Addendum 3 07 Thermal and Moisture Protection 21187.pdf

PDF 457 KB Posted

Attached to
511/21187. CAK; Albion Armory - Renovate Armory
Solicitation number
RFQ - 171 - 220000000461
Issued by
Calhoun County, Alden CDP, Michigan

About this file

This document is an addendum related to a state and local contract opportunity for the Renovate Armory - Albion Armory project in Calhoun County, Michigan. The addendum provides details on the thermal and moisture protection requirements for the project, including the installation of extruded polystyrene foam-plastic board insulation and polyisocyanurate foam-plastic board insulation. The addendum also covers the delivery, storage, and handling requirements for the insulation materials. Key details include the required performance characteristics, testing standards, and approved manufacturers for the insulation products.

The contract opportunity appears to be for the renovation of the Albion Armory facility. The addendum is part of the overall bid documents and technical specifications for the project. No specific details are provided regarding the response due date, award date, contract term, or funding sources. Pricing terms, set-asides, and incumbent information are also not included in the addendum.

View the file

Other files

File Type Posted
Addendum 2 270500 DATA COMMUNICATION SYSTEM 220428.docx DOCX document
Addendum 5 21187.pdf PDF
MtgAttend1 - 21187.pdf PDF
Advertisement 21187.pdf PDF
Addendum No.2 08122022 - 21187.pdf PDF
21-046 Albion Armory - A0.0 - Cover Sheet.pdf PDF
21-046 Albion Armory Civil Drawings.pdf PDF
MtgAttend1 - 21187_REVISED.pdf PDF
Addendum 3 06 Wood Plastics and Composites 21187.pdf PDF
Addendum No.6 08222022 - 21187.pdf PDF
Addendum 1 - 21187.pdf PDF
Albion Armory MEP Set.pdf PDF
Albion Armory Specification 14 of 15.pdf PDF
Albion Armory Specification 12 of 15.pdf PDF
Albion Armory Specification 11 of 15.pdf PDF
Albion Armory Specification 3 of 15.pdf PDF
Addendum 2 M-303 - MECHANICAL CONTROLS DIAGRAMS.pdf PDF
Albion Armory Specification 1 of 15.pdf PDF
Albion Armory Specification 7 of 15.pdf PDF
Addendum 3 21187.pdf PDF
Addendum 3 05 Metals 21187.pdf PDF
Albion Armory Draft Logs 11-23-21.pdf PDF
Albion Armory Specification 8 of 15.pdf PDF
Addendum 2 M-301 - MECHANICAL SCHEDULES_ —
Albion Armory Specification 4 of 15.pdf PDF
Addendum 3 08 Openings 21187.pdf PDF
Albion Armory Specification 6 of 15.pdf PDF
Specifications 21187.pdf PDF
Addendum 4 21187.pdf PDF
21-046 Albion Armory Architectural A4-S1 Set.pdf PDF
Albion Armory Draft Map 11-23-21.pdf PDF
Albion Armory Specification 13 of 15.pdf PDF
Albion Armory Specification 9 of 15.pdf PDF
Albion Armory Specification 15 of 15.pdf PDF
Albion Armory Specification 10 of 15.pdf PDF
Albion Armory Specification 2 of 15.pdf PDF
Albion Armory Specification 5 of 15.pdf PDF
21-046 Albion Armory Architectural A0-A3 Set.pdf PDF
Addendum 2 E-301 - ELECTRICAL DATA.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE ARMORY - ALBION ARMORY

SECTION 072100 - THERMAL INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1.Extruded polystyrene foam-plastic board insulation.

2.Polyisocyanurate foam-plastic board insulation.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1.Extruded polystyrene foam-plastic board insulation.

2.Polyisocyanurate foam-plastic board insulation.

1.3 INFORMATIONAL SUBMITTALS

A. Product Test Reports: For each product, for tests performed by a qualified testing agency.

B. Research Reports: For foam-plastic insulation, from

ICC-ES.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Protect insulation materials from physical damage and from deterioration due to moisture, soiling, and other sources.

Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.

B. Protect foam-plastic board insulation as follows:

1.Do not expose to sunlight except to necessary extent for period of installation and concealment.

2.Protect against ignition at all times. Do not deliver foam-plastic board materials to Project site until just before installation time.

3.Quickly complete installation and concealment of foam-plastic board insulation in each area of construction.

PART 2 - PRODUCTS

2.1 EXTRUDED POLYSTYRENE FOAM-PLASTIC BOARD

INSULATION

A. Extruded Polystyrene Board Insulation, TypeII Insert drawing designation: ASTM C578, Type II, 25-psi minimum compressive strength.

1.Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. The Dow Chemical Company Foamular NGX 250 (bases of design)

2.Flame-Spread Index: Not more than 25 when tested in accordance with ASTM E84.

THERMAL INSULATION 072100 - 1

3.Smoke-Developed Index: Not more than 450 when tested in accordance with ASTM E84.

2.2 POLYISOCYANURATE FOAM-PLASTIC BOARD

INSULATION

A. Polyisocyanurate Board Insulation, Glass-Fiber-Mat Faced Insert drawing designation: ASTM C1289, glass-fiber-mat faced, Type II, Class 2.

1.Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. LafargeHolcim (Firestone) ISO 95+ GL with Isoguard HD Composite Board (basis of design)

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean substrates of substances that are harmful to insulation, including removing projections capable of puncturing insulation or vapor retarders, or that interfere with insulation attachment.

3.2 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's written instructions applicable to products and applications.

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.

C. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation.

Remove projections that interfere with placement.

D. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths.

Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.

3.3 INSTALLATION OF SLAB INSULATION

A. On vertical slab edge and foundation surfaces, set insulation units using manufacturer's recommended adhesive according to manufacturer's written instructions.

1.If not otherwise indicated, extend insulation a minimum of 36 inches below exterior grade line.

B. On horizontal surfaces, loosely lay insulation units according to manufacturer's written instructions. Stagger end joints and tightly abut insulation units.

1.If not otherwise indicated, extend insulation a minimum of 36 inches in from exterior walls.

THERMAL INSULATION 072100 - 2

3.4 INSTALLATION OF FOUNDATION WALL INSULATION

A. Butt panels together for tight fit.

B. Anchor Installation: Install board insulation on concrete substrates by adhesively attached, spindle-type insulation anchors as follows:

1.Fasten insulation anchors to concrete substrates with insulation anchor adhesive according to anchor manufacturer's written instructions.

2.Space anchors according to insulation manufacturer's written instructions for insulation type, thickness, and application.

3.After adhesive has dried, install board insulation by pressing insulation into position over spindles and securing it tightly in place with insulation-retaining washers, taking care not to compress insulation.

4.Where insulation will not be covered by other building materials, apply capped washers to tips of spindles.

C. Adhesive Installation: Install with adhesive or press into tacky waterproofing or dampproofing according to manufacturer's written instructions.

3.5 INSTALLATION OF CAVITY-WALL INSULATION

A. Foam-Plastic Board Insulation: Install pads of adhesive spaced approximately 24 inches o.c. both ways on inside face and as recommended by manufacturer.

1.Fit courses of insulation between obstructions, with edges butted tightly in both directions, and with faces flush.

2.Press units firmly against inside substrates.

3.6 INSTALLATION OF INSULATION IN FRAMED

CONSTRUCTION

A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:

1.Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.

2.Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.

3.Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.

4.For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets

THERMAL INSULATION 072100 - 3

mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs.

B. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:

1.Glass-Fiber Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft..

3.7 PROTECTION

A. Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes.

B. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.

END OF SECTION 072100

THERMAL INSULATION 072100 - 4

SECTION 074619 - STEEL SIDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes steel soffit.

B. Related Requirements:

1.Section 061000 "Rough Carpentry" for wood furring, grounds, nailers, and blocking.

1.2 COORDINATION

A. Coordinate siding installation with flashings and other adjoining construction to ensure proper sequencing.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples for Initial Selection: For steel soffit including related accessories.

C. Samples for Verification:

1.12-inch- long-by-actual-width Sample of soffit.

2.12-inch- long-by-actual-width Samples of trim and accessories.

1.4 INFORMATIONAL SUBMITTALS

A. Product Certificates: For each type of steel soffit.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Data: For each type of product, including related accessories, to include in maintenance manuals.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store packaged materials in original containers with labels intact until time of use.

B. Store materials on elevated platforms, under cover, and in a dry location.

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain products, including related accessories, from single source from single manufacturer.

2.2 STEEL SIDING

A. Steel Siding: Formed product made from galvanized steel complying with ASTM A653/A653M, G90 coating.

1.Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. EDCO Products Inc.

b. Norandex

c. Centria IW-10A 18 ga G-90 Galvanized Stl.

(bases of design) B. Single-Board Horizontal Pattern: 12-inch exposure in plain, single-board style.

STEEL SIDING 074619 - 1

C. Texture: Smooth.

D. Nominal Thickness: 0.050 inch.

E. Finish: Manufacturer's standard primer and heat-fused

PVC.

1.Colors: As selected by Architect from manufacturer's full range of colors.

2.3 ACCESSORIES

A. Siding Accessories, General: Provide starter strips, edge trim, outside and inside corner caps, and other items as recommended by siding manufacturer for building configuration.

1.Provide accessories made from same material as adjacent siding unless otherwise indicated.

B. Decorative Accessories: Provide the following steel decorative accessories as indicated:

1.Fasciae.

2.Moldings and trim.

C. Flashing: Provide flashing complying with Section 076200 "Sheet Metal Flashing and Trim" at window and door heads and where indicated.

D. Fasteners:

1.For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch into substrate.

2.For fastening to metal, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1/4 inch, or three screw-threads, into substrate.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of steel soffit and related accessories.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrates of projections and substances detrimental to application.

3.3 INSTALLATION

A. General: Comply with manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.

1.Center nails in elongated nailing slots without binding siding to allow for thermal movement.

B. Install joint sealants as specified in Section 079200 "Joint Sealants" and to produce a weathertight installation.

STEEL SIDING 074619 - 2

C. Where steel siding contacts dissimilar metals, protect against galvanic action by painting contact surfaces with primer or by applying sealant or tape or installing nonconductive spacers as recommended by manufacturer for this purpose.

3.4 ADJUSTING AND CLEANING

A. Remove damaged, improperly installed, or otherwise defective materials and replace with new materials complying with specified requirements.

B. Clean finished surfaces according to manufacturer's written instructions and maintain in a clean condition during construction.

END OF SECTION 074619

STEEL SIDING 074619 - 3

SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1.Mechanically fastened ethylene-propylene-diene-terpolymer (EPDM) roofing system.

2.Accessory roofing materials.

3.Roof insulation.

B. Related Requirements:

1.Section 061000 "Rough Carpentry for wood nailers, curbs, and blocking.

2.Section 072100 "Thermal Insulation" for insulation beneath the roof deck.

3.Section 076200 "Sheet Metal Flashing and Trim" for metal roof flashings and counterflashings.

4.Section 077100 "Roof Specialties" for roof edge flashings.

5.Section 079200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.

6.Section 221423 "Storm Drainage Piping

Specialties" for roof drains.

1.2 DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D1079 and glossary of NRCA's "The NRCA Roofing Manual:

Membrane Roof Systems" apply to work of this Section.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.For insulation and roof system component fasteners, include copy of FM Approvals' RoofNavlisting.

B. Shop Drawings: Include roof plans, sections, details, and attachments to other work, including the following:

1.Layout and thickness of insulation.

2.Base flashings and membrane terminations.

3.Flashing details at penetrations.

4.Tapered insulation, thickness, and slopes.

5.Roof plan showing orientation of steel roof deck and orientation of roof membrane and fastening spacings and patterns for mechanically fastened roofing system.

6.Insulation fastening patterns for corner, perimeter, and field-of-roof locations.

C. Samples for Verification: For the following products:

1.Roof membrane and flashings of color required.

ETHYLENE-PROPYLENE-DIENE-MONOMER

(EPDM) ROOFING

075323 - 1

2.Walkway pads or rolls, of color required.

D. Wind Uplift Resistance Submittal: For roofing system, indicating compliance with wind uplift performance requirements.

1.4 INFORMATIONAL SUBMITTALS

A. Manufacturer Certificates:

1.Performance Requirement Certificate: Signed by roof membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance Requirements" Article.

a. Submit evidence of complying with performance requirements.

2.Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.

B. Product Test Reports: For components of roof membrane and insulation, for tests performed by a qualified testing agency, indicating compliance with specified requirements.

C. Evaluation Reports: For components of roofing system, from ICC-ES.

D. Sample Warranties: For manufacturer's special warranties.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing system to include in maintenance manuals.

B. Certified statement from existing roof membrane manufacturer stating that existing roof warranty has not been affected by Work performed under this Section.

1.6 QUALITY ASSURANCE

A. Qualifications:

1.Manufacturers: A qualified manufacturer that listed in FM Approvals' RoofNav for roofing system identical to that used for this Project.

2.Installers: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 2

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.

1.Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.

C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.

D. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck.

1.8 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

1.9 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.

1.Special warranty includes roof membrane, base flashings, roof insulation, fasteners and other components of roofing system.

2.Warranty Period: 20 years from Date of Substantial Completion.

B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this Section, signed by Installer, covering the Work of this Section, including all components of roofing system such as roof membrane, base flashing, roof insulation, fasteners and, for the following warranty period:

1.Warranty Period: Two years from Date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. General Performance: Installed roofing system and base flashings to withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing and flashings to remain watertight.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 3

1.Accelerated Weathering: Roof membrane to withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or

ASTM G155.

2.Impact Resistance: Roof membrane to resist impact damage when tested according to ASTM D3746, ASTM D4272, or the "Resistance to Foot Traffic Test" in FM Approvals 4470.

B. Material Compatibility: Roofing materials to be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roof membrane manufacturer based on testing and field experience.

C. Wind Uplift Resistance: Design roofing system to resist the following wind uplift pressures when tested according to FM Approvals 4474, UL 580, or UL 1897:

1.Zone 1 (Roof Area Field): 22 psf.

2.Zone 2 (Roof Area Perimeter): 25 psf.

3.Zone 3 (Roof Area Corners): 25 psf.

D. FM Approvals' RoofNav Listing: Roof membrane, base flashings, and component materials comply with requirements in FM Approvals 4450 or FM Approvals 4470 as part of a roofing system, and are listed in FM Approvals' RoofNav for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals Certification markings.

1.Fire/Windstorm Classification: Class 1A-75.

2.Hail-Resistance Rating: FM Global Property Loss

Prevention Data Sheet 1-34 SH.

E. Solar Reflectance Index (SRI): Three-year-aged SRI not less than 64 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.

F. ENERGY STAR Listing: Roofing system to be listed on the DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products.

G. Exterior Fire-Test Exposure: ASTM E108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

2.2 ACCESSORY ROOFING MATERIALS

A. General: Accessory materials recommended by roofing system manufacturer for intended use and compatible with other roofing components.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 4

1.Adhesive and Sealants: Comply with VOC limits of authorities having jurisdiction.

B. Sheet Flashing: 60-mil- thick EPDM, partially cured or cured, according to application.

C. Slip Sheet: Manufacturer's standard, of thickness required for application.

D. Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer.

E. Roof Vents: As recommended by roof membrane manufacturer.

1.Size: Not less than 4-inch diameter.

F. Bonding Adhesive: Manufacturer's standard.

G. Seaming Material: Manufacturer's standard, synthetic-rubber polymer primer and 3-inch- wide minimum, butyl splice tape with release film.

H. Lap Sealant: Manufacturer's standard, single-component sealant.

I. Water Cutoff Mastic: Manufacturer's standard butyl mastic sealant.

J. Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or aluminum bars, approximately 1 by 1/8 inch thick; with anchors.

K. Metal Battens: Manufacturer's standard, aluminum-zinc-alloy-coated or zinc-coated steel sheet, approximately 1 inch wide by 0.05 inch thick, prepunched.

L. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening components to substrate, and acceptable to roofing system manufacturer.

M. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, molded pipe boot flashings, preformed inside and outside corner sheet flashings, reinforced EPDM securement strips, T-joint covers, in-seam sealants, termination reglets, cover strips, and other accessories.

2.3 ROOF INSULATION

A. General: Preformed roof insulation boards manufactured by

EPDM roof membrane manufacturer, approved for use in FM Approvals' RoofNav-listed roof assemblies.

B. Composite Polyisocyanurate Board Insulation:

ASTM C1289, with factory-applied facing board on one major surface, as indicated below by type, and felt or glass-fiber mat facer on the other.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 5

1.Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Carlisle Construction Materials; Carlisle Companies

b. Certainteed; Saint-Gobain North America

c. Johns Manville

d. Firestone.

2.Facer: Type IV, cellulosic-fiber-insulation-board facer, Grade 2, 1/2 inch thick

C. Tapered Insulation: Provide factory-tapered insulation boards.

1.Material: Match roof insulation.

2.Minimum Thickness: 1/4 inch.

3.Slope:

a. Roof Field: 1/8 inch per foot unless otherwise indicated on Drawings.

b. Saddles and Crickets: 1/2 inch per foot unless otherwise indicated on Drawings.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.

1.Verify that roof openings and penetrations are in place, curbs are set and braced, and roof-drain bodies are securely clamped in place.

2.Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.

3.Verify that surface plane flatness and fastening of steel roof deck complies with requirements in Section 053100 "Steel Decking."

3.2 PREPARATION

A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing system installation according to roofing system manufacturer's written instructions. Remove sharp projections.

B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 6

3.3 INSTALLATION OF ROOFING, GENERAL

A. Install roofing system according to roofing system manufacturer's written instructions, FM Approvals' RoofNav assembly requirements, and FM Global Property Loss Prevention Data Sheet 1-29.

B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at end of workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing.

C. Install roof membrane and auxiliary materials to tie in to existing roofing to maintain weathertightness of transition.

3.4 INSTALLATION OF INSULATION

A. Coordinate installing roofing system components so insulation is not exposed to precipitation or left exposed at end of workday.

B. Comply with roofing system and insulation manufacturer's written instructions for installing roof insulation.

C. Installation Over Metal Decking:

1.Install base layer of insulation with end joints staggered not less than 12 inches in adjacent rows and with long joints continuous at right angle to flutes of decking.

a. Locate end joints over crests of decking.

b. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.

c. Make joints between adjacent insulation boards not more than 1/4 inch in width.

d. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches.

1) Trim insulation so that water flow is unrestricted.

e. Fill gaps exceeding 1/4 inch with insulation.

f. Cut and fit insulation within 1/4 inch of nailers, projections, and penetrations.

g. Mechanically attach base layer of insulation using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to metal decks.

1) Fasten insulation according to requirements in FM Approvals'

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 7

RoofNav for specified Windstorm Resistance Classification.

2) Fasten insulation to resist specified uplift pressure at corners, perimeter, and field of roof.

2.Install upper layers of insulation with joints of each layer offset not less than 12 inches from previous layer of insulation.

a. Install with long joints continuous and with end joints staggered not less than 12 inches in adjacent rows.

b. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.

c. Make joints between adjacent insulation boards not more than 1/4 inch in width.

d. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches.

e. Trim insulation so that water flow is unrestricted.

f. Fill gaps exceeding 1/4 inch with insulation.

g. Cut and fit insulation within 1/4 inch of nailers, projections, and penetrations.

h. Adhere each layer of insulation to substrate using adhesive according to FM Approvals' RoofNav listed roof assembly requirements for specified Windstorm Resistance Classification and FM Global Property Loss Prevention Data Sheet 1-29, as follows:

1) Set each layer of insulation in ribbons of bead-applied insulation adhesive, firmly pressing and maintaining insulation in place.

3.5 INSTALLATION OF MECHANICALLY FASTENED ROOF

MEMBRANE

A. Mechanically fasten roof membrane over area to receive roofing according to roofing system manufacturer's written instructions.

B. Unroll roofing membrane and allow to relax before installing.

C. For in-splice attachment, install roof membrane with long dimension perpendicular to steel roof deck flutes.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 8

D. Start installation of roofing in presence of roofing system manufacturer's technical personnel.

E. Accurately align roof membrane, and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.

F. Mechanically fasten or adhere roof membrane securely at terminations, penetrations, and perimeter of roofing.

G. Apply roof membrane with side laps shingled with slope of roof deck where possible.

H. Adhesive Seam Installation: Clean both faces of splice areas, apply splicing cement.

1.Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.

2.Apply lap sealant and seal exposed edges of roofing terminations.

3.Apply a continuous bead of in-seam sealant before closing splice if required by roofing system manufacturer.

I. Tape Seam Installation: Clean and prime both faces of splice areas, apply splice tape.

1.Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.

2.Apply lap sealant and seal exposed edges of roofing terminations.

J. Factory-Applied Seam Tape Installation: Clean and prime surface to receive tape.

1.Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.

2.Apply lap sealant and seal exposed edges of roofing terminations.

K. Repair tears, voids, and lapped seams in roof membrane that do not comply with requirements.

L. Spread sealant or mastic bed over deck-drain flange at roof drains, and securely seal roof membrane in place with clamping ring.

M. In-Splice Attachment: Secure one edge of roof membrane using fastening plates or metal battens centered within splice, and mechanically fasten roof membrane to roof deck. Field splice seam.

3.6 INSTALLATION OF BASE FLASHING

A. Install sheet flashings and preformed flashing accessories, and adhere to substrates according to roofing system manufacturer's written instructions.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 9

B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow to partially dry. Do not apply to seam area of flashing.

C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing.

D. Clean splice areas, apply splicing cement, and firmly roll side and end laps of overlapping sheets to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of sheet flashing terminations.

E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination bars.

3.7 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to inspect substrate conditions, surface preparation, roof membrane application, sheet flashings, protection, and drainage components, and to furnish reports to Architect.

B. Perform the following tests:

1.Flood Testing: Flood test each roofing area for leaks, according to recommendations in ASTM D5957, after completing roofing and flashing. Install temporary containment assemblies, plug or dam drains, and flood with potable water.

a. Perform tests before overlying construction is placed.

b. Flood to an average depth of 2 inch with a minimum depth of 1 inch and not exceeding a depth of 6 inches. Maintain 2 inches of clearance from top of base flashing.

c. Flood each area for 24 hours.

d. After flood testing, repair leaks, repeat flood tests, and make further repairs until roofing and flashing installations are watertight.

1) Cost of retesting is Contractor's responsibility.

e. Testing agency to prepare survey report indicating locations initial leaks, if any, and final survey report.

C. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion, in presence of Architect, and to prepare inspection report.

D. Repair or remove and replace components of roofing system where inspections indicate that they do not comply with specified requirements.

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 10

E. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.

3.8 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing system, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.

B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.

3.9 ROOFING INSTALLER'S WARRANTY

A. WHEREAS _______________________________ of

___________________________, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project:

1.Owner: <Insert name of Owner>.

2.Owner Address: <Insert address>.

3.Building Name/Type: <Insert information>.

4.Building Address: <Insert address>.

5.Area of Work: <Insert information>.

6.Acceptance Date: _________________.

7.Warranty Period: <Insert time>.

8.Expiration Date: __________________.

B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period Roofing Installer will, at Roofing Installer's own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.

D. This Warranty is made subject to the following terms and conditions:

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 11

1.Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by:

a. lightning;

b. peak gust wind speed exceeding 115 mph;

c. fire;

d. failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition;

e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work;

f. vapor condensation on bottom of roofing;

and

g. activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner.

2.When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.

3.Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.

4.During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 12 would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty.

5.During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.

6.Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.

7.This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.

E. IN WITNESS THEREOF, this instrument has been duly executed this ___________ day of ___________________, 1.Authorized Signature:

2.Name:

3.Title:

END OF SECTION 075323

ETHYLENE-PROPYLENE-DIENE-MONOMER

075323 - 13

SECTION 076200 - SHEET METAL FLASHING AND TRIM

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1.Roof-drainage sheet metal fabrications.

2.Low-slope roof sheet metal fabrications.

3.Wall sheet metal fabrications.

4.Miscellaneous sheet metal fabrications.

B. Related Requirements:

1.Section 061000 "Rough Carpentry" for wood nailers, curbs, and blocking.

2.Section 077100 "Roof Specialties" for manufactured copings, roof-edge specialties, roof-edge drainage systems, reglets, and counterflashings.

3.Section 077200 "Roof Accessories" for set-on-type curbs, equipment supports, roof hatches, vents, and other manufactured roof accessory units.

1.2 COORDINATION

A. Coordinate sheet metal flashing and trim layout and seams with sizes and locations of penetrations to be flashed, and joints and seams in adjacent materials.

B. Coordinate sheet metal flashing and trim installation with adjoining roofing and wall materials, joints, and seams to provide leakproof, secure, and noncorrosive installation.

1.3 ACTION SUBMITTALS

A. Product Data: For each of the following

1.Underlayment materials.

2.Elastomeric sealant.

B. Shop Drawings: For sheet metal flashing and trim.

1.Include plans, elevations, sections, and attachment details.

2.Detail fabrication and installation layouts, expansion-joint locations, and keyed details.

Distinguish between shop- and field-assembled Work.

3.Include identification of material, thickness, weight, and finish for each item and location in Project.

4.Include details for forming, including profiles, shapes, seams, and dimensions.

5.Include details for joining, supporting, and securing, including layout and spacing of fasteners, cleats, clips, and other attachments. Include pattern of seams.

SHEET METAL FLASHING AND TRIM 076200 - 1

6.Include details of termination points and assemblies.

7.Include details of roof-penetration flashing.

8.Include details of edge conditions, including eaves, ridges, valleys, rakes, crickets, flashings, and counterflashings.

9.Include details of connections to adjoining work.

C. Samples: For each exposed product and for each color and texture specified, 12 inches long by actual width.

1.4 INFORMATIONAL SUBMITTALS

A. Product Certificates: For each type of coping and roof edge flashing that is FM Approvals approved.

B. Product Test Reports: For each product, for tests performed by a qualified testing agency.

C. Sample Warranty: For special warranty.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Data: For sheet metal flashing and trim, and its accessories, to include in maintenance manuals.

B. Special warranty.

1.6 QUALITY ASSURANCE

A. Fabricator Qualifications: Employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.

1.For copings and roof edge flashings that are ANSI/SPRI/FM 4435/ES-1 tested and FM Approvals approved, shop is to be listed as able to fabricate required details as tested and approved.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage.

1.Store sheet metal flashing and trim materials away from uncured concrete and masonry.

2.Protect stored sheet metal flashing and trim from contact with water.

B. Protect strippable protective covering on sheet metal flashing and trim from exposure to sunlight and high humidity, except to extent necessary for period of sheet metal flashing and trim installation.

1.8 WARRANTY

A. Special Warranty on Finishes: Manufacturer agrees to repair finish or replace sheet metal flashing and trim that shows evidence of deterioration of factory-applied finishes within specified warranty period.

SHEET METAL FLASHING AND TRIM 076200 - 2

1.Exposed Panel Finish: Deterioration includes, but is not limited to, the following:

a. Color fading more than 5 Delta E units when tested in accordance with ASTM D2244.

b. Chalking in excess of a No. 8 rating when tested in accordance with ASTM D4214.

c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.

2.Finish Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Sheet metal flashing and trim assemblies, including cleats, anchors, and fasteners, are to withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim are not to rattle, leak, or loosen, and are to remain watertight.

B. Sheet Metal Standard for Flashing and Trim: Comply with NRCA's "The NRCA Roofing Manual: Architectural Metal Flashing, Condensation and Air Leakage Control, and Reroofing" and SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.

C. SPRI Wind Design Standard: Manufacture and install roof edge flashings tested in accordance with ANSI/SPRI/FM 4435/ES-1 and capable of resisting the following design pressure:

1.Design Pressure: As indicated on Drawings.

D. FM Approvals Listing: Manufacture and install roof edge flashings that are listed in FM Approvals' "RoofNav" and approved for windstorm classification, Class 1-75. Identify materials with name of fabricator and design approved by FM Approvals.

E. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1.Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

2.2 FABRICATION, GENERAL

SHEET METAL FLASHING AND TRIM 076200 - 3

A. Custom fabricate sheet metal flashing and trim to comply with details indicated and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required.

1.Fabricate sheet metal flashing and trim in shop to greatest extent possible.

2.Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal.

3.Verify shapes and dimensions of surfaces to be covered and obtain field measurements for accurate fit before shop fabrication.

4.Form sheet metal flashing and trim to fit substrates without excessive oil-canning, buckling, and tool marks; true to line, levels, and slopes; and with exposed edges folded back to form hems.

5.Conceal fasteners and expansion provisions where possible. Do not use exposed fasteners on faces exposed to view.

B. Fabrication Tolerances:

1.Fabricate sheet metal flashing and trim that is capable of installation to a tolerance of 1/4 inch in 20 feet on slope and location lines indicated on Drawings and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.

C. Expansion Provisions: Form metal for thermal expansion of exposed flashing and trim.

1.Form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with butyl sealant concealed within joints.

D. Sealant Joints: Where movable, nonexpansion-type joints are required, form metal in accordance with cited sheet metal standard to provide for proper installation of elastomeric sealant.

E. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal.

F. Fabricate cleats and attachment devices of sizes as recommended by cited sheet metal standard for application, but not less than thickness of metal being secured.

G. Seams:

1.Fabricate nonmoving seams with flat-lock seams.

Form seams and seal with elastomeric sealant

SHEET METAL FLASHING AND TRIM 076200 - 4

unless otherwise recommended by sealant manufacturer for intended use.

2.3 LOW-SLOPE ROOF SHEET METAL FABRICATIONS

A. Roof Edge Flashing (Gravel Stop) and Fascia Cap:

Fabricate in minimum 96-inch- long, but not exceeding 12-foot- long sections. Furnish with 6-inch- wide, joint cover plates.

1.Joint Style: Overlapped, 4 inches wide.

2.Fabricate from the following materials:

a. Aluminum: 0.050 inch thick.

b. Galvanized Steel: 0.028 inch thick.

c. Aluminum-Zinc Alloy-Coated Steel: 0.028 inch thick.

B. Copings: Fabricate in minimum 96-inch- long, but not exceeding 12-foot- long, sections. Fabricate joint plates of same thickness as copings. Furnish with continuous cleats to support edge of external leg and interior leg. Miter corners, fasten and seal watertight.

1.Joint Style: Butted with expansion space and 6-inch- wide, concealed backup plate.

2.Fabricate from the materials noted for roof edge flashing:

C. Base Flashing: Fabricate from the following materials:

1.Aluminum: 0.040 inch thick.

2.Galvanized Steel: 0.028 inch thick.

3.Aluminum-Zinc Alloy-Coated Steel: 0.028 inch thick.

D. Counterflashing: Fabricate from the following materials:

1.Aluminum: 0.032 inch thick.

2.Galvanized Steel: 0.022 inch thick.

3.Aluminum-Zinc Alloy-Coated Steel: 0.022 inch thick.

E. Roof-Penetration Flashing: Fabricate from the following materials:

1.Galvanized Steel: 0.028 inch thick.

2.Aluminum-Zinc Alloy-Coated Steel: 0.028 inch thick.

F. Roof-Drain Flashing: Fabricate from the following materials:

1.Copper: 12 oz./sq. ft..

2.Copper-Clad Stainless Steel: 0.016 inch thick.

2.4 WALL SHEET METAL FABRICATIONS

SHEET METAL FLASHING AND TRIM 076200 - 5

A. Through-Wall Flashing: Fabricate continuous flashings in minimum 96-inch- long, but not exceeding 12-foot- long, sections, under copings, and at shelf angles. Fabricate discontinuous lintel, sill, and similar flashings to extend 6 inches beyond each side of wall openings; and form with 2-inch- high, end dams. Fabricate from the following materials:

1.Copper: 16 oz./sq. ft..

2.Zinc-Tin Alloy-Coated Copper: 16 oz./sq. ft..

3.Copper-Clad Stainless Steel: 0.016 inch thick.

B. Opening Flashings in Frame Construction: Fabricate head, sill, and similar flashings to extend 4 inches beyond wall openings. Form head and sill flashing with 2-inch- high, end dams. Fabricate from the following materials:

1.Copper: 16 oz./sq. ft..

2.Zinc-Tin Alloy-Coated Copper: 16 oz./sq. ft..

3.Galvanized Steel: 0.022 inch thick.

4.Aluminum-Zinc Alloy-Coated Steel: 0.022 inch thick.

2.5 MISCELLANEOUS SHEET METAL FABRICATIONS

A. Equipment Support Flashing: Fabricate from the following materials:

1.Galvanized Steel: 0.028 inch thick.

2.Aluminum-Zinc Alloy-Coated Steel: 0.028 inch thick.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with installer present, for compliance with requirements for installation tolerances, substrate, and other conditions affecting performance of the Work.

1.Verify compliance with requirements for installation tolerances of substrates.

2.Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION OF UNDERLAYMENT

A. Synthetic Underlayment: Install synthetic underlayment, wrinkle free, in accordance with manufacturers' written instructions, and using adhesive where possible to minimize use of mechanical fasteners under sheet metal.

1.Lap horizontal joints not less than 4 inches.

2.Lap end joints not less than 12 inches.

SHEET METAL FLASHING AND TRIM 076200 - 6

3.3 INSTALLATION, GENERAL

A. Install sheet metal flashing and trim to comply with details indicated and recommendations of cited sheet metal standard that apply to installation characteristics required unless otherwise indicated on Drawings.

1.Install fasteners, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.

2.Install sheet metal flashing and trim true to line, levels, and slopes. Provide uniform, neat seams with minimum exposure of sealant.

3.Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement.

4.Install sheet metal flashing and trim to fit substrates and to result in watertight performance.

5.Install continuous cleats with fasteners spaced not more than 12 inches o.c.

6.Space individual cleats not more than 12 inches apart. Attach each cleat with at least two fasteners.

Bend tabs over fasteners.

7.Install exposed sheet metal flashing and trim with limited oil-canning, and free of buckling and tool marks.

8.Do not field cut sheet metal flashing and trim by torch.

B. Metal Protection: Where dissimilar metals contact each other, or where metal contacts pressure-treated wood or other corrosive substrates, protect against galvanic action or corrosion by painting contact surfaces with bituminous coating or by other permanent separation as recommended by sheet metal manufacturer or cited sheet metal standard.

1.Coat concealed side of uncoated-aluminum sheet metal flashing and trim with bituminous coating where flashing and trim contact wood, ferrous metal, or cementitious construction.

2.Underlayment: Where installing sheet metal flashing and trim directly on cementitious or wood substrates, install underlayment and cover with slip sheet.

C. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim.

1.Space movement joints at maximum of 10 feet with no joints within 24 inches of corner or intersection.

SHEET METAL FLASHING AND TRIM 076200 - 7

2.Form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with sealant concealed within joints.

D. Fasteners: Use fastener sizes that penetrate wood blocking or sheathing not less than 1-1/4 inches for nails and not less than 3/4 inch for wood screws.

E. Conceal fasteners and expansion provisions where possible in exposed work and locate to minimize possibility of leakage. Cover and seal fasteners and anchors as required for a tight installation.

F. Seal joints as required for watertight construction.

1.Use sealant-filled joints unless otherwise indicated.

a. Embed hooked flanges of joint members not less than 1 inch into sealant.

b. Form joints to completely conceal sealant.

c. When ambient temperature at time of installation is between 40 and 70 deg F, set joint members for 50 percent movement each way.

d. Adjust setting proportionately for installation at higher ambient temperatures.

1) Do not install sealant-type joints at temperatures below 40 deg F.

2.Prepare joints and apply sealants to comply with requirements in Section 079200 "Joint Sealants."

G. Rivets: Rivet joints in uncoated aluminum where necessary for strength.

3.4 INSTALLATION OF ROOF…