5. Price Breakdown Worksheet.docx

DOCX document 40 KB Posted

Attached to
Z2DB--Renovate Imaging and Catheterization Lab 570 21 220 Fresno VA Medical Center Fresno
Solicitation number
36C26126R0045
Issued by

About this file

This is a Cost/Price Breakdown Worksheet template for Solicitation No. 36C26126R0045 related to the renovation of the Imaging and Catheterization Lab at Fresno VA Medical Center. The worksheet is designed for vendors to provide detailed pricing across multiple construction divisions using the MasterFormat classification system, including General Requirements, Existing Conditions, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, and Electronic Safety and Security. Each division requires vendors to itemize costs by Material, Labor, Equipment, and Other categories, with subtotals calculated for each division.

The template provides a standardized format for vendors to submit their complete cost proposal, including summary lines for overhead, profit, bonds and insurance, and a final total proposal cost. The worksheet accommodates additional costs outside the primary divisions through an "Other Costs" section that must be specified separately. This pricing structure aligns with the comprehensive scope of work for the approximately 10,200 square-foot renovation project, which encompasses relocation of medical equipment, reconfiguration of multiple functional areas, and full architectural, structural, mechanical, electrical, and plumbing work over a 730-calendar-day period of performance.

View the file

Other files

File Type Posted
36C26126R0045 Amendment 0004.pdf PDF
Wage Determination CA20260018 dtd 7 14 2026.pdf PDF
2B04 Shielding Design X Ray Room.pdf PDF
2A25B Shielding Design RF Room.pdf PDF
2B02 Shielding Design X Ray Room.pdf PDF
2A12B Shielding Design Cath Lab.pdf PDF
2A02B Shielding Design X Ray Room.pdf PDF
RFI Responses Part II 36C26126R0045.pdf PDF
Q2022-304 VA Fresno Cath Lab rev03.pdf PDF
RFI Responses 36C26126R0045 2.pdf PDF
QC-072_1.PDF PDF
X1_ACM_1.PDF PDF
C3 Montr Carrier.PDF PDF
Shielding Design RF Room 2A25B.pdf PDF
VHA ICRA-1.5 (July 2 2026).pdf PDF
Privacy-Curtains-And-Track-Standard-Track-Product-Sheet-PS-CC6062.pdf PDF
C1-Anesthesia.PDF PDF
VA FRESNO CATH LAB_R-RAD3_26_E_PF1_03-18-2026.pdf PDF
VA FRESNO CATH LAB_R-RAD2_26_E_PF1_03-18-2026.pdf PDF
P300Datasheet.pdf PDF
FS with stops.pdf PDF
Partial Brand Name JA Cath Lab_RD.pdf PDF
Addendum 0002 - Specifications Added.pdf PDF
C3-Monitor Carrier.PDF PDF
Shielding Design X-Ray Room 2A02B.pdf PDF
SEC 21793 VA FRESNO RF 3 12.22.2021 ELECT DWGS 100 CD Binder1.pdf PDF
Privacy-Curtains-And-Track-Curtain-Accessories-Product-Sheet-PS-CCACH.pdf PDF
C2-EMS.PDF PDF
Addendum 0002 - Drawings Added.pdf PDF
0654C6R1.pdf PDF
Shielding Design X-Ray Room 2B02.pdf PDF
Shielding Design X-Ray Room 2B04.pdf PDF
VA FRESNO CATH LAB_R-RAD1_26_E_PF1_03-17-2026.pdf PDF
USA_Data_Sheets Flow Splitter 651 06.pdf PDF
GE-Logiq-E10-Brochure-1.pdf PDF
Fresno VA FA R3 N-WES250405_Rev00 08.25.25.pdf PDF
11028.pdf PDF
EVOLUTION TYPICAL_WS2 RAIL_TBL2_08-14-2023.pdf PDF
ELECTRICAL_EQUIPMENT_DRAWING_-_HARMONYAIR_SURGICAL_LIGHTING_SYSTEM__A-SERIES.pdf PDF
36C26126R0045 Amendment 0002.pdf PDF
570-21-220 Sign in Sheet - Site Visit 6_8_26.pdf PDF
36C26126R0045 0001.docx DOCX document
8. WD CA20260018 dtd 5 18 2026.pdf PDF
3. 570-21-220 Drawings.pdf PDF
36C26126R0045_2.docx DOCX document
7. Factor 2 Past Performance Questionnaire.docx DOCX document
6. Pre Proposal Site Visit Flyer 36C26126R0045.pdf PDF
4. Requests for Information RFI_ Form.docx DOCX document
2. 570-21-220 - Basis of Design.pdf PDF
1. 570-21-220 - Specifications.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26126R0045 Attachment – Cost/Price Breakdown Worksheet

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 - General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 05- Metals
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 06- Wood Plastics and Composites
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07- Thermal and Moisture Protection
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 08- Openings
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 09- Finishes
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 10- Specialties
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 11- Equipment
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
Division Total
$
$
$
$
$
Division 12- Furnishings
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 13- Special Construction
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 21- Fire Suppression
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 22- Plumbing
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$

Division 23- HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 25- Integrated Automation
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
Division Total
$
$
$
$
$
Division 26 Electrical
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 27- Communications
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 28 - Electronic Safety and Security
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Other Costs (If applicable)
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Other Total
$
$
$
$
$
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
Total Proposal Costs/Offer =
$
$
$
$
$

*NOTE: All other costs may be included as a separate item and must be specified in this breakdown.

File details come from the government source that posted it. Updated .