Fresno VA FA R3 N-WES250405_Rev00 08.25.25.pdf
PDF 2 MB Posted
- Attached to
- Z2DB--Renovate Imaging and Catheterization Lab 570 21 220 Fresno VA Medical Center Fresno
- Solicitation number
- 36C26126R0045
About this file
This document is a Philips Equipment Requirements and Site Preparation Support Document for the installation of an Azurion 7 C20 FlexArm imaging system at VA Medical Center Fresno in Fresno, California. The document, generated from Quote No. Q-00496649 dated August 25, 2025, serves as preliminary planning documentation and is explicitly noted as not constituting architectural drawings or construction documents.
The document establishes comprehensive requirements and responsibilities for site preparation and system installation. Key specifications include HVAC requirements maintaining temperatures between 59°F–86°F with maximum 1°F/minute gradients and humidity levels between 20–80% (non-condensing) across three rooms: exam room (4,433 BTU/hr), equipment room (8,184 BTU/hr), and control room (1,876 BTU/hr). Electrical requirements specify a three-phase, 480 VAC, 60 Hz power supply with 100 kVA capacity, featuring an 80A system circuit breaker and 125A–150A UPS breaker. The document includes detailed project milestones spanning 52.4 weeks from planning through project completion, with critical path items including architect/engineering (8 weeks), construction (16 weeks), system delivery and installation (3 weeks), and final inspections. The customer assumes primary responsibility for site preparation, permitting, structural certification, radiation physics consultation, hazardous material remediation, and construction labor, while Philips provides technical supervision. A mandatory site readiness checklist covers floor preparation, ceiling infrastructure, electrical systems, HVAC commissioning, and permit compliance. The document identifies Tony Fortney as the Philips Project Manager with contact information (559) 352-1578 and establishes that final revisions remain valid for 90 days from the latest revision date.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.healthcare.philips.com
C O
VE
R
S H
EE
T
*Photo shown is not site specific.
Important Note:
THE INFORMATION IN THIS PACKAGE IS PROVIDED AS PHILIPS EQUIPMENT REQUIREMENTS, AND IS NOT TO BE CONSTRUED AS ARCHITECTURAL DRAWINGS OR CONSTRUCTION DOCUMENTS.
Philips assumes no liability nor offers any warranty for the fitness or adequacy of the premises or the utilities available at the premises in which the equipment is to be installed, used, or stored.
For Architects and/or Contractors: The latest revision listed must be thoroughly reviewed so that all changes can be incorporated into your project, final revisions are valid for 90 days from latest revision date. Please check with Philips PM for current updates.
Rev. Date Revision Descriptions Planner CPM Approved By
- 08/25/2025 Created Preliminary Site Preparation Support Document per Quote No.: Q-00496649. System upgraded to Rel. 3 from Rel. 2.2 reference project #: N-WES190300. Abraham Pravia Toney Fortney
CS
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS
AND SHOULD NOT BE SEPARATED. 03.31.2025
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.
Project Details
Philips Contacts
Drawing Number N-WES250405_Rev00 Date Drawn: 8/25/2025 Quote:
Order:
Project Manager:
Contact Number:
Email:
Tony Fortney
(559) 352-1578 tony.fortney@philips.com
Pr oj ec t
VA
M ed ic al C en te r F re sn o
Fr es no , C
A R oo m
: C at h La b
D ra w in g Ti tle
Q-00496649 None
VA
M ed ic al C en te r F re sn o
Fr es no , C
A
Drawn By: Abraham Pravia
TH
E
IN
FO
R M
AT
IO
N
IN
T H
IS
P
AC
KA
G E
IS
P
R O
VI
D
ED
A
S
PH
IL
IP
S
EQ
U
IP
M
EN
T R
EQ
U
IR
EM
EN
TS
, A N
D
IS
N O
T
TO
B E
C O
N
ST
R U
ED
A
S
AR
C H
IT
EC
TU
R
AL
D
R
AW
IN
G
S O
R C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
A zu rio n
C
F le xA rm m m
A
D
VA Medical Center Fresno
Fresno, CA
Table of Contents Sheet Number Sheet Name
CS COVER SHEET
GN GENERAL NOTES
A1 ARCHITECTURAL PLANS
G
EN
ER
A
L N
O
TE
S
INSPECTIONS
Inspected by: Date:
Facilities:
Clinical:
Infectious Control:
Architect:
Engineer:
Administrator:
Project Manager:
Sales Specialist:
Account Manager:
Service:
(24.0)
(24.0)
Milestones and Tasks for Successful IGT a Single Suite Project
ID
Task Name
IGT Single Suite Project
Hospital Multidisciplinary Project Team Planning with AM and CPM (Project Initial Schedule)
Philips P.O. Issued
Architect/Engineering Phase (Experienced Design Build 6-8 Weeks/Standard AE 8-16 Weeks)
Construction Bidding and Award (Depends on Complexity)
Final Defined Project/Construction Schedule Review Meeting with CPM, Hospital PM, GC
Philips Secures Production Slot and Determines Delivery Date
Permitting - DOH/CON Approvals (Local Permits 1-4 Weeks)
Mobilization - MEP Lead Times (HVAC System and Airframe "Hybrid" 8-24 Weeks)
Removal of Old Equipment (3 Days)
Construction Phase (Based on Complexity and Site Constraints - Average 16 Weeks)
Philips System Delivery and Installation (3 Weeks Average)
Hospital 3rd Party Delivery and Installation (Booms, Hemo, Laser, Ultrasound, Video Integration)
14 Final Inspections (Philips Certification, Radiation Physicist, Fire Marshal, Cert. of Occupancy, etc.)
Terminal Cleaning and Stocking
Clinical Training - First Patient
Non-Standard System Acceptance Terms and Conditions (Govt 45 Days from Inspection Notice or Other Special Terms)
18 Project Complete (Sale Record Date)
Duration
52.4 wks
4 wks Hospital Multidisciplinary Project Team Planning with AM and CPM (Project Initial Schedule)
1 wk Philips P.O. Issued
8 wks Architect/Engineering Phase (Experienced Design Build 6-8 Weeks/Standard AE 8-16 Weeks)
4 wks
0.2 wks
Construction Bidding and Award (Depends on Complexity)
Final Defined Project/Construction Schedule Review Meeting with CPM, Hospital PM, GC
0.8 wks
4 wks
4 wks
Philips Secures Production Slot and Determines Delivery Date
Permitting - DOH/CON Approvals (Local Permits 1-4 Weeks)
Mobilization - MEP Lead Times (HVAC System and Airframe "Hybrid" 8-24 Weeks)
1 wk Removal of Old Equipment (3 Days)
16 wks Construction Phase (Based on Complexity and Site Constraints - Average 16 Weeks)
3 wks Philips System Delivery and Installation (3 Weeks Average)
2 wks Hospital 3rd Party Delivery and Installation (Booms, Hemo, Laser, Ultrasound, Video Integration)
2 wks Final Inspections (Philips Certification, Radiation Physicist, Fire Marshal, Cert. of Occupancy, etc.)
1 wk
1 wk
0.2 wks
Terminal Cleaning and Stocking
Clinical Training - First Patient
Non-Standard System Acceptance Terms and Conditions (Govt 45 Days from Inspection Notice or Other Special Terms)
0.2 wks Project Complete (Sale Record Date)
1 54
Remote Control of Room Lighting Room lighting controls are the responsibility of the customer. Refer to sheet 3-ED for X-ray in use and room light switching requirements.
(25.0)
Milestone and General Conditions for Successful IGT Projects
1. Planning, Design, and Implementation Process
The multidisciplinary project team should be assembled as early as possible in the design process. The multidisciplinary team should include administrators, clinicians, infection preventionists, architects and other design professionals, facility managers, safety officers, security managers, users of equipment, and support staff relevant to the areas affected by the project as well as those with knowledge of the organization's functional goal for the project. Inclusion of patient advocates/consumers, A/E consultants, and construction specialists should be considered. FGI (Facility Guidelines Institute) 2022 APPENDIX A1.2-1.2. (www.fgiguidelines.org) (Architect Responsible for ADA compliance.)
2. Schedule The customer or general contractor shall provide Philips with a project/construction schedule with milestones to assist in the coordination of delivery of Philips supplied products and primary equipment.
Project schedule must be provided by customer to obtain production slot and delivery.
3. Responsibility The customer shall be solely responsible, at their expense for preparation of site. Philips required specifications and any required MEP, construction and structural alterations shall be incorporated into customer's design and construction documents. Compliance with all safety, electrical, and building design codes relevant to the build out of the clinical area for Philips equipment and its installation is the customer's responsibility. Sufficiency of such plans and specifications, specifically including, but not limited to the accuracy of the dimensions described therein, shall be the sole responsibility of the customer. The customer shall advise Philips of conditions at or near the site, which could adversely affect the function of the equipment and/or carrying out of the delivery and installation work.
a. Customer's structural engineer shall provide Philips with written certification that structural supports meet Philips requirements to permit delivery and installation of equipment.
b. Customer shall acknowledge the final site preparation confirmation document.
c. Upon completion of project, Customer's Architect and Engineers of record shall provide a set of As-Built project construction documents (.dwg) to Philips for closure of the Philips project history file.
This shall ensure that such conditions are compliant and that the site is fully prepared and available for Philips before the installation work is due to begin.
4. Permits Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and shall bear any expense in obtaining same or in complying with any related rules, regulations, ordinances and statutes.
5. Infection Control and Interim Life Safety Measure The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures (ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.
6. Radiation Protection The customer or their contractor, at their own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection and testing.
7. Asbestos and Other Toxic Substances Philips assumes that there is no hazardous material contained in the project site. The customer is responsible for the removal of any materials, including but not limited to asbestos, deemed hazardous by local authorities, the EPA, OSHA, or any other authority having jurisdiction over the work. If such materials are discovered at any time that the work is proceeding, the work will immediately cease, the owner will be notified, and the work will again proceed after the owner has removed all of the hazardous material from the job site.
8. Labor In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate technical support and supervision for proper completion for the Philips equipment installation.
9. Extended Installation or Turnkey Work by Philips If an extended installation or turnkey contract exists between Philips and the customer for room preparation some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract work scope and these drawings, the turnkey contract work scope shall govern.
10. Boom Vendors/3rd party cables Separation of cables shall be provided by boom vendor for the installation of cables within the boom. For example, use liquid-tight plastic conduit.
(24.0)
GN
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS
AND SHOULD NOT BE SEPARATED. 03.31.2025
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.
Project Details
Philips Contacts
Drawing Number N-WES250405_Rev00 Date Drawn: 8/25/2025 Quote:
Order:
Project Manager:
Contact Number:
Email:
Tony Fortney
(559) 352-1578 tony.fortney@philips.com
Pr oj ec t
VA
M ed ic al C en te r F re sn o
Fr es no , C
A R oo m
: C at h La b
D ra w in g Ti tle
Q-00496649 None
VA
M ed ic al C en te r F re sn o
Fr es no , C
A
Drawn By: Abraham Pravia
TH
E
IN
FO
R M
AT
IO
N
IN
T H
IS
P
AC
KA
G E
IS
P
R O
VI
D
ED
A
S
PH
IL
IP
S
EQ
U
IP
M
EN
T R
EQ
U
IR
EM
EN
TS
, A N
D
IS
N O
T
TO
B E
C O
N
ST
R U
ED
A
S
AR
C H
IT
EC
TU
R
AL
D
R
AW
IN
G
S O
R C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
A zu rio n
C
F le xA rm m m
A
D
AVO NAMING
Line Item Corresponding Naming
FCV0972 (powered by system, in control room) AVOC
FCV0973 (powered by system, in exam room) AVOE
FCVO974 (powered by hospital) AVOX
FCV0975 (4K AVO) AVOK
FCV0976 (XL) AVOL
Integration Kits AVOB
FlexVision Non-Philips Frame AVOM
HVAC Requirement for General Equipment Locations
*Average heat emission during clinical use Data applicable for basic system:
Large monitor + 4 x small monitor in Monitor Ceiling Suspension 1 workstation + 2 x small monitor in Control Room
Add 8750 BTU/hr for optional Socomec UPS Add 1075 BTU/hr for additional large monitor Add 256 BTU/hr for additional small monitor Add 631 BTU/hr for additional workstation See AD details for additional heat load in case of UPS
Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.
Philips IGT-S systems may only be operated at an altitude of max. 9,843 ft (3,000m) above sea level as defined in our instructions for use (IFU).
(25.0)
These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).
Temperature 59°F (15°C) to 86°F (30°C)
Temperature gradient Max. 1°F / Minute (0.5°C / Minute)
Humidity (non-condensing) Humidity shall be stable within 10% 20% to 80%
Exam Room *4433 BTU/hr
Equipment Room *8184 BTU/hr
Control Room *1876 BTU/hr
REQUIRED SITE READINESS CHECK LIST FOR PHILIPS DELIVERY
Items to be completed Prior to Equipment Delivery: Inspected by: Date: Common Site Drawing Reference:
Sheet/Section/Detail
Table Iso Center: Verified per Philips Final Drawings. 1-A1,2-A1.
Floor Levelness: Checked with Laser Level. 1-S1, S1/Equipment Support Information.
Floor Plates: Installed, isolated, and leveled at the correct locations. 1-S1, 2-S1, 3-S1, S1/Equipment Support Information.
Ceiling Unistruts (P1001): Installed and leveled per Sheet with written engineer certification. 2-S2, 4-S2, 6-S2, S2/Equipment Support Information.
Modular Laminar Array with Unistruts (P1001) installed and level per sheet if Class 3 required. 4-S2, S2/Equipment Support Information.
Ceiling Plate for Equipment Rack (EP Boom) (if applicable): Installed and leveled.
Cable Trough/Raceway/Conduit: A Greenlee measuring tape (part no. 435) are Installed, verified and locations checked. E1/Point to Point Run Lengths, 1-E1,4-E1.
3rd Party Booms (if applicable): Structural support installed and verified with boom vendor and locations.
Ceiling Height: Verified and measure from bottom of Unistrut. 3-S2, 4-S2.
Verify the Fixing Blocks sits properly in the Unistrut channel with no obstructions. 4-S2,1-S2.
Ceiling Obstructions: Verify there are no obstructions where Philips rails will be installed. 1-S2, 3-S2.
Clearances: Verified to the closest obstacles (i.e. walls, cabinets), in order to lift up the C-arm, monitor support, etc. 1-AD1.
Back Boxes: Installed with required covers and grommet material. 1-E1, 4-ED, 5-ED.
ERB Conductor Bar Installed per drawing. 1-E1,2-E1.
All electrical boxes and raceway are grounded to the ERB. 1-ED, 2-ED, 5-ED
Mains Power Supply: Installed per drawing (Including impedance, isolated grounds, wire size and circuit breakers verified). ED/Power Quality Requirements (Azurion), ED/Branch Circuit and Wire Gauge Requirement (Azurion).
Mains Supply Wiring installed for connection in Cabinet Rear Cover (CRC) of MA-Cabinet. 5-ED
Video Connection Boxes: video sources, and display destinations are verified with customer and located. A1/AUX Chart.
Med Gas Box (if applicable): Location does not interfere with the installation and movement of table. 3-S1
Walls: Installed and final finished per customers architectural specifications.
Millwork: Completely installed in all rooms.
Leaded glass installed.
Flooring: Installed and covered with protective covering (1/8" masonite). S1/Equipment Support Information.
Lighting and Wall Outlets Installed and functional. ED/General Electrical Information.
HVAC system is operational and commissioned to engineered specifications. GN/HVAC Requirement for General Equipment Locations.
3rd Party Booms (if applicable): Installed prior to Philips equipment delivery.
UPS: Fully installed per Philips Final Drawings, and startup has been scheduled with vendor. 5-ED.
X-Ray in Use Light is installed. 3-ED.
Physicist: If required has been scheduled.
UPS: Commissioned and certified by UPS vendor.
Permits Inspections: Completed or scheduled by applicable governing authorities.
All network information provided by facility IT, i.e. IP addresses (static IPs only), AE Titles, SNM, GTWY and DNS server are available. NN.
Project Space: Is clean, free of dust, all construction-related debris and tools have been removed.
PPE requirements identified (Construction and Hospital). No open electrical or hazardous materials on site. GN/Milestone and General Conditions for Successful IGT project.
Site Access Is available for after hours. Storage for tools, parts, covers and packing material has been arranged.
Room is secure with keys provided.
Complete Delivery Path Route and backup for bad weather has been reviewed & reverfied with the customer and lead FSE.
(25.0)
Electrical Requirements Mains MA Cabinet Maximum Rated Power: 100kW
Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 4 AWG, 90°C or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:
Nominal Line Voltage: 380 (Canada) - 480 VAC, 60 Hz
Branch Power Requirement: 100 kVA (System only; verify UPS power requirements)
System Circuit Breaker: 3 phase, Type D with long-time delay and shunt trip
System Circuit Breaker: 80A rating.
UPS breaker: 125A-150A, pending configuration.
(24.1)
Clea / Table ℄
AD
Ad ap ta tio n Fl oo r P la te
Iso Center The Iso Center is the initial and most crucial control point in the construction of a procedure room.
Once established, it guides the placement of all imaging equipment, third-party devices, mechanical, electrical, and plumbing systems (MEPs), as well as the overall construction. These are positioned relative to the Iso Center's X, Y, and Z coordinates to avoid operational issues and clinical limitations.
'-9
5 8"
9'-81 8" 10'-11"
25'-11"
'-6
8"
6' -0
3 8"
2' -0
1' -0
10'-65 8"
1'-10" 5'-23 8"
1' -1
0"
2'-0"
'-4
3 4"
'-9
2' -6
2' -1
7' -7
3 8"
26'-77 8"
1' -1
0"
'-1
Control room window added.
AD
C ei lin g
In le t
Sa fe ty Z on e
Sa fe ty Z on e
C C
DB
M E
M A
M B
AT
Y
Exact location to be coordinated by Customer and local Philips service.
Clea / Table ℄
AD
Ad ap ta tio n Fl oo r P la te
SH
Iso Center
10'-11"
'-9
Service area to meet NEC/ESA requirement
3'-61 8"
AVOX1AVOX2 AV
O
X3
SY
N
C
IN
T
AU
X1
AU
X2
C Y
C R
AU
X4
SB
O
UPS
AU
X5
AUX6
AUX7
AUX8
AUX9
AUX10
AUX11
AUX12
AUX13
AUX14
AUX13 & AUX14
to be mounted on back of FVXL
IC
R
IC
Shelf provided /installed by contractor
AF
S
C R
AU
X3
7'-13 4"
4'-77 8"
4"
81 4"
3' -3
3 8"
Elevation check needed
Min. distance for boomsUse this area only when boom can fit between bottom of rails and vertical arm.
Vertical Arm
Min. distance for booms. Use this area only when boom arm can fit between bottom of hybrid cable arm and vertical arm.
<8 1 4" b ot to m o f
Fl ex
Ar m c ab le du ct a rm
No fly zone
Elevation check needed
Hybrid cable duct
Hybrid cable arm
2'-103 8"
1' -6
1 2"
2'-03 4"
4'-7"
Patient Right Patient Left
To p of v er tic al ar m x-ax is
C en te r lin e of Tr an sv er sa l m ov em en t
5'-3" 5'-3"
No fly zone
Fi ni sh ed fl oo r t o bo tto m o f u pp er d ec k he ig ht
8' -1
1 2"
1 8"
(2
5m m
3m m
U ni st ru t h ei gh t m ea su re d fro m fi ni sh ed fl oo r t o bo tto m o f U ni st ru t.
Se e de ta il
S2 /1
4' -0
4'-0"
4'-0"
4'-0"
20'-5"
'-6
C le a
/ T ab le
AD7 Table Floor Plate ℄
20'-5"
'-1
11 2" C le a
/ T ab le
AD7 Table Floor Plate ℄
1'-6"
2' -6
4' -0
4'-0"
4'-0"
4'-0"
2' -6
1'-6"
1'-6"
1'-6"
Walls
Soffit
Existing (to be removed)
Beams or other building construction elements
Legend
A R
C H
IT
EC
TU
R
A L
PL
A
N S
A AD7 Angio Diagnost 7 Table w/ Premium Tilt & Cradle (Pivot, Tilt & Cradle)
992 450
A ME Certeray iX Generator Cabinet 320 145
A MA Mains 40E Cabinet 717 325
A DB Documentation Box - Mounted on Wheels (Final location to be coordinated with customer and/or local Philips Service)
176 80
A ATY Exam Room Auxiliary Box 7 3
A MB Image 40E Cabinet 497 225
A AUX1 Auxiliary Equipment Adapter 4 2
A AUX14 Auxiliary Equipment Adapter 4 2
A CR1 Control Room Equipment Adapter 4 2
A SH Service Hub 7 3
Items not on Philips Quote/Order
Table Movement Ceiling Equipment Movement Table Pinch Hazard
Legend
SCALE:
Required Unistrut Height: 8' - 101
2", ±1 8" (2705mm, ±3mm) Unistrut height measured from finished floor to bottom of Unistrut.
A1
EQUIPMENT LAYOUT
1/4" = 1' - 0"
SCALE:
Required Unistrut Height: 8' - 101
2", ±1 8" (2705mm, ±3mm) Unistrut height measured from finished floor to bottom of Unistrut.
A1
SITE LAYOUT
1/4" = 1' - 0"
SCALE:
A1
ELEVATION (Not Site Specific)
1/4" = 1' - 0"
* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework. Architect to coordinate with Philips Project Manager to reflect final placement on Philips drawings.
Important Notes:
* Field to verify all room dimensions by customer and Philips
Service Area
Important Notes:
Minimum FGI Area for Movable Equipment
Minimum FGI Area for Circulation Pathway
Sterile Field 8'x16' (2438mm x 4877mm)
Legend
Anesthesia Zone 6'x8' (1829mm x 2438mm)
(24.0)
(24.0)
Required Ventilation
Source Location Displayed
AUX1 INT Control FlexVision
AUX2 SYNC Control FlexVision
AUX3 TBD Control FlexVision
AUX4 TBD Control FlexVision
AUX5 TBD Exam FlexVision
AUX6 TBD TBD FlexVision
AUX7 TBD TBD FlexVision
AUX8 TBD TBD FlexVision
AUX9 TBD TBD FlexVision
AUX10 TBD TBD FlexVision
AUX11 TBD TBD FlexVision
AUX12 TBD TBD FlexVision
AUX13 TBD TBD FlexVision
AUX14 TBD TBD FlexVision
AVOX1 MB TBD TV2
AVOX2 MB TBD TV3
(24.0)
A1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS
AND SHOULD NOT BE SEPARATED. 03.31.2025
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.
Project Details
Philips Contacts
Drawing Number N-WES250405_Rev00 Date Drawn: 8/25/2025 Quote:
Order:
Project Manager:
Contact Number:
Email:
Tony Fortney
(559) 352-1578 tony.fortney@philips.com
Pr oj ec t
VA
M ed ic al C en te r F re sn o
Fr es no , C
A R oo m
: C at h La b
D ra w in g Ti tle
Q-00496649 None
VA
M ed ic al C en te r F re sn o
Fr es no , C
A
Drawn By: Abraham Pravia
TH
E
IN
FO
R M
AT
IO
N
IN
T H
IS
P
AC
KA
G E
IS
P
R O
VI
D
ED
A
S
PH
IL
IP
S
EQ
U
IP
M
EN
T R
EQ
U
IR
EM
EN
TS
, A N
D
IS
N O
T
TO
B E
C O
N
ST
R U
ED
A
S
AR
C H
IT
EC
TU
R
AL
D
R
AW
IN
G
S O
R C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
A zu rio n
C
F le xA rm m m
A
D
Existing to be MovedH
Equipment Designation
Description
Equipment Legend
Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor
G
D C B
Furnished and installed by PhilipsA
F E
Furnished by Philips and installed by Philips 3rd PartyI
Weight (lbs)
Weight (kg)
Detail Sheet
Safety Zone * The Safety Zone reduces the stand's speed by a factor of 4 if it is infringed upon.
SCALE:
A1
FGI GUIDELINES CLASS 2 (Not Site Specific)(If Applicable)
3/16" = 1' - 0"
SCALE:
A1
FGI GUIDELINES CLASS 3 (Not Site Specific)(If Applicable)
3/16" = 1' - 0"
D SBO Signaling Box Option 6.7 3
D UPS Socomec - Low Load Fluoro (LLF) UPS - OSHPD 2273 1031
A CC Clea Ceiling with Short L-Arm 2557 1160
A FVXL 58" FlexVision XL + (2) 27" LCD Monitor Suspension (To be mounted on Third Party Boom - Not Shown)
386 175
A AVOX1 Auxiliary Video Output 4 2
A AVOX2 Auxiliary Video Output 4 2
A AVOX3 Auxiliary Video Output (For SyncVision) 4 2
A INT IntraSight- Workstation (Integrated with FlexSpot) 83 38
A SYNC SyncVision (Integrated with FlexSpot) 71 32
A CY Control Room Junction Box 86 39
A AFS Additional FlexSpot 33 15
A CR2 Control Room Equipment Adapter 4 2
A IC Injector Room Console 11 4.9
A RIC Injector Remote Panel 7 3
A INJ Medrad Universal T-Rail Bracket for Injector Head (Not shown on plan)
Reported ceiling is at the absolute minimum of 8'-10 5 16" for a Short L-Arm
System. There is no leniency and site must maintain this minimum.
Planning Issues and Considerations
Structural Engineer to verify adequate space on sides of equipment cabinets for seismic anchoring.
Third Party Items - It is the customer's responsibility to interface and coordinate all non-Philips' item(s) / equipment to ensure full functionality and movement of all equipment.
Verify quantity and designation of Video Cloning with local Philips Service.
Potential collision of equipment with noted door / wall.
Due to door location and swing, servicing will create a safety hazard due to position of rack MA.
Recommended that the control room door open into the exam room.
Third Party Items - Boom Vendor to provide elevations and plans to check for collision free operation.
General Notes
* System upgraded to Rel. 3 from Rel. 2.2 reference project #: N-WES190300
A TV2 Philips Slave Monitor (Location to be determined - Not Shown)
A TV3 Philips Slave Monitor (Location to be determined - Not Shown)
Switchable Monitors to be applied to the [2] LCD's on the back of the FlexVision.
AutoCAD SHX Text 4815mm
AutoCAD SHX Text 2950mm
AutoCAD SHX Text 3327mm
AutoCAD SHX Text 7899mm
AutoCAD SHX Text 5029mm
AutoCAD SHX Text 86mm
AutoCAD SHX Text 1837mm
AutoCAD SHX Text 610mm
AutoCAD SHX Text 305mm
AutoCAD SHX Text 3216mm
AutoCAD SHX Text 559mm
AutoCAD SHX Text 1584mm
AutoCAD SHX Text 559mm
AutoCAD SHX Text 610mm
AutoCAD SHX Text 8045mm
AutoCAD SHX Text 5105mm
AutoCAD SHX Text 762mm
AutoCAD SHX Text 635mm
AutoCAD SHX Text 2321mm
AutoCAD SHX Text 8125mm
AutoCAD SHX Text 559mm
AutoCAD SHX Text 4597mm
AutoCAD SHX Text 3327mm
AutoCAD SHX Text 5105mm
AutoCAD SHX Text 1070mm
AutoCAD SHX Text 2176mm
AutoCAD SHX Text 1419mm
AutoCAD SHX Text 99mm
AutoCAD SHX Text 210mm
AutoCAD SHX Text 1000mm
AutoCAD SHX Text 873mm
AutoCAD SHX Text 470mm
AutoCAD SHX Text 627mm
AutoCAD SHX Text 1396mm
AutoCAD SHX Text 1600mm
AutoCAD SHX Text 1600mm
AutoCAD SHX Text 1219mm
AutoCAD SHX Text 1220mm
AutoCAD SHX Text 1219mm
AutoCAD SHX Text 1219mm
AutoCAD SHX Text 6222mm
AutoCAD SHX Text 3505mm
AutoCAD SHX Text 6222mm
AutoCAD SHX Text 4254mm
AutoCAD SHX Text 457mm
AutoCAD SHX Text 762mm
AutoCAD SHX Text 1219mm
AutoCAD SHX Text 1220mm
AutoCAD SHX Text 1219mm
AutoCAD SHX Text 1219mm
AutoCAD SHX Text 762mm
AutoCAD SHX Text 457mm
AutoCAD SHX Text 457mm
AutoCAD SHX Text 457mm
| Sheets and Views |
| N-WES250405_Rev00-CS |
| N-WES250405_Rev00-GN |
| N-WES250405_Rev00-A1 |
File details come from the government source that posted it. Updated .