Addendum_#1_-_10500-Mobile_PPE_Lockers_.pdf

PDF 132 KB Posted

Attached to
Construction of Clay County Fire Station No. 24
Solicitation number
25/26-042
Issued by
Clay County, Harold CDP, Florida

About this file

This is an Addendum #1 to Section 10500 specifications for Clay County Fire Station 24 in Florida, revising the scope of work for mobile PPE lockers. Per the addendum, all PPE lockers will be provided by the owner and are therefore removed from the General Contractor's scope of work. The specification outlines requirements for mobile lockers designed for storage of personal protective equipment and "turn out" gear, with standard nominal dimensions of 24 inches wide by 24 inches deep by 83 inches high, configurable in groups of 2, 3, 4, or 6 units. Lockers must be capable of being rolled out of the room for periodic cleaning. The specification identifies four acceptable manufacturers: GearGrid Corporation, Ready Rack, Feld Fire, or other manufacturers meeting the specified requirements. Products must include a 1-1/4 inch diameter steel tubing frame, high-strength steel wire side and back grids with 3-inch by 3-inch square pattern, two adjustable shelves, three apparel hooks per locker opening, 250-pound capacity locking casters, and powder coat finish in colors selected by the architect from the manufacturer's standard range. Each locker must include a nameplate holder constructed of 20-gauge sheet metal measuring 2 inches by 16.5 inches. All parts and hardware must be structurally sound and free from defects, with a 5-year limited warranty on manufacturer's defects required.

Installation and assembly must be completed in accordance with manufacturer's instructions with locker interiors and exterior surfaces cleaned prior to project completion. Products must be stored in dry, ventilated areas until installation and protected from moisture, soiling, and damage during handling and delivery. Installation may not occur until painting and similar operations that could damage lockers are completed. Environmental conditions during and after installation must be maintained within manufacturer's recommended limits for temperature, humidity, and ventilation. Any damaged products must be touched up, repaired, or replaced before substantial completion of the project.

View the file

Other files

File Type Posted
Construction_of_Clay_County_Fire_Station_No._24_(Addendum_#2_Revision).pdf PDF
Demolition_Asbestos_Survey_Report_.pdf PDF
Tile_Image_.jpg JPG image
07410-STANDING_SEAM_MTL_ROOFING_(Per_Addendum_1).pdf PDF
01260-CONTRACT_MOD_(per_Addendum_1).pdf PDF
01100_Owner_Furnished_Items_(Per_Addendum_1).pdf PDF
@TOC_(Per_Addendum_1).pdf PDF
266612-ASCO_ATS_ELEC_(per_Addendum_1).pdf PDF
Addendum_#1_-_266301-ELEC_TANK_SPEC_(per_Addendum_1).pdf PDF
Addendum_#1_-_266120-ELEC_GENSET_.pdf PDF
Addendum_#1_-_230000-HVAC_.pdf PDF
Addendum_#1_-_12511-Window_Blinds_.pdf PDF
Addendum_#1_-_11452-Appliances_.pdf PDF
Addendum_#1_-_10425-Signs.pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Arch_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Plum_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Mech_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_FP_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Civil_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Struct_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Landscape_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Elec_(2026_02-17).pdf PDF
Construction_of_Clay_County_Fire_Station_No._24.pdf PDF
Standard_Protection_Measures-Eastern_Indigo_Snake.pdf PDF
Indigo_Snake_Poster.pdf PDF
Clay_Co_Fire_Station_24_(2026_01-02)_Specifications-Bid_Set.pdf PDF
Clay_Co_FS24_AV_Documents_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Purvis_Documents_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Plumb_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Mech_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_FP_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Elec_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Struct_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Arch_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Landscape_Arch_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Civil_(2026_01-02)_Bid_Set.pdf PDF
Owner_Direct_Purchase_Program.pdf PDF
Appendix_II_for_2_CFR_Part_200.pdf PDF
FEMA_Field_Manual.pdf PDF
Subgrant-Agreement-226-SR-DR-4283-Executed-Funding-Agreement-Clay-County-460634-53096.pdf PDF
W-9_(2024).pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Warranty_Letter_.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLAY CO FIRE STATION 24 10500-1 MOBILE PPE

DH COMM. NO. 22003 LOCKERS

SECTION 10500

MOBILE PPE LOCKERS

REVISED PER ADDENDUM #1

ALL PPE LOCKERS WILL BE PROVIDED BY THE OWNER AND ARE THEREFORE

REMOVED FROM THE GC’S SCOPE OF WORK.

PART 1 - 1.0 GENERAL

1.1 SECTION INCLUDES

A. Mobile lockers for storage of PPE “Turn Out” Gear

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the contract, including general and supplementary materials.

1.3 REFERENCES

A. American Society for Testing and Materials.

B. ADA, Accessibility Guidelines for Buildings and Facilities

1.4 QUALITY ASSURANCE

A. All parts and hardware shall be structurally sound and free from defects, in material and workmanship under normal use and service for the full warranty period.

1.5 WARRANTY

A. Provide 5 year limited warranty on manufacturer’s defects.

1.6 SUBMITTALS

A. Product Data:

1. Product literature illustrating the following:

a. Sizes and configurations

b. Construction details

c. Hardware and/or accessories

d. Material and color selection

B. Shop Drawings: Indicate locker plan layout.

CLAY CO FIRE STATION 24 10500-2 MOBILE PPE

1.7 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Store products in a dry, ventilated area until ready for installation.

B. Protect finishes from moisture, soiling and damage during handling.

C. Do not deliver lockers to be installed until painting and similar operations that could damage lockers have been completed in installation areas.

1.8 PROJECT CONDITIONS

A. During and after installation maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer’s absolute limits.

B. Protect locker finish and adjacent surfaces from damage.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Subject to the requirements of this specification, provide one of the following manufacturers.

1. GearGrid Corporation: Contact (888) 643-6694 or at sales@geargrid.com.

2. Ready Rack: 818 Trakk Lane, Woodstock, IL 60098. Contact (800) 991-2120 or at https://readyrack.com/contact/.

3. Feld Fire: 113 N. Griffith Rd, PO Box 625, Carroll, IA. 51401. 712-792-3143.

4. Other manufacturer meeting the requirements.

2.2 MATERIALS

A. Frame: 1-1/4” diameter steel tubing

B. Side & Back Grids: High Strength ¼” steel wire. 3” x 3” square grid pattern.

C. Shelves: Two shelves constructed of high strength ¼” wire. Adjustable in 3 inch increments.

D. Hooks: Three apparel hooks per locker opening.

E. Casters: 250lb. capacity locking casters. Adjustable or bolt down supports.

F. Finish:

1. Powder Coat

2. To be selected by architect from full range of manufacturer’s standard colors.

mailto:(888)%20643-6694 mailto:sales@geargrid.com https://goo.gl/maps/6mFXWTxzpurWZvVeA tel:+18009912120 https://readyrack.com/contact/

CLAY CO FIRE STATION 24 10500-3 MOBILE PPE

2.3 CONFIGURATIONS

A. Locker Module: 24”w x 24”dp x 83”h standard nominal locker size.

B. Configure in groups of 2, 3, 4, or 6 lockers. Provide shop drawing layout showing the proposed configuration. Lockers must be capable of being rolled out of room for periodic cleaning.

2.4 ACCESORIES

A. Nameplate Holder: 20-gauge sheet metal. 2” x 16.5”.

PART 3 - EXECUTION

3.1 ASSEMBLY

A. Assemble PPE lockers per manufacturer’s instructions.

3.2 INSTALLATION

A. Install in accordance with manufacturer’s instructions.

B. Install accessories (number plates etc.).

3.3 CLEANING

A. Clean locker interiors and exterior surfaces.

3.4 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before substantial completion.

END OF SECTION 10500