01100_Owner_Furnished_Items_(Per_Addendum_1).pdf

PDF 117 KB Posted

Attached to
Construction of Clay County Fire Station No. 24
Solicitation number
25/26-042
Issued by
Clay County, Harold CDP, Florida

About this file

This is an addendum to the project specifications for Clay County Fire Station No. 24, clarifying the allocation of work responsibilities among the contractor, owner, and other parties involved in the construction project. The document establishes three primary categories of work: Contractor-Furnished Contractor-Installed (CFCI) items, which include telecommunications systems, security and access control systems, Purvis notification systems, interior signage, meeting room audio-visual equipment, and large appliances procured through an Owner Direct Purchase (ODP) program; Owner-Furnished Contractor-Installed (OFCI) items limited to a firefighter gear extractor; and Owner-Furnished Owner-Installed (OFOI) items including the engine generator, all furniture across multiple spaces (meeting rooms, day room, kitchen, dining room, bunk rooms, and offices), fitness equipment, computers and printers, SCBA/cascade systems, and small appliances such as coffee machines. The contractor is responsible for coordinating all mechanical, plumbing, and electrical work to support owner-furnished items, receiving and unloading items at the site, protecting them from damage, and designating delivery dates in the construction schedule. The owner arranges payment and delivery of owner-furnished items, inspects delivered goods for damage, manages replacements for defective or missing items, and arranges manufacturer field services and warranties.

The ODP program allows the owner to purchase certain building elements with values exceeding $20,000 directly without sales tax obligations, with these items included in the contractor's bid as line items and subsequently deducted through deductive change orders. The contractor bears responsibility for protecting all owner-furnished items from weather exposure and damage resulting from construction operations, with repair or replacement costs borne by the contractor if damage occurs during its work. All shop drawings, product data, and samples for owner-furnished items are provided by the owner to the contractor for coordination and review, with the contractor required to notify the architect of any anticipated discrepancies or problems. The contractor must also coordinate fully with any separate contractors awarded by the owner under different contracts to ensure smooth project execution without interference or delays to work under the primary contract.

View the file

Other files

File Type Posted
Construction_of_Clay_County_Fire_Station_No._24_(Addendum_#2_Revision).pdf PDF
Demolition_Asbestos_Survey_Report_.pdf PDF
Tile_Image_.jpg JPG image
07410-STANDING_SEAM_MTL_ROOFING_(Per_Addendum_1).pdf PDF
01260-CONTRACT_MOD_(per_Addendum_1).pdf PDF
@TOC_(Per_Addendum_1).pdf PDF
266612-ASCO_ATS_ELEC_(per_Addendum_1).pdf PDF
Addendum_#1_-_266301-ELEC_TANK_SPEC_(per_Addendum_1).pdf PDF
Addendum_#1_-_266120-ELEC_GENSET_.pdf PDF
Addendum_#1_-_230000-HVAC_.pdf PDF
Addendum_#1_-_12511-Window_Blinds_.pdf PDF
Addendum_#1_-_11452-Appliances_.pdf PDF
Addendum_#1_-_10500-Mobile_PPE_Lockers_.pdf PDF
Addendum_#1_-_10425-Signs.pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Arch_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Plum_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Mech_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_FP_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS_24_-_Civil_(2026_02-17)_.pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Struct_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Landscape_(2026_02-17).pdf PDF
Addendum_#1_-_Clay_Co_FS24_-_Elec_(2026_02-17).pdf PDF
Construction_of_Clay_County_Fire_Station_No._24.pdf PDF
Standard_Protection_Measures-Eastern_Indigo_Snake.pdf PDF
Indigo_Snake_Poster.pdf PDF
Clay_Co_Fire_Station_24_(2026_01-02)_Specifications-Bid_Set.pdf PDF
Clay_Co_FS24_AV_Documents_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Purvis_Documents_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Plumb_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Mech_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_FP_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Elec_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Struct_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Arch_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Landscape_Arch_(2026_01-02)_Bid_Set.pdf PDF
Clay_Co_FS24_Civil_(2026_01-02)_Bid_Set.pdf PDF
Owner_Direct_Purchase_Program.pdf PDF
Appendix_II_for_2_CFR_Part_200.pdf PDF
FEMA_Field_Manual.pdf PDF
Subgrant-Agreement-226-SR-DR-4283-Executed-Funding-Agreement-Clay-County-460634-53096.pdf PDF
W-9_(2024).pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Warranty_Letter_.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLAY CO FIRE STATION 24 01100-1 OWNER FURNISHED

DH Comm. No. 22003 ITEMS

SECTION 01100

OWNER FURNISHED ITEMS

REVISED PER ADDENDUM #1

PART 1 - GENERAL

1.1 DESCRIPTION

A. This project includes work to be performed by the Contractor, by the Owner, and by Others. This section is intended to clarify the scope of each party.

1.2 DEFINITIONS

A. The term “Furnish” is defined as “supply and deliver to project site, ready for installation.”

B. The term “Install” is defined as “place (material, equipment, etc) in position for service or use.”

C. The term “Provide” is defined as “Furnish and Install, complete and ready for intended use.”

1.3 CONTRACTOR-FURNISHED CONTRACTOR-INSTALLED (CFCI) PRODUCTS

A. Unless otherwise specified, all work shown in construction documents is considered to be Contractor-Furnished Contractor-Installed (CFCI) work.

B. All Contractor-Furnished Contractor-Installed (CFCI) items are to be included in the Contractor’s Bid quote.

1.4 OWNER-FURNISHED CONTRACTOR-INSTALLED (OFCI) PRODUCTS

A. All Owner furnished contractor installed (OFCI) items are indicated on the Drawings and/or listed in the schedule at the end of this section. The Contractor shall coordinate plumbing, mechanical, and electrical work and provide support systems to receive Owner furnished items.

1. The Owner will provide necessary shop drawings, product data, and samples to the Contractor for Owner supplied items.

2. The Owner will arrange and pay for delivery of Owner-furnished items according to the Contractor's Construction Schedule.

3. Following delivery, the Owner will inspect items delivered for damage.

4. If Owner-furnished items are damaged, defective, or missing, the Owner will arrange for replacement.

5. The Owner will arrange for manufacturer's field services and for the delivery of manufacturer's warranties to the appropriate Contractor.

6. The Contractor shall designate delivery dates of Owner-furnished items in the Contractor's Construction Schedule.

CLAY CO FIRE STATION 24 01100-2 OWNER FURNISHED

7. The Contractor shall review shop drawings, product data, and samples and submit them to the Architect noting discrepancies or problems anticipated in use of the product.

8. The Contractor is responsible for receiving, unloading, and handling Owner-furnished items at the site.

9. The Contractor is responsible for protecting Owner-furnished items from damage, including damage from exposure to the elements. The Contractor shall repair or replace items damaged as a result of his operations.

B. As the Owner is a government entity and not subject to sales tax, a portion of these OFCI items are expected to be purchased through an Owner Direct Purchase (ODP) Program.

Contractor is to coordinate with the Owner’s Project Manager to determine the inventory of applicable items and the administrative process to procure these items.

1. The conditions of OFCI items are applicable to ODP items.

2. All Owner Direct Purchase (ODP) items are to be included in the Contractor’s Bid quote and identified as such. Deductive Change Orders would then be issued for the value of each purchase.

1.5 OWNER-FURNISHED OWNER-INSTALLED (OFOI) PRODUCTS

A. Work in this category shall not be included in the Contractor’s Bid, except those responsibilities that are assigned to the Contractor.

B. The Owner will furnish and install certain equipment as indicated on the Drawings. The Contractor shall coordinate plumbing, mechanical, and electrical work and provide support systems to receive Owner installed items.

1. The Owner will provide necessary shop drawings, product data, and samples to the Contractor for coordination purposes.

2. The Contractor shall review shop drawings, product data, and samples and return them to the Architect noting discrepancies or problems anticipated in use of the product.

3. The Owner will arrange and pay for delivery of Owner-furnished items according to the Contractor's Construction Schedule.

4. The Contractor shall designate delivery dates of Owner-furnished items in the Contractor's Construction Schedule.

5. Following delivery, the Owner will inspect items delivered for damage.

6. If Owner-furnished items are damaged, defective, or missing, the Owner will arrange for replacement.

7. The Contractor is responsible for protecting Owner-furnished items from damage, including damage from exposure to the elements. The Contractor shall repair or replace items damaged as a result of their operations.

8. The Owner will arrange for manufacturer's field services and for the delivery of manufacturer's warranties to the Owner.

CLAY CO FIRE STATION 24 01100-3 OWNER FURNISHED

1.6 WORK BY OTHERS (UNDER SEPARATE CONTRACT(S))

A. General: Where the Owner has awarded separate contracts for construction operations, the Contractor shall coordinate and cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE

A. CONTRACTOR FURNISHED CONTRACTOR INSTALLED (CFCI) PRODUCTS /

SYSTEMS

1. All items contained in the construction documents that are not specifically categorized otherwise below.

2. Telecommunications items as indicated on “T” drawings including all cabling and terminations.

a. Security System including devices, cabling, etc.

b. Access Control System including devices, cabling, etc.

3. Purvis notification and communication system including devices, cabling, etc.

a. Design has been provided by the County’s vendor and included as an exhibit in drawing set.

4. Signage

a. Interior Signage per Section 10425

5. Meeting room A/V Equipment

a. All A/V equipment per drawing AV01

b. Meeting room white boards

6. ODP Items (to be included in GC’s bid, but will later be backed out per the ODP program)

a. Large Appliances (see 11452)

b. Other items as directed by the Owner. Building elements with a value exceeding $20,000 will be considered for ODP.

B. OWNER FURNISHED CONTRACTOR INSTALLED (OFCI) PRODUCTS / SYSTEMS

1. Appliances

a. Firefighter Gear Extractor

C. OWNER FURNISHED OWNER INSTALLED (OFOI) PRODUCTS / SYSTEMS

1. Engine Generator

CLAY CO FIRE STATION 24 01100-4 OWNER FURNISHED

2. All furniture

a. Meeting Room

1) Tables & chairs

b. Day Room

1) Chairs

c. Kitchen

1) Stools

d. Dining Room

1) Table & Chairs

e. Bunk Rooms

1) Beds

2) Night Stands

f. Offices

1) Desks & Chairs

2) Filing Cabinets / Bookshelves

3. Fitness Equipment

4. Printers, Computers

5. SCBA / Cascade System

6. Small Appliances

a. Coffee Machine

D. BY OTHERS (Owner to procure under separate contract)

END OF SECTION 01100