Privacy-Curtains-And-Track-Curtain-Accessories-Product-Sheet-PS-CCACH.pdf

PDF 280 KB Posted

Attached to
Z2DB--Renovate Imaging and Catheterization Lab 570 21 220 Fresno VA Medical Center Fresno
Solicitation number
36C26126R0045
Issued by

About this file

This is a technical specification document for public lavatory energy code compliance, specifically depicting a plumbing system design schematic compliant with N.T.S. (not to scale) standards.

The document illustrates a re-circulating hot water loop system for public lavatories utilizing KHS flow-splitter models 6510603200 and 6510604000. Key components include an integral shut-off valve with access panel above the ceiling, a reducer, and branch connections to fixtures with a maximum distance of 2 feet from the main line. The system incorporates inside wall cavity routing and is designed to minimize water volume and heat loss. Table C404.5.1 specifies piping volume and maximum piping lengths based on nominal pipe size, with volumes ranging from 0.33 to 18.0 liquid ounces per foot length, and maximum piping lengths from 4 to 43 feet depending on pipe diameter (1/4" to 2" or larger). The maximum allowable pipe volume methodology (C404.5.2) establishes compliance parameters: public lavatory faucets are limited to 2 ounces (0.06 liters) maximum, while other plumbing fixtures on plumbing appliances shall not exceed 0.5 gallons (1.89 liters). The water volume calculation accounts for fixture supply pipe termination and incorporates heat trace temperature maintenance systems as sources of heated water, ensuring energy-efficient hot water delivery in commercial plumbing installations.

View the file

Other files

File Type Posted
36C26126R0045 Amendment 0004.pdf PDF
Wage Determination CA20260018 dtd 7 14 2026.pdf PDF
RFI Responses Part II 36C26126R0045.pdf PDF
2A02B Shielding Design X Ray Room.pdf PDF
2A12B Shielding Design Cath Lab.pdf PDF
2B04 Shielding Design X Ray Room.pdf PDF
2A25B Shielding Design RF Room.pdf PDF
36C26126R0045 Amendment 0003.pdf PDF
2B02 Shielding Design X Ray Room.pdf PDF
RFI Responses 36C26126R0045 2.pdf PDF
X1_ACM_1.PDF PDF
QC-072_1.PDF PDF
Q2022-304 VA Fresno Cath Lab rev03.pdf PDF
0654C6R1.pdf PDF
SEC 21793 VA FRESNO RF 3 12.22.2021 ELECT DWGS 100 CD Binder1.pdf PDF
C3 Montr Carrier.PDF PDF
Shielding Design X-Ray Room 2A02B.pdf PDF
C2-EMS.PDF PDF
11028.pdf PDF
Fresno VA FA R3 N-WES250405_Rev00 08.25.25.pdf PDF
VA FRESNO CATH LAB_R-RAD3_26_E_PF1_03-18-2026.pdf PDF
EVOLUTION TYPICAL_WS2 RAIL_TBL2_08-14-2023.pdf PDF
ELECTRICAL_EQUIPMENT_DRAWING_-_HARMONYAIR_SURGICAL_LIGHTING_SYSTEM__A-SERIES.pdf PDF
C3-Monitor Carrier.PDF PDF
USA_Data_Sheets Flow Splitter 651 06.pdf PDF
GE-Logiq-E10-Brochure-1.pdf PDF
VA FRESNO CATH LAB_R-RAD1_26_E_PF1_03-17-2026.pdf PDF
P300Datasheet.pdf PDF
FS with stops.pdf PDF
VA FRESNO CATH LAB_R-RAD2_26_E_PF1_03-18-2026.pdf PDF
Partial Brand Name JA Cath Lab_RD.pdf PDF
Addendum 0002 - Specifications Added.pdf PDF
Addendum 0002 - Drawings Added.pdf PDF
Shielding Design X-Ray Room 2B04.pdf PDF
36C26126R0045 Amendment 0002.pdf PDF
Shielding Design X-Ray Room 2B02.pdf PDF
Shielding Design RF Room 2A25B.pdf PDF
Privacy-Curtains-And-Track-Standard-Track-Product-Sheet-PS-CC6062.pdf PDF
C1-Anesthesia.PDF PDF
VHA ICRA-1.5 (July 2 2026).pdf PDF
570-21-220 Sign in Sheet - Site Visit 6_8_26.pdf PDF
36C26126R0045 0001.docx DOCX document
7. Factor 2 Past Performance Questionnaire.docx DOCX document
6. Pre Proposal Site Visit Flyer 36C26126R0045.pdf PDF
3. 570-21-220 Drawings.pdf PDF
4. Requests for Information RFI_ Form.docx DOCX document
5. Price Breakdown Worksheet.docx DOCX document
8. WD CA20260018 dtd 5 18 2026.pdf PDF
36C26126R0045_2.docx DOCX document
1. 570-21-220 - Specifications.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .