About this file

This is a technical specification document for Section 16120 Wires and Cables prepared by the West Branch Regional Authority for the Route 54 Sanitary Sewer Extension Project (Contract No. WB-1) in Clinton Township, Lycoming County, Pennsylvania. The specification establishes requirements for building wire, cable, wiring connections, and terminations as part of the overall sanitary sewer infrastructure project, which includes approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, and one stream crossing. Sealed bids for the project were to be received online through PennBid until 1:00 PM local prevailing time on Monday, February 16, 2026. Prospective bidders were required to register as plan holders on PennBid to receive addenda and project updates, and each bid must be accompanied by a certified check or bid bond in the amount of ten percent of the total bid amount.

The specification requires all conductors to be soft-drawn copper with a minimum conductivity of 98 percent, with conductor sizes No. 10 and smaller being solid and sizes No. 8 and larger being stranded. All wire and cable must be installed in conduit and comply with NEMA, EPCEA, and NFPA standards, including the National Electrical Code. Interior power and lighting conductors shall be Type THWN rated at 600 volts, branch circuit wiring shall be no less than #12 AWG with #14 AWG minimum for control wiring, and service cable and underground installations shall be copper type XHHW at 600 volts. The specification mandates comprehensive color-coding schemes for all conductors in accordance with the National Electrical Code, with a typed and framed schedule to be posted in the main switchboard room. All splices and terminations must achieve full ampacity without perceptible temperature rise, with mechanical splicing devices required for wires #6 and larger and solderless pressure connectors for wires #8 and smaller. Field quality control includes inspection for physical damage, torque testing of connections to manufacturer specifications, and continuity testing of all power and equipment branch circuit conductors.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
14-00660 Form Change Order No 1.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
69-REV 1.19.26 16161 Grounding.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
71-REV 1.19.26 16511 Led Exterior Lighting.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 16120

WIRES AND CABLES DIVISION 16

West Branch Regional Authority 16120-1 January 2026 Route 54 Sanitary Sewer Extension Project Wires and Cables Contract No. WB-1

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Building wire.

B. Cable.

C. Wiring connections and terminations.

1.02 RELATED WORK

A. Section 16111: Conduit: Provisions and installation of conduit systems.

1.03 REFERENCE STANDARDS

A. National Electrical Manufacturer's Association (NEMA)

1. NEMA WC 3: Rubber-insulated Wire and Cable for the Transmission and Distribution of Electrical Energy.

2. NEMA WC 5: Thermoplastic-Insulated Wire and Cable for the Transmission and

Distribution of Electrical Energy.

B. Insulated Power Cable Engineers Association (EPCEA)

1. EPCEA S-68-516: Ethylene-propylene-rubber-insulated Wire and Cable.

C. National Fire Protection Association (NFPA)

1. NFPA 70: National Electrical Code.

1.04 SUBMITTALS

A. Section 01340: Shop Drawings, Product Data and Samples: Submit product data and samples under the provisions of Division 1.

B. Samples: All materials and devices used for making joints and splices shall be approved by samples, catalog designation or Shop Drawings.

PART 2 - PRODUCTS

2.01 MATERIALS

A. All conductors shall be of soft drawn copper having a conductivity of at least ninety-eight (98%) percent. Conductors No. 10 and smaller shall be solid. Conductors No. 8 and larger shall be stranded; all wire and cable shall be single conductor type unless otherwise indicated.

West Branch Regional Authority 16120-2 January 2026

B. All conductors installed in interior raceways for power and lighting shall be Type THWN, 600 volts.

C. Branch circuit wiring for power and lighting circuits shall be not less than #12 AWG, and no smaller than #14 AWG for control wiring.

D. Service cable and underground installations shall be copper type XHHW 600 volts insulation.

E. All wire and cable, regardless of function (power, control, voice/data, video, etc.) must be installed in conduit. Installation of exposed wire or cable of any kind is not acceptable.

PART 3 - EXECUTION

3.01 WIRING METHODS AND INSTALLATION

A. Installation, Low Voltage Cable: All wire and cable unless otherwise specified or shown on the Drawings shall be installed in conduit, and in a manner so as not to damage the insulation.

B. All conduits shall be clean and dry before conductors are installed. Should the drag wire or pulling cable indicate that the conduit is not clean or dry, the conditions shall be corrected by this Contractor before wires are installed.

C. Use only UL approved wire pulling lubricants to decrease the friction of pulling in wires.

D. The installation of wire and cable shall be sufficiently perfect to provide a minimum insulation resistance between conductors, and between conductors and ground of that required by the National Electrical Code.

E. Use #10 AWG conductors for all 20 ampere, 120-volt circuit runs greater than 50'-0" one way from panelboard to first outlet, and for 20 ampere, 277-volt circuit runs longer than 200 feet.

F. All conductors #6 AWG and smaller shall be factory color coded and shall be color coded in accordance with the schedule herein. Color coding shall be in accordance with the National Electrical Code. Grounding conductors shall have green color insulation.

G. The Contractor shall make full use of color-coded wire and cables in all installations. A given color wire will be used for a single purpose throughout any one given system and the phase or undergrounded conductors, as well as the neutral or grounded conductor of different voltage systems, will be of different colors and will be consistent through each system.

H. The entire color-coding scheme for the work shall be submitted to the Engineer for approval prior to the ordering and installation of wire and cable. A neat, typewritten

West Branch Regional Authority 16120-3 January 2026 schedule of the approved color coding for all systems shall be framed in glass and posted in the main switchboard room of each building.

I. Where color coding is established by the NEC, local code, inspecting agency, or other applicable authority, such coding shall be used. Otherwise, the following coding system shall be employed:

1. 240/120 Volt Single/Three-Phase Circuits:

Neutral . . . . . White Line 1 . . . . . Black Line 2 . . . . . Red Line 3 . . . . . Blue

2. All wires used solely for grounding purposes shall have green color if insulated.

3.02 WIRING CONNECTIONS AND TERMINATIONS

A. Thoroughly clean wires before installing lugs and connectors.

B. Make splices, taps, and terminations to carry full ampacity of conductors without perceptible temperature rise.

C. Terminate spare conductors with electrical tape.

D. Splices and terminations in wires #6 and larger shall be made with mechanical splicing devices and lugs, for wires #2 and larger shall be of a type in which the contact pressure on the wire is obtained by two or more screws or bolts and so designed that the failure of any one screw, bolt or nut will not result in a total loss of contact pressure. Mechanical splicing devices shall have insulating covers whenever obtainable, and shall otherwise be insulated with Scotch No. 33, Elastimold, or approved equal, plastic tape.

E. Splices in conductors #8 and smaller shall be made with solderless pressure connectors consisting of cone shaped coiled springs with insulating covers, similar to Scotch “Scotchlok” crimped sleeved conductors, T & B Color Keyed Line, with nylon insulating covers; or Ideal Series 450, with nylon sheath containing wingnuts.

F. The termination of solid wires No. 10 and smaller wires shall be made by forming the wires about the terminal screws; all stranded wires shall be provided with spade lugs attached to the wires by a crimped sleeve.

G. Portable cable fittings for terminating the cable shall provide a watertight seal between the cord and the terminator and between the terminator and mounting hub. The cable terminator shall be provided with a neoprene liner which grips the cord jacket when the back nut on the fitting is tightened. In addition, on all pendent cord applications and other applications where called for, a stainless-steel wire mesh cord grip shall be provided as an integral part of the cord terminator.

West Branch Regional Authority 16120-4 January 2026

3.03 FIELD QUALITY CONTROL

A. Inspect wire and cable for physical damage and proper connection.

B. Torque test conductor connections and terminations to manufacturers’ recommended values.

C. Perform continuity test on all power and equipment branch circuit conductors. Verify proper phasing connections.