3819P22115A03_c0v0_FY26_TGI.pdf

PDF 85 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059-0008
Issued by

About this file

This Task Group Instruction (TGI) details a naval maintenance project for the USS Blue Ridge (LCC-19) involving the replacement of a 1B Boiler Steam Atomizing Check Valve with piping in the Fire Room (8-76-0-E). The project specifications include two 3/4-inch IPS lift check valves made of carbon steel, rated for 900 PSIG, and one lot of 3/4-inch carbon steel piping. The contractor work is scheduled to start on 7/21/2026 and complete by 11/21/2027, with the Naval Sea Repair Facility Japan Regional Maintenance Center (SRF-JRMC) providing government-furnished material and support services such as crane rigging, utility services, and quality assurance inspections. The project requires adherence to specific cleanliness standards for piping systems and involves detailed testing procedures, including a hydrostatic test using feed water at 237 PSIG.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
N6264925RA059-0002.pdf PDF
N6264925RA059-0001.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P25001T01_c0v0_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P65416A01_c1v2_FY26_TGI.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
3819P22115A06_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
3819P22115A01_c1v1_FY26_TGI.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
3819P22114A10_c0v0_FY26_TGI.pdf PDF
3819P43701T01_c0v0_TGI.pdf PDF
3819P25001T02_c0v0_TGI.pdf PDF
TGI_3819P22115T02_c0v0.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT02_c0v0_TT_rev.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P25514A01_c0v0_FY26_TGI.pdf PDF
3819P25001A01_c1v0_FY26_TGI.pdf PDF
3819P22124A01_c0v0_FY26_TGI.pdf PDF
3819P22115A11_c0v0_FY26_TGI.pdf PDF
3819P22115A10_c0v0_FY26_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A05_c0v0_FY26_TGI.pdf PDF
3819P22114A04_c1v1_FY26_TGI.pdf PDF
3819P22114A02_c0v0_FY26_TGI.pdf PDF
3819P22114A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0003.pdf PDF
3819P43701T02_c0v0_TGI.pdf PDF
3819P25606T01_c0v0_TGI.pdf PDF
3819P25001T03_c0v0_TGI.pdf PDF
TGI_3819P22115T05_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-MAR-2025 1529

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR STM ATMG PP PP A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53411

CU PHASE TITLE: *(K37A-4) F/O - REPLACE 1B BLR STEAM ATOMIZING CHECK VALVE WITH PP IN 8-76-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

OGAWA, DAIKI 234 3152435968 22-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

ITO, SHINICHI 234 3152434297 22-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 8-76-0-E 8 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: 1B Boiler Steam Atomizing Check Valve with Piping; replace

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One AY), 1B Boiler Steam Atomizing Check Valve with Piping for No. One Burner Remarks: See Sheet 2 (SECTION 16-D) of Ref. No. 3 and Ref. No. 4 for detail.

1.3.1.1 Quantity (2 EA), Check Valve

Size: 3/4 Inch IPS Type: Lift Check Valve, Socket Welding Material: Carbon Steel

TGI Short Form

05-MAR-2025 1529

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR STM ATMG PP PP A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53411

CU PHASE TITLE: *(K37A-4) F/O - REPLACE 1B BLR STEAM ATOMIZING CHECK VALVE WITH PP IN 8-76-0-E

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

Specification: 803-2177525 Pressure: 900 PSIG

1.3.1.2 Quantity (One Lot), Pipe

Size: 3/4 Inch IPS (1.050 Inch OD X 0.120 Inch WT) Material: Carbon Steel Specification: MIL-T-20157

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Remove existing, fabricate and install each new 1B boiler steam atomizing check valve with piping listed in 1.3.1, using Ref.

No. 3 and Ref. No. 4 for guidance.

2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table One, Column(s) A, Lines One through 10.

2.1.1.1 Accomplish nondestructive testing in accordance with Line 13 for liquid penetrant testing accomplished to satisfy operational pressure test option.

2.1.2 Accomplish the requirements of 009-71 of Ref. No. One for hydrostatic test, using feed water at 237 PSIG, for each new and disturbed 1B boiler steam atomizing check valve with piping systems.

2.1.2.1 Document shop hydrostatic test results on QA Form 28, Enclosure-01-1.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 D. Ogawa, 080-9345-4110

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line item(s) K37A-4.

2.3.4 Removal and installation of each insulation and lagging for 1B steam atomizing piping will be covered by TGI No.

3819P22102A01 (KTR TGI).

2.3.5 JCN EM02-L192 is related to this TGI.

05-MAR-2025 1529

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR STM ATMG PP PP A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53411

CU PHASE TITLE: *(K37A-4) F/O - REPLACE 1B BLR STEAM ATOMIZING CHECK VALVE WITH PP IN 8-76-0-E

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No. 3819P22115S04).

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility Service, electrical.

2.5.3 [X99M] Utility Service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

2.5.7 [C135] QA inspection for (G) symbol(s).

05-MAR-2025 1529

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR STM ATMG PP PP A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53411

CU PHASE TITLE: *(K37A-4) F/O - REPLACE 1B BLR STEAM ATOMIZING CHECK VALVE WITH PP IN 8-76-0-E

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II.

CLASS P-2 PIPING.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 513-5341764 LP AIR SUPPLY TO STEAM

ATOMIZERS INCIDENTAL TO

NAV-JET BURNER INSTL

A Y 2

4 DWG 514-2492509 150 LB AUX Steam DIAG D Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 PFTR HRs, WELD HRs, PNTR HRs, QA HRs 22/KE PC N

2.2 PNTR HRs, QA HRs 22/KE PC N

Piping Work CFM for welding rod, paint, NDT cost, firewatch and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M VALVE, LIFT CHECK, VALVE,

LIFT CHECK. SIZE: 3/4"IPS,

SOCKET WELDING, MATERIAL:

C-STEEL, 900PSI, DWG# 803-

2177525

ORIGINATOR:C234 D, OGAWA

080-9345-4110

ORDERED FOR KTR

9B 4820 LL9303190 NA 4 N 50417471 2/EA

002 M TUBE,METALLIC, PIPE, 3/4"

IPS, STEEL

ORIGINATOR:C234 D, OGAWA

080-9345-4110

ORDERED FOR KTR

9B 4710 002777452 NA 4 N 50385079 10/FT

003 M COUPLING,PIPE, COUPLING,

3/4" IPS, STEEL

ORIGINATOR:C234 D, OGAWA

080-9345-4110

ORDERED FOR KTR

9B 4730 010131542 NA 4 N 50385087 2/EA

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A03

05-MAR-2025 1529

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR STM ATMG PP PP A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53411

CU PHASE TITLE: *(K37A-4) F/O - REPLACE 1B BLR STEAM ATOMIZING CHECK VALVE WITH PP IN 8-76-0-E

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

004 M GASKET,SPIRAL WOUND,

SPIRAL WOUND GASKET

ORIGINATOR:C234 D, OGAWA

080-9345-4110

ORDERED FOR KTR

9B 5330 013387824 NA 4 N 50385088 4/EA

005 M STUD,CONTINUOUS THR,

CONTINUOUS THREAD STUD,

1/2"-13UNC X 2-1/2"

ORIGINATOR:C234 D, OGAWA

080-9345-4110

ORDERED FOR KTR

9B 5307 006376465 NA 4 N 50385089 8/EA

006 M NUT,PLAIN,HEXAGON, NUT,

1/2"-13 UNC

ORIGINATOR:C234 D, OGAWA

080-9345-4110

ORDERED FOR KTR

9B 5310 006373628 NA 4 N 50385200 16/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P22115A03-QA28.docx 22-FEB-2025 0000

COMUSFLTFORCOMINST 4790.3 REV D CHG 3

07 Nov 2023

3819P22115A03 ENCLOSURE-01-1 TOTAL 1

SHOP TEST RECORD Page 1 of 1

QA FORM 28 Planning must fill in blocks identified by a prior to issuing

1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.

USS BLUE RIDGE LCC19 EM02-L192 KTR N/A STEAM ATOMIZING SYSTEM PIPING

6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT

A. S9086-RK-STM-010/CH-505 Rev. 6

B. DWG 514-2492509 Rev. D

C.

D.

9. TEST REQUIREMENTS & RESULTS

TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER

(SPECIFY): ______________________

TE

ST

T Y

PE

(S

EE

K

EY

) PARAGRAPH

DESCRIBING

VALVE POSITION

AND POINT OF

ENTRY

REF

LTR

GAGE

USED

(LTR

FROM

BLK 7)

REQUIRED

MEDIUM

MEDIUM

USED

REQUIRED

PRESSURE

ACTUAL

PRESSURE

MINIMUM

DURATION

ACTUAL

DURATION

ALLOWED

LEAKAGE

ACTUAL

LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE

H 2.1.2 A,B Feed Water 237 PSIG 30 minutes None

10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)

11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD

REVIEWED FOR FINAL ACCEPTANCE)

DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR

COMPLETENESS)

DATE

File details come from the government source that posted it. Updated .