QC-072_1.PDF
PDF 575 KB Posted
- Attached to
- Z2DB--Renovate Imaging and Catheterization Lab 570 21 220 Fresno VA Medical Center Fresno
- Solicitation number
- 36C26126R0045
About this file
This document is an installation drawing set for ceiling lift systems by Arjo for VA Fresno Central facility. The installation includes four rooms (2A23B, 2A25A, 2A26A, and 2B04) with ECS (Electrical Charging System) ceiling lifts featuring suspended and embedded trolley configurations. Each lift system has a safe working load capacity of 600 lbs (272 kg), with load test weight varying by region up to 750 lbs (340 kg).
The drawings specify comprehensive installation requirements including track layouts, lateral bracing configurations, and structural specifications. Concrete slab strength must meet minimum 3000 PSI, with ceiling structure capacity verification required to support all imposed loads per International Building Code (IBC) and regional seismic requirements. Electrical power source outlet must be available within 3 meters of the charging station. All hardware is included according to structure type. Critical installation notes mandate that any deviations from Arjo-specified hardware, bracing, or track layout must be documented and returned to Arjo for as-built revision. The facility is responsible for removing or relocating obstructions such as vents, pipes, lights, and sprinklers prior to installation. Rails are cut on-site only. Drawings include standard installation details for concrete slab anchoring, lateral brace requirements (minimum three braces with specific formulas for multi-track configurations), seismic bridge details with strut span specifications, and ECS-to-ECS charging configurations compatible with various lift models (V5 Duo, MS600 ecs, MS2 ecs, MS440).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTOR :
REPRESENTATIVE :
DATE (DD-MMM-YYYY) :
REFERENCE # : PAGE :
INSTALLATION DRAWING
1. The ceiling minimum structure capacity must be able to support the load specified on the installation drawing.
2. Electrical power source outlet already available by the facility at a maximum distance of 3 meters from charging station.
3. Any obstructions such as vents, pipes, lights and sprinklers that could possibly be in the path of the ceiling lifts to be removed or relocated by the facility prior to installation.
4. Modifications of door headers by the facility.
5. Arjo reserves the right to slightly modify the track layout if necessary.
6. See the "Agreed Conditions for the Installation of Ceiling Lifts" document included with this quote for important installation details.
7. Arjo will not be held responsible for any damages, inconvenience, resulting from hitting any non visible conduits during our installation process.
8. Signed drawings are required prior to ordering and installation of ceiling lifts. This signature of each drawings confirms agreement of all the conditions listed above.
IMPORTANT NOTES
MY SIGNATURE BELOW VERIFIES THAT I HAVE:
Reviewed all ____ pages, with a total quantity of ____ rooms, for the approbation of layout for each room and the approbation of structure for each room. I verify that the answers below are accurate to the best of my knowledge and I understand that the quote produced is dependent upon the conditions below as well as this full drawing set.
· Is a load dock available? YES NO
· Can facility accept shipment and store until install begins? YES NO
· Will a drop trailer be needed? YES NO
· Is parking available on site? Is there a fee involved? YES NO
· Are there any installation time frame limitations?
What are they? YES NO
· Is a level of infectious control required? YES NO
If YES, then what level ___________________________
CUSTOMER
APPROVAL: DATE:
REVISION(S) DATE(S) (D-M-Y)
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
ARJO
CHRIS TOREN
1 / 9
Rev1-un001629 15-AUG-2022
Legend
IV
(*) Symbol may vary depending of equipment type
Track
ServZone
Track with gate
X-Y Trolley (Suspended)
X-Y Trolley (Embedded)
Turntable (Auto/Manual)
Track with gate reverse
Wall post
Wall bracket
Wall post side
Track with service zone
Track with wall fixation
Track with T-junction
Exchanger
Swivel pole
IV track
Curtain track
Sprinkler
Smoke detector
Electrical outlet
Ceiling light
Ceiling vent
Access trap required
Existing access trap
Additional items
Motor/charger location
SPRINKLER SHIM
ECS-CSTAT
X-Y alim. type + options h h
164"oal h140
ECS-ECS
65"
LISTING OF ROOM NUMBER(S):
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 1/4" = 1'
2 / 9
600LB [272KG]
Rev1-un001629 15-AUG-2022
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [3000 PSI] MIN.
A
TILE
2A23B
A=96"
B=43 1/2"
D=4 1/2" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
MUST be captured, marked on the drawings and returned to Arjo for an as built revision.*****
Par Consults h h
126"oal h140
ECS-ECS
17 1/2"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 1/4" = 1'
3 / 9
600LB [272KG]
Rev1-un001629 15-AUG-2022
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [3000 PSI] MIN.
A
TILE
2A25A
A=96"
B=43 1/2"
D=4 1/2" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
MUST be captured, marked on the drawings and returned to Arjo for an as built revision.*****
Par Consults
BlueA Cloud+
BlueA Cloud+ 2A26A
130"h90
130"h90 o a l h
E C
S E
C S
107 1/2"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 1/4" = 1'
4 / 9
600LB [272KG]
Rev1-un001629 15-AUG-2022
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [3000 PSI] MIN.
A
TILE
2B04
A=96"
B=43 1/2"
D=4 1/2" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
MUST be captured, marked on the drawings and returned to Arjo for an as built revision.*****
H
H
108" OAL H140
ECS-ECS
H
H
95" OAL H140
ECS-ECS
29 1/2"
4 1/2"
112"
8"
103 1/2"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 1/4" = 1'
5 / 9
600LB [272KG]
Rev1-un001629 15-AUG-2022
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [3000 PSI] MIN.
A
TILE
A=96"
B=43 1/2"
D=4 1/2" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
MUST be captured, marked on the drawings and returned to Arjo for an as built revision.*****
Par Consults
B D
27.6 MPA [3000 PSI] MIN.
A
TILE
2A16/2A16A
A=96"
B=43 1/2"
D=4 1/2" ECS SYSTEM
LIFT CAPACITY= 600 LBS
LIFT TRACK BY
ARJO
" MAX. DISTANCE
BETWEEN ANGLE
FITTING AND CEILING
BRACE
EQUAL +2" OF
CENTERLINE
OF STRUT
"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE
CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE
ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."
FINISH
CEILING
121212
2 7 9 11
BRACE
(X2) UPPER AND LOWER
CONNECTION FOR LATERAL
" MIN.
EMBEDMENT
TYP.
STANDARD INSTALLATIONCONCRETE SLAB MIN 3000 PSI
L
U
S
P
T
M
A
X
U
N
I
S
T
R
U
P
M
X
Item # Part # Description Qty
000.00394 THREADED ROD 3/8-16 X 10' ZINC 13
000.00402 LOCKNUT STOVER 3/8-16 ZINC 14
000.00405 NUT 3/8-16 ZINC 45
000.00424 SADDLE NUT NUT 3/8-16 1
000.04430 FLAT WASHER M10 ZINC 5
200.11140 CEILING PLATE ø100MM 2
200.11170 BRACKET SHIM 12mm 1
LUS-304582 HILTI KBTZ 3/8 X 3 3/4 3
700.11100 TRACK BRACKET KWIKTRAK 1
LUS-P1068 UNISTRUT ANGLE 2
000.04435 TAB WASHER M10 1
1-5/8 x 10' SLOTTED CHANNEL
000.00425 LOCKWASHER 3/8" 4
000.04875 FLAT WASHER M12 6
16 LUS-P1000T
20"
200.11160
200.11150
BRACKET SHIM 3mm
BRACKET SHIM 1.5mm
45.5"LUS-P1000T
1-5/8 x 1- 5/8 12GA 10' SLOTTED
3LUS-P2486
CRADLE CLIP 15" O/C MAX SPACING
000.00375 BOLT 3/8" - 16 X 1 1/4"
000.00426 CHANNEL NUT 3/8-16 219
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 N/A
6 / 9
600LB [272KG]
750LB [340KG]
Rev1-un001629 15-AUG-2022
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 N/A
7 / 9
600LB [272KG]
750LB [340KG]
Rev1-un001629 15-AUG-2022
LATERAL BRACE REQUIREMENTS REV-3
LEGEND
LATERAL
BRACE
TRACK
BRACKET
TRACK
BRACKET JOINT
4 TRACKS SECTION
3 TRACK BRACKETS JOINT
9 LATERAL BRACES
1 TRACK SECTION
0 TRACK BRACKET JOINT
3 LATERAL BRACES
2 TRACKS SECTION
1 TRACK BRACKET JOINT
4 LATERAL BRACES
3 TRACKS SECTION
2 TRACK BRACKETS JOINT
6 LATERAL BRACES
- MINIMUM 3 LATERAL BRACES.
- NUMBER OF LATERAL BRACE = (NUMBER OF TRACK BRACKET JOINT X 2) + 2.
POSSIBLE ANCHOR LATERAL TO THE CEILING OR TO THE WALL
ACCEPTABLE ANGLE
LATERAL BRACE
LUS-P1000T
FLAT WASHER M12
000.04875
CONCRETE
HILTI KBTZ 3/8 X 3 3/4
LUS-304582
BELOW CEILING TRACK
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 N/A
8 / 9
600LB [272KG]
750LB [340KG]
Rev1-un001629 15-AUG-2022
MAX. STRUT BRIDGE "SPAN"
STRUT
LIFT CAPACITY
P5501
P5001
P1001
P5000
600#
1'-8"
2'-0"
3'-3"
4'-0"
5'-4"
6'-4"
8'-6"
10'-4"
STRUT BRIDGE PER TABLE
BELOW (SLOT- FACE DOWN)
"SPAN"
REF. TABLE BELOW
DUCT, PIPE
OR OTHER
OBSTRUCTION
AS OCCURS
STRUT TO BUILDING STRUCTURE
REF. PLANS AND DETAILS
B
R
A
C
E
O
S
R
U
C
T
U
R
E
R
E
F
P
L
A
N
S
N
D
D
E
T
A
I
L
S
SEISMIC BRIDGE DETAIL
TYP. ROD
HANGER PER
PLANS AND
DETAILS
"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE
CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE
ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."
VERIFY IN FIELD
Item # Part # Description Qty
000.00394 THREADED ROD 3/8-16 X 10' ZINC 21
000.00405 NUT 3/8-16 ZINC 6
SQUARE PLATE 3/8"
000.00424 SADDLE NUT 3/8 23
4 4
LUS-P1063
2LUS-P1000T
1-5/8 x 1- 5/8 12GA 10' SLOTTED
6LUS-P2486
CRADLE CLIP 15" O/C MAX SPACING
P1000T
P1000
P5500T
P5500
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA FRESNO
CENTRAL
QC-07202202
20-JUL-2022
un001629 N/A
9 / 9
Z
600LB [272KG]
750LB [340KG]
Rev1-un001629 15-AUG-2022
EMBEDDED X-Y CONFIG.
700-11228 - ECS to ECS wiring kit
FLUSH X-Y CONFIG.
STANDARD X-Y CONFIG.
WALL MOUNTED X-Y CONFIG.
ECS - ECS CHARGING
CONTACT BOX (3X)
ECS ON FIXED RAIL
ECS ON MOVING RAIL
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
| Sheets and Views |
| QC-07202202 Va Fresno Central - Rev 1-Title |
| QC-07202202 Va Fresno Central - Rev 1-02 |
| QC-07202202 Va Fresno Central - Rev 1-03 |
| QC-07202202 Va Fresno Central - Rev 1-04 |
| QC-07202202 Va Fresno Central - Rev 1-05 |
| QC-07202202 Va Fresno Central - Rev 1-X-31210.01-S1 |
| QC-07202202 Va Fresno Central - Rev 1-X-31210.01-LateralUS |
| QC-07202202 Va Fresno Central - Rev 1-X-31210.01-LateralUS (2) |
| QC-07202202 Va Fresno Central - Rev 1-X-BB-BD-ECS.ECS-X-ECS-ECS |
File details come from the government source that posted it. Updated .