AGAINST WATER HAMMER. (SEE SPECIFICATIONS SECTION 15410) PROVIDE

HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER BRANCHES

(EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS RECOMMENDATIONS.

(LOCATIONS AND QUANTITY NOT SHOWN ON PLANS, PLUMBING CONTRACTOR SHALL

BE RESPONSIBLE FOR COORDINATING WITH MANUF. RECOMMENDATIONS).

9. NEW ROOF DESIGNED WITHOUT PARAPET, EMERGENCY ROOF DRAINAGE DESIGNED

TO RUN OFF SIDE OF ROOF. REFER TO ARCHITECTURAL DOCUMENTATION FOR

ADDITIONAL INFORMATION.

10. P.C. SHALL VERIFY EXISTENCE OF AN ASSE 1070 MIXING VALVE. PROVIDE BID TO ADD

AN ASSE 1070 MIXING VALVE, REPAIR OF INSULATION, IF FIXTURE IS BARRIER FREE.

PLUMBING GENERAL NOTES

2" OR 3" VENT FROM BELOW, SIZES NOTED ON PLAN.

2" SANITARY DOWN.

2" SANITARY DOWN, 2" VENT UP.

OFFSET 1-1/2" SAN. IN WALL TO ADJACENT 3" SAN DOWN. 2" V UP.8

ABANDON PIPING WITHIN WALL.

CAP OPEN ENDED PIPES.

1/4" VINYL DISCHARGE TUBE.

1-1/4" CONDENSATE TO DRAIN AT FLOOR DRAIN WITH AIR GAP. PROVIDE FUNNEL FOR

FLOOR DRAIN.

SEAL PIPE PENETRATION THOUGH EXISTING FOUNDATION WALL.

CAP OPEN ENDED PIPES WITHIN WALL.

REPAIR REMOVED SECTION OF EXISTING UNDERGROUND PIPING.

COORDINATE NEW PLUMBING SANITARY/STORM PIPE WITH EXISTING MECHANICAL

SYSTEMS WITHIN EXISTING CORRIDOR.

P.C. SHALL VERIFY EXISTANCE OF AN ASSE 1070 MIXING VALVE. PROVIDE UNIT PRICE

IN BID TO ADD AN ASSE 1070 MIXING VALVE. REPAIR AND INSULATION IF FIXTURE IS

BARRIER FREE.

BALL VALVE.

NOT ALL KEY NOTES MAY BE UTILIZED ON THIS SHEET

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

P-2

SCALE:

Plumbing Main Level Domestic Water

PIPE HANGER DETAIL

SCALE: N.T.S.P301

FOR PIPE SIZES 2"

METAL INSERT TO

PREVENT CRUSHING

OMIT FOR GAS PIPING.18 GA PIPE SHIELD MIN.

HIGH DENSITY

INSULATION

12" LONG

INSULATION.

STRUCTURE

W/ROD TO

PIPE HANGER

& LARGER

INSULATION

FOR PIPE SIZES

STRUCTURE

TO HANGER W/ROD

1 1/2" & SMALLER

G

7.

IN GENERAL ALL PLUMBING FIXTURES AND TRIMS AND EQUIPMENT REQUIRING

PLUMBING CONNECTIONS AS FURNISHED BY THE OWNER SHALL BE RECEIVED

AND UNCRATED BY THE GENERAL CONTRACTOR. G.C. SHALL VERIFY THAT ALL

EQUIPMENT IS INCLUDED PER THE OWNERS EQUIPMENT LIST AND THAT THERE

ARE NO DAMAGED COMPONENTS. AT THIS POINT G.C. SHALL TURN THE

PLUMBING FIXTURES OR EQUIPMENT OVER TO THE PLUMBING CONTRACTOR

FOR INSTALLATION. P.C. SHALL VERIFY ALL ROUGH-IN REQUIREMENTS.

AIR CHAMBERS ARE TO BE INSTALLED ON ALL COLD AND HOT WATER SUPPLY

LINES AT ALL PLUMBING FIXTURES AND AT THE TOP OF EACH WATER RISER TO

ENSURE AGAINST WATER HAMMER. (SEE SPECIFICATIONS SECTION 221119)

PROVIDE HYDROTOL WATER HAMMER ARRESTERS FOR HOT AND COLD WATER

BRANCHES (EQUAL TO JAY R. SMITH MFG. CO.) PER MANUFACTURERS

RECOMMENDATIONS. (LOCATIONS AND QUANTITY NOT SHOWN ON PLANS,

PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH

MANUF. RECOMMENDATIONS).

PLUMBING CONTRACTOR SHALL COORDINATE WITH SITE UTILITY CONTRACTOR

PRIOR TO INSTALLATION. (TYPICAL FOR ALL UTILITIES)

9.

8.

UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE

INFORMATION. THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT

LOCATIONS NOR SHOULD THEY BE CONSIDERED AS THE ONLY UTILITIES IN

THE AREA.

ALL OF THE PLUMBING WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE

DRAWINGS. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY

FOR REMOVAL OR RELOCATION BY THE OWNER OR HIS/HER REPRESENTATIVE,

SHALL BE PART OF THIS CONTRACT.

INSTALLING CONTRACTOR SHALL USE EXTREME CAUTION TO COORDINATE THE

EXACT ROUTING AND ELEVATION OF PIPING SYSTEMS WITH OTHER TRADES.

5.

6.

KEEP AREA CLEAN. REMOVE DEBRIS ON A DAILY BASIS.

SLEEVE AND SEAL ALL WALL, FLOOR, AND ROOF PENETRATIONS.

CUTTING AND PATCHING BY GENERAL CONTRACTOR UNLESS

OTHERWISE NOTED.

4.

3.

2.

PLUMBING GENERAL NOTES

1.

VENT

STORM DRAIN

HOT WATER

COLD WATER

GAS

HOT WATER RECIRC.

BALL VALVE

CHECK VALVE

BALANCING VALVE

GAS COCK

GATE VALVE

FLOW ARROW

PIPING CAP

PIPE DROP, BOTTOM

PIPING CONTINUATION

PIPE RISE

PIPE DROP

V

ST

S SAN SEWER

EMERGENCY STORM DRAINEM ST

CONDENSATECON

PLUMBING SYMBOL LEGEND

GT-S GREASE TRAP SANITARY

NEW CONNECTION TO

EXISTING PIPE.

FLOOR.

MOP SINK FAUCET.

MOP HOLDER MOUNTED 5'-0"

ABOVE FLOOR.

HOSE BRACKET MOUNTED 18"

ABOVE FINISHED FLOOR.

24"x24"x10" SERVICE SINK. MSB-1

P301

MOP SINK DETAIL

SCALE: N.T.S.

H&CW DOWN IN WALL

REMOVABLE STAINLESS STEEL

COMBINATION DOME STRAINER

AND LINT BASKET.

SEAL ALONG WALL

SEAL WATERTIGHT ON ALL

SIDES WITH CAULK.

WITH CAULK.

1/2"

CHECK VALVES ABOVE CEILING.

PROVIDE ACCESS DOOR AS REQUIRED IF

GYPSUM CEILING SYSTEM.

WITH ACCESS

COVER (TYP.)

WADE W-8550-E

W/8480R6-85 W-8550-B W/ W-8480C6-1

WALL CLEANOUT

P301

WALL CLEANOUT DETAIL

SCALE: N.T.S.

P301

FLOOR DRAIN DETAIL

SCALE: N.T.S.

FD-1 FLOOR DRAINS TO BE FLUSH

WITH FLOOR FINISH.

"P" TRAP

FLOOR

TRAP SEAL

FLOOR DRAIN

FLOOR DRAINS OR FLOOR SINK

SHALL BE FLUSH FLOOR FINISH.

"P" TRAP

FLOOR

W.C.O.

SCALE:

FLOOR DRAIN / VENT DETAIL

N.T.S.

P301

ROOF DECK

MEMBRANE ROOFING BY

ROOFING CONTRACTOR

BY ROOFING CONTRACTOR.

TAPERED ROOFING MEMBRANE

SAN. VENT OR GAS PIPE THROUGH

ROOF.

P301

PIPE THROUGH ROOF DETAIL

SCALE: N.T.S.

CAST IRON DOME.

ROOF DRAIN AND PIPE SIZING.

SEE PLUMBING DRAWINGS FOR

FOR ADDITIONAL HANGER INFORMATION.

PLUMBING PLANS AND SPECIFICATIONS

ANGLE OR UNISTRUT AT THIS POINT. SEE ALSO

SUPPORT FROM STRUCTURE, STEEL

REFER TO ARCH'L. DOCUMENTS FOR

ROOFING SYSTEM SPECIFICATIONS.

ROOFING MEMBRANE OR BUILT-UP ROOFING.

GRAVEL STOP AND MEMBRANE CLAMPING RING

WATER CUT-OFF MASTIC

MATERIALS AND JOINING METHODS.

FOR ACCEPTED PIPING

SEE SPECIFICATIONS 15000

SPECIFICATIONS 15000.

PLUMBING DRAWINGS.

MANUFACTURERS.

SUPPLEMENTARY STEEL AROUND ROOF OPENING.

ROOFING CONTRACTOR. COORDINATE ALSO FOR

PIPING, INSULATION, HANGERS AND ACCEPTED

FOR ADDITIONAL INFORMATION PERTAINING TO

ARRANGEMENT SHOWN IS SCHEMATIC, ADJUST AS

DRAWINGS. COORDINATE WITH

DRAWINGS. SEE ALSO STRUCTURAL AND

SEE ALSO SPECIFICATIONS, DIVISION 15000

REQUIRED FOR ACTUAL CONDITIONS.

RECOMMENDATIONS. OVERFLOW DRAIN SAME

INSTALL ROOF DRAINS PER MANUFACTURER'S

INSULATE DRAIN BODIES AND PIPING. SEE

LOCATE DRAINS WHERE SHOWN ON ARCH'L.

SIZE AS ROOF DRAIN, WHEN REQUIRED. SEE

5.

4.

2.

3.

1.

NOTES:

CUT THE ROOFING MEMBRANE SO IT EXTENDS A MINIMUM OF 1/2 INCH FROM THE

ATTACHMENT POINTS OF THE DRAIN CLAMPING RING.

INSULATION SYSTEM SPECIFICATIONS.

REFER TO ARCH'L. DOCUMENTS FOR

TAPER ROOF INSULATION TO DRAIN.

UNDERDECK CLAMP.

REVERSIBLE DECK RING.

ADJUSTABLE COLLAR.

ALL BOLTS OR CLAMPS MUST BE IN PLACE TO PROVIDE CONSTANT

COMPRESSION ON WATER CUT-OFF MASTIC.

GENERAL INSTALLATION NOTES

HOLE IN MEMBRANE MUST EXCEED SIZE OF DRAIN PIPE.

1.

2.

3.

SCALE:

ROOF DRAIN DTAIL

N.T.S.

P301

WATER HAMMER ARRESTERS

SCALE: N.T.S.P302

ON HORIZONTAL BRANCH LINE LESS THAN 20

FEET LONG. PLACE ONE WITHIN SIX FEET OF

THE LAST FIXTURE SERVED.

ON BRANCH LINE GREATER THAN 20 FEET

LONG, PLACE ANOTHER ARRESTER IN THE

MIDDLE, EACH IS SIZED FOR HALF THE FIXTURE

UNITS

HOT OR

COLD

WATER

SUPPLY

ARRESTER

WITHIN SIX

FEET OF

FIXTURE

SERVED.

PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND O-RING CONSTRUCTION, HAVING PDI-WH-201 OR ASSE #1010 CERTIFICATION. SIZE AND INSTALL PER PDI #WH-201 STANDARD FOR SIIZZES A THOUGH F, ASSE 1010 FOR SIZES AA AND A THOUGH F OR MANUFACTURER'S INSTRUCTION. THE TABLES ABOVE ARE BASED ON THE SIOX CHIEF PRODUCT LINE. IF PRESSURE IS IN EXCESS OF 65 PSIG THEN UPSIZE THE ARRESTER BY ONE (EXAMPLE:

AN 'A' ARRESTER WOULD BECOME A 'B' ARRESTER.)

SINGLE FIXTURE MULTIPLE FIXTURES

PDI

SIZE

FIXTURE UNIT

LOAD

FIXTURE UNIT TABULATION

FIXTURE COLD HOT

VALVE WATER CLOSET

URINAL

LAVATORY

SINK

MOP BASIN

DRINKING FOUNTAIN

AA

A

B

C

D

E

1-3

4-11

12-32

33-60

61-113

114-154

1.5

0.5

1.5

GREASE WASTEGW

PAN INSULATION.

PLUMBING ABBREVIATIONS

CW

CO

BF

ASME

BTUH

COLD WATER

CLEAN OUT

BARRIER FREE

MECHANICAL ENGINEERS

AMERICAN SOCIETY OF

UNITS PER HOUR

BRITISH THERMAL

A.F.F. ABOVE FINISHED FLOOR

Y.C.O. YARD CLEAN OUT

INVERT ELEVATION

LAVATORY

I.E.

LAV

ELECTRIC WATER COOLER

GALLONS PER MINUTE

FLOOR DRAIN

FLOOR CLEAN OUT

EWC

GPM

F.C.O.

FD

VTR

V

W.H.

W.C.O.

WC

VENT THRU ROOF

VENT

WATER HEATER

WALL CLEAN OUT

WATER CLOSET

RTU

ST

SAN

UR

ROOF TOP UNIT

STORM SEWER

SANITARY SEWER

URINALGREASE TRAPG.T.

R.L. RAIN LEADER

T.S. TRAP SEAL

EM-ST EMERGENCY STORM

B&G MODEL TC-1 TIMER. WIRED BY EC..

NBF-12, 3.0 GPM AT 8' HEAD, 120V-1Ø,

75.0 WATTS FURNISH PUMP WITH

EQUAL TO BELL & GOSSETT MODEL

RECIRC. PUMP SC/RCP-3

3/4" H.W. RECIRC. FROM SYSTEM

WATER HEATER DETAIL

NO SCALE

P301

UNION (TYP.)

2"

DRIP LEG

GAS COCK (TYP.)

WH-1

1 1/2"

1 1/2" 140°

BALL VALVE

WTR. HEATER WH-1 & WH-2

3 1/2" CONC. PAD BY P.C..

UNION

WH-2

SET ON STEEL ANGLE WALL

SUPPORT BRACKET. PRIME &

PAINT BRACKET.

EXPANSION TANK. EQUAL TO

AMTROL "THERM-X-TROL"

MODEL ST-25V, 8.5 GALLONS.

CHECK VALVE

2"

1"

2"

CW

1 1/2"

SOFTENED/CONDITIONED COLD

WATER FROM SYSTEM.

FLASH AND SEAL

ROOF PENETRATION

AS REQUIRED UTILIZE

OPEN.

3/4" CONDENSATE, EXTEND TO FLOOR DRAIN.

3" SCHEDULE 40 CPVC (TYP.)

"PATE" PIPE SEAL.

ENTIRE VENTING FURNISHED AND

INSTALLED BY M.C. UNDER THE MECH.

PERMIT AND LICENSING. NOTE: CONCENTRIC

VENT KIT FURNISHED BY P.C., INSTALLED BY

THE M.C.. P.C. SHALL COORDINATE WITH THE M.C..

NEUTRALIZER (NOT SHOWN) FURNISHED WITH

WATER HEATER.

NOTES:

COMPLY WITH MANUFACTURER'S INSTALLATION

REQUIREMENTS, SIZE, DISTANCE LIMITS, AND

SPACING BETWEEN MULTIPLE VENTS.

SEPARATE MULTIPLE VENTS MIN 3FT. APART.

1.

WTR. HEATER VENT/COMB.

THERMOMETER (TYP.)

LOCHINVAR SHIELD MODEL SNR200-100. 199,000 BTU, 100 GAL

STORAGE CAPACITY. 233 GAL/HR @ 100F TEMP. RISE. PROVIDE

BTH-120 CONCENTRIC VENT KIT.

TDC TILE DRAIN CONNECTION

CONDENSATECON

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

A1

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

0 E as t C ou rt

St re et Fl in t, MI

T:

0-

8-ww w.

sf ar ch

.u s

H en ry S tre et

Mu sk eg on

, M I 4

T:

1-

8-

PL

U

RI

B

U E

S U

N U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

FE

B.

,20

4-1 -22

ST

AT

E R

EV

IEW

CP LV

P-3

AutoCAD SHX Text 3/4"

PERSONAL

EQUIPMENT

STORAGE

UNIT

STORAGE

FDC ROOM

CORRIDOR/

STAIR #2

TOILET

MAINTENANCE

SHOP

SHOWERS

UNIT

SUPPLY

OFFICE

DRYING

AREA

006TOILET

STAIR #1

BOILER

ROOM

GP

MAINTENANCE

015B

STORAGE

EG

30"x8"

EG

20"x20"

D04

EXISTING BOILER

EXISTING

CONDENSATE

RECIVER PUMP

(E)

UH

(E)

UH (E)

UH

(E)

UH

(E)

UH

(E)

UH

D05D05

D05D05 D05D05

D05

D05D05

D05

D05D05

D05

D06

D06

D06 D06

D07D07 D07D07 D07D07 D07D07 D07D07D07D07 D07D07

D07D07

D07D07

D07D07 D07D07

(E)

ACCU

2-1/2" LPC UP

2 1/2"

F&T

1"

3/4"

(E)

BCU

10"x8"

10"x8"

"x

"x

8"x6"

10"x8"

D08

DX-L &

DX-S

EG

0 CFM

8"x6"

EG

8"x6"

EG

8"x6"

EG

8"x6"

D09

D10

D10

105 7

AA

BB

CC

DD

EE

FF

HH

JJ

GG

7A

11 13 14

KK

2.8 3.9 6.2 6.9 7.9

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M

OE

N A

M

DA

TE

ISS

UE

D F

OR

IDE

NT

IFI

CA

TIO

N N

O.

SH

EE

T

P.M

DR

AW

N

CH

EC

KE

D

DA

TE

RE

VIS

ION

DE

SC

AR

CH

PR

OJ

EC

T #

DT

MB

PR

OJ

EC

T #

DM

VA

PR

OJ

EC

T #

BID

S

CO

NS

TR

UC

TIO

N

FIN

AL

RE

CO

RD

26A

/21

.CA

K

DE

PA

RT

ME

NT

O

F

TE

CH

NO

LO

GY

, M

AN

AG

EM

EN

T

AN

D

BU

DG

ET

ST

AT

E

OF

M

IC

HI

GA

N

RO

BE

RT

C

. H

AL

L, RA

, N

CA

RB

, D

IR

EC

TO

R

ST

AT

E

FA

CI

LIT

IE

S

AD

MI

NI

ST

RA

TI

ON

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

DI

VI

SI

ON

AP

PR

OV

ED

De pa rtm en t o f M ilit ar y a nd

V ete ra ns

A ffa irs Ar mo ry

Mo dif ica tio ns Al bio n A rm or y, Al bio n, Mi ch iga n

E as t C o u rt S tr ee t F lin t, M I 4

T

0-

8-w w w .s fa rc h .u s

H en ry S tr ee t M u sk eg o n

M I

T

1-

8-

/4

/2

:2 :5

P

M

M -1

Au tho r

Ch ec ke r

Ap pr ov er

De sig ne r

-0

N

SCALE: 1/8" = 1'-0"

MECHANICAL HVAC - BASEMENT DEMO

SHEET KEY NOTES

D04 DEMOLISH 30"x8" DUCT CONNECTED TO BASE OF MASSONRY

SHAFT.

D05 DEMOLISH EXISTING STEAM AND CONDENSATE TO EXISTING

TO BE DEMOLISH STEAM RADIATOR OR UNIT HEATER.

REMOVE ANY SUPPORTS, INSULATION AND ACCESSORIES.

CAP OPEN ENDED PIPES AT MAINS.

D06 DEMOLISH EXISTING STEAM UNIT HEATER AND ASSOCIATED

CONTROLS.

D07 EXISTING STEAM AND CONDENSATE RETURN UP TO EXISTING

STEAM CONVECTOR.

D08 DEMOLISH EXISTING 16"x8" OUTDOOR AIR INTAKE LOUVER.

D09 DEMOLISH EXISTING 2-1/2" STEAM CONDENSATE RETURN

PIPE.

D10 DEMOLISH EXISTING BLOWER COIL UNIT AND ASSOCIATED

AIR COOLED CONDENSING UNIT COMPLETELY INCLUDING

CONTROLS, DISCONNECT, REFRIGERENT PIPING, STEAM

PIPING, PIPING ACCESSORIES ETC. COMPLETLY. CAP ANY

OPEN ENDED PIPING.

1. REFER TO WRITTEN SPECIFICATION FOR ADDITIONAL REQUIREMENTS.

2. MECHANICAL TRADES TO COORDINATE ALL WORK WITH OTHER

TRADES.

3. MECHANICAL TRADES TO MAINTAIN WORK AREA IN A NEAT AND

ORDERLY STATE. DISPOSE OF CONSTRUCTION DEBRIS ON A DAILY BASIS.

4. ALL CUTTING, PATCHING AND ASSOCIATED COSTS SHALL BE THE

RESPONSIBILITY OF THE INSTALLING CONTRACTOR OR SUBCONTRACTOR.

ACTUAL PATCHING AND FINISHING OF SURFACES SHALL BE PERFORMED

BY TRADESMEN QUALIFIED AND LICENSED FOR THE SPECIFIC WORK TO

BE PERFORMED. THIS CONTRACTOR SHALL COORDINATE THIS WORK

WITH THE OWNER AND GENERAL TRADES.

5. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT ALL

CONCLUSIVE AND SHOW GENERAL ARRANGEMENT OF DUCTWORK,

PIPING AND EQUIPMENT WHICH HAVE BEEN OBTAINED FROM EXISTING

DRAWINGS AND FIELD INSPECTIONS. CONTRACTOR SHALL FIELD VERIFY

EXACT LOCATION AND QUANTITY PRIOR TO PRICING AND CONSTRUCTION.

6. DEMOLITION WORK IS IDENTIFIED ON FLOOR PLAN BY NOTES AND/OR

ITEMS SHOWN WITHIN HATCH TYPE LINE PATTERN. DISCONNECT AND

REMOVE ALL MECHANICAL EQUIPMENT, DUCTWORK, PIPING AND

ACCESSORIES NOTED FOR DEMOLITION IN A NEAT, PROFESSIONAL, AND

LEGAL MANNER. NOT ALL OF THE MECHANICAL WORK IS NECESSARILY

SHOWN OR NOTED ON THESE DRAWINGS. THOSE ITEMS NOT SHOWN OR

NOTED, BUT ARE DEEMED NECESSARY FOR THIS PROJECT SHALL BE

PART OF THIS CONTRACT. ALL MECHANICAL EQUIPMENT AND

ACCESSORIES NOT BEING REUSED SHALL BE REMOVED AND DISPOSED

OF.

7. CONSULT WITH OWNER PRIOR TO DEMOLITION OF EQUIPMENT ITEMS.

AT OWNER'S REQUEST, EQUIPMENT TO BE REMOVED SHALL BE

CAREFULLY TURNED OVER TO OWNER, MAINTAINING ITS EXISTING

CONDITION.

8. ROOF PATCHING SHALL BE PERFORMED BY EXISTING ROOF WARRANTY

HOLDER, SUCH THAT EXISTING ROOF WARRANTY IS MAINTAINED;

COORDINATE WITH CONSTRUCTION MANAGER.

9. UTILITIES SHOWN ARE APPROXIMATE LOCATIONS FROM AVAILABLE

INFORMATION. THEIR LOCATIONS SHOULD NOT BE CONSIDERED EXACT

LOCATIONS NOR SHOULD THEY BE CONSIDERED AS THE ONLY UTILITIES

IN THE AREA AND TO CALL MICHIGAN 811 PRIOR TO START OF WORK.

MECHANICAL DEMOLITION NOTES

S T

A T

E R

E V

IE

W

-1

-2

DRILL HALL

#18

UNISEX

DRY STOR.

OFFICE

KITCHEN

SERVING

LINE

CORRIDOR

STAIR #2

TABLE AND

CHAIR

JAN.

"x

R

A

100"x48" OA

24"x26" SA

EG

50"x24"

(E)

VU-2

36"x18" SA

24"x26" SA

EG

36"x24"

(TYP. 3)

D01

100"x48" O.A.

LOUVER

24"x26" SA

36"x18" SA

24"x26" SA

EG

36"x24"

(TYP. 3)

(E)

VU-1 EG

50"x24"

100…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .