Addendum 0002 - Drawings Added.pdf
PDF 4 MB Posted
- Attached to
- Z2DB--Renovate Imaging and Catheterization Lab 570 21 220 Fresno VA Medical Center Fresno
- Solicitation number
- 36C26126R0045
About this file
This is an architectural drawing package for a renovation project of the Imaging and Catheterization Lab in Building 1 at VA Central California Healthcare System in Fresno, California (Project 570-21-220, Drawing package prepared by Spees Design Build). The documentation is dated March 27, 2026 with Addendum #1 dated July 6, 2026, and represents 100% construction documents.
The project scope encompasses comprehensive renovation of imaging and catheterization facilities on Level 2, including structural modifications, mechanical systems, interior finishes, equipment integration, and infection control provisions. Key construction elements include Level 2 ceiling framing plans with mechanical unit support specifications (HSS members, unistrut supports, maximum unit weight 3,900 lbs); Infection Control and Risk Assessment (ICRA) phased plans addressing Class II and Class III containment requirements across four construction phases with negative air pressure specifications, temporary barriers, and ante rooms; demolition and new floor plans showing room reconfigurations, wall relocations, and space programming; detailed interior elevations for specialized medical spaces including radiology rooms (2B02, 2B04), ultrasound suites (2A26A, 2A26B, 2A26D), catheterization lab (2A12B), MRI zones, and support spaces; equipment plans documenting placement of medical devices, furniture, and casework; door and window schedules with fire-rating and sound-rating requirements (ranging from 1-hour to 2-hour fire ratings, STC 35-50 sound ratings); wall assembly types with fire-rated partitions (up to 2-hour rated walls with lead lining in radiology areas); and finish schedules specifying materials for ceilings, floors, base, wainscot, and walls by room. The renovation integrates specialized medical equipment including ultrasound systems (X2100), radiology imaging tables, catheter storage systems (M3165), and MRI zone preparation areas with appropriate shielding, electrical provisions, and infection control measures throughout.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9 10 11 12
FF
GG
HH
EE
13 14 15 16 17 1887
7A 8A
DD
A6
B1
A
B
C
(E) BEAM, TYP
F7
S-501
S-111
F5
F1
S-201
EXACT LOCATIONS OF
UNISTRUT SUPPORTS PER
MFR SITE DRAWINGS, TYP
HSS5X3X1/4
HSS5X3X1/4
F1
S-501
HSS4x3x3/16 FLAT HIGH
P1001D3 LOW
DO
DO
DO
DO
F1
S-501
HSS5X3X1/4
HSS5X3X1/4
HSS6x4x3/16 HIGH
P1001D3 LOW, TYP
F7
S-501
TYP
TYP
NOTE:
EXACT UNISTRUT LOCATIONS PER ARCH AND MANUF
DRAWINGS..
HSS5X3X1/4
HSS5X3X1/4
P1001D3
M A
X , T
Y P
4'
HANGER
HSS3x3x3/16, TYP
HANGER
HSS3x3x3/16, TYP
DO
DO
DO
DO
DO
DO
DO
W8X15
W8X15
P1001D3
HSS5X3X1/4
HSS5X3X1/4
HANGER
HSS3x3x3/16, TYP
M A
X , T
Y P
4'
W8X15
W8X15
C3
S-501
MECH UNIT SUPPORT BEAMS.
COORDINATE LOCATION WITH
UNIT SUPPORT LOCATIONS. DO
NOT HANG UNIT FROM
EXISTING CONCRETE DECK
(MAX UNIT WEIGHT 3900 LBS) ,
TYP
F7
S-501
HSS4x3x3/16 FLAT HIGH
P1001D3 LOW
DO
DO
DO
DO
M A
X T
Y P
8" M
A X
T Y
P
TYP
TYP
TYP
TYP
EXISTING BEAM,
TYP
HSS HANGER
BRACE
LEGEND
WSP USA Inc.
Suite 300
Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
33301 9th Avenue South
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
RENOVATE IMAGING AND
CATH LAB IN BUILDING 1
570-21-701
2615 E CLINTON AVE, FRESNO, CA 93703
03/27/2026
S-101A
REFLECTED CEILING PLAN
Checker Author
100% CD
1/8" = 1'-0"
LEVEL 2 CEILING FRAMING PLAN
Revisions: Date:
ADDENDUM #1 07/06/2026
A
B
C
D
E
F
G
7 8 9 10 11
12 13 14 15 16 17 18
H
A6
B1
7A 8A
ICRA
CLASS II
1A-1
1A03
1A04
ELEVATOR
LOBBY
LIFT
P-1
P-2
S-3S-4
1A01 1A01A
1A02
1A-1
C-1U5
1A01F1A01D
VESTIBULE
1A13A
1A10
1A13 1A14 1A16C
1A16B
1A16
1A16A 1A17B 1A17 1A17A
1A19
1A20
1A18E
1A18C
1A18B1A18A
1A18D1A18F1A18G1A18H
1A-3
1A18J
1A18
1A18IE116A
AREA OF
WORK
PROJECT
NORTH
BLDG 1
TEMPORARY ICRA AIR PRESSURE
CONTRACTOR PATH OF TRAVEL
TEMPORARY EMERGENCY EGRESS ROUTE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
KEYNOTE (WITH SUBPHASE) WHERE NOTED
INACCESABLE DURING CONSTRUCTION
ICRA BOUNDARY
(3A)
TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF
CONSTRUCTION.
TEMPORARY ICRA BARRIER FRAMED TO THE CEILING
ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X
GYP EACH SIDE.
TEMPORARY ICRA DOOR AND FRAME.
EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL
OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.
WORK AREA ACCESS POINT WITH STICKY WALK OFF
MATS
ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE
ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS
NEGATIVE THAN THE MAIN CONSTRUCTION AREA.
AREA TO BE INACCESSIBLE DURING PHASE OF
CONSTRUCTION OR PORTION OF PHASE.
AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD
POSSIBLE. COORDINATE DURATION OF THIS WORK WITH
THE COR. SOME PARTS WILL NEED TO REMAIN LONGER
THAN OTHERS.
1. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS102
ICRA PLAN - PHASE I (BELOW)
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 Checker Author
100% CD
15 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
1/8" = 1'-0"
LEVEL 1 - ICRA PLAN - PHASE I
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
ICRA NOTES
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
CLASS II
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA
FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
AREA OF
WORK
PROJECT
NORTH
BLDG 1
TEMPORARY ICRA AIR PRESSURE
CONTRACTOR PATH OF TRAVEL
TEMPORARY EMERGENCY EGRESS ROUTE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
KEYNOTE (WITH SUBPHASE) WHERE NOTED
INACCESABLE DURING CONSTRUCTION
ICRA BOUNDARY
(3A)
TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF
CONSTRUCTION.
TEMPORARY ICRA BARRIER FRAMED TO THE CEILING
ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X
GYP EACH SIDE.
TEMPORARY ICRA DOOR AND FRAME.
EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL
OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.
WORK AREA ACCESS POINT WITH STICKY WALK OFF
MATS
ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE
ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS
NEGATIVE THAN THE MAIN CONSTRUCTION AREA.
AREA TO BE INACCESSIBLE DURING PHASE OF
CONSTRUCTION OR PORTION OF PHASE.
AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD
POSSIBLE. COORDINATE DURATION OF THIS WORK WITH
THE COR. SOME PARTS WILL NEED TO REMAIN LONGER
THAN OTHERS.
1. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
A
B
C
D
E
F
G
7 8 9 10 11
12 13 14 15 16 17 18
H
A6
B1
7A 8A
NON ICRA
ENCLOSURE
ICRA
CLASS II
-2
SIM
SIM
1A18IE116A 1A18H 1A18G 1A18F 1A18D
1A18E
1A18C
1A18B1A18A
1A18
1A-3
1A18J 1A18N
1A20
1A19
1A17A1A171A17B1A16A
1A16B
1A16
1A16C
1A14
1A13
1A13A
1A10
SIM
SIM
SIM
SIM
ICRA
CLASS II
2-
ICRA
CLASS II
SIM
7 7
1A-1
1A03
1A04
ELEVATOR
LOBBY
LIFT
P-1
P-2
S-3S-4
1A01 1A01A
1A02
1A-1
C-1U5
1A01F1A01D
VESTIBULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS202
ICRA PLAN - PHASE II (BELOW)
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MC
100% CD
17 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
PROJECT
NORTH
1/8" = 1'-0"
LEVEL 1 - ICRA PLAN - PHASE II
ICRA NOTES
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
CLASS II
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA
FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
PROJECT
NORTH
BLDG 1
TEMPORARY ICRA AIR PRESSURE
CONTRACTOR PATH OF TRAVEL
TEMPORARY EMERGENCY EGRESS ROUTE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
KEYNOTE (WITH SUBPHASE) WHERE NOTED
INACCESABLE DURING CONSTRUCTION
ICRA BOUNDARY
(3A)
TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF
CONSTRUCTION.
TEMPORARY ICRA BARRIER FRAMED TO THE CEILING
ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X
GYP EACH SIDE.
TEMPORARY ICRA DOOR AND FRAME.
EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL
OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.
WORK AREA ACCESS POINT WITH STICKY WALK OFF
MATS
ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE
ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS
NEGATIVE THAN THE MAIN CONSTRUCTION AREA.
AREA TO BE INACCESSIBLE DURING PHASE OF
CONSTRUCTION OR PORTION OF PHASE.
AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD
POSSIBLE. COORDINATE DURATION OF THIS WORK WITH
THE COR. SOME PARTS WILL NEED TO REMAIN LONGER
THAN OTHERS.
1. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
A
B
C
D
E
F
G
7 8 9 10 11
12 13 14 15 16 17 18
H
A6
B1
7A 8A
1A18IE116A 1A18H 1A18G 1A18F 1A18D
1A18E
1A18C
1A18B
1A18A
1A18
1A-3
1A18J1A18N
1A20
1A19
1A17A1A171A17B1A16A
1A16B
1A16
1A16C
1A14
1A13
1A13A
1A10
ICRA
CLASS II
SIM
SIM
SIM 3
SIM
SIM
1A-1
1A03
1A04
ELEVATOR
LOBBY
LIFT
P-1
P-2
S-3S-4
1A01 1A01A
1A02
1A-1
C-1U5
1A01F1A01D
VESTIBULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS302
ICRA PLAN - PHASE III (BELOW)
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 Checker Author
100% CD
19 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
ICRA NOTES
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
CLASS II
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA
FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
1/8" = 1'-0"
LEVEL 1 - ICRA PLAN - PHASE III
PROJECT
NORTH
BLDG 1
TEMPORARY ICRA AIR PRESSURE
CONTRACTOR PATH OF TRAVEL
TEMPORARY EMERGENCY EGRESS ROUTE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
KEYNOTE (WITH SUBPHASE) WHERE NOTED
INACCESABLE DURING CONSTRUCTION
ICRA BOUNDARY
(3A)
TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF
CONSTRUCTION.
TEMPORARY ICRA BARRIER FRAMED TO THE CEILING
ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X
GYP EACH SIDE.
TEMPORARY ICRA DOOR AND FRAME.
EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL
OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.
WORK AREA ACCESS POINT WITH STICKY WALK OFF
MATS
ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE
ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS
NEGATIVE THAN THE MAIN CONSTRUCTION AREA.
AREA TO BE INACCESSIBLE DURING PHASE OF
CONSTRUCTION OR PORTION OF PHASE.
AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD
POSSIBLE. COORDINATE DURATION OF THIS WORK WITH
THE COR. SOME PARTS WILL NEED TO REMAIN LONGER
THAN OTHERS.
1. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
A
B
C
D
E
F
G
7 8 9 10 11
12 13 14 15 16 17 18
H
A6
B1
7A 8A
ICRA
CLASS III
ICRA
CLASS III
4 4
1A-1
1A03
1A04
ELEVATOR
LOBBY
LIFT
P-1
P-2
S-3S-4
1A01 1A01A
1A02
1A-1
C-1U5
1A01F1A01D
VESTIBULE
1A18I
E116A 1A18H 1A18G 1A18F 1A18D
1A18E
1A18C
1A18B
1A18A1A18 1A-3
1A18J1A18N
1A201A191A17A1A171A17B1A16A
1A16B
1A16
1A16C1A141A13
1A13A
1A10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS402
ICRA PLAN - PHASE IV (BELOW)
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
21 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
PROJECT
NORTH
1/8" = 1'-0"
LEVEL 1 - ICRA PLAN - PHASE IV
ICRA NOTES
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
CLASS II
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA
FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
ICRA NOTES
DURING CONSTRUCTION PROJECT:
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
CLASS III
UPON COMPLETION OF PROJECT:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE OWNER’S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
PROJECT
NORTH
BLDG 1
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING TO REMAIN
EXISTING TO DEMOLISH
NIS
DEMO EXSTING WALLS AS SHOWN ON PLAN
DEMO EXISTING FLOOR THROUGHOUT EXISTING ROOM
DEMO EXISTING WINDOW, INSTALL NEW LOUVER PER
MECHANICAL IN EXISTING ROUGH OPENING.
A
B
C
D
E
F
G
7 8 9 10 11 12 13 14 15 16 17
H
A6
B1
7A 8A
PATHOLOGY /
LAB MEDICINE
2B18
ASSOCIATE
PATHOLOGY
2B16
LAB INFO
MANAGER
2B15
TOILET
2B10A.1
HSKPG
2B14
RADIOLOGY
ROOM 1
2B10A
CONTROL
2B10
RADIOLOGY
ROOM 2
2B10B
TOILET
2B10C
TOILET
2B20
ANATOMIC
PATHOLOGY
2B13
CONFERENCE
2B19A
OFFICE
2B19B
COMM
2B17
CORRIDOR
2B2
CORRIDOR
2B1
CHANGING ROOM
2B12
STORAGE /
DUMWAITER
2B11
STORAGE
2B02
STORAGE /
DUMWAITER
2B03
STORAGE
2B13A
MECHANICAL
2A01
SERVICE
ELEVATOR
S-4
SERVICE
ELEVATOR
S-3
PASSENGER
ELEVATOR
P-1
PASSENGER
ELEVATOR
P-2
WAITING AREA
ELEVATOR
LOBBY
ELEVATOR
LOBBY
CHECK-IN
CORRIDOR
2B-1
STAIR 2
2B05
FLUORO
2B04
IMAGING WAITING
AREA
2B01
IMAGING DEPT
STORAGE ROOM
2A11
DUMB WAITER 3
MECHANICAL
2A17A
UNISEX
RESTROOM
2A14
MEDICATION
PREPERATION
2A15A
CONTROL
2A17
CT SUITE
2A18
IMAGING
EQUIPMENT
2A18A
PATIENT
CHANGING /
TOILET
2A18C
BREAK ROOM
2A21
FREIGHT
ELEVATOR
SUPERVISORY AO
OFFICE
2A22
DRT OFFICE
2A24
STAIR 1
2A30
IMAGING OFFICE
2A27B IMAGING OFFICE
2A27C
COPY RM
2A27A IMAGING OFFICE
2A27D
CORRIDOR
2A27
TOILET
2A27K
IMAGING OFFICE
2A27E
IMAGING OFFICE
2A27J
IMAGING OFFICE
2A27I
IMAGING OFFICE
2A27F
IMAGING OFFICE
2A27G
IMAGING ADMIN
2A27H
CORRIDOR
2A-1
ULTRASOUND 1
2A23
VSO OFFICE
2A20
COMM
2A19
OFFICE
2A16G
BREAK AREA
OFFICE
2A16D
OFFICE
2A16E
OFFICE
2A16F
ULTRASOUND 2
2A25A
TOILET
2A23A
DUCT
IMAGING SUITE
2A16
ADMIN ASSIST
2A16A
CHIEF IMAGING
2A16B
MECHANICAL
2A13B.1
CONFERENCE
2A16C
SPECIAL
PROCEDURES
O.R.
2A13B
SPECIAL
PROCEDURES
PRE/POST
OPERATIVE
2A13
GURNEY SPACE
CONTROL ROOM
2A13A
HSKPG
2A12
ULTRASOUND 1
2A09C
ULTRASOUND 2
2A09B
CLEAN SUPPLY
2A09A
ULTRASOUND
SUITE
2A09
TOILET
2A09D
PREP AREA
2A07
TOILET
2A08
ELECTRICAL
2A07A
MRI CONTROL
ROOM / WORK
AREA
2A07B
MRI SCANNER
2A07D
CLOSET
2A07E
EQUIPMENT
ROOM
2A07C
IMAGING ROOM 4
2A05
TOILET
2A06
CORRIDOR
2A-2
STORAGE
2A03
NURSING
INFORMATIES
OFFICE
2A02D
DECEDENT
AFFAIRS
2A02C
LEAD CHAPLAIN
2A02B
STORAGE
2A02B.1
STORAGE
2A02A.1
STORAGE
2A02D.1
CHAPEL
CHAPEL
2A02A
CHAPEL
CORRIDOR
CORRIDOR
2A02
STORAGE
2A02D.2
1 1
3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AD101
DEMO FLOOR PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1/8" = 1'-0"
LEVEL 2 - DEMO - FLOOR PLAN
PROJECT
NORTH
Revisions: Date:
ADDENDUM #1 07/06/2026
1. SCHEDULE SYSTEM AND FUNCTIONAL SHUTDOWNS TWO
WEEKS PRIOTR TO BEGINNING ANY CONSTRUCTION
ACTIVITY.
2. REMOVE WALL ACCESSORIES MOUNTED ACCESSORIES
REQUIRED TO COMPLETE ANY CONSTRUCTION TASK.
3. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED PRIOR
TO BEGINNING WORK. NO WORK SHALL BE DONE WITHOUT
PROPERLY MEETING ICRA REQUIREMENTS. SEE SHEETS
AS101, AS102, AS103, AND SPECIFICATION SECTION 01 35 25
'SAFETY REQUIREMENTS' FOR SPECIFIC ICRA CLASS
INFORMATION.
4. DEMO EXISTING FLOOR FINISH THROUGHOUT WORK AREA.
5. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF
ANY EXISTING EQUIPMENT.
6. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW PER
FINISH SCHEDULE.
PROJECT
NORTH
BLDG 1
EXISTING DOOR TO REMAIN
NEW DOOR
EXISTING TO REMAIN
NEW CONSTRUCTION
2 HR FIRE RATED WALL
NIS
2 HR & SMOKE RATED WALL
1 HR FIRE RATED WALL
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE COR.
2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS,
CENTERLINE OF OPENINGS, UON
3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERSECTING WALL OR CENTERED ON THE
WALL, UON.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INTALLING DRYWALL.
A
B
C
D
E
F
G
7 8 9 10 11 12 13 14 15 16 17 18
H
A6
B1
7A 8A
198 SF
ULTRASOUND #2
2A26B
462 SF
RAD FLUORO
2A25B
128 SF
DRESSING &
TOILET - RAD
FLOURO
2A25A
1721 SF
CORRIDOR
2A-1
411 SF
PRE-OPERATIVE
& RECOVERY
2A16
S
F
C O
R R
ID
O
R
A
828 SF
CATH LAB
2A12B
230 SF
SYSTEM
COMPONENT -
CATH LAB
2A09B
41 SF
TOILET, STAFF
2A08
191 SF
MRI ZONE III
PREP AREA
2A07
115 SF
MSA / SCHEDULE
2A05
191 SF
CONTROL - CATH
LAB
2A12C
PATIENT
CHANGING /
TOILET
2A18C
IMAGING
EQUIPMENT
2A18A
486 SF
CT SUITE
2A18
298 SF
CONTROL
2A17
87 SF
MEDICATION
PREPERATION
2A15A
85 SF
MECHANICAL
2A17A
41 SF
UNISEX
RESTROOM
2A14
83 SF
PAREX MEDS
2A11
351 SF
RADIOLOGY #2
2B02
STAIR 1
2A30
IMAGING OFFICE
2A27B
IMAGING OFFICE
2A27CCOPY RM
2A27A
TOILET
2A27K IMAGING OFFICE
2A27E
IMAGING OFFICE
2A27J
IMAGING OFFICE
2A27I
IMAGING OFFICE
2A27G
IMAGING ADMIN
2A27H
IMAGING OFFICE
2A27F
WAITING AREA
ELEVATOR
LOBBY
58 SF
STAFF LOCKER -
MEN
2A20
108 SF
CONTROL -
ULTRASOUND
2A26E
64 SF
DRESSING &
TOILET -
ULTRASOUND
2A26C
58 SF
STAFF LOCKER -
WOMEN
2A19
DRESSING &
STORAGE - MRI
2A09A
154 SF
OFFICE - SHARED
2A23
362 SF
RADIOLOGY #1
2B04
163 SF
EHRM
2B11
177 SF
MRI ZONE II
2A09
146 SF
RECEPTION
2A06
54 SF
TOILET -
PRE-OPERATIVE
& RECOVERY
2A13
34 SF
TOILET, STAFF
2A09D
111 SF
ELECTRICAL
2A07A
188 SF
MRI CONTROL
ROOM / WORK
AREA
2A07B
353 SF
MRI SCANNER
2A07D
13 SF
CLOSET
2A07E
242 SF
MRI EQUIPMENT
ROOM
2A07C
227 SF
CORRIDOR
2A-2
68 SF
TOILET
2A03
239 SF
RAD WORK
2A02C
358 SF
RADIOLOGY #3
2A02B
CHAPEL
105 SF
CHAPEL
CORRIDOR
2A02A
207 SF
CORRIDOR
2A02
77 SF
SERVICE
ELEVATOR
S-4
108 SF
SERVICE
ELEVATOR
S-3
76 SF
PASSENGER
ELEVATOR
P-1
70 SF
PASSENGER
ELEVATOR
P-2
806 SF
ANATOMIC
PATHOLOGY
2B13
82 SF
CHANGING ROOM
2B12
43 SF
STORAGE
2B02
125 SF
STORAGE
2B13A
72 SF
MECHANICAL
2A01
168 SF
ELEVATOR
LOBBY
C O
R R
ID
O
R
B
-1
276 SF
PATHOLOGY /
LAB MEDICINE
2B18
122 SF
ASSOCIATE
PATHOLOGY
2B16
130 SF
LAB INFO
MANAGER
2B15 47 SF
TOILET
2B10A.1
49 SF
HSKPG
2B14
406 SF
OLD RADIOLOGY
ROOM 1
2B10A
221 SF
CONTROL ROOM
2B10
262 SF
OLD RADIOLOGY
ROOM 2
2B10B
40 SF
TOILET
2B10C
951 SF
CORRIDOR
2B2
303 SF
CORRIDOR
2B1
197 SF
STAIR 2
2B05
240 SF
CONFERENCE
2B19A
98 SF
OFFICE
2B19B
70 SF
COMM
2B17
105 SF
STORAGE -
RADIOLOGY
2B01
198 SF
ULTRASOUND #3
2A26D
VENDING MACHINE
155 SF
CORRIDOR
2A26
STORAGE - CATH
LAB
2A12B.1
AE113
AE112
AE111
CHARGING
ALCOVE
2A-1A
AE301
AE301
CHAPEL
STORAGE
2A02D.1
SINK
107 SF
CARDIOLOGY
WORK
2A16A
123 SF
RAD FLOURO -
WAITING
2A25
1' - 1"
10' - 11"
COMM
2A12D
55 SF
SCRUB ALCOVE
2A12A
87 SF
MSA / SCHEDULE
2A05A
BREAK ROOM
2A21
STORAGE
2A02D.2
40E40E
E
7' - 1"
4' - 10"
ULTRASOUND #1
2A26A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE101
FLOOR PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
PROJECT
NORTH
LEGEND
GENERAL NOTES
KEY PLAN
1/8" = 1'-0"
LEVEL 2 - FLOOR PLAN
Revisions: Date:
POST-100% REVISION 09/08/2021
ADDENDUM #1 07/06/2026
DEPARTMENT SIGN OFF:
COR:
CARDIOLOGIST:
ULTRASOUND:
RADIOLOGY:
BIO MED:
A A
B B
C C
D D
E E
8 9 10 11
A6
351 SF
RADIOLOGY #2
2B02
83 SF
PAREX MEDS
2A11
85 SF
MECHANICAL
2A17A
41 SF
UNISEX
RESTROOM
2A14
362 SF
RADIOLOGY #1
2B04
423 SF
CORRIDOR
2B-1
105 SF
STORAGE -
RADIOLOGY
2B01
85 SF
MECHANICAL
2A17A
41 SF
UNISEX
RESTROOM
2A14
197 SF
STAIR 2
2B05
262 SF
OLD RADIOLOGY
ROOM 2
2B10B
221 SF
CONTROL ROOM
2B10
406 SF
OLD RADIOLOGY
ROOM 1
2B10A
303 SF
CORRIDOR
2B1
163 SF
EHRM
2B11
43 SF
STORAGE
2B02
82 SF
CHANGING ROOM
2B12
168 SF
ELEVATOR
LOBBY
108 SF
SERVICE
ELEVATOR
S-3
77 SF
SERVICE
ELEVATOR
S-4
125 SF
STORAGE
2B13A
72 SF
MECHANICAL
2A01
806 SF
ANATOMIC
PATHOLOGY
2B13
951 SF
CORRIDOR
2B2
49 SF
HSKPG
2B14
47 SF
TOILET
2B10A.1
130 SF
LAB INFO
MANAGER
2B15
225 SF
WAITING AREA
125 SF
ELEVATOR
LOBBY
76 SF
PASSENGER
ELEVATOR
P-1
70 SF
PASSENGER
ELEVATOR
P-2
2B01
2B02
2B04
AE401
AE301
AE301
03B
10B
/6
.0
5' - 8"
3' - 6"
6' - 0"
3' - 10"
.0
AE401
AE401
AE401
AE401
09 09
W3
W3
C L E
A R
37 SF
CHARGING
ALCOVE
2A-1A
03B 03Z
03Z
03Z
03Z 03Z
3' - 11"
3' - 2"
A
EXISTING DOOR TO REMAIN
NEW DOOR
EXISTING TO REMAIN
NEW CONSTRUCTION
2 HR FIRE RATED WALL
NIS
2 HR & SMOKE RATED WALL
1 HR FIRE RATED WALL
AREA SHOWN
PROJECT
NORTH
BLDG 1
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE COR.
2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS,
CENTERLINE OF OPENINGS, UON
3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERSECTING WALL OR CENTERED ON THE
WALL, UON.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INTALLING DRYWALL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE111
PARTIAL FLOOR PLAN - NORTH
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
1/4" = 1'-0"
PARTIAL FLOOR PLAN - NORTH
PROJECT
NORTH
Revisions: Date:
ADDENDUM #1 07/06/2026
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
INFILL EXISTING WALL OPENING TO MATCH AND ALIGN
WITH ADJACENT WALL FINISHES
ALIGN FINISHED FACE OF NEW WALL WITH FINISHED FACE
OF EXISTING WALL
NOT USED
IN-FILL WALL WITH 2-1/2" SOUND ACTUATION BLANKET,
FRAME EXISTING WALL TO STRUCTURE IF EXISTING
CONSTRUCTION REFLECTS A DIFFERENT CONDITION.
E
E
F F
G G
7 8 9 10 11
H H
A6
B1
7A 8A
CORRIDOR
2A-2
RADIOLOGY #3
2A02B
207 SF
CORRIDOR
2A02
230 SF
SYSTEM
COMPONENT -
CATH LAB
2A09B
63 SF
STORAGE - CATH
LAB
2A12B.1
111 SF
DRESSING &
STORAGE - MRI
2A09A
37 SF
CHARGING
ALCOVE
2A-1A
1721 SF
CORRIDOR
2A-1
353 SF
MRI SCANNER
2A07D
13 SF
CLOSET
2A07E
242 SF
MRI EQUIPMENT
ROOM
2A07C
68 SF
TOILET
2A03
115 SF
MSA / SCHEDULE
2A05
188 SF
MRI CONTROL
ROOM / WORK
AREA
2A07B
191 SF
MRI ZONE III
PREP AREA
2A07
177 SF
MRI ZONE II
2A09
34 SF
TOILET, STAFF
2A09D
111 SF
ELECTRICAL
2A07A
146 SF
RECEPTION
2A06
2A02C
A
B
2A09A
A
239 SF
RAD WORK
2A02C
41 SF
TOILET, STAFF
2A08
83 SF
PAREX MEDS
2A11
326 SF
CHAPEL
2A02A
105 SF
CHAPEL
CORRIDOR
2A02A
70 SF
PASSENGER
ELEVATOR
P-2
W7
AE401
AE401
AE401
/2
2A02B
VENDING MACHINE
5' - 9 1/2"
/8
/6
/6
AE401
AE401
AE401
AE401
F-1
W3
120.00°
A
D
.1
17 SF
CHAPEL
STORAGE
2A02D.1
MSA / SCHEDULE
2A05A
2A05A
2A05
A
A
2A07
A
A
A
03B
F-1
A-503
EXISTING DOOR TO REMAIN
NEW DOOR
EXISTING TO REMAIN
NEW CONSTRUCTION
2 HR FIRE RATED WALL
NIS
2 HR & SMOKE RATED WALL
1 HR FIRE RATED WALL
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE COR.
2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS,
CENTERLINE OF OPENINGS, UON
3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERSECTING WALL OR CENTERED ON THE
WALL, UON.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INTALLING DRYWALL.
AREA SHOWN
PROJECT
NORTH
BLDG 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE112
PARTIAL FLOOR PLAN -
SOUTHWESTSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
1/4" = 1'-0"
PARTIAL FLOOR PLAN - SOUTH WEST
PROJECT
NORTH
Revisions: Date:
ADDENDUM #1 07/06/2026
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
INFILL EXISTING WALL OPENING TO MATCH AND ALIGN
WITH ADJACENT WALL FINISHES
ALIGN FINISHED FACE OF NEW WALL WITH FINISHED FACE
OF EXISTING WALL
ALIGN CENTERLINE OF NEW WALL WITH BUILDING GRID
LINE
IN-FILL WALL WITH 2-1/2" SOUND ATTENUATION BLANKET,
FRAME EXISTING WALL TO STRUCTURE IF EXISTING
CONSTRUCTION REFLECTS A DIFFERENT CONDITION.
2x2 ACOUSTICAL CEILING TILE
GYPSUM BOARD ON METAL STUDS
EXISTING TO REMAIN
NEW CONSTRUCTION
NIS
A
B
C
D
E
8 9 10 11
A6
RADIOLOGY #2
2B02
PAREX MEDS
2A11
MECHANICAL
2A17A
UNISEX
RESTROOM
2A14
WAITING AREA ELEVATOR
LOBBY
RADIOLOGY #1
2B04
EHRM
2B11
SERVICE
ELEVATOR
S-4
SERVICE
ELEVATOR
S-3
PASSENGER
ELEVATOR
P-1
PASSENGER
ELEVATOR
P-2
ANATOMIC
PATHOLOGY
2B13
CHANGING ROOM
2B12
STORAGE
2B02
STORAGE
2B13A
MECHANICAL
2A01
ELEVATOR
LOBBY
CORRIDOR
2B-1
LAB INFO
MANAGER
2B15
TOILET
2B10A.1
HSKPG
2B14
OLD RADIOLOGY
ROOM 1
2B10A
CONTROL ROOM
2B10
OLD RADIOLOGY
ROOM 2
2B10B
TOILET
2B10C
CORRIDOR
2B1
STAIR 2
2B05
STORAGE -
RADIOLOGY
2B01
AFF
ACT 2x2
9' - 6"
AFF
ACT 2x2
9' - 6"
AFF
ACT 2x2
8' - 0"
A5180
PRIVACY
CURTAIN
& TRACK
A5180
PRIVACY
CURTAIN
& TRACK
AFF
ACT 2x2
8' - 0"
CHARGING
ALCOVE
2A-1A
7' - 6"
SOFFIT
AFF
GYP
8' - 0"
AFF
GYP
8' - 0"
AREA SHOWN
PROJECT
NORTH
BLDG 1
CEILING MOUNTED WALL STAND RAIL, PER MFR
DRAWINGS.
SLOPED TOP WALL CABINET, TYP. SEE INTERIOR
ELEVATIONS FOR MATERIAL.
SLOPED TOP TALL CABINET, TYP. SEE INTERIOR
ELEVATIONS FOR MATERIAL.
RADIOLOGY EQUIPMENT - OTC CEILING RAIL, PER MFR
DRAWINGS.
EXISTING RAD FLUORO EQUIPMENT - RAIL MOUNTED TUBE
HEAD UNIT.
EXISTING RAD FLUORO EQUIPMENT - RAIL MOUNTED
MONITOR BOOM.
CEILING OPEN TO STRUCTURE ABOVE
RADIOLOGY EQUIPMENT - IGUS CHAIN, PER MFR
DRAWINGS.
RESTRICTED CEILING AREA FOR RADIOLOGY EQUIPMENT.
NO CEILING MOUNTED FIXTURES INCLUDING HVAC,
LIGHTING AND SPRINKLERS
NEW UNISTRUT: FLUSH MOUNTED WITH FINISHED CEILING.
UNISTRUT P1000 SERIES OR EQUIVALENT REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AC111
PARTIAL CEILING PLAN - NORTH
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
PROJECT
NORTH
1/4" = 1'-0"
LEVEL 2 - CEILING PLAN - NORTH
Revisions: Date:
NOT USED ON THIS SHEET
LEVEL 2
13' - 6"
LEVEL 3
25' - 6"
D E F G
CATH LAB
CONTROL - CATH
LAB
CORRIDOR
UNISEX
RESTROOM
MECHANICAL
LEVEL 2
13' - 6"
LEVEL 3
25' - 6"
10 11
RADIOLOGY #1
2B04
W1
W3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE301
SECTIONS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
1/2" = 1'-0"
BUILDING SECTION
1/2" = 1'-0"
RADIOLOGY #1 SECTION
Revisions: Date:
F
G
RAD FLUORO
2A25B
F0230 CHAIR
M1801 COMPUTER
AE421
F2000 WASTEPAPER
F0205 CHAIR
X3155 LEAD APRON RACK
A5145 GARMENT HOOK
A5108 SHARPS
X3145 X-RAY SCREEN
F0340 STOOL
F0350STEP STOOL
M4255IV STAND
M3072WASTE - INFECTIOUS
M3070HAMPER
M3073WASTE - BIOHAZARD
A1132RAIL
M8810
MAYO
STAND
A5077SANITIZER
A1012TELEPHONE
EXISTING WALL STAND,
PER MFR DRAWINGS
EXISTING LUMINOS AGILE
TABLE, PER MFR DRAWINGS
9' - 3"
A
B F2700 BAR CODE READER
M8840TABLE - INSTRUMENT
AT EACH STUD
20" MAX
HIDDEN COUNTERTOP SUPPORT
BRACKET TYP, PER /2 A-503
HIDDEN EXTENDED
COUNTERTOP SUPPORT
BRACKET PER /4 A-503
E0948 CART - STORAGE
M0430 DVD PLAYER
F0360 FOOTSTOOL W/ HANDLE
A5107 GLOVES
A6046 ARTWORK
RAD FLOURO -
WAITING
2A25
F0210 CHAIR
F
AE42511
RECEPTION
2A06
F0275 CHAIR
TYP
PRIVACY
DIVIDER
MSA / SCHEDULE
2A05
M1801 COMPUTER
TYP
F2000 WASTEPAPER
TYP
AE403
AE403
AE425 18
A
A T
E A
C H
S T
U D
M A
X
HIDDEN COUNTERTOP
SUPPORT BRACKET
TYP, PER /2 A-503
/2
F0420 FILE CABINET
TYP
MSA / SCHEDULE
2A05A
AE403
2A05A
2A05
C
10 11
AE421
RADIOLOGY #1
2B04
M3070 HAMPER
M4255IV STAND
F0205CHAIR
F0340 STOOLM8810MAYO STAND
X3145 X-RAY SCREEN
A5077SANITIZER
F0360
FOOTSTOOL W/
HANDLE
A5145
GARMENT
HOOK
M0755
OXYGEN
FLOWMETER
M0765
VACUUM
REGULATOR
A1132 RAIL
F0350
STEP
STOOL
X3155
LEAD
APRON
RACK
A5180
PRIVACY
CURTAIN
& TRACK
AE403
AE403
2B04
M4645
TRANSFER
DEVICE
WALL STAND-PREMIUM,
PER MFR DRAWINGS
IMAGING TABLE,
PER MFR DRAWINGS
GENERATOR AND PDU,
PER MFR DRAWINGS
2' - 0"
4' - 8" 5"
RAIL-FLOOR, WALL STAND,
PER MFR DRAWINGS
ROLLING STAND,
PER MFR DRAWINGS
D
10 11
RADIOLOGY #2
2B02
AE403
AE403
AE421
X3145 X-RAY SCREEN
A1132 RAIL
F0340 STOOL
A5145GARMENT HOOK
M4645TRANSFER DEVICE
X3155
LEAD
APRON
RACK
F0350
STEP
STOOL
M3070 HAMPER
M4255IV STAND
M8810MAYO STAND
A5077SANITIZER
2' - 0"
WALL STAND-PREMIUM,
PER MFR DRAWINGS
IMAGING TABLE,
PER MFR DRAWINGS
GENERATOR AND PDU,
PER MFR DRAWINGS
2B02
A5180
PRIVACY CURTAIN
& TRACK
RAIL-FLOOR, WALL STAND,
PER MFR DRAWINGS
F0360
FOOTSTOOL W/
HANDLE
M0765
VACUUM
REGULATOR
M0755
OXYGEN
FLOWMETER
ROLLEING STAND,
PER MFR DRAWINGS
F
88A
RADIOLOGY #3
2A02B
AE403
AE421 22
AE403
A5106
SHARPS & GLOVE
DISPENSER
A1132 RAILX3145
X-RAY
SCREEN
F0205 CHAIR
M0765
VACUUM
REGULATOR
M0755
OXYGEN
FLOWMETER
A5077 SANITIZER
X3155 LEAD APRON RACK
M3073 WASTE - BIOHAZARD
A5077 SANITIZER
A1012 TELEPHONE
A5180
PRIVACY CURTAIN
& TRACK
WALL STAND-PREMIUM,
PER MFR DRAWINGS
2A02B
IMAGING TABLE,
PER MFR DRAWINGS
M4645
TRANSFER
DEVICE
GENERATOR AND PDU,
PER MFR DRAWINGS
M4255 IV STAND
A1015 TELEPHONE
RAIL-FLOOR, WALL STAND,
PER MFR DRAWINGS
M3070HAMPER
F0360
FOOTSTOOL W/
HANDLE
F0350STEP STOOL
ROLLING STAND, PER
MFR DRAWINGS
G
H
8A
RAD WORK
2A02C
AE403
F2000 WASTEPAPER
F0420 FILE CABINET
AE403
AE403
AE403
TYP
TYP
AE425 17
2A02C
E
8 9
AE4256
WAITING AREA
AE425
F0305 CHAIR
F0206BARIATRIC CHAIR
F2000WASTEPAPER
A6046ARTWORK
AE425
ELECTRICAL
2A07A
H
TOILET
2A03
AE4254
AE403
AE403
2' - 2"
TOILET, STAFF
2A08
AE425 8
2' - 1"
PLEASE NOTE: DUE TO
EXISTING CONDITIONS,
THIS RESTROOM IS
NOT WHEELCHAIR
ACCESSIBLE
F
G
SYSTEM
COMPONENT -
CATH LAB
2A09B
DRESSING &
STORAGE - MRI
2A09A
STORAGE - CATH
LAB
2A12B.1
AE424
2A09A
F0535 CART - UTILITY
F0210 CHAIR
A1030LOCKER
A1080 MIRROR
TYP
TYP
M3165
CATHETER
STORAGE
UPS, PER MFR
DRAWINGS
EQUIPMENT CABINET,
PER MFR DRAWINGS,TYP
AE425 19
TYP
INJECTOR ROOM
CONSOLE PER MFR
DRAWINGS
SERVICE HUB, PER
MFR DRAWINGS,TYP
PAREX
A-503
E
PAREX MEDS
2A11
AE424 18
20E0945CART - COMPUTER
M3151PAREX
A1014TELEPHONE
A5077SANITIZER
A5145GARMENT HOOK
F3050WHITE BOARD
M1801COMPUTER
M A
X
B A
S E
C A
B
IN
E T
M A
X F
R O
M
HIDDEN COUNTERTOP
SUPPORT BRACKET
TYP, PER /2 A-503
HIDDEN EXTENDED
COUNTERTOP
SUPPORT BRACKET
TYP, PER /4 A-503
COUNTERTOP
SUPPORT AT END
A
STORAGE -
RADIOLOGY
2B01
2B01
CHARGING
ALCOVE
2A-1A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE401
EQUIPMENT PLANS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK AB
100% CD
1/4" = 1'-0"
EQUIPMENT PLAN - 2A25B & 2A25
1/4" = 1'-0"
EQUIPMENT PLAN - 2A06
1/4" = 1'-0"
EQUIPMENT PLAN - 2B04
Revisions: Date:
ADDENDUM #1 07/06/2026
1/4" = 1'-0"
EQUIPMENT PLAN - 2B02
1/4" = 1'-0"
EQUIPMENT PLAN - 2A02B
1/4" = 1'-0"
EQUIPMENT PLAN - 2A02C
1/4" = 1'-0"
EQUIPMENT PLAN - WAITING
1/4" = 1'-0"
EQUIPMENT PLAN - 2A07A
1/4" = 1'-0"
EQUIPMENT PLAN - 2A03
1/4" = 1'-0"
EQUIPMENT PLAN - 2A08
1/4" = 1'-0"
EQUIPMENT PLAN - 2A09B & 2A12B.1
1/4" = 1'-0"
EQUIPMENT PLAN - 2A11
1/4" = 1'-0"
EQUIPMENT PLAN - 2B01 & 2A-1A
F0275 CHAIR
A1015TELEPHONE
E0123 WORKSTATIONM1801COMPUTER
F0300 CHAIR - TASK
F2010 WASTEPAPER
F2700BAR CODE READER
F0680
WORKSTATION,
ADJUSTABLE
A1015TELEPHONE
M1801COMPUTER
A5080PAPER TOWEL
A5075SOAP
E0930MOBILE LOCKER
AE4263
HIDDEN EXTENDED
COUNTERTOP SUPPORT
BRACKET PER /4 A-503
A5107GLOVES
A5108SHARPS
F0230CHAIR
F2000 WASTEPAPER
M1801 COMPUTER
F2700BAR CODE READER
TYP
TYP
W3
W1
M A
X
A T
E A
C H
S T
U D
HIDDEN COUNTERTOP
SUPPORT BRACKET
TYP, PER /2 A-503
END BRACKET REQUIRED TO
SUPPORT FRONT EDGE OF
COUNTERTOP TO WALL
END BRACKET REQUIRED
WITHIN 10" MAX OF WALL /
END OF COUNTER, TYP
A1015TELEPHONE
M3073WASTE - BIOHAZARD
A5080PAPER TOWEL
A5075 SOAP
F2000WASTEPAPER
7' - 6"
AE426
DROP-IN SINK,
PER PLUMBING
HIDDEN EXTENDED
COUNTERTOP SUPPORT
BRACKET PER /4 A-503
A5106
SHARPS & GLOVE
DISPENSER
6" 3' - 0"
1' - 5"
A5109GRAB BAR
TYP
A5090SANITARY NAPKIN
A5200
TOILET TISSUE
DISPENSER
WALL MOUNTED TOILET,
PER PLUMBING
AE4268
1"1"
A1067 MIRROR
F2010WASTEPAPER
A5082
PAPER TOWEL
DISPENSER
A5075 SOAP
AE426
WALL MOUNTED SINK,
PER PLUMBING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE403
ENLARGED EQUIPMENT PLANS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK AB
100% CD
37 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
1/2" = 1'-0"
TYP EQUIPMENT PLAN - STAFF WORKSTATION
1/2" = 1'-0"
TYP EQUIPMENT PLAN - ULTRASOUND CASEWORK
1/2" = 1'-0"
TYP EQUIPMENT PLAN - RADIOLOGY CONTROL
1/2" = 1'-0"
TYP EQUIPMENT PLAN - RADIOLOGY CASEWORK
1/2" = 1'-0"
TYP EQUIPMENT PLAN - TOILET
1/2" = 1'-0"
TYP EQUIPMENT PLAN - SINK
AE426
ULTRASOUND #1
2A26A A5180
PRIVACY
CURTAIN
& TRACK
X2100 ULTRASOUND
E0930 MOBILE LOCKER2
A
A
ULTRASOUND #1
2A26A
A5180 PRIVACY CURTAIN & TRACK
M4255IV STAND
M4116MONITOR
E0948 CART - STORAGE
E0948 CART - STORAGE
M8810MAYO STAND
ULTRASOUND #1
2A26A
H-TRACK PATIENT LIFT,
PER MFR DRAWINGS
A5180 PRIVACY CURTAIN & TRACK
TYP
TYP
A1132RAIL
M3072WASTE - INFECTIOUS
M3070HAMPER F2017 WASTE - RECEPTACLE
A
A
.1
ULTRASOUND #1
2A26A
F
AE426
OPP
198 SF
ULTRASOUND #2
2A26B
A5180
PRIVACY CURTAIN &
TRACK A5145 GARMENT HOOK
TYP
X2100ULTRASOUND F0205 CHAIR
M8810 MAYO STANDF2017
WASTE -
RECEPTACLE
198 SF
ULTRASOUND #2
2A26B
F0540 CART - SCOPE
E0948 CART - STORAGE
M3072 WASTE - INFECTIOUSM3070HAMPER
M3073WASTE - BIOHAZARD
E0930MOBILE LOCKER
198 SF
ULTRASOUND #2
2A26B
X1999
ULTRASOUND
PROBE RACK
F
A5180
PRIVACY CURTAIN
& TRACK
F2017 WASTE - RECEPTACLE
E0948CART - STORAGE
M4116MONITOR
M4255 IV STAND
M9007 ULTRASOUND CHAIR
X1999
ULTRASOUND
PROBE RACK
198 SF
ULTRASOUND #2
2A26B
A
B
ULTRASOUND #3
2A26D
A5077SANITIZER
A5180
PRIVACY
CURTAIN
& TRACK
E0948 CART - STORAGE
M4116 MONITOR
M4255 IV STAND
X2100 ULTRASOUNDM9007ULTRASOUND CHAIR
X1999
ULTRASOUND
PROBE RACK
A
D
ULTRASOUND #3
2A26D
F0205 CHAIRF2017
WASTE -
RECEPTACLE
A6046ARTWORK
M8810 MAYO STAND
TYP
A5180 PRIVACY CURTAIN & TRACK
A5145GARMENT HOOK
F0540CART - SCOPE
ULTRASOUND #3
2A26D
E0930 MOBILE LOCKER
E0948CART - STORAGE
M3072WASTE - INFECTIOUS M3070 HAMPER
M3073 WASTE - BIOHAZARD
X1999
ULTRASOUND
PROBE RACK
ULTRASOUND #3
2A26D
AE426
DRESSING &
TOILET -
ULTRASOUND
2A26C
A5145GARMENT HOOK
A
C
DRESSING &
TOILET -
ULTRASOUND
2A26C
AE426
CT1
CT2
CT3
OPP
DRESSING &
TOILET -
ULTRASOUND
2A26CAE426
CT1
CT2
CT3
OPP
M3070 HAMPER
DRESSING &
TOILET -
ULTRASOUND
2A26C
F0205CHAIR
F2010WASTEPAPER
AE426
OPP PLAM1 TALL CABINET
CT1
CT2
CT3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE423
INTERIOR ELEVATIONS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
40 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
1/4" = 1'-0"
2A26A - EAST ELEVATION
1/4" = 1'-0"
2A26A - NORTH ELEVATION
1/4" = 1'-0"
2A26A - SOUTH ELEVATION
1/4" = 1'-0"
2A26A - WEST ELEVATION
1/4" = 1'-0"
2A26B - EAST ELEVATION
1/4" = 1'-0"
2A26B - NORTH ELEVATION
1/4" = 1'-0"
2A26B - SOUTH ELEVATION
1/4" = 1'-0"
2A26B - WEST ELEVATION
1/4" = 1'-0"
2A26D - EAST ELEVATION
1/4" = 1'-0"
2A26D - NORTH ELEVATION
1/4" = 1'-0"
2A26D - SOUTH ELEVATION
1/4" = 1'-0"
2A26D - WEST ELEVATION
1/4" = 1'-0"
2A26C - NORTH ELEVATION
1/4" = 1'-0"
2A26C - EAST ELEVATION
1/4" = 1'-0"
2A26C - SOUTH ELEVATION
1/4" = 1'-0"
2A26C - WEST ELEVATION
2 2
RAD FLOURO -
WAITING
2A25
A
RAD FLOURO -
WAITING
2A25
RAD FLOURO -
WAITING
2A25
A
B
RAD FLOURO -
WAITING
2A25
A5025 BENCH
E0935 CART - SCRUB
A1012 TELEPHONE
A5180
PRIVACY
CURTAIN
& TRACK
STAFF LOCKER -
WOMEN
2A19
A1030 LOCKER
A5025 BENCH
F3200 CLOCKA5180
PRIVACY
CURTAIN
& TRACK
A1012TELEPHONE
F2000WASTEPAPER
E0935
CART -
SCRUB
STAFF LOCKER -
WOMEN
2A19
A1030 LOCKER
TYP
58 SF
STAFF LOCKER -
WOMEN
2A19
WALL
ABOVE
LOCKERS
A1080MIRROR
A5180
PRIVACY
CURTAIN &
TRACK
A1030LOCKER
58 SF
STAFF LOCKER -
WOMEN
2A19
DRESSING &
TOILET - RAD
FLOURO
2A25A
AE426
WALL
ABOVE
LOCKERS
OPP
A4995
BABY CHANGING
STATION
A
A
DRESSING &
TOILET - RAD
FLOURO
2A25A
AE426
AE426
CT1
CT2
CT3
OPP OPP
A4995
BABY CHANGING
STATION
F0210CHAIR
DRESSING &
TOILET - RAD
FLOURO
2A25A
A5145GARMENT HOOK
TYP
CT1
CT2
CT3
A1082MIRROR
M3070 HAMPER
F0210 CHAIR
DRESSING &
TOILET - RAD
FLOURO
2A25A
CT1
CT2
CT3
111 SF
DRESSING &
STORAGE - MRI
2A09A
A1080 MIRROR
F0535 CART - UTILITY
111 SF
DRESSING &
STORAGE - MRI
2A09A
F0535 CART - UTILITY
TYP
A1080MIRROR
F0535
CART -
UTILITY
111 SF
DRESSING &
STORAGE - MRI
2A09A
A5145
GARMENT
HOOK
A1030LOCKER
111 SF
DRESSING &
STORAGE - MRI
2A09A
WALL
ABOVE
LOCKERS
A
A
M3151PAREX
R6200 REFRIGERATOR
PLAM1 SLOPED TOP
WALL CABINET
EQ EQ
2' - 6"
83 SF
PAREX MEDS
2A11
F3200 CLOCK
EQ EQ
E
AE426
83 SF
PAREX MEDS
2A11
A1014 TELEPHONE
A5077 SANITIZER
E0945
CART -
COMPUTER
83 SF
PAREX MEDS
2A11
M1801 COMPUTER
F2010WASTEPAPER
A5145 GARMENT HOOK
A
E
M3151 PAREX
E0945
CART -
COMPUTER
83 SF
PAREX MEDS
2A11
F3050
WHITE
BOARD
M1801COMPUTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE424
INTERIOR ELEVATIONS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK AB
100% CD
1/4" = 1'-0"
2A23C - NORTH ELEVATION
1/4" = 1'-0"
2A23C - EAST ELEVATION
1/4" = 1'-0"
2A23C - SOUTH ELEVATION
1/4" = 1'-0"
2A23C - WEST ELEVATION
Revisions: Date:
ADDENDUM #1 07/06/2026
1/4" = 1'-0"
2A19 - NORTH ELEVATION
1/4" = 1'-0"
2A19 - EAST ELEVATION
1/4" = 1'-0"
2A19 - SOUTH ELEVATION
1/4" = 1'-0"
2A19 - WEST ELEVATION
1/4" = 1'-0"
2A25A - NORTH ELEVATION
1/4" = 1'-0"
2A25A - EAST ELEVATION
1/4" = 1'-0"
2A25A - SOUTH ELEVATION
1/4" = 1'-0"
2A25A - WEST ELEVATION
1/4" = 1'-0"
2A09A - NORTH ELEVATION
1/4" = 1'-0"
2A09A - EAST ELEVATION
1/4" = 1'-0"
2A09A - SOUTH ELEVATION
1/4" = 1'-0"
2A09A - WEST ELEVATION
1/4" = 1'-0"
2A11 - NORTH ELEVATION
1/4" = 1'-0"
2A11 - EAST ELEVATION
1/4" = 1'-0"
2A11 - SOUTH ELEVATION
1/4" = 1'-0"
2A11 - WEST ELEVATION
2 2
AE426
TOILET
2A03
A
H
TOILET
2A03
CT3
CT1
CT2
A4995
BABY CHANGING
STATION
AE426
TOILET
2A03
CT3
CT1
CT2
A4995
BABY CHANGING
STATION
H
AE426
TOILET
2A03
CT3
CT1
CT2
TOILET, STAFF
2A08
CT3
CT1
CT2
A4995
BABY CHANGING
STATION
A
TOILET, STAFF
2A08
AE426
OPP
A4995
BABY CHANGING
STATION
TOILET, STAFF
2A08
AE426
OPP
TOILET, STAFF
2A08
ELECTRICAL
2A07A
NOTE: REFER TO ELECTRICAL
FOR EQUIPMENT INFORMATION
AND INSTALLATION
ELECTRICAL
2A07A
NOTE: REFER TO ELECTRICAL
FOR EQUIPMENT INFORMATION
AND INSTALLATION
ELECTRICAL
2A07A
NOTE: REFER TO ELECTRICAL
FOR EQUIPMENT INFORMATION
AND INSTALLATION
F G
E0123 WORKSTATION
F0420 FILE CABINET
F2000 WASTEPAPER
MSA / SCHEDULE
2A05
F0275 CHAIR
M1801 COMPUTER
E0123 WORKSTATION
F0275 CHAIR
E0123 WORKSTATION
ELECTRICAL
2A07A
NOTE: REFER TO ELECTRICAL
FOR EQUIPMENT INFORMATION
AND INSTALLATION
G H
EQ EQ
E0123 WORKSTATION
F0275 CHAIR
M1801 COMPUTER
TYP
TYP
F2000WASTEPAPER
F3200CLOCK
RAD WORK
2A02C
A
C
RECEPTION
2A06
EQ EQ
PLAM1 COUNTERTOP
PLAM1 BASE CABINET, TYP
PENCIL DRAWER, TYP
2' - 6"
A-503
SIM
8' - 0"
3' - 0"
A1015TELEPHONE
A1015 TELEPHONE
EQ EQ
F3200 CLOCK
F2000WASTEPAPER
RECEPTION
2A06
4' - 9 7/8"
F3200CLOCK
E
WAITING AREA
F3200CLOCK
A5077SANITIZER
M0506 TELEVISION
WAITING AREA
A5210 TV BRACKET
EQ EQ
E0123WORKSTATION
F0275CHAIR A5145 GARMENT HOOK
F3200 CLOCK
TYP
OFFICE - SHARED
2A23
A
WAITING AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE425
INTERIOR ELEVATIONS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK AB
100% CD
42 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
1/4" = 1'-0"
2A03 - NORTH ELEVATION
1/4" = 1'-0"
2A03 - EAST ELEVATION
1/4" = 1'-0"
2A03 - SOUTH ELEVATION
1/4" = 1'-0"
2A03 - WEST ELEVATION
1/4" = 1'-0"
2A08 - NORTH ELEVATION
1/4" = 1'-0"
2A08 - EAST ELEVATION
1/4" = 1'-0"
2A08 - SOUTH ELEVATION
1/4" = 1'-0"
2A08 - WEST ELEVATION
1/4" = 1'-0"
2A07A - NORTH ELEVATION
1/4" = 1'-0"
2A07A - SOUTH ELEVATION
1/4" = 1'-0"
2A07A - WEST ELEVATION
1/4" = 1'-0"
2A05 - EAST ELEVATION
1/4" = 1'-0"
2A07A - EAST ELEVATION
1/4" = 1'-0"
2A02C - EAST ELEVATION
1/4" = 1'-0"
2A06 - WEST ELEVATION
1/4" = 1'-0"
2A06 - EAST ELEVATION
1/4" = 1'-0"
2A09C - EAST ELEVATION
1/4" = 1'-0"
WAIT - EAST ELEVATION
1/4" = 1'-0"
WAIT - WEST ELEVATION
1/4" = 1'-0"
2A23 - NORTH ELEVATION
1/4" = 1'-0"
WAIT - SOUTH ELEVATION
WALL ASSEMBLY AS NOTED
SEMI-RECESSED FIRE
EXTINGUISHER CABINET
LINE OF WALL BEYOND
FIRE EXTINGUISHER PER
MANUFACTURER
CAULKING AT PERIMETER,
TYP.
WALL ASSEMBLY AS NOTED
SEMI-RECESSED FIRE
EXTINGUISHER CABINET
LINE OF WALL BEYOND
FIRE EXTINGUISHER PER
MANUFACTURER
CAULKING AT PERIMETER,
TYP.
A .F
.F T
O C
E N
T E
R
FASTEN AT BOTH
ENDS WITH MIN. 4
TAPPING SCREWS
GENERAL NOTE:
CONTRACTOR SHALL COORDINATE LOCATIONS OF HORIZONTAL FASTENERS
PLAN VIEW
ISOMETRIC VIEW
WALL FINISH
VERTICAL WALL STUDS
@ 16" OR 24" OC
CUT
HORIZONTAL
FASTENER
FROM STUD
COUNTERTOP
AS NOTED
FLOATING STEEL
COUNTERTOP SUPPORT,
ATTACH AT EACH STUD.
COUNTERTOP
AS NOTED
EXTENDED FLOATING
STEEL COUNTERTOP
SUPPORT, ATTACH AT
EACH STUD.
W
NON-SHRINK GROUT
EXIST CONCRETE WALL
ABANDONED
PIPE OPENING
ROUGHEN EXISTING
CONCRETE SURFACE
HORIZONTAL OPENING VERTICAL OPENING
1" 2" W 2" 1"
ABANDONED PIPE OPENING
FLOOR FINISH AS SCHEDULED
ROUGHEN EXIST
CONC SURFACE
EXIST CONC FLOOR SLAB
NON-SHRINK GROUT
1MM MIN. THICK METAL
PLATE; W/ (4) M6 CONC
SCEWS EMBED 1"
W
EXST CONC FILLED METAL DECK
ABANDONED PIPE OPENING
FLOOR FINISH AS SCHEDULED
ROUGHEN EXIST
CONC SURFACE
NON-SHRINK GROUT
1MM MIN. THICK METAL
PLATE; WELD 4 SIDES
LEVEL 2
13' - 6"
G
EXISTING WALL
(F
IE
L D
V E
R
IF
Y R
.O D
IM
S
LOUVER PER MECH
NEW AHU AND DUCTS PER
MECHANICAL, TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-503
INTERIOR DETAILS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK MA
100% CD
46 OF 140Revisions: Date:
ADDENDUM #1 07/06/2026
1 1/2" = 1'-0"
FIRE EXTINGUISHER - PLAN VIEW
1 1/2" = 1'-0"
FIRE EXTINGUISHER - SECTION VIEW
1/2" = 1'-0"
TYP. BLOCKING DETAIL
1" = 1'-0"
HIDDEN COUNTERTOP SUPPORT BRACKET
1" = 1'-0"
HIDDEN EXTENDED COUNTERTOP SUPPORT BRACKET
3" = 1'-0"
TYP. PATCH-UP/INFILL DETAIL
1" = 1'-0"
NEW LOUVER @ EXISTING WINDOW OPENING
A(C)T ACOUSTICAL CEILING TILE
GYP GYPSUM BOARD
P PAINT
RES RESINOUS
SC/SP SPECIAL COATING
WSF WELDED SHEET FLOORING
CPT CARPET
VT VINYL TILE
LVT LUXURY VINYL TILE
SVT SHEET VINYL TILE
EPY EPOXY FLOORING
PT PORCELAIN TILE
CT CERAMIC TILE
RWC RIGID WALL COVERING
RB RUBBER BASE
S SOLID SURFACE
FINISH ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-601
ROOM FINISH SCHEDULE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE IMAGING &
CATHETERIZATION LAB IN BLDG 1
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -
FRESNO, CA
570-21-220
3/27/2026 MK AK
100% CD
ROOM FINISH SCHEDULE
ROOM
# ROOM NAME
CEILING FLOOR
MAT
BASE WAINSCOT WALL
COMMENTSMAT FIN MAT HT MAT HT MAT FIN
- WAITING AREA EXISTING -- -- EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING NO ADJUSTMENTS TO FINISHES
- ELEVATOR LOBBY EXISTING -- -- EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING NO ADJUSTMENTS TO FINISHES
2A02 CORRIDOR EXISTING -- MATCH ADJ
EXIST
MATCH ADJ EXIST -- MATCH
ADJ
MATCH
ADJ
MATCH ADJ EXIST MATCH ADJ EXIST PATCH WORK ONLY
2A02B RADIOLOGY #3 ACT 2x2 -- WSF INTEGRAL WSF 4" -- -- GYP P STC 40
2A02C RAD WORK ACT 2x2 -- WSF RB 4" -- -- GYP P
2A02D.1 CHAPEL STORAGE EXISTING -- VT RB 4" -- -- GYP P
2A03 TOILET ACT 2x2 -- PT PT 4" CT 4'-0" GYP P STC 40
2A05 MSA / SCHEDULE ACT 2x2 -- CPT RB 4" -- -- GYP P
2A05A MSA / SCHEDULE ACT 2x2 -- CPT RB 4" -- -- GYP P
2A06 RECEPTION ACT 2x2 -- CPT PRB 4" -- -- GYP P
2A07A ELECTRICAL EXPOSED -- SVT SVT 4" CT 4'-0" GYP SC
2A08 TOILET, STAFF ACT 2x2 -- PT PT 4" CT 4'-0" GYP P
2A09 MRI ZONE II EXISTING -- MATCH ADJ
EXIST
MATCH ADJ EXIST -- MATCH
ADJ
MATCH
ADJ
MATCH ADJ EXIST MATCH ADJ EXIST PATCH WORK ONLY
2A09A DRESSING & STORAGE - MRI ACT 2x2 -- LVT RB 4" -- -- GYP P
2A09B SYSTEM COMPONENT - CATH LAB EXPOSED SC RES-3 INTEGRAL RES-3 4" -- -- GYP SC
2A11 PAREX MEDS ACT 2x2 SP WSF INTEGRAL WSF 4" -- -- GYP SC
2A12 CORRIDOR EXISTING -- MATCH ADJ
EXIST
MATCH ADJ EXIST -- MATCH
ADJ
MATCH
ADJ
MATCH ADJ EXIST MATCH ADJ EXIST PATCH WORK ONLY
2A12A SCRUB ALCOVE EXISTING -- RES-3 INTEGRAL RES-3 4" S 5'-0" GYP SC
2A12B CATH LAB GYP SC RES-3 RF INTEGRAL RES-3 6" -- -- GYP SC STC 35 TO COOR, STC 50 TO ADJ ROOMS
2A12B.1 STORAGE - CATH LAB GYP -- RES-3 INTEGRAL RES-3 4" RWC 4'-0" GYP P STC 35 TO COOR, STC 50 TO ADJ ROOMS
2A12C CONTROL - CATH LAB GYP SC RES-3 INTEGRAL RES-3 4" -- -- GYP SC
2A12D COMM EXISTING -- -- EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
2A13 TOILET - PRE-OPERATIVE & RECOVERY ACT 2x2 SP PT PT 4" PT 4'-0" GYP SC STC 40
2A16 PRE-OPERATIVE & RECOVERY ACT 2x2 SP WSF INTEGRAL WSF 6" -- -- GYP SC STC 35
2A16A CARDIOLOGY WORK EXISTING -- EPY RB 4" RWC 4'-0" GYP SC
2A19 STAFF LOCKER - WOMEN ACT 2x2 -- PT PT 4" -- -- GYP P
2A20 STAFF LOCKER - MEN ACT 2x2 -- WSF RB 4" -- -- GYP P
2A23 OFFICE - SHARED ACT 2x2 -- CPT RB 4" -- -- GYP P
2A25 RAD FLOURO - WAITING EXISTING -- MATCH ADJ
EXIST
MATCH ADJ EXIST -- MATCH
ADJ
MATCH
ADJ
MATCH ADJ EXIST MATCH ADJ EXIST
2A25A DRESSING & TOILET - RAD FLOURO ACT 2x2 -- PT PT 4" CT 4'-0" GYP P STC 40
2A25B RAD FLUORO ACT 2x2 -- WSF INTEGRAL WSF 4" -- -- GYP P STC 40
2A26 CORRIDOR EXISTING -- MATCH ADJ
EXIST
MATCH ADJ EXIST --…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .