Addendum No.6 08222022 - 21187.pdf
PDF 456 KB Posted
- Attached to
- 511/21187. CAK; Albion Armory - Renovate Armory
- Solicitation number
- RFQ - 171 - 220000000461
- Issued by
- Calhoun County, Alden CDP, Michigan
About this file
The provided document is Addendum No.6 dated August 22, 2022 for the Renovate Armory - Albion Armory project located at the National Guard Armory Battery Albion Armory in Albion, Michigan. This addendum clarifies the allowances included in the project specifications. Specifically, it states that Allowances #1 through #5 are not used, Carpet Allowance #6 was deleted in a previous addendum, Allowance #7 for a $100,000 contingency is included, and Allowance #8 for testing is deleted as the contractor is responsible for all required testing. Additionally, Allowance #9 for $60,000 in HVAC controls is included.
The related state and local contract opportunity is Project 511/21187 to renovate the Albion Armory, located in Calhoun County, Michigan. The jurisdiction for this opportunity includes Calhoun County and the Alden CDP.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 22, 2022
Renovate Armory – Albion Armory
Addendum Number 06
Project Location National Guard Armory Battery Albion Armory 1023 N Clark Street Albion, Michigan 49224
Notice to Proposers
Receipt of this Addendum shall be acknowledged on the Proposal Form.
This Addendum forms part of the Contract documents for the above reference project and shall be incorporated integrally therewith.
Each proposer shall make necessary adjustments and submit their proposal with full knowledge of all modification, clarifications and supplemental data included therein. Where provisions of the following supplemental data differ from those of the original Contract Document, this Addendum shall govern.
Architectural Items (Clarifications on Allowances in the Specifications)
1. Allowances #1 thru #5 are not used.
2. Carpet allowance 6 was deleted (Addendum No. 4 August 16th, 2022)
3. Allowance #7, $100,000 contingency is included.
4. Allowance #8 testing, delete (the contractor is responsible for all concrete., asphalt, steel, masonry, flooring, etc. testing, call for in specifications)
5. Allowance #9, $60,000 for HVAC controls is included.
End of Addendum Number 06
File details come from the government source that posted it. Updated .