Addendum 1 - 21187.pdf
PDF 88 KB Posted
- Attached to
- 511/21187. CAK; Albion Armory - Renovate Armory
- Solicitation number
- RFQ - 171 - 220000000461
- Issued by
- Calhoun County, Alden CDP, Michigan
About this file
This document is Addendum 1 to the construction bid for the Albion Armory Renovation project in Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division. The addendum announces a second non-mandatory site visit for contractors and subcontractors on August 9, 2022 at 10:00 am local time. The project involves the renovation of the Albion Armory, located in Calhoun County and Alden CDP. The bid opening date is August 17, 2022.
The addendum requires bidders to acknowledge receipt of the addendum as part of the bid submission. Failure to acknowledge the addendum may result in the bid being rejected. The addendum becomes part of the contract documents for the project.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
August 3, 2022
PROJECT
Albion Armory Renovation
FILE NUMBER
511/21187.CAK
PROFESSIONAL
Sedgewick + Ferdewa Architects
PROJECT DIRECTOR
Chris Kulhanek
BID OPENING DATE:
August 17, 2022
ADDENDUM ITEMS:
Item 1. There will be a second non-mandatory site visit at the Albion Armory for contractors and sub-contractors on Tuesday, August 9, at 10:00 am local time. The site visit will be self-guided.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE: Click to enter date
APPROVED BY:
Chris Kulhanek PROJECT DIRECTOR: DATE: August 3, 2022 http://www.michigan.gov/SIGMAVSS