This is an Addendum #1 to Section 266301 specifications for an above-ground fuel tank system for Clay County Fire Station No. 24 in Green Cove Springs, Florida. The specification details the procurement and installation of a 500-gallon UL 2085 listed, secondary-contained, concrete-vaulted, double-walled rectangular steel tank manufactured by Phoenix Products LLC of Jacksonville, Florida. The tank package includes a 115V high-flow hand-held fuel dispenser (Fill-Rite FR700 Series) with meter, hose, and nozzle mounted on the sub-base tank, with hose length to be coordinated with the owner prior to ordering. The specification requires the tank to be provided with earthquake and hurricane restraint tie-downs, stainless steel overfill and equipment boxes, 304 Schedule 40 stainless steel threaded pipe outlets, and a sub-base tank-mounted leak detection system with microprocessor-based monitor and audible alarm. The contractor must supply 500 gallons of diesel fuel, obtain all necessary permits and service charges, and coordinate with local fire regulating authorities for installation review and approval. Testing requirements include air pressure testing of the primary tank at 3 PSI in accordance with UL 142 standards.

The tank includes a 30-year warranty covering concrete vaulting materials, primary tank, and secondary tank. The annular space between inner and outer walls must be filled with a minimum of six inches of concrete to provide a two-hour fire wall rating per the Uniform Building Code. The outer tank shall be sandblasted to white metal per SSPC-SP10 standards and painted with a high-build polyester glass flake coat (12 to 15 mils DFT) and an aliphatic polyurethane finish coat (3 to 5 mils DFT). All equipment must be new, current production from a national manufacturer with applicable UL listing. The subcontractor is responsible for obtaining all applicable permits, service charges, fees, and insurance required for work performance under this section, with specifications and drawings to be interpreted only by the project architect or engineer in cases of contradiction or ambiguity.

View the file

Other files

File Type Posted
Construction_of_Clay_County_Fire_Station_No._24_(Addendum_#2_Revision).pdf PDF
Demolition_Asbestos_Survey_Report_.pdf PDF
Tile_Image_.jpg JPG image
07410-STANDING_SEAM_MTL_ROOFING_(Per_Addendum_1).pdf PDF
01260-CONTRACT_MOD_(per_Addendum_1).pdf PDF
01100_Owner_Furnished_Items_(Per_Addendum_1).pdf PDF
@TOC_(Per_Addendum_1).pdf PDF
266612-ASCO_ATS_ELEC_(per_Addendum_1).pdf PDF
Addendum_#1_-_266120-ELEC_GENSET_.pdf PDF
Addendum_#1_-_230000-HVAC_.pdf PDF
Addendum_#1_-_12511-Window_Blinds_.pdf PDF
Addendum_#1_-_11452-Appliances_.pdf PDF
Addendum_#1_-_10500-Mobile_PPE_Lockers_.pdf PDF
Addendum_#1_-_10425-Signs.pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Arch_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Plum_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Mech_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_FP_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Civil_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Struct_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Landscape_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Elec_(2026_02-17).pdf PDF
Construction_of_Clay_County_Fire_Station_No._24.pdf PDF
Standard_Protection_Measures-Eastern_Indigo_Snake.pdf PDF
Indigo_Snake_Poster.pdf PDF
Clay_Co_Fire_Station_24_(2026_01-02)_Specifications-Bid_Set.pdf PDF
Clay_Co_FS24_AV_Documents_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Purvis_Documents_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Plumb_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Mech_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_FP_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Elec_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Struct_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Arch_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Landscape_Arch_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Civil_(2026_01-02)_Bid_Set.pdf PDF
Owner_Direct_Purchase_Program.pdf PDF
Appendix_II_for_2_CFR_Part_200.pdf PDF
FEMA_Field_Manual.pdf PDF
Subgrant-Agreement-226-SR-DR-4283-Executed-Funding-Agreement-Clay-County-460634-53096.pdf PDF
W-9_(2024).pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Warranty_Letter_.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLAY CO FIRE STATION 24 26 6301-1 SUB-BASE TANK

DH Comm. No. 22003

SECTION 266301 ABOVE GROUND FUEL TANK

REVISED PER ADDENDUM #1

PART 1 – GENERAL

1.1 CONTRACT

A. General Requirements, included in Section 0100, are hereby made a part of this section as if fully repeated herein.

B. Specifications and drawings shall be considered as supplementary to each other, requiring materials and labor indicated, specified, or implied by either specifications or drawings. Contradictions shall be presented to the Architect/Engineer for resolution.

C. Interpretation of specifications or drawings, where deemed necessary, shall be made only by the

Architect/Engineer.

D. The Subcontractor shall obtain and pay for all applicable service charges, fees, permits, royalties, taxes and insurance for work performed under this Section.

1.2 SCOPE OF WORK

A. It is the intent of this specification to secure the purchase and installation of an above ground fuel tank which has been prototype tested, factory built, production tested, site tested, together with all accessories necessary for a complete installation as shown on the plans and drawings and specified herein.

B. All equipment shall be new, of current production by a national firm which manufactures the tank complete with applicable UL listing.

1.3 SUBMITTALS

A. Submittal shall include specification sheets showing all standard and optional accessories to be supplied, dimension drawings, and generator connection piping diagrams for required fuel interconnection to on site generator.

1.4 WARRANTY

A. Tank shall have a 30 year warranty that includes the concrete vaulting materials, the primary tank, and the secondary tank.

PART 2 – PRODUCTS

2.2 STORAGE TANK

A. 500 GALLON Storage Tank shall be a UL 2085 listed and labeled, secondarily contained and protected, concrete-vaulted, double-walled rectangular steel tank as manufactured by Phoenix Products LLC, Jacksonville, FL. 904-354-1858.

B. Provide 115V High Flow hand-held fuel dispenser with meter, hose and nozzle mounted on sub-base tank as manufactured by Fill-Rite# FR700 Series, Coordinate hose length with owner prior to ordering pump, pump shall be factory installed by Phoenix Products LLC, Jacksonville, FL. 904-354-1858

C. The annular space between the inner and outer walls shall be filled with a minimum of six inches of concrete, to provide a minimum two hour fire wall rating per the Uniform Building Code.

CLAY CO FIRE STATION 24 26 6301-2 SUB-BASE TANK

DH Comm. No. 22003

D. Tanks shall be provided in single or split configurations as application dictates. Split configuration tanks can be provided in non-equal tank sizes, i.e., 750/250 gallon ratio. Specific splits to be confirmed with the manufacturer.

E. Outer tank shall be sandblasted per SSPC-SP10 (White Metal Blast), and then painted with one coat of high-build polyester glass flake (International Glassflake), minimum 12 to 15 mils (DFT) thickness, and a finish coat of Aliphatic Polyurethane, 3 to 5 mils (DFT) thickness.

F. Tanks shall be provided 10 gauge stainless steel overfill and equipment boxes welded to the tank top and shall include a handle rain to allow fuel to return to the tank.

G. All tank outlets shall be 304 Schedule 40 stainless steel threaded pipe.

H. All tanks shall be labeled by product, capacity, and manufacturer.

A. Leak detection shall be accomplished through the use of a sub-base tank mounted leak detection probe monitored by an intrinsically safe, microprocessor based monitor. Leak detection system shall complete with diesel fuel sensor, and audible alarm. Leak detection system shall be equal to Phoenix Products # HLR 1001. Probes shall be provided which are suitable for continuous leak monitoring of secondary containment areas as required.

B. Contractor shall provide 500 gallons of diesel fuel.

PART 3 – INSTALLATION AND TESTING

3.1 INSTALLATION

A. The tank shall include earthquake/hurricane restraint tie-downs.

B. The proper fire regulating authority shall review all tank applications (installations).

C. Contractor shall be required to give proper notice to authority having jurisdiction for gallon fuel tank delivery, and associated on site inspection.

D. All tank applications (installations) shall be reviewed by the proper fire district regulating authority and properly permitted.

3.2 TESTING

A. The primary tank shall be air pressure tested at 3 PSI and shall be constructed in accordance with UL 142.