Audio Visual System for Conference Room
Solicitation number
RFP 2026-10-09
Issued by
Franklin County, Ohio

About this file

This document is a detailed specification sheet for an air compressor system installation project for Franklin County, Ohio. The scope encompasses the supply, delivery, installation, commissioning, and training for a compressed air compressor system with a deadline for installation by August 17, 2026. The vendor is responsible for furnishing all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the County's designated location, including mechanical assembly, connection to the existing compressed air distribution header, and verification of all safety devices and controls. The project includes factory-authorized startup and commissioning with documentation submitted within five business days of completion, as well as operator and maintenance training conducted on-site by the vendor's factory-authorized technician for a minimum of two hours duration. A critical requirement stipulates that all components must be capable of passing through a 46-inch doorframe without structural modification, with any required disassembly for transport to be documented with reassembly instructions provided.

The County is responsible for providing electrical rough-in work (conduit, disconnect, and branch circuit wiring), compressed air distribution piping beyond the system outlet connection point, and a level, reinforced concrete or structural floor adequate for the unit's weight prior to the scheduled installation date. The vendor must provide certified weight data to the County at least ten business days in advance of delivery. The total project cost includes the system, installation, training, and warranty coverage with pricing to be specified by the vendor. The warranty package includes 24 months coverage for the compressor pump and 12 months parts and labor coverage for the system. Delivery is F.O.B. destination via lift-gate equipped truck, with the vendor responsible for offload and staging at the installation site. The vendor must coordinate delivery access with the County no less than five business days before the scheduled delivery date. All permits, licenses, and any required calibration certificates are the vendor's responsibility and cost.

View the file

Other files

File Type Posted
43CFA393-9DF4-05E3-DC34D8CD0BBC6974.pdf PDF
6E289AB6-A1A3-D139-AC198FD956FD1A77.pdf PDF
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
F388F0B8-095B-81FD-4AB0A90CB30AE31F.pdf PDF
600AF88E-C800-4399-20BE9FDE4A50714B.docx DOCX document
1DCD1842-B247-5772-E27F53DB3DE27613.pdf PDF
600B382B-92C2-EE01-36E3171A1CE23381.pdf PDF
2D575AB7-B92A-4C61-DE1B68E18F3B1809.pdf PDF
8BE999EA-C1F3-6CAA-1ED2B57E621612FB.pdf PDF
600B193E-A6DE-E459-0374B7046DEB49BE.xlsx XLSX spreadsheet
8CFF3838-EA7E-33CD-42D86D9937F5AFDB.pdf PDF
FAFB33F1-A49E-7354-6799AC07E5D29DA0.pdf PDF
379F0AFD-BC67-5833-47CED9B9F8A77644.pdf PDF
600ACEFD-D8A4-EF86-6746123A35214FBD.pdf PDF
39A8A9E3-F569-C6B6-B9E7BF50CFDC4F51.pdf PDF
BCDA75E7-EC2E-694E-CB30EC7B8D89F683.pdf PDF
9705A9CE-B76B-3514-2AB6D46F5013FD96.pdf PDF
CCC737E4-C815-7DA9-BAFDD4D8BCA83EAE.pdf PDF
9AEA49E5-D258-E830-CAAB03DD9BBE7883.pdf PDF
6D302278-A5F3-8508-AEC851283D91EF01.pdf PDF
52DB9448-0DA4-58EC-7CC559390BFA917E.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
6AB6D002-9E6C-0CCC-A56790941F2BE704.pdf PDF
1FF834AF-CB60-B607-A9DD3103FF766EDA.pdf PDF
B867E43E-FCA2-ABC6-686473D3D551080B.docx DOCX document
477F0E99-DAE2-3C20-3E7D603ABFDF3EFB.pdf PDF
47B899A6-E73C-31FA-C552C2E2911070DF.pdf PDF
A468D9BE-C742-A53B-A0E51044FC47530E.pdf PDF
58DCD716-9EAC-9E14-6719EE5FDA607EE3.pdf PDF
E990E137-C5A3-F52C-C390BB811E5E078A.pdf PDF
E0386349-DCD2-5C55-5FABC9CA40029CE7.pdf PDF
48FFA356-A619-FDBE-4B4D833D8E7B2589.pdf PDF
56D200B6-A79A-5846-53B374D48289713F.xlsx XLSX spreadsheet
1FF7B35A-B067-E38B-5984FBC2B840ECE1.pdf PDF
E93EE438-A2D2-AF8E-6F5941F303D00F6A.pdf PDF
36771012-968A-47BA-49FB1CC4DFFFEC63.pdf PDF
1FF81613-C943-E907-903208614AFFB273.pdf PDF
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
45745F40-E0BA-1577-1AE1A9CC2179CA13.pdf PDF
490005E7-0009-0FD7-0E92BD0F4BF1B987.xlsx XLSX spreadsheet
47039A14-CC1D-3979-F8226F8E1E768343.pdf PDF
47413282-9830-5BA4-96685E7F9A28C371.xlsx XLSX spreadsheet
BEA8D216-B719-D18D-2A1EF07B83D22C78.xlsx XLSX spreadsheet
D19B3093-A699-8107-EE175100DAB2A969.pdf PDF
47411393-E3B2-7F55-0865EAB909BEF818.xlsx XLSX spreadsheet
4ADC54F2-C74F-3F02-B4900398FFBEE5A5.xlsx XLSX spreadsheet
8F3A405E-0241-7E43-C0DC0A6106AC42BB.pdf PDF
E990C360-C4D7-52D4-A9F69D45175563F1.pdf PDF
441CC2FC-B00B-E914-728A3B9F6E284C71.pdf PDF
365FC443-9C1D-6871-4B183773D28A5AB9.pdf PDF
Show 40 more

Latest 50 of 150 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Quantity Units Description Cost

1 1 Each

Installation by August 17, 2026 (Must be installed by date.) Vendor shall furnish all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the designated installation location. Installation shall include: mechanical assembly and re-connection of any components disassembled for transport; connection to the existing compressed air distribution header at the point of connection identified by the County; connection of condensate drain lines to the nearest available floor drain; and verification that all safety devices, gauges, and controls are properly mounted and functional. Electrical rough-in (conduit, disconnect, and branch circuit wiring to the single power connection point on the unit) is the responsibility of the County and shall be completed prior to the Vendor’s installation visit.

Installation to be completed by:

Included

2 1 System

Model Type and Number:

BRAND NAME(s) OR EQUAL PURCHASE

DESCRIPTION:

3 1 System

SITE READINESS: The County shall provide a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. Vendor shall provide certified weight data to the County not less than ten

(10) business days in advance of delivery to allow floor-loading verification. Included

ELECTRICAL ROUGH-IN (COUNTY-FURNISHED):

Electrical conduit, disconnect switch, and branch circuit wiring from the County facility panel to the single power connection point on the compressor unit is the responsibility of the County and shall be completed and inspected before the Vendor’s startup visit. County

COMPRESSED AIR DISTRIBUTION PIPING

(COUNTY-FURNISHED): Compressed air distribution piping beyond the system outlet connection point to the laboratory header is the responsibility of the County and shall be completed prior to the startup and commissioning visit. County

FACTORY-AUTHORIZED STARTUP AND

COMMISSIONING: Documentation of all commissioning data on a startup report to be submitted to the County within five (5) business days of completion. Included

6 1 System Training

OPERATOR AND MAINTENANCE TRAINING: The Vendor’s factory-authorized technician shall conduct on-site operator and maintenance training at the time of startup and commissioning. O&M manual is provided. Training shall be a minimum of two (2) hours in duration.

Included

7 24 Months Warranty – compressor pump ≥ 24 months from acceptance

Included

8 12 Months Warranty – system ≥ 12 months parts and labor

Included

CRITICAL:

All components and sub-assemblies of the air compressor package, whether shipped assembled or knocked down, must be capable of passing through a 46-inch (46") wide doorframe without structural modification to the building.

Included

DELIVERY:

F.O.B. – Destination: System shall be delivered via lift-gate equipped truck to the designated delivery point at the County facility. The Vendor shall offload and stage the equipment at the installation site. Any disassembly required for transport through the 46-inch doorframe shall be documented, and re-assembly instructions shall be provided. Vendor shall coordinate delivery access with the County not less than five

(5) business days before the scheduled delivery date.

Any required permits or licenses are the responsibility and cost of Vendor. Any calibration will have a certificate provided to the County at the responsibility and cost of Vendor. Included

12 All Costs Included

Total Costs with System, Installation, Training, and Warranty $

13 1-5 Annual Rate Optional Extended Warranty Coverage $

Vendor Name

Completed By

Date

File details come from the government source that posted it. Updated .