Addendum 0002 - Drawings Added.pdf

PDF 4 MB Posted

Attached to
Z2DB--Renovate Imaging and Catheterization Lab 570 21 220 Fresno VA Medical Center Fresno
Solicitation number
36C26126R0045
Issued by

About this file

This is an architectural drawing package for a renovation project of the Imaging and Catheterization Lab in Building 1 at VA Central California Healthcare System in Fresno, California (Project 570-21-220, Drawing package prepared by Spees Design Build). The documentation is dated March 27, 2026 with Addendum #1 dated July 6, 2026, and represents 100% construction documents.

The project scope encompasses comprehensive renovation of imaging and catheterization facilities on Level 2, including structural modifications, mechanical systems, interior finishes, equipment integration, and infection control provisions. Key construction elements include Level 2 ceiling framing plans with mechanical unit support specifications (HSS members, unistrut supports, maximum unit weight 3,900 lbs); Infection Control and Risk Assessment (ICRA) phased plans addressing Class II and Class III containment requirements across four construction phases with negative air pressure specifications, temporary barriers, and ante rooms; demolition and new floor plans showing room reconfigurations, wall relocations, and space programming; detailed interior elevations for specialized medical spaces including radiology rooms (2B02, 2B04), ultrasound suites (2A26A, 2A26B, 2A26D), catheterization lab (2A12B), MRI zones, and support spaces; equipment plans documenting placement of medical devices, furniture, and casework; door and window schedules with fire-rating and sound-rating requirements (ranging from 1-hour to 2-hour fire ratings, STC 35-50 sound ratings); wall assembly types with fire-rated partitions (up to 2-hour rated walls with lead lining in radiology areas); and finish schedules specifying materials for ceilings, floors, base, wainscot, and walls by room. The renovation integrates specialized medical equipment including ultrasound systems (X2100), radiology imaging tables, catheter storage systems (M3165), and MRI zone preparation areas with appropriate shielding, electrical provisions, and infection control measures throughout.

View the file

Other files

File Type Posted
36C26126R0045 Amendment 0004.pdf PDF
2A12B Shielding Design Cath Lab.pdf PDF
2A02B Shielding Design X Ray Room.pdf PDF
RFI Responses Part II 36C26126R0045.pdf PDF
36C26126R0045 Amendment 0003.pdf PDF
2B04 Shielding Design X Ray Room.pdf PDF
2A25B Shielding Design RF Room.pdf PDF
2B02 Shielding Design X Ray Room.pdf PDF
Q2022-304 VA Fresno Cath Lab rev03.pdf PDF
RFI Responses 36C26126R0045 2.pdf PDF
QC-072_1.PDF PDF
X1_ACM_1.PDF PDF
C3 Montr Carrier.PDF PDF
Shielding Design RF Room 2A25B.pdf PDF
VHA ICRA-1.5 (July 2 2026).pdf PDF
Privacy-Curtains-And-Track-Standard-Track-Product-Sheet-PS-CC6062.pdf PDF
C1-Anesthesia.PDF PDF
Shielding Design X-Ray Room 2B02.pdf PDF
Shielding Design X-Ray Room 2B04.pdf PDF
VA FRESNO CATH LAB_R-RAD1_26_E_PF1_03-17-2026.pdf PDF
USA_Data_Sheets Flow Splitter 651 06.pdf PDF
GE-Logiq-E10-Brochure-1.pdf PDF
Fresno VA FA R3 N-WES250405_Rev00 08.25.25.pdf PDF
11028.pdf PDF
EVOLUTION TYPICAL_WS2 RAIL_TBL2_08-14-2023.pdf PDF
ELECTRICAL_EQUIPMENT_DRAWING_-_HARMONYAIR_SURGICAL_LIGHTING_SYSTEM__A-SERIES.pdf PDF
36C26126R0045 Amendment 0002.pdf PDF
VA FRESNO CATH LAB_R-RAD3_26_E_PF1_03-18-2026.pdf PDF
VA FRESNO CATH LAB_R-RAD2_26_E_PF1_03-18-2026.pdf PDF
P300Datasheet.pdf PDF
FS with stops.pdf PDF
Partial Brand Name JA Cath Lab_RD.pdf PDF
Addendum 0002 - Specifications Added.pdf PDF
C3-Monitor Carrier.PDF PDF
Shielding Design X-Ray Room 2A02B.pdf PDF
SEC 21793 VA FRESNO RF 3 12.22.2021 ELECT DWGS 100 CD Binder1.pdf PDF
Privacy-Curtains-And-Track-Curtain-Accessories-Product-Sheet-PS-CCACH.pdf PDF
C2-EMS.PDF PDF
0654C6R1.pdf PDF
570-21-220 Sign in Sheet - Site Visit 6_8_26.pdf PDF
36C26126R0045 0001.docx DOCX document
6. Pre Proposal Site Visit Flyer 36C26126R0045.pdf PDF
4. Requests for Information RFI_ Form.docx DOCX document
2. 570-21-220 - Basis of Design.pdf PDF
1. 570-21-220 - Specifications.pdf PDF
8. WD CA20260018 dtd 5 18 2026.pdf PDF
5. Price Breakdown Worksheet.docx DOCX document
3. 570-21-220 Drawings.pdf PDF
36C26126R0045_2.docx DOCX document
7. Factor 2 Past Performance Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9 10 11 12

FF

GG

HH

EE

13 14 15 16 17 1887

7A 8A

DD

A6

B1

A

B

C

(E) BEAM, TYP

F7

S-501

S-111

F5

F1

S-201

EXACT LOCATIONS OF

UNISTRUT SUPPORTS PER

MFR SITE DRAWINGS, TYP

HSS5X3X1/4

HSS5X3X1/4

F1

S-501

HSS4x3x3/16 FLAT HIGH

P1001D3 LOW

DO

DO

DO

DO

F1

S-501

HSS5X3X1/4

HSS5X3X1/4

HSS6x4x3/16 HIGH

P1001D3 LOW, TYP

F7

S-501

TYP

TYP

NOTE:

EXACT UNISTRUT LOCATIONS PER ARCH AND MANUF

DRAWINGS..

HSS5X3X1/4

HSS5X3X1/4

P1001D3

M A

X , T

Y P

4'

HANGER

HSS3x3x3/16, TYP

HANGER

HSS3x3x3/16, TYP

DO

DO

DO

DO

DO

DO

DO

W8X15

W8X15

P1001D3

HSS5X3X1/4

HSS5X3X1/4

HANGER

HSS3x3x3/16, TYP

M A

X , T

Y P

4'

W8X15

W8X15

C3

S-501

MECH UNIT SUPPORT BEAMS.

COORDINATE LOCATION WITH

UNIT SUPPORT LOCATIONS. DO

NOT HANG UNIT FROM

EXISTING CONCRETE DECK

(MAX UNIT WEIGHT 3900 LBS) ,

TYP

F7

S-501

HSS4x3x3/16 FLAT HIGH

P1001D3 LOW

DO

DO

DO

DO

M A

X T

Y P

8" M

A X

T Y

P

TYP

TYP

TYP

TYP

EXISTING BEAM,

TYP

HSS HANGER

BRACE

LEGEND

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

RENOVATE IMAGING AND

CATH LAB IN BUILDING 1

570-21-701

2615 E CLINTON AVE, FRESNO, CA 93703

03/27/2026

S-101A

REFLECTED CEILING PLAN

Checker Author

100% CD

1/8" = 1'-0"

LEVEL 2 CEILING FRAMING PLAN

Revisions: Date:

ADDENDUM #1 07/06/2026

A

B

C

D

E

F

G

7 8 9 10 11

12 13 14 15 16 17 18

H

A6

B1

7A 8A

ICRA

CLASS II

1A-1

1A03

1A04

ELEVATOR

LOBBY

LIFT

P-1

P-2

S-3S-4

1A01 1A01A

1A02

1A-1

C-1U5

1A01F1A01D

VESTIBULE

1A13A

1A10

1A13 1A14 1A16C

1A16B

1A16

1A16A 1A17B 1A17 1A17A

1A19

1A20

1A18E

1A18C

1A18B1A18A

1A18D1A18F1A18G1A18H

1A-3

1A18J

1A18

1A18IE116A

AREA OF

WORK

PROJECT

NORTH

BLDG 1

TEMPORARY ICRA AIR PRESSURE

CONTRACTOR PATH OF TRAVEL

TEMPORARY EMERGENCY EGRESS ROUTE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

KEYNOTE (WITH SUBPHASE) WHERE NOTED

INACCESABLE DURING CONSTRUCTION

ICRA BOUNDARY

(3A)

TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF

CONSTRUCTION.

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X

GYP EACH SIDE.

TEMPORARY ICRA DOOR AND FRAME.

EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL

OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.

WORK AREA ACCESS POINT WITH STICKY WALK OFF

MATS

ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE

ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS

NEGATIVE THAN THE MAIN CONSTRUCTION AREA.

AREA TO BE INACCESSIBLE DURING PHASE OF

CONSTRUCTION OR PORTION OF PHASE.

AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD

POSSIBLE. COORDINATE DURATION OF THIS WORK WITH

THE COR. SOME PARTS WILL NEED TO REMAIN LONGER

THAN OTHERS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS102

ICRA PLAN - PHASE I (BELOW)

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 Checker Author

100% CD

15 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

1/8" = 1'-0"

LEVEL 1 - ICRA PLAN - PHASE I

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

ICRA NOTES

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

CLASS II

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

AREA OF

WORK

PROJECT

NORTH

BLDG 1

TEMPORARY ICRA AIR PRESSURE

CONTRACTOR PATH OF TRAVEL

TEMPORARY EMERGENCY EGRESS ROUTE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

KEYNOTE (WITH SUBPHASE) WHERE NOTED

INACCESABLE DURING CONSTRUCTION

ICRA BOUNDARY

(3A)

TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF

CONSTRUCTION.

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X

GYP EACH SIDE.

TEMPORARY ICRA DOOR AND FRAME.

EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL

OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.

WORK AREA ACCESS POINT WITH STICKY WALK OFF

MATS

ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE

ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS

NEGATIVE THAN THE MAIN CONSTRUCTION AREA.

AREA TO BE INACCESSIBLE DURING PHASE OF

CONSTRUCTION OR PORTION OF PHASE.

AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD

POSSIBLE. COORDINATE DURATION OF THIS WORK WITH

THE COR. SOME PARTS WILL NEED TO REMAIN LONGER

THAN OTHERS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

A

B

C

D

E

F

G

7 8 9 10 11

12 13 14 15 16 17 18

H

A6

B1

7A 8A

NON ICRA

ENCLOSURE

ICRA

CLASS II

-2

SIM

SIM

1A18IE116A 1A18H 1A18G 1A18F 1A18D

1A18E

1A18C

1A18B1A18A

1A18

1A-3

1A18J 1A18N

1A20

1A19

1A17A1A171A17B1A16A

1A16B

1A16

1A16C

1A14

1A13

1A13A

1A10

SIM

SIM

SIM

SIM

ICRA

CLASS II

2-

ICRA

CLASS II

SIM

7 7

1A-1

1A03

1A04

ELEVATOR

LOBBY

LIFT

P-1

P-2

S-3S-4

1A01 1A01A

1A02

1A-1

C-1U5

1A01F1A01D

VESTIBULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS202

ICRA PLAN - PHASE II (BELOW)

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MC

100% CD

17 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

1/8" = 1'-0"

LEVEL 1 - ICRA PLAN - PHASE II

ICRA NOTES

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

CLASS II

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

PROJECT

NORTH

BLDG 1

TEMPORARY ICRA AIR PRESSURE

CONTRACTOR PATH OF TRAVEL

TEMPORARY EMERGENCY EGRESS ROUTE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

KEYNOTE (WITH SUBPHASE) WHERE NOTED

INACCESABLE DURING CONSTRUCTION

ICRA BOUNDARY

(3A)

TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF

CONSTRUCTION.

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X

GYP EACH SIDE.

TEMPORARY ICRA DOOR AND FRAME.

EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL

OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.

WORK AREA ACCESS POINT WITH STICKY WALK OFF

MATS

ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE

ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS

NEGATIVE THAN THE MAIN CONSTRUCTION AREA.

AREA TO BE INACCESSIBLE DURING PHASE OF

CONSTRUCTION OR PORTION OF PHASE.

AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD

POSSIBLE. COORDINATE DURATION OF THIS WORK WITH

THE COR. SOME PARTS WILL NEED TO REMAIN LONGER

THAN OTHERS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

A

B

C

D

E

F

G

7 8 9 10 11

12 13 14 15 16 17 18

H

A6

B1

7A 8A

1A18IE116A 1A18H 1A18G 1A18F 1A18D

1A18E

1A18C

1A18B

1A18A

1A18

1A-3

1A18J1A18N

1A20

1A19

1A17A1A171A17B1A16A

1A16B

1A16

1A16C

1A14

1A13

1A13A

1A10

ICRA

CLASS II

SIM

SIM

SIM 3

SIM

SIM

1A-1

1A03

1A04

ELEVATOR

LOBBY

LIFT

P-1

P-2

S-3S-4

1A01 1A01A

1A02

1A-1

C-1U5

1A01F1A01D

VESTIBULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS302

ICRA PLAN - PHASE III (BELOW)

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 Checker Author

100% CD

19 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

ICRA NOTES

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

CLASS II

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

1/8" = 1'-0"

LEVEL 1 - ICRA PLAN - PHASE III

PROJECT

NORTH

BLDG 1

TEMPORARY ICRA AIR PRESSURE

CONTRACTOR PATH OF TRAVEL

TEMPORARY EMERGENCY EGRESS ROUTE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

KEYNOTE (WITH SUBPHASE) WHERE NOTED

INACCESABLE DURING CONSTRUCTION

ICRA BOUNDARY

(3A)

TEMPORARILY SEAL EXISTING DOOR FOR DURATION OF

CONSTRUCTION.

TEMPORARY ICRA BARRIER FRAMED TO THE CEILING

ABOVE. CONSTRUCT WITH MTL STUDS AND 5/8" TYPE X

GYP EACH SIDE.

TEMPORARY ICRA DOOR AND FRAME.

EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL

OPENINGS / PENETRATIONS / HVAC DUCTS AS REQUIRED.

WORK AREA ACCESS POINT WITH STICKY WALK OFF

MATS

ANTE ROOM AS SHOWN (WHERE APPLICABLE). ANTE

ROOM TO HAVE NEGATIVE AIR PRESSURE, BUT LESS

NEGATIVE THAN THE MAIN CONSTRUCTION AREA.

AREA TO BE INACCESSIBLE DURING PHASE OF

CONSTRUCTION OR PORTION OF PHASE.

AREA OF WORK TO BE DONE IN THE BRIEFEST PERIOD

POSSIBLE. COORDINATE DURATION OF THIS WORK WITH

THE COR. SOME PARTS WILL NEED TO REMAIN LONGER

THAN OTHERS.

1. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

A

B

C

D

E

F

G

7 8 9 10 11

12 13 14 15 16 17 18

H

A6

B1

7A 8A

ICRA

CLASS III

ICRA

CLASS III

4 4

1A-1

1A03

1A04

ELEVATOR

LOBBY

LIFT

P-1

P-2

S-3S-4

1A01 1A01A

1A02

1A-1

C-1U5

1A01F1A01D

VESTIBULE

1A18I

E116A 1A18H 1A18G 1A18F 1A18D

1A18E

1A18C

1A18B

1A18A1A18 1A-3

1A18J1A18N

1A201A191A17A1A171A17B1A16A

1A16B

1A16

1A16C1A141A13

1A13A

1A10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS402

ICRA PLAN - PHASE IV (BELOW)

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

21 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

1/8" = 1'-0"

LEVEL 1 - ICRA PLAN - PHASE IV

ICRA NOTES

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

CLASS II

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

ICRA NOTES

DURING CONSTRUCTION PROJECT:

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

CLASS III

UPON COMPLETION OF PROJECT:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED

BY THE OWNER’S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND

THOROUGHLY CLEANED BY THE OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

PROJECT

NORTH

BLDG 1

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING TO REMAIN

EXISTING TO DEMOLISH

NIS

DEMO EXSTING WALLS AS SHOWN ON PLAN

DEMO EXISTING FLOOR THROUGHOUT EXISTING ROOM

DEMO EXISTING WINDOW, INSTALL NEW LOUVER PER

MECHANICAL IN EXISTING ROUGH OPENING.

A

B

C

D

E

F

G

7 8 9 10 11 12 13 14 15 16 17

H

A6

B1

7A 8A

PATHOLOGY /

LAB MEDICINE

2B18

ASSOCIATE

PATHOLOGY

2B16

LAB INFO

MANAGER

2B15

TOILET

2B10A.1

HSKPG

2B14

RADIOLOGY

ROOM 1

2B10A

CONTROL

2B10

RADIOLOGY

ROOM 2

2B10B

TOILET

2B10C

TOILET

2B20

ANATOMIC

PATHOLOGY

2B13

CONFERENCE

2B19A

OFFICE

2B19B

COMM

2B17

CORRIDOR

2B2

CORRIDOR

2B1

CHANGING ROOM

2B12

STORAGE /

DUMWAITER

2B11

STORAGE

2B02

STORAGE /

DUMWAITER

2B03

STORAGE

2B13A

MECHANICAL

2A01

SERVICE

ELEVATOR

S-4

SERVICE

ELEVATOR

S-3

PASSENGER

ELEVATOR

P-1

PASSENGER

ELEVATOR

P-2

WAITING AREA

ELEVATOR

LOBBY

ELEVATOR

LOBBY

CHECK-IN

CORRIDOR

2B-1

STAIR 2

2B05

FLUORO

2B04

IMAGING WAITING

AREA

2B01

IMAGING DEPT

STORAGE ROOM

2A11

DUMB WAITER 3

MECHANICAL

2A17A

UNISEX

RESTROOM

2A14

MEDICATION

PREPERATION

2A15A

CONTROL

2A17

CT SUITE

2A18

IMAGING

EQUIPMENT

2A18A

PATIENT

CHANGING /

TOILET

2A18C

BREAK ROOM

2A21

FREIGHT

ELEVATOR

SUPERVISORY AO

OFFICE

2A22

DRT OFFICE

2A24

STAIR 1

2A30

IMAGING OFFICE

2A27B IMAGING OFFICE

2A27C

COPY RM

2A27A IMAGING OFFICE

2A27D

CORRIDOR

2A27

TOILET

2A27K

IMAGING OFFICE

2A27E

IMAGING OFFICE

2A27J

IMAGING OFFICE

2A27I

IMAGING OFFICE

2A27F

IMAGING OFFICE

2A27G

IMAGING ADMIN

2A27H

CORRIDOR

2A-1

ULTRASOUND 1

2A23

VSO OFFICE

2A20

COMM

2A19

OFFICE

2A16G

BREAK AREA

OFFICE

2A16D

OFFICE

2A16E

OFFICE

2A16F

ULTRASOUND 2

2A25A

TOILET

2A23A

DUCT

IMAGING SUITE

2A16

ADMIN ASSIST

2A16A

CHIEF IMAGING

2A16B

MECHANICAL

2A13B.1

CONFERENCE

2A16C

SPECIAL

PROCEDURES

O.R.

2A13B

SPECIAL

PROCEDURES

PRE/POST

OPERATIVE

2A13

GURNEY SPACE

CONTROL ROOM

2A13A

HSKPG

2A12

ULTRASOUND 1

2A09C

ULTRASOUND 2

2A09B

CLEAN SUPPLY

2A09A

ULTRASOUND

SUITE

2A09

TOILET

2A09D

PREP AREA

2A07

TOILET

2A08

ELECTRICAL

2A07A

MRI CONTROL

ROOM / WORK

AREA

2A07B

MRI SCANNER

2A07D

CLOSET

2A07E

EQUIPMENT

ROOM

2A07C

IMAGING ROOM 4

2A05

TOILET

2A06

CORRIDOR

2A-2

STORAGE

2A03

NURSING

INFORMATIES

OFFICE

2A02D

DECEDENT

AFFAIRS

2A02C

LEAD CHAPLAIN

2A02B

STORAGE

2A02B.1

STORAGE

2A02A.1

STORAGE

2A02D.1

CHAPEL

CHAPEL

2A02A

CHAPEL

CORRIDOR

CORRIDOR

2A02

STORAGE

2A02D.2

1 1

3 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD101

DEMO FLOOR PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1/8" = 1'-0"

LEVEL 2 - DEMO - FLOOR PLAN

PROJECT

NORTH

Revisions: Date:

ADDENDUM #1 07/06/2026

1. SCHEDULE SYSTEM AND FUNCTIONAL SHUTDOWNS TWO

WEEKS PRIOTR TO BEGINNING ANY CONSTRUCTION

ACTIVITY.

2. REMOVE WALL ACCESSORIES MOUNTED ACCESSORIES

REQUIRED TO COMPLETE ANY CONSTRUCTION TASK.

3. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED PRIOR

TO BEGINNING WORK. NO WORK SHALL BE DONE WITHOUT

PROPERLY MEETING ICRA REQUIREMENTS. SEE SHEETS

AS101, AS102, AS103, AND SPECIFICATION SECTION 01 35 25

'SAFETY REQUIREMENTS' FOR SPECIFIC ICRA CLASS

INFORMATION.

4. DEMO EXISTING FLOOR FINISH THROUGHOUT WORK AREA.

5. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF

ANY EXISTING EQUIPMENT.

6. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW PER

FINISH SCHEDULE.

PROJECT

NORTH

BLDG 1

EXISTING DOOR TO REMAIN

NEW DOOR

EXISTING TO REMAIN

NEW CONSTRUCTION

2 HR FIRE RATED WALL

NIS

2 HR & SMOKE RATED WALL

1 HR FIRE RATED WALL

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE

ATTENTION OF THE COR.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS,

CENTERLINE OF OPENINGS, UON

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERSECTING WALL OR CENTERED ON THE

WALL, UON.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INTALLING DRYWALL.

A

B

C

D

E

F

G

7 8 9 10 11 12 13 14 15 16 17 18

H

A6

B1

7A 8A

198 SF

ULTRASOUND #2

2A26B

462 SF

RAD FLUORO

2A25B

128 SF

DRESSING &

TOILET - RAD

FLOURO

2A25A

1721 SF

CORRIDOR

2A-1

411 SF

PRE-OPERATIVE

& RECOVERY

2A16

S

F

C O

R R

ID

O

R

A

828 SF

CATH LAB

2A12B

230 SF

SYSTEM

COMPONENT -

CATH LAB

2A09B

41 SF

TOILET, STAFF

2A08

191 SF

MRI ZONE III

PREP AREA

2A07

115 SF

MSA / SCHEDULE

2A05

191 SF

CONTROL - CATH

LAB

2A12C

PATIENT

CHANGING /

TOILET

2A18C

IMAGING

EQUIPMENT

2A18A

486 SF

CT SUITE

2A18

298 SF

CONTROL

2A17

87 SF

MEDICATION

PREPERATION

2A15A

85 SF

MECHANICAL

2A17A

41 SF

UNISEX

RESTROOM

2A14

83 SF

PAREX MEDS

2A11

351 SF

RADIOLOGY #2

2B02

STAIR 1

2A30

IMAGING OFFICE

2A27B

IMAGING OFFICE

2A27CCOPY RM

2A27A

TOILET

2A27K IMAGING OFFICE

2A27E

IMAGING OFFICE

2A27J

IMAGING OFFICE

2A27I

IMAGING OFFICE

2A27G

IMAGING ADMIN

2A27H

IMAGING OFFICE

2A27F

WAITING AREA

ELEVATOR

LOBBY

58 SF

STAFF LOCKER -

MEN

2A20

108 SF

CONTROL -

ULTRASOUND

2A26E

64 SF

DRESSING &

TOILET -

ULTRASOUND

2A26C

58 SF

STAFF LOCKER -

WOMEN

2A19

DRESSING &

STORAGE - MRI

2A09A

154 SF

OFFICE - SHARED

2A23

362 SF

RADIOLOGY #1

2B04

163 SF

EHRM

2B11

177 SF

MRI ZONE II

2A09

146 SF

RECEPTION

2A06

54 SF

TOILET -

PRE-OPERATIVE

& RECOVERY

2A13

34 SF

TOILET, STAFF

2A09D

111 SF

ELECTRICAL

2A07A

188 SF

MRI CONTROL

ROOM / WORK

AREA

2A07B

353 SF

MRI SCANNER

2A07D

13 SF

CLOSET

2A07E

242 SF

MRI EQUIPMENT

ROOM

2A07C

227 SF

CORRIDOR

2A-2

68 SF

TOILET

2A03

239 SF

RAD WORK

2A02C

358 SF

RADIOLOGY #3

2A02B

CHAPEL

105 SF

CHAPEL

CORRIDOR

2A02A

207 SF

CORRIDOR

2A02

77 SF

SERVICE

ELEVATOR

S-4

108 SF

SERVICE

ELEVATOR

S-3

76 SF

PASSENGER

ELEVATOR

P-1

70 SF

PASSENGER

ELEVATOR

P-2

806 SF

ANATOMIC

PATHOLOGY

2B13

82 SF

CHANGING ROOM

2B12

43 SF

STORAGE

2B02

125 SF

STORAGE

2B13A

72 SF

MECHANICAL

2A01

168 SF

ELEVATOR

LOBBY

C O

R R

ID

O

R

B

-1

276 SF

PATHOLOGY /

LAB MEDICINE

2B18

122 SF

ASSOCIATE

PATHOLOGY

2B16

130 SF

LAB INFO

MANAGER

2B15 47 SF

TOILET

2B10A.1

49 SF

HSKPG

2B14

406 SF

OLD RADIOLOGY

ROOM 1

2B10A

221 SF

CONTROL ROOM

2B10

262 SF

OLD RADIOLOGY

ROOM 2

2B10B

40 SF

TOILET

2B10C

951 SF

CORRIDOR

2B2

303 SF

CORRIDOR

2B1

197 SF

STAIR 2

2B05

240 SF

CONFERENCE

2B19A

98 SF

OFFICE

2B19B

70 SF

COMM

2B17

105 SF

STORAGE -

RADIOLOGY

2B01

198 SF

ULTRASOUND #3

2A26D

VENDING MACHINE

155 SF

CORRIDOR

2A26

STORAGE - CATH

LAB

2A12B.1

AE113

AE112

AE111

CHARGING

ALCOVE

2A-1A

AE301

AE301

CHAPEL

STORAGE

2A02D.1

SINK

107 SF

CARDIOLOGY

WORK

2A16A

123 SF

RAD FLOURO -

WAITING

2A25

1' - 1"

10' - 11"

COMM

2A12D

55 SF

SCRUB ALCOVE

2A12A

87 SF

MSA / SCHEDULE

2A05A

BREAK ROOM

2A21

STORAGE

2A02D.2

40E40E

E

7' - 1"

4' - 10"

ULTRASOUND #1

2A26A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE101

FLOOR PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

PROJECT

NORTH

LEGEND

GENERAL NOTES

KEY PLAN

1/8" = 1'-0"

LEVEL 2 - FLOOR PLAN

Revisions: Date:

POST-100% REVISION 09/08/2021

ADDENDUM #1 07/06/2026

DEPARTMENT SIGN OFF:

COR:

CARDIOLOGIST:

ULTRASOUND:

RADIOLOGY:

BIO MED:

A A

B B

C C

D D

E E

8 9 10 11

A6

351 SF

RADIOLOGY #2

2B02

83 SF

PAREX MEDS

2A11

85 SF

MECHANICAL

2A17A

41 SF

UNISEX

RESTROOM

2A14

362 SF

RADIOLOGY #1

2B04

423 SF

CORRIDOR

2B-1

105 SF

STORAGE -

RADIOLOGY

2B01

85 SF

MECHANICAL

2A17A

41 SF

UNISEX

RESTROOM

2A14

197 SF

STAIR 2

2B05

262 SF

OLD RADIOLOGY

ROOM 2

2B10B

221 SF

CONTROL ROOM

2B10

406 SF

OLD RADIOLOGY

ROOM 1

2B10A

303 SF

CORRIDOR

2B1

163 SF

EHRM

2B11

43 SF

STORAGE

2B02

82 SF

CHANGING ROOM

2B12

168 SF

ELEVATOR

LOBBY

108 SF

SERVICE

ELEVATOR

S-3

77 SF

SERVICE

ELEVATOR

S-4

125 SF

STORAGE

2B13A

72 SF

MECHANICAL

2A01

806 SF

ANATOMIC

PATHOLOGY

2B13

951 SF

CORRIDOR

2B2

49 SF

HSKPG

2B14

47 SF

TOILET

2B10A.1

130 SF

LAB INFO

MANAGER

2B15

225 SF

WAITING AREA

125 SF

ELEVATOR

LOBBY

76 SF

PASSENGER

ELEVATOR

P-1

70 SF

PASSENGER

ELEVATOR

P-2

2B01

2B02

2B04

AE401

AE301

AE301

03B

10B

/6

.0

5' - 8"

3' - 6"

6' - 0"

3' - 10"

.0

AE401

AE401

AE401

AE401

09 09

W3

W3

C L E

A R

37 SF

CHARGING

ALCOVE

2A-1A

03B 03Z

03Z

03Z

03Z 03Z

3' - 11"

3' - 2"

A

EXISTING DOOR TO REMAIN

NEW DOOR

EXISTING TO REMAIN

NEW CONSTRUCTION

2 HR FIRE RATED WALL

NIS

2 HR & SMOKE RATED WALL

1 HR FIRE RATED WALL

AREA SHOWN

PROJECT

NORTH

BLDG 1

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE

ATTENTION OF THE COR.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS,

CENTERLINE OF OPENINGS, UON

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERSECTING WALL OR CENTERED ON THE

WALL, UON.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INTALLING DRYWALL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE111

PARTIAL FLOOR PLAN - NORTH

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

1/4" = 1'-0"

PARTIAL FLOOR PLAN - NORTH

PROJECT

NORTH

Revisions: Date:

ADDENDUM #1 07/06/2026

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

INFILL EXISTING WALL OPENING TO MATCH AND ALIGN

WITH ADJACENT WALL FINISHES

ALIGN FINISHED FACE OF NEW WALL WITH FINISHED FACE

OF EXISTING WALL

NOT USED

IN-FILL WALL WITH 2-1/2" SOUND ACTUATION BLANKET,

FRAME EXISTING WALL TO STRUCTURE IF EXISTING

CONSTRUCTION REFLECTS A DIFFERENT CONDITION.

E

E

F F

G G

7 8 9 10 11

H H

A6

B1

7A 8A

CORRIDOR

2A-2

RADIOLOGY #3

2A02B

207 SF

CORRIDOR

2A02

230 SF

SYSTEM

COMPONENT -

CATH LAB

2A09B

63 SF

STORAGE - CATH

LAB

2A12B.1

111 SF

DRESSING &

STORAGE - MRI

2A09A

37 SF

CHARGING

ALCOVE

2A-1A

1721 SF

CORRIDOR

2A-1

353 SF

MRI SCANNER

2A07D

13 SF

CLOSET

2A07E

242 SF

MRI EQUIPMENT

ROOM

2A07C

68 SF

TOILET

2A03

115 SF

MSA / SCHEDULE

2A05

188 SF

MRI CONTROL

ROOM / WORK

AREA

2A07B

191 SF

MRI ZONE III

PREP AREA

2A07

177 SF

MRI ZONE II

2A09

34 SF

TOILET, STAFF

2A09D

111 SF

ELECTRICAL

2A07A

146 SF

RECEPTION

2A06

2A02C

A

B

2A09A

A

239 SF

RAD WORK

2A02C

41 SF

TOILET, STAFF

2A08

83 SF

PAREX MEDS

2A11

326 SF

CHAPEL

2A02A

105 SF

CHAPEL

CORRIDOR

2A02A

70 SF

PASSENGER

ELEVATOR

P-2

W7

AE401

AE401

AE401

/2

2A02B

VENDING MACHINE

5' - 9 1/2"

/8

/6

/6

AE401

AE401

AE401

AE401

F-1

W3

120.00°

A

D

.1

17 SF

CHAPEL

STORAGE

2A02D.1

MSA / SCHEDULE

2A05A

2A05A

2A05

A

A

2A07

A

A

A

03B

F-1

A-503

EXISTING DOOR TO REMAIN

NEW DOOR

EXISTING TO REMAIN

NEW CONSTRUCTION

2 HR FIRE RATED WALL

NIS

2 HR & SMOKE RATED WALL

1 HR FIRE RATED WALL

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE

ATTENTION OF THE COR.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS,

CENTERLINE OF OPENINGS, UON

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERSECTING WALL OR CENTERED ON THE

WALL, UON.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INTALLING DRYWALL.

AREA SHOWN

PROJECT

NORTH

BLDG 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE112

PARTIAL FLOOR PLAN -

SOUTHWESTSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

1/4" = 1'-0"

PARTIAL FLOOR PLAN - SOUTH WEST

PROJECT

NORTH

Revisions: Date:

ADDENDUM #1 07/06/2026

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

INFILL EXISTING WALL OPENING TO MATCH AND ALIGN

WITH ADJACENT WALL FINISHES

ALIGN FINISHED FACE OF NEW WALL WITH FINISHED FACE

OF EXISTING WALL

ALIGN CENTERLINE OF NEW WALL WITH BUILDING GRID

LINE

IN-FILL WALL WITH 2-1/2" SOUND ATTENUATION BLANKET,

FRAME EXISTING WALL TO STRUCTURE IF EXISTING

CONSTRUCTION REFLECTS A DIFFERENT CONDITION.

2x2 ACOUSTICAL CEILING TILE

GYPSUM BOARD ON METAL STUDS

EXISTING TO REMAIN

NEW CONSTRUCTION

NIS

A

B

C

D

E

8 9 10 11

A6

RADIOLOGY #2

2B02

PAREX MEDS

2A11

MECHANICAL

2A17A

UNISEX

RESTROOM

2A14

WAITING AREA ELEVATOR

LOBBY

RADIOLOGY #1

2B04

EHRM

2B11

SERVICE

ELEVATOR

S-4

SERVICE

ELEVATOR

S-3

PASSENGER

ELEVATOR

P-1

PASSENGER

ELEVATOR

P-2

ANATOMIC

PATHOLOGY

2B13

CHANGING ROOM

2B12

STORAGE

2B02

STORAGE

2B13A

MECHANICAL

2A01

ELEVATOR

LOBBY

CORRIDOR

2B-1

LAB INFO

MANAGER

2B15

TOILET

2B10A.1

HSKPG

2B14

OLD RADIOLOGY

ROOM 1

2B10A

CONTROL ROOM

2B10

OLD RADIOLOGY

ROOM 2

2B10B

TOILET

2B10C

CORRIDOR

2B1

STAIR 2

2B05

STORAGE -

RADIOLOGY

2B01

AFF

ACT 2x2

9' - 6"

AFF

ACT 2x2

9' - 6"

AFF

ACT 2x2

8' - 0"

A5180

PRIVACY

CURTAIN

& TRACK

A5180

PRIVACY

CURTAIN

& TRACK

AFF

ACT 2x2

8' - 0"

CHARGING

ALCOVE

2A-1A

7' - 6"

SOFFIT

AFF

GYP

8' - 0"

AFF

GYP

8' - 0"

AREA SHOWN

PROJECT

NORTH

BLDG 1

CEILING MOUNTED WALL STAND RAIL, PER MFR

DRAWINGS.

SLOPED TOP WALL CABINET, TYP. SEE INTERIOR

ELEVATIONS FOR MATERIAL.

SLOPED TOP TALL CABINET, TYP. SEE INTERIOR

ELEVATIONS FOR MATERIAL.

RADIOLOGY EQUIPMENT - OTC CEILING RAIL, PER MFR

DRAWINGS.

EXISTING RAD FLUORO EQUIPMENT - RAIL MOUNTED TUBE

HEAD UNIT.

EXISTING RAD FLUORO EQUIPMENT - RAIL MOUNTED

MONITOR BOOM.

CEILING OPEN TO STRUCTURE ABOVE

RADIOLOGY EQUIPMENT - IGUS CHAIN, PER MFR

DRAWINGS.

RESTRICTED CEILING AREA FOR RADIOLOGY EQUIPMENT.

NO CEILING MOUNTED FIXTURES INCLUDING HVAC,

LIGHTING AND SPRINKLERS

NEW UNISTRUT: FLUSH MOUNTED WITH FINISHED CEILING.

UNISTRUT P1000 SERIES OR EQUIVALENT REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AC111

PARTIAL CEILING PLAN - NORTH

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

1/4" = 1'-0"

LEVEL 2 - CEILING PLAN - NORTH

Revisions: Date:

NOT USED ON THIS SHEET

LEVEL 2

13' - 6"

LEVEL 3

25' - 6"

D E F G

CATH LAB

CONTROL - CATH

LAB

CORRIDOR

UNISEX

RESTROOM

MECHANICAL

LEVEL 2

13' - 6"

LEVEL 3

25' - 6"

10 11

RADIOLOGY #1

2B04

W1

W3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE301

SECTIONS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

1/2" = 1'-0"

BUILDING SECTION

1/2" = 1'-0"

RADIOLOGY #1 SECTION

Revisions: Date:

F

G

RAD FLUORO

2A25B

F0230 CHAIR

M1801 COMPUTER

AE421

F2000 WASTEPAPER

F0205 CHAIR

X3155 LEAD APRON RACK

A5145 GARMENT HOOK

A5108 SHARPS

X3145 X-RAY SCREEN

F0340 STOOL

F0350STEP STOOL

M4255IV STAND

M3072WASTE - INFECTIOUS

M3070HAMPER

M3073WASTE - BIOHAZARD

A1132RAIL

M8810

MAYO

STAND

A5077SANITIZER

A1012TELEPHONE

EXISTING WALL STAND,

PER MFR DRAWINGS

EXISTING LUMINOS AGILE

TABLE, PER MFR DRAWINGS

9' - 3"

A

B F2700 BAR CODE READER

M8840TABLE - INSTRUMENT

AT EACH STUD

20" MAX

HIDDEN COUNTERTOP SUPPORT

BRACKET TYP, PER /2 A-503

HIDDEN EXTENDED

COUNTERTOP SUPPORT

BRACKET PER /4 A-503

E0948 CART - STORAGE

M0430 DVD PLAYER

F0360 FOOTSTOOL W/ HANDLE

A5107 GLOVES

A6046 ARTWORK

RAD FLOURO -

WAITING

2A25

F0210 CHAIR

F

AE42511

RECEPTION

2A06

F0275 CHAIR

TYP

PRIVACY

DIVIDER

MSA / SCHEDULE

2A05

M1801 COMPUTER

TYP

F2000 WASTEPAPER

TYP

AE403

AE403

AE425 18

A

A T

E A

C H

S T

U D

M A

X

HIDDEN COUNTERTOP

SUPPORT BRACKET

TYP, PER /2 A-503

/2

F0420 FILE CABINET

TYP

MSA / SCHEDULE

2A05A

AE403

2A05A

2A05

C

10 11

AE421

RADIOLOGY #1

2B04

M3070 HAMPER

M4255IV STAND

F0205CHAIR

F0340 STOOLM8810MAYO STAND

X3145 X-RAY SCREEN

A5077SANITIZER

F0360

FOOTSTOOL W/

HANDLE

A5145

GARMENT

HOOK

M0755

OXYGEN

FLOWMETER

M0765

VACUUM

REGULATOR

A1132 RAIL

F0350

STEP

STOOL

X3155

LEAD

APRON

RACK

A5180

PRIVACY

CURTAIN

& TRACK

AE403

AE403

2B04

M4645

TRANSFER

DEVICE

WALL STAND-PREMIUM,

PER MFR DRAWINGS

IMAGING TABLE,

PER MFR DRAWINGS

GENERATOR AND PDU,

PER MFR DRAWINGS

2' - 0"

4' - 8" 5"

RAIL-FLOOR, WALL STAND,

PER MFR DRAWINGS

ROLLING STAND,

PER MFR DRAWINGS

D

10 11

RADIOLOGY #2

2B02

AE403

AE403

AE421

X3145 X-RAY SCREEN

A1132 RAIL

F0340 STOOL

A5145GARMENT HOOK

M4645TRANSFER DEVICE

X3155

LEAD

APRON

RACK

F0350

STEP

STOOL

M3070 HAMPER

M4255IV STAND

M8810MAYO STAND

A5077SANITIZER

2' - 0"

WALL STAND-PREMIUM,

PER MFR DRAWINGS

IMAGING TABLE,

PER MFR DRAWINGS

GENERATOR AND PDU,

PER MFR DRAWINGS

2B02

A5180

PRIVACY CURTAIN

& TRACK

RAIL-FLOOR, WALL STAND,

PER MFR DRAWINGS

F0360

FOOTSTOOL W/

HANDLE

M0765

VACUUM

REGULATOR

M0755

OXYGEN

FLOWMETER

ROLLEING STAND,

PER MFR DRAWINGS

F

88A

RADIOLOGY #3

2A02B

AE403

AE421 22

AE403

A5106

SHARPS & GLOVE

DISPENSER

A1132 RAILX3145

X-RAY

SCREEN

F0205 CHAIR

M0765

VACUUM

REGULATOR

M0755

OXYGEN

FLOWMETER

A5077 SANITIZER

X3155 LEAD APRON RACK

M3073 WASTE - BIOHAZARD

A5077 SANITIZER

A1012 TELEPHONE

A5180

PRIVACY CURTAIN

& TRACK

WALL STAND-PREMIUM,

PER MFR DRAWINGS

2A02B

IMAGING TABLE,

PER MFR DRAWINGS

M4645

TRANSFER

DEVICE

GENERATOR AND PDU,

PER MFR DRAWINGS

M4255 IV STAND

A1015 TELEPHONE

RAIL-FLOOR, WALL STAND,

PER MFR DRAWINGS

M3070HAMPER

F0360

FOOTSTOOL W/

HANDLE

F0350STEP STOOL

ROLLING STAND, PER

MFR DRAWINGS

G

H

8A

RAD WORK

2A02C

AE403

F2000 WASTEPAPER

F0420 FILE CABINET

AE403

AE403

AE403

TYP

TYP

AE425 17

2A02C

E

8 9

AE4256

WAITING AREA

AE425

F0305 CHAIR

F0206BARIATRIC CHAIR

F2000WASTEPAPER

A6046ARTWORK

AE425

ELECTRICAL

2A07A

H

TOILET

2A03

AE4254

AE403

AE403

2' - 2"

TOILET, STAFF

2A08

AE425 8

2' - 1"

PLEASE NOTE: DUE TO

EXISTING CONDITIONS,

THIS RESTROOM IS

NOT WHEELCHAIR

ACCESSIBLE

F

G

SYSTEM

COMPONENT -

CATH LAB

2A09B

DRESSING &

STORAGE - MRI

2A09A

STORAGE - CATH

LAB

2A12B.1

AE424

2A09A

F0535 CART - UTILITY

F0210 CHAIR

A1030LOCKER

A1080 MIRROR

TYP

TYP

M3165

CATHETER

STORAGE

UPS, PER MFR

DRAWINGS

EQUIPMENT CABINET,

PER MFR DRAWINGS,TYP

AE425 19

TYP

INJECTOR ROOM

CONSOLE PER MFR

DRAWINGS

SERVICE HUB, PER

MFR DRAWINGS,TYP

PAREX

A-503

E

PAREX MEDS

2A11

AE424 18

20E0945CART - COMPUTER

M3151PAREX

A1014TELEPHONE

A5077SANITIZER

A5145GARMENT HOOK

F3050WHITE BOARD

M1801COMPUTER

M A

X

B A

S E

C A

B

IN

E T

M A

X F

R O

M

HIDDEN COUNTERTOP

SUPPORT BRACKET

TYP, PER /2 A-503

HIDDEN EXTENDED

COUNTERTOP

SUPPORT BRACKET

TYP, PER /4 A-503

COUNTERTOP

SUPPORT AT END

A

STORAGE -

RADIOLOGY

2B01

2B01

CHARGING

ALCOVE

2A-1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE401

EQUIPMENT PLANS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK AB

100% CD

1/4" = 1'-0"

EQUIPMENT PLAN - 2A25B & 2A25

1/4" = 1'-0"

EQUIPMENT PLAN - 2A06

1/4" = 1'-0"

EQUIPMENT PLAN - 2B04

Revisions: Date:

ADDENDUM #1 07/06/2026

1/4" = 1'-0"

EQUIPMENT PLAN - 2B02

1/4" = 1'-0"

EQUIPMENT PLAN - 2A02B

1/4" = 1'-0"

EQUIPMENT PLAN - 2A02C

1/4" = 1'-0"

EQUIPMENT PLAN - WAITING

1/4" = 1'-0"

EQUIPMENT PLAN - 2A07A

1/4" = 1'-0"

EQUIPMENT PLAN - 2A03

1/4" = 1'-0"

EQUIPMENT PLAN - 2A08

1/4" = 1'-0"

EQUIPMENT PLAN - 2A09B & 2A12B.1

1/4" = 1'-0"

EQUIPMENT PLAN - 2A11

1/4" = 1'-0"

EQUIPMENT PLAN - 2B01 & 2A-1A

F0275 CHAIR

A1015TELEPHONE

E0123 WORKSTATIONM1801COMPUTER

F0300 CHAIR - TASK

F2010 WASTEPAPER

F2700BAR CODE READER

F0680

WORKSTATION,

ADJUSTABLE

A1015TELEPHONE

M1801COMPUTER

A5080PAPER TOWEL

A5075SOAP

E0930MOBILE LOCKER

AE4263

HIDDEN EXTENDED

COUNTERTOP SUPPORT

BRACKET PER /4 A-503

A5107GLOVES

A5108SHARPS

F0230CHAIR

F2000 WASTEPAPER

M1801 COMPUTER

F2700BAR CODE READER

TYP

TYP

W3

W1

M A

X

A T

E A

C H

S T

U D

HIDDEN COUNTERTOP

SUPPORT BRACKET

TYP, PER /2 A-503

END BRACKET REQUIRED TO

SUPPORT FRONT EDGE OF

COUNTERTOP TO WALL

END BRACKET REQUIRED

WITHIN 10" MAX OF WALL /

END OF COUNTER, TYP

A1015TELEPHONE

M3073WASTE - BIOHAZARD

A5080PAPER TOWEL

A5075 SOAP

F2000WASTEPAPER

7' - 6"

AE426

DROP-IN SINK,

PER PLUMBING

HIDDEN EXTENDED

COUNTERTOP SUPPORT

BRACKET PER /4 A-503

A5106

SHARPS & GLOVE

DISPENSER

6" 3' - 0"

1' - 5"

A5109GRAB BAR

TYP

A5090SANITARY NAPKIN

A5200

TOILET TISSUE

DISPENSER

WALL MOUNTED TOILET,

PER PLUMBING

AE4268

1"1"

A1067 MIRROR

F2010WASTEPAPER

A5082

PAPER TOWEL

DISPENSER

A5075 SOAP

AE426

WALL MOUNTED SINK,

PER PLUMBING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE403

ENLARGED EQUIPMENT PLANS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK AB

100% CD

37 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

1/2" = 1'-0"

TYP EQUIPMENT PLAN - STAFF WORKSTATION

1/2" = 1'-0"

TYP EQUIPMENT PLAN - ULTRASOUND CASEWORK

1/2" = 1'-0"

TYP EQUIPMENT PLAN - RADIOLOGY CONTROL

1/2" = 1'-0"

TYP EQUIPMENT PLAN - RADIOLOGY CASEWORK

1/2" = 1'-0"

TYP EQUIPMENT PLAN - TOILET

1/2" = 1'-0"

TYP EQUIPMENT PLAN - SINK

AE426

ULTRASOUND #1

2A26A A5180

PRIVACY

CURTAIN

& TRACK

X2100 ULTRASOUND

E0930 MOBILE LOCKER2

A

A

ULTRASOUND #1

2A26A

A5180 PRIVACY CURTAIN & TRACK

M4255IV STAND

M4116MONITOR

E0948 CART - STORAGE

E0948 CART - STORAGE

M8810MAYO STAND

ULTRASOUND #1

2A26A

H-TRACK PATIENT LIFT,

PER MFR DRAWINGS

A5180 PRIVACY CURTAIN & TRACK

TYP

TYP

A1132RAIL

M3072WASTE - INFECTIOUS

M3070HAMPER F2017 WASTE - RECEPTACLE

A

A

.1

ULTRASOUND #1

2A26A

F

AE426

OPP

198 SF

ULTRASOUND #2

2A26B

A5180

PRIVACY CURTAIN &

TRACK A5145 GARMENT HOOK

TYP

X2100ULTRASOUND F0205 CHAIR

M8810 MAYO STANDF2017

WASTE -

RECEPTACLE

198 SF

ULTRASOUND #2

2A26B

F0540 CART - SCOPE

E0948 CART - STORAGE

M3072 WASTE - INFECTIOUSM3070HAMPER

M3073WASTE - BIOHAZARD

E0930MOBILE LOCKER

198 SF

ULTRASOUND #2

2A26B

X1999

ULTRASOUND

PROBE RACK

F

A5180

PRIVACY CURTAIN

& TRACK

F2017 WASTE - RECEPTACLE

E0948CART - STORAGE

M4116MONITOR

M4255 IV STAND

M9007 ULTRASOUND CHAIR

X1999

ULTRASOUND

PROBE RACK

198 SF

ULTRASOUND #2

2A26B

A

B

ULTRASOUND #3

2A26D

A5077SANITIZER

A5180

PRIVACY

CURTAIN

& TRACK

E0948 CART - STORAGE

M4116 MONITOR

M4255 IV STAND

X2100 ULTRASOUNDM9007ULTRASOUND CHAIR

X1999

ULTRASOUND

PROBE RACK

A

D

ULTRASOUND #3

2A26D

F0205 CHAIRF2017

WASTE -

RECEPTACLE

A6046ARTWORK

M8810 MAYO STAND

TYP

A5180 PRIVACY CURTAIN & TRACK

A5145GARMENT HOOK

F0540CART - SCOPE

ULTRASOUND #3

2A26D

E0930 MOBILE LOCKER

E0948CART - STORAGE

M3072WASTE - INFECTIOUS M3070 HAMPER

M3073 WASTE - BIOHAZARD

X1999

ULTRASOUND

PROBE RACK

ULTRASOUND #3

2A26D

AE426

DRESSING &

TOILET -

ULTRASOUND

2A26C

A5145GARMENT HOOK

A

C

DRESSING &

TOILET -

ULTRASOUND

2A26C

AE426

CT1

CT2

CT3

OPP

DRESSING &

TOILET -

ULTRASOUND

2A26CAE426

CT1

CT2

CT3

OPP

M3070 HAMPER

DRESSING &

TOILET -

ULTRASOUND

2A26C

F0205CHAIR

F2010WASTEPAPER

AE426

OPP PLAM1 TALL CABINET

CT1

CT2

CT3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE423

INTERIOR ELEVATIONS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

40 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

1/4" = 1'-0"

2A26A - EAST ELEVATION

1/4" = 1'-0"

2A26A - NORTH ELEVATION

1/4" = 1'-0"

2A26A - SOUTH ELEVATION

1/4" = 1'-0"

2A26A - WEST ELEVATION

1/4" = 1'-0"

2A26B - EAST ELEVATION

1/4" = 1'-0"

2A26B - NORTH ELEVATION

1/4" = 1'-0"

2A26B - SOUTH ELEVATION

1/4" = 1'-0"

2A26B - WEST ELEVATION

1/4" = 1'-0"

2A26D - EAST ELEVATION

1/4" = 1'-0"

2A26D - NORTH ELEVATION

1/4" = 1'-0"

2A26D - SOUTH ELEVATION

1/4" = 1'-0"

2A26D - WEST ELEVATION

1/4" = 1'-0"

2A26C - NORTH ELEVATION

1/4" = 1'-0"

2A26C - EAST ELEVATION

1/4" = 1'-0"

2A26C - SOUTH ELEVATION

1/4" = 1'-0"

2A26C - WEST ELEVATION

2 2

RAD FLOURO -

WAITING

2A25

A

RAD FLOURO -

WAITING

2A25

RAD FLOURO -

WAITING

2A25

A

B

RAD FLOURO -

WAITING

2A25

A5025 BENCH

E0935 CART - SCRUB

A1012 TELEPHONE

A5180

PRIVACY

CURTAIN

& TRACK

STAFF LOCKER -

WOMEN

2A19

A1030 LOCKER

A5025 BENCH

F3200 CLOCKA5180

PRIVACY

CURTAIN

& TRACK

A1012TELEPHONE

F2000WASTEPAPER

E0935

CART -

SCRUB

STAFF LOCKER -

WOMEN

2A19

A1030 LOCKER

TYP

58 SF

STAFF LOCKER -

WOMEN

2A19

WALL

ABOVE

LOCKERS

A1080MIRROR

A5180

PRIVACY

CURTAIN &

TRACK

A1030LOCKER

58 SF

STAFF LOCKER -

WOMEN

2A19

DRESSING &

TOILET - RAD

FLOURO

2A25A

AE426

WALL

ABOVE

LOCKERS

OPP

A4995

BABY CHANGING

STATION

A

A

DRESSING &

TOILET - RAD

FLOURO

2A25A

AE426

AE426

CT1

CT2

CT3

OPP OPP

A4995

BABY CHANGING

STATION

F0210CHAIR

DRESSING &

TOILET - RAD

FLOURO

2A25A

A5145GARMENT HOOK

TYP

CT1

CT2

CT3

A1082MIRROR

M3070 HAMPER

F0210 CHAIR

DRESSING &

TOILET - RAD

FLOURO

2A25A

CT1

CT2

CT3

111 SF

DRESSING &

STORAGE - MRI

2A09A

A1080 MIRROR

F0535 CART - UTILITY

111 SF

DRESSING &

STORAGE - MRI

2A09A

F0535 CART - UTILITY

TYP

A1080MIRROR

F0535

CART -

UTILITY

111 SF

DRESSING &

STORAGE - MRI

2A09A

A5145

GARMENT

HOOK

A1030LOCKER

111 SF

DRESSING &

STORAGE - MRI

2A09A

WALL

ABOVE

LOCKERS

A

A

M3151PAREX

R6200 REFRIGERATOR

PLAM1 SLOPED TOP

WALL CABINET

EQ EQ

2' - 6"

83 SF

PAREX MEDS

2A11

F3200 CLOCK

EQ EQ

E

AE426

83 SF

PAREX MEDS

2A11

A1014 TELEPHONE

A5077 SANITIZER

E0945

CART -

COMPUTER

83 SF

PAREX MEDS

2A11

M1801 COMPUTER

F2010WASTEPAPER

A5145 GARMENT HOOK

A

E

M3151 PAREX

E0945

CART -

COMPUTER

83 SF

PAREX MEDS

2A11

F3050

WHITE

BOARD

M1801COMPUTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE424

INTERIOR ELEVATIONS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK AB

100% CD

1/4" = 1'-0"

2A23C - NORTH ELEVATION

1/4" = 1'-0"

2A23C - EAST ELEVATION

1/4" = 1'-0"

2A23C - SOUTH ELEVATION

1/4" = 1'-0"

2A23C - WEST ELEVATION

Revisions: Date:

ADDENDUM #1 07/06/2026

1/4" = 1'-0"

2A19 - NORTH ELEVATION

1/4" = 1'-0"

2A19 - EAST ELEVATION

1/4" = 1'-0"

2A19 - SOUTH ELEVATION

1/4" = 1'-0"

2A19 - WEST ELEVATION

1/4" = 1'-0"

2A25A - NORTH ELEVATION

1/4" = 1'-0"

2A25A - EAST ELEVATION

1/4" = 1'-0"

2A25A - SOUTH ELEVATION

1/4" = 1'-0"

2A25A - WEST ELEVATION

1/4" = 1'-0"

2A09A - NORTH ELEVATION

1/4" = 1'-0"

2A09A - EAST ELEVATION

1/4" = 1'-0"

2A09A - SOUTH ELEVATION

1/4" = 1'-0"

2A09A - WEST ELEVATION

1/4" = 1'-0"

2A11 - NORTH ELEVATION

1/4" = 1'-0"

2A11 - EAST ELEVATION

1/4" = 1'-0"

2A11 - SOUTH ELEVATION

1/4" = 1'-0"

2A11 - WEST ELEVATION

2 2

AE426

TOILET

2A03

A

H

TOILET

2A03

CT3

CT1

CT2

A4995

BABY CHANGING

STATION

AE426

TOILET

2A03

CT3

CT1

CT2

A4995

BABY CHANGING

STATION

H

AE426

TOILET

2A03

CT3

CT1

CT2

TOILET, STAFF

2A08

CT3

CT1

CT2

A4995

BABY CHANGING

STATION

A

TOILET, STAFF

2A08

AE426

OPP

A4995

BABY CHANGING

STATION

TOILET, STAFF

2A08

AE426

OPP

TOILET, STAFF

2A08

ELECTRICAL

2A07A

NOTE: REFER TO ELECTRICAL

FOR EQUIPMENT INFORMATION

AND INSTALLATION

ELECTRICAL

2A07A

NOTE: REFER TO ELECTRICAL

FOR EQUIPMENT INFORMATION

AND INSTALLATION

ELECTRICAL

2A07A

NOTE: REFER TO ELECTRICAL

FOR EQUIPMENT INFORMATION

AND INSTALLATION

F G

E0123 WORKSTATION

F0420 FILE CABINET

F2000 WASTEPAPER

MSA / SCHEDULE

2A05

F0275 CHAIR

M1801 COMPUTER

E0123 WORKSTATION

F0275 CHAIR

E0123 WORKSTATION

ELECTRICAL

2A07A

NOTE: REFER TO ELECTRICAL

FOR EQUIPMENT INFORMATION

AND INSTALLATION

G H

EQ EQ

E0123 WORKSTATION

F0275 CHAIR

M1801 COMPUTER

TYP

TYP

F2000WASTEPAPER

F3200CLOCK

RAD WORK

2A02C

A

C

RECEPTION

2A06

EQ EQ

PLAM1 COUNTERTOP

PLAM1 BASE CABINET, TYP

PENCIL DRAWER, TYP

2' - 6"

A-503

SIM

8' - 0"

3' - 0"

A1015TELEPHONE

A1015 TELEPHONE

EQ EQ

F3200 CLOCK

F2000WASTEPAPER

RECEPTION

2A06

4' - 9 7/8"

F3200CLOCK

E

WAITING AREA

F3200CLOCK

A5077SANITIZER

M0506 TELEVISION

WAITING AREA

A5210 TV BRACKET

EQ EQ

E0123WORKSTATION

F0275CHAIR A5145 GARMENT HOOK

F3200 CLOCK

TYP

OFFICE - SHARED

2A23

A

WAITING AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE425

INTERIOR ELEVATIONS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK AB

100% CD

42 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

1/4" = 1'-0"

2A03 - NORTH ELEVATION

1/4" = 1'-0"

2A03 - EAST ELEVATION

1/4" = 1'-0"

2A03 - SOUTH ELEVATION

1/4" = 1'-0"

2A03 - WEST ELEVATION

1/4" = 1'-0"

2A08 - NORTH ELEVATION

1/4" = 1'-0"

2A08 - EAST ELEVATION

1/4" = 1'-0"

2A08 - SOUTH ELEVATION

1/4" = 1'-0"

2A08 - WEST ELEVATION

1/4" = 1'-0"

2A07A - NORTH ELEVATION

1/4" = 1'-0"

2A07A - SOUTH ELEVATION

1/4" = 1'-0"

2A07A - WEST ELEVATION

1/4" = 1'-0"

2A05 - EAST ELEVATION

1/4" = 1'-0"

2A07A - EAST ELEVATION

1/4" = 1'-0"

2A02C - EAST ELEVATION

1/4" = 1'-0"

2A06 - WEST ELEVATION

1/4" = 1'-0"

2A06 - EAST ELEVATION

1/4" = 1'-0"

2A09C - EAST ELEVATION

1/4" = 1'-0"

WAIT - EAST ELEVATION

1/4" = 1'-0"

WAIT - WEST ELEVATION

1/4" = 1'-0"

2A23 - NORTH ELEVATION

1/4" = 1'-0"

WAIT - SOUTH ELEVATION

WALL ASSEMBLY AS NOTED

SEMI-RECESSED FIRE

EXTINGUISHER CABINET

LINE OF WALL BEYOND

FIRE EXTINGUISHER PER

MANUFACTURER

CAULKING AT PERIMETER,

TYP.

WALL ASSEMBLY AS NOTED

SEMI-RECESSED FIRE

EXTINGUISHER CABINET

LINE OF WALL BEYOND

FIRE EXTINGUISHER PER

MANUFACTURER

CAULKING AT PERIMETER,

TYP.

A .F

.F T

O C

E N

T E

R

FASTEN AT BOTH

ENDS WITH MIN. 4

TAPPING SCREWS

GENERAL NOTE:

CONTRACTOR SHALL COORDINATE LOCATIONS OF HORIZONTAL FASTENERS

PLAN VIEW

ISOMETRIC VIEW

WALL FINISH

VERTICAL WALL STUDS

@ 16" OR 24" OC

CUT

HORIZONTAL

FASTENER

FROM STUD

COUNTERTOP

AS NOTED

FLOATING STEEL

COUNTERTOP SUPPORT,

ATTACH AT EACH STUD.

COUNTERTOP

AS NOTED

EXTENDED FLOATING

STEEL COUNTERTOP

SUPPORT, ATTACH AT

EACH STUD.

W

NON-SHRINK GROUT

EXIST CONCRETE WALL

ABANDONED

PIPE OPENING

ROUGHEN EXISTING

CONCRETE SURFACE

HORIZONTAL OPENING VERTICAL OPENING

1" 2" W 2" 1"

ABANDONED PIPE OPENING

FLOOR FINISH AS SCHEDULED

ROUGHEN EXIST

CONC SURFACE

EXIST CONC FLOOR SLAB

NON-SHRINK GROUT

1MM MIN. THICK METAL

PLATE; W/ (4) M6 CONC

SCEWS EMBED 1"

W

EXST CONC FILLED METAL DECK

ABANDONED PIPE OPENING

FLOOR FINISH AS SCHEDULED

ROUGHEN EXIST

CONC SURFACE

NON-SHRINK GROUT

1MM MIN. THICK METAL

PLATE; WELD 4 SIDES

LEVEL 2

13' - 6"

G

EXISTING WALL

(F

IE

L D

V E

R

IF

Y R

.O D

IM

S

LOUVER PER MECH

NEW AHU AND DUCTS PER

MECHANICAL, TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-503

INTERIOR DETAILS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK MA

100% CD

46 OF 140Revisions: Date:

ADDENDUM #1 07/06/2026

1 1/2" = 1'-0"

FIRE EXTINGUISHER - PLAN VIEW

1 1/2" = 1'-0"

FIRE EXTINGUISHER - SECTION VIEW

1/2" = 1'-0"

TYP. BLOCKING DETAIL

1" = 1'-0"

HIDDEN COUNTERTOP SUPPORT BRACKET

1" = 1'-0"

HIDDEN EXTENDED COUNTERTOP SUPPORT BRACKET

3" = 1'-0"

TYP. PATCH-UP/INFILL DETAIL

1" = 1'-0"

NEW LOUVER @ EXISTING WINDOW OPENING

A(C)T ACOUSTICAL CEILING TILE

GYP GYPSUM BOARD

P PAINT

RES RESINOUS

SC/SP SPECIAL COATING

WSF WELDED SHEET FLOORING

CPT CARPET

VT VINYL TILE

LVT LUXURY VINYL TILE

SVT SHEET VINYL TILE

EPY EPOXY FLOORING

PT PORCELAIN TILE

CT CERAMIC TILE

RWC RIGID WALL COVERING

RB RUBBER BASE

S SOLID SURFACE

FINISH ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-601

ROOM FINISH SCHEDULE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE IMAGING &

CATHETERIZATION LAB IN BLDG 1

VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM -

FRESNO, CA

570-21-220

3/27/2026 MK AK

100% CD

ROOM FINISH SCHEDULE

ROOM

# ROOM NAME

CEILING FLOOR

MAT

BASE WAINSCOT WALL

COMMENTSMAT FIN MAT HT MAT HT MAT FIN

- WAITING AREA EXISTING -- -- EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING NO ADJUSTMENTS TO FINISHES

- ELEVATOR LOBBY EXISTING -- -- EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING NO ADJUSTMENTS TO FINISHES

2A02 CORRIDOR EXISTING -- MATCH ADJ

EXIST

MATCH ADJ EXIST -- MATCH

ADJ

MATCH

ADJ

MATCH ADJ EXIST MATCH ADJ EXIST PATCH WORK ONLY

2A02B RADIOLOGY #3 ACT 2x2 -- WSF INTEGRAL WSF 4" -- -- GYP P STC 40

2A02C RAD WORK ACT 2x2 -- WSF RB 4" -- -- GYP P

2A02D.1 CHAPEL STORAGE EXISTING -- VT RB 4" -- -- GYP P

2A03 TOILET ACT 2x2 -- PT PT 4" CT 4'-0" GYP P STC 40

2A05 MSA / SCHEDULE ACT 2x2 -- CPT RB 4" -- -- GYP P

2A05A MSA / SCHEDULE ACT 2x2 -- CPT RB 4" -- -- GYP P

2A06 RECEPTION ACT 2x2 -- CPT PRB 4" -- -- GYP P

2A07A ELECTRICAL EXPOSED -- SVT SVT 4" CT 4'-0" GYP SC

2A08 TOILET, STAFF ACT 2x2 -- PT PT 4" CT 4'-0" GYP P

2A09 MRI ZONE II EXISTING -- MATCH ADJ

EXIST

MATCH ADJ EXIST -- MATCH

ADJ

MATCH

ADJ

MATCH ADJ EXIST MATCH ADJ EXIST PATCH WORK ONLY

2A09A DRESSING & STORAGE - MRI ACT 2x2 -- LVT RB 4" -- -- GYP P

2A09B SYSTEM COMPONENT - CATH LAB EXPOSED SC RES-3 INTEGRAL RES-3 4" -- -- GYP SC

2A11 PAREX MEDS ACT 2x2 SP WSF INTEGRAL WSF 4" -- -- GYP SC

2A12 CORRIDOR EXISTING -- MATCH ADJ

EXIST

MATCH ADJ EXIST -- MATCH

ADJ

MATCH

ADJ

MATCH ADJ EXIST MATCH ADJ EXIST PATCH WORK ONLY

2A12A SCRUB ALCOVE EXISTING -- RES-3 INTEGRAL RES-3 4" S 5'-0" GYP SC

2A12B CATH LAB GYP SC RES-3 RF INTEGRAL RES-3 6" -- -- GYP SC STC 35 TO COOR, STC 50 TO ADJ ROOMS

2A12B.1 STORAGE - CATH LAB GYP -- RES-3 INTEGRAL RES-3 4" RWC 4'-0" GYP P STC 35 TO COOR, STC 50 TO ADJ ROOMS

2A12C CONTROL - CATH LAB GYP SC RES-3 INTEGRAL RES-3 4" -- -- GYP SC

2A12D COMM EXISTING -- -- EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

2A13 TOILET - PRE-OPERATIVE & RECOVERY ACT 2x2 SP PT PT 4" PT 4'-0" GYP SC STC 40

2A16 PRE-OPERATIVE & RECOVERY ACT 2x2 SP WSF INTEGRAL WSF 6" -- -- GYP SC STC 35

2A16A CARDIOLOGY WORK EXISTING -- EPY RB 4" RWC 4'-0" GYP SC

2A19 STAFF LOCKER - WOMEN ACT 2x2 -- PT PT 4" -- -- GYP P

2A20 STAFF LOCKER - MEN ACT 2x2 -- WSF RB 4" -- -- GYP P

2A23 OFFICE - SHARED ACT 2x2 -- CPT RB 4" -- -- GYP P

2A25 RAD FLOURO - WAITING EXISTING -- MATCH ADJ

EXIST

MATCH ADJ EXIST -- MATCH

ADJ

MATCH

ADJ

MATCH ADJ EXIST MATCH ADJ EXIST

2A25A DRESSING & TOILET - RAD FLOURO ACT 2x2 -- PT PT 4" CT 4'-0" GYP P STC 40

2A25B RAD FLUORO ACT 2x2 -- WSF INTEGRAL WSF 4" -- -- GYP P STC 40

2A26 CORRIDOR EXISTING -- MATCH ADJ

EXIST

MATCH ADJ EXIST --…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .